Compliance Checklist Sealed Bids.pdf

PDF 727 KB Posted

Attached to
B316 HVAC Repair Federal contract opportunity
Solicitation number
W50S8U-20-B-0002
Issued by
Department of the Army National Guard

About this file

This document is a compliance checklist for sealed bids submitted in response to solicitation number W50S8U-20-B-0002 for the B316 HVAC Repair project. The project scope includes replacing the existing HVAC and HVAC controls systems in building 316 for the Department of the Army National Guard, running a new floor drain from the NDI Area to Falcon Avenue, demolishing all existing HVAC equipment other than a new chiller and chilled water pumps with associated piping, demolishing and replacing all HVAC controls with ALC systems, and replacing any necessary electrical components to the systems. Bids were due by the date and time specified in the solicitation and must include prices for all items, completed computations, decimal points in proper places, and signatures. An original bid bond for 20% of the bid amount with a raised seal was also required. The awarded contractor must meet any applicable small business set-aside requirements.

View the file

Other files for this federal contract opportunity

Other files attached to B316 HVAC Repair, newest first.
File Type Posted
Sealed Bid OF 1419A B316 HVAC.pdf PDF
Sealed Bid OF 1419 B316 HVAC.pdf PDF
Bid Opening Sign In Sheet 9Sep20_Redacted.pdf PDF
Pre-Bid RFI 316 HVAC Project 09-01-2020.pdf PDF
Bid Bond Checklist Sealed Bid.pdf PDF
Site Visit Slides 316 HVAC.ppt PPT presentation
B316 Site Visit Minutes.pdf PDF
B316 Site Visit Sign In Redacted.pdf PDF
B316 XHZG182005 - Drawings.pdf PDF
138FW Safety Accident Prevention Guide_2018.pdf PDF
B316 XHZG182005 - Spec Manual.pdf PDF
NDI Floor Drain Demo Plan.pdf PDF
W50S8U-20-B-0002.pdf PDF
Bldg 316 Interior Drains.pdf PDF
316 HVAC AF 66 modified 1.2.pdf PDF
Brand Name 316 HVAC JA 1.4_Redacted.pdf PDF
NDI floor drain plan.pdf PDF
SOW 1.07 316 HVAC Repair 2020.pdf PDF
EMS Commitment Statement.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMPLIANCE CHECKLIST FOR SEALED BIDS

Name of Firm:

Solicitation No.:

YES NO N/A

1. Bid was received by the due date & time specified in the solicitation. ___ ___ ___

2. Have prices been inserted for all bid items of the Bid Schedule? ___ ___ ___

3. Have all prices and computations been checked? ___ ___ ___

4. Are decimal points in the bid prices in the proper places? ___ ___ ___

5. Bid (SF1442) was signed by an officer of the company. ___ ___ ___

6. An ORIGINAL Bid Bond on the Standard Form 24 (rev. 10/1998) with a RAISED Seal was submitted with the bid. Fax or copies of a bid bond are not acceptable. ___ ___ ___

7. Was the Bid bond signed by an officer of the company. If the bid is signed by an agent, is legal evidence of agent’s authority to sign included with the bid? ___ ___ ___

8. Bid bond was for 20% of the bid amount. ___ ___ ___

9. The contractor’s company name & address on the bid bond is EXACTLY the same as it is shown on the SF1442 (BID). ___ ___ ___

10. The unit prices have been double checked for the total amount and match the numbers shown on the abstract. ___ ___ ___

11. All amendments have been acknowledged. ___ ___ ___

12. Does the bidder meet the Small Business Set Aside Requirements (if applicable)? ___ ___ ___

13. If no. 13 applies, what is the type of Set Aside, has this been verified in SAM?

14. Is the firm registered in SAM? Are the reps & certs completed? ___ ___ ___

15. Is the firm on the excluded parties list in SAM?

Reviewed by:

Contract Specialist Date

CONCUR/NONCONCUR:

Contracting Officer Date

NGB April 2020 C-49

YES 1:
YES 2:
YES 3:
YES 4:
YES 5:
NO 1:
NO 2:
NO 3:
NO 4:
NO 5:
NA:
1:
2:
3:
4:
undefined:
undefined_2:
undefined_3:
1_2:
2_2:
1_3:
2_3:
1_4:
2_4:
undefined_4:
undefined_5:
undefined_6:
1_5:
2_5:
1_6:
2_6:
1_7:
2_7:
undefined_7:
undefined_8:
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text78:
Text79:
Check Box80: Off
Check Box81: Off
Check Box82: Off
Check Box83: Off
Check Box84: Off
Check Box85: Off
Check Box86: Off
Check Box87: Off
Check Box88: Off
Check Box89: Off
Check Box90: Off
Check Box91: Off
Check Box92: Off
Check Box93: Off
Check Box94: Off
Check Box95: Off
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Check Box102: Off
Check Box103: Off
Check Box104: Off
Check Box105: Off
Check Box106: Off
Check Box107: Off
Check Box108: Off
Check Box109: Off
Check Box110: Off
Check Box111: Off
Check Box112: Off
Check Box113: Off
Check Box114: Off
Check Box115: Off
Check Box116: Off
Check Box117: Off
Check Box118: Off
Check Box119: Off
Check Box120: Off
Check Box121: Off
Check Box122: Off
Text125:
Text126:
Check Box127: Off
Check Box128: Off

File details come from the government source that posted it. Updated .