Amendment 24-B-0002-0001.pdf
PDF 215 KB Posted
- Attached to
- Replace R22 HVAC Systems Phase 2 Federal contract opportunity
- Solicitation number
- W50S8U-24-B-0002
- Issued by
- Department of the Army National Guard
About this file
This document is an amendment to Solicitation W50S8U-24-B-0002 for the "Replace R22 HVAC Systems Phase 2" project at the Tulsa Air National Guard Base in Tulsa, Oklahoma. The amendment includes:
- Pre-bid request for information (RFI) spreadsheet responses and HVAC drawings from the RFI.
- An updated wage determination.
- Modifications to the Table of Contents and Section 00 21 00 - Instructions, Conditions, and Notices to Offerors.
The solicitation is a 100% small business set-aside for the base CLIN to replace AHU-8 and CU-8 at Building 501, with additional options to replace HVAC units at other buildings. The contract type is firm-fixed price, with a 180-calendar day period of performance. A pre-bid conference and site visit are scheduled for August 5, 2024, and bids are due by August 28, 2024 at 2pm CST. All questions must be submitted by August 19, 2024. The North American Industry Classification (NAICS) Code is 238220, with a $19M size standard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sealed Bid OF 1419 HVAC_signed.pdf | ||
| Amendment 24-B-0002-0002.pdf | ||
| Pre-Bid RFI Log Replace R22 HVAC Systems Phase 2.pdf | ||
| Conform Copy 24-B-0002-0001.pdf | ||
| 501_AHU_CU-8 - Drawings.pdf | ||
| 314_CU-1 and CU-2 - Drawings.pdf | ||
| Pre-Bid RFI Log Replace R22 HVAC Systems Phase 2.xlsx | XLSX spreadsheet | |
| Site Visit Slides HVAC R-22 Phase 2.pdf | ||
| Site Visit Sign In HVAC R-22 Phase 2_Redacted.pdf | ||
| HVAC Drawings.pdf | ||
| W50S8U-24-B-0002.pdf | ||
| SoW Base HVAC.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Include pre-bid Request for information spreadsheet responses
2. Include 2 HVAC draw ings from the RFI.
3. Update Wage determination All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8U24B0002
X 9B. DATED (SEE ITEM 11)
30-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2024
CODE
USPFO OK 138 MISSION SUPPORT CONTRACTING
4200 N 93RD EAST AVE
TULSA OK 74115-1699
W50S8U 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8U24B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 - SoW Base HVAC ATTACHMENT 2 - HVAC Drawings to:
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 - SoW Base HVAC ATTACHMENT 2 - HVAC Drawings ATTACHMENT 3 - Pre-Bid RFI Log Replace R22 HVAC Systems Phase 2 ATTACHMENT 4 - 501_AHU_CU-8 - Drawings ATTACHMENT 5 - 314_CU-1 and CU-2 - Drawings
The following have been modified:
SECTION 00 21 00 - INSTRUCTIONS
INSTRUCTIONS, CONDITIONS AND N
SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: Base CLIN entails replacing AHU-8 and CU-8 at Building 501. In addition to the base work described above, the solicitation will include the following option line items: Option 1: Replace AHU-1 and CU-1 at Building 314, Option 2: Replace AHU-11 and CU-11 at Building 501E, Option 3: Replace AHU-2 and CU-2 at Building 314
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S8U-24-B- 0002 entitled Replace R22 HVAC Systems Phase 2, Project Number XHZG242005, at Tulsa ANG Base, Tulsa, Oklahoma.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for small businesses
3. RESERVED
4. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
4.1. A pre-bid conference will be conducted on 5 August at 2:00pm CST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at Tulsa Air National Guard Building 222 Classroom, 4200 N 93rd E Avenue, Tulsa, OK 744115. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
4.2. Due to security conditions, all offerors must register to attend this conference and site visit using the website: https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page
4.3. This information must be provided in advance in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating.
4.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival.
You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
4.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
4.6. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
5. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
5.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact A-E or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W50S8U-24-B-0002 Email: 138.FW.MSC@us.af.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: _____________________________
Address:_____________________________________________________________________
Phone Number: _____________________________
Email address: __________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
5.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
5.3. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO
SUBMIT QUESTIONS EARLY IN THIS PROCESS.
5.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov.
5.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
5.6. All technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system.
5.6.1. Amendments, if/when issued will be posted to www.SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
6. BID REPOSITORY AND BID OPENING:
6.1. A bid repository is provided for hand carried bids and is located at Tulsa Air National
Guard Base, Building 222 Classroom, 4200 N 93rd E Avenue, Tulsa, OK 74115. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtaining access to the base in the Site Visit instruction. Follow the same instructions for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
6.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
6. WAGE DETERMINATION:
Construction Wage Rates are applicable to this project are OK20240053 08/23/2024 as shown in Section 00 73 00.
7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:
This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
8. CLAUSES:
Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
9. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
10. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
END OF SECTION 00 21 00
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 - SoW Base HVAC ATTACHMENT 2 - HVAC Drawings ATTACHMENT 3 - Pre-Bid RFI Log Replace R22 HVAC Systems Phase 2
ATTACHMENT 4 - 501_AHU_CU-8 - Drawings ATTACHMENT 5 - 314_CU-1 and CU-2 - Drawings
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
HVAC Drawings 501_AHU_CU-8 - Drawings 314_CU-1 and CU-2 - Drawings
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
WAGE DETERMINATION
"General Decision Number: OK20240053 08/23/2024
Superseded General Decision Number: OK20230053
State: Oklahoma
Construction Type: Building Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on industrial sites and treatment plants)
County: Tulsa County in Oklahoma.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 04/05/2024 2 07/05/2024 3 08/23/2024
BROK0005-004 06/01/2023
Rates Fringes
BRICKLAYER.......................$ 26.92 13.09
* ELEC0584-006 06/01/2024
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems).........................$ 36.38 7%+10.20
ELEV0083-003 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 49.05 37.885+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
ENGI0627-020 06/01/2023
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 35.65 16.50 Group 2.....................$ 33.80 16.50 Group 3.....................$ 33.10 16.50 Group 4.....................$ 31.95 16.50 Group 8.....................$ 26.90 16.50 Group10.....................$ 25.45 16.50
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane and Bulldozer.
GROUP 8: ForkLift GROUP 10:Oiler; Semi- Trailer Truck Driver
IRON0584-025 06/01/2023
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 29.00 16.50
PLUM0430-010 07/01/2024
Rates Fringes
PLUMBER (Excludes HVAC Pipe and Unit Installation)...........$ 36.65 17.60
PLUM0430-019 07/01/2024
Rates Fringes
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)............................$ 36.65 17.60
PLUM0430-020 07/01/2024
Rates Fringes
PIPEFITTER (Including HVAC Pipe Installation, excluding
HVAC Unit Installation)..........$ 36.65 17.60
* ROOF0143-001 07/01/2024
Rates Fringes
ROOFER...........................$ 26.30 10.34
SHEE0270-006 06/01/2020
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 35.49 14.60
* SUOK2012-033 07/30/2012
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 15.08 ** 1.21
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 14.96 ** 1.55
CAULKER..........................$ 20.00 1.61
CEMENT MASON/CONCRETE FINISHER...$ 13.72 ** 1.27
DRYWALL FINISHER/TAPER...........$ 13.00 ** 0.00
ELECTRICIAN (Alarm Installation)....................$ 19.48 3.34
ELECTRICIAN (Low Voltage Wiring)..........................$ 20.65 3.06
ELECTRICIAN (Sound and Communications Systems Installation)....................$ 21.11 2.47
FORM WORKER......................$ 12.69 ** 0.38
LABORER: Common or General......$ 12.44 ** 2.71
LABORER: Mason Tender - Brick...$ 12.43 ** 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 13.00 ** 1.91
LABORER: Pipelayer..............$ 12.39 ** 0.00
OPERATOR: Asphalt Paver.........$ 16.25 ** 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.96 ** 4.22
OPERATOR: Bulldozer.............$ 21.07 2.48
OPERATOR: Grader/Blade..........$ 14.28 ** 1.70
OPERATOR: Loader (Front End)....$ 16.18 ** 0.00
PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping.................$ 12.22 ** 0.00
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 22.11 4.93
SPRINKLER FITTER (Fire Sprinklers)......................$ 21.86 1.19
TRUCK DRIVER: Dump and Flatbed Truck....................$ 11.00 ** 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)