Site Visit Sign In HVAC R-22 Phase 2_Redacted.pdf
PDF 585 KB Posted
- Attached to
- Replace R22 HVAC Systems Phase 2 Federal contract opportunity
- Solicitation number
- W50S8U-24-B-0002
- Issued by
- Department of the Army National Guard
About this file
This document is a Site Visit Sign In sheet for the Replace R22 HVAC Systems Phase 2 solicitation (Solicitation Number W50S8U-24-B-0002) issued by the Department of the Army National Guard.
The solicitation is for a firm fixed-price contract to replace R22 HVAC systems at various buildings at the 138th Fighter Wing in Tulsa, Oklahoma. The base CLIN requires replacing AHU-8 and CU-8 at Building 501, with additional option CLINs to replace systems in other buildings. The contract duration is 180 calendar days after notice to proceed. This is a 100% small business set-aside with a NAICS code of 238220 and a size standard of $19M. The magnitude of construction is between $100,000 and $250,000. A site visit is scheduled for August 5, 2024, with an RFI deadline of August 19, 2024, and bid opening on August 28, 2024. The solicitation includes specific limitations on subcontracting requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sealed Bid OF 1419 HVAC_signed.pdf | ||
| Amendment 24-B-0002-0002.pdf | ||
| Pre-Bid RFI Log Replace R22 HVAC Systems Phase 2.pdf | ||
| Amendment 24-B-0002-0001.pdf | ||
| Conform Copy 24-B-0002-0001.pdf | ||
| 501_AHU_CU-8 - Drawings.pdf | ||
| 314_CU-1 and CU-2 - Drawings.pdf | ||
| Pre-Bid RFI Log Replace R22 HVAC Systems Phase 2.xlsx | XLSX spreadsheet | |
| Site Visit Slides HVAC R-22 Phase 2.pdf | ||
| HVAC Drawings.pdf | ||
| SoW Base HVAC.pdf | ||
| W50S8U-24-B-0002.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .