B316 XHZG182005 - Drawings.pdf

PDF 22 MB Posted

Attached to
B316 HVAC Repair Federal contract opportunity
Solicitation number
W50S8U-20-B-0002
Issued by
Department of the Army National Guard

About this file

This federal contract opportunity is a solicitation to replace the existing HVAC and HVAC controls systems in Building 316 at an Army National Guard facility. The project includes demolishing all existing HVAC equipment other than the new chiller and chilled water pumps and associated piping. It also requires demolishing all HVAC controls and replacing them with an Automated Logic Controls system, as justified in the solicitation. The electrical components serving the systems must be replaced as well. Bidders must perform all work according to the drawings and specifications provided. Offerors are invited to submit proposals in response to solicitation number W50S8U-20-B-0002 by the date specified for award of a firm fixed price contract for HVAC repair and replacement services at a National Guard facility.

View the file

Other files for this federal contract opportunity

Other files attached to B316 HVAC Repair, newest first.
File Type Posted
Sealed Bid OF 1419A B316 HVAC.pdf PDF
Sealed Bid OF 1419 B316 HVAC.pdf PDF
Bid Opening Sign In Sheet 9Sep20_Redacted.pdf PDF
Pre-Bid RFI 316 HVAC Project 09-01-2020.pdf PDF
Bid Bond Checklist Sealed Bid.pdf PDF
Compliance Checklist Sealed Bids.pdf PDF
B316 Site Visit Minutes.pdf PDF
Site Visit Slides 316 HVAC.ppt PPT presentation
B316 Site Visit Sign In Redacted.pdf PDF
138FW Safety Accident Prevention Guide_2018.pdf PDF
B316 XHZG182005 - Spec Manual.pdf PDF
NDI Floor Drain Demo Plan.pdf PDF
W50S8U-20-B-0002.pdf PDF
Bldg 316 Interior Drains.pdf PDF
316 HVAC AF 66 modified 1.2.pdf PDF
Brand Name 316 HVAC JA 1.4_Redacted.pdf PDF
NDI floor drain plan.pdf PDF
SOW 1.07 316 HVAC Repair 2020.pdf PDF
EMS Commitment Statement.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t G d w g

P

M

P l o t t e d

B y j b o w m a n

P e n

T a b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

N D

S

I G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I L E

A

T

H

O

F F

I C

E

O

F

T

B

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

G-001.DWG

ENGINEER OF RECORD

W912L6-13-D-0002/0020

T Y

P

N

U B

M I T

T A

L

J U

I S

S U

R

S

S U

C

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

BUILDING 316 HVAC RENOVATION

PROJECT NO. XHZG182005

OKLAHOMA AIR NATIONAL GUARD

TULSA, OKLAHOMA

COMBA

A I R

MAND

COM

T

PROJECT KEY MAP

PROJECT LOCATION

COVER SHEET

G-001

SHEET INDEX

GENERAL

G-001

COVER SHEET

ARCHITECTURE

A-101

REFLECTED CEILING PLAN

M-001

MECHANICAL SYMBOLS AND ABBREVIATIONS

MD101

MECHANICAL DEMOLITION PLAN

MD401

MECHANICAL ENLARGED DEMOLITION PLANS

M-101

MECHANICAL ENLARGED DEMOLITION PLANS

M-102

MECHANICAL PLAN

M-401

MECHANICAL PIPING PLAN

M-402

MECHANICAL ENLARGED PLANS

M-501

MECHANICAL ENLARGED PLANS

ELECTRICAL

E-001

ELECTRICAL NOTES AND SYMBOLS

ED101

ELECTRICAL DEMOLITION PLAN

ED401

ELECTRICAL ENLARGED DEMOLITION PLAN

ED501

ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

E-101

ELECTRICAL PLAN

E-501

ELECTRICAL ONE-LINE DIAGRAM

E-601

ELECTRICAL SCHEDULES

M-002

MECHANICAL NOTES AND KEYNOTES

M-502

MECHANICAL DETAILS

MECHANICAL

MD402

M-504

M-601

M-602

M-701

M-702

M-703

M-704

M-705

M-706

MECHANICAL DETAILS

MECHANICAL DETAILS

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

MECHANICAL CONTROLS

MECHANICAL CONTROLS

MECHANICAL CONTROLS

MECHANICAL CONTROLS

MECHANICAL CONTROLS

MECHANICAL CONTROLS

14M-503

MECHANICAL DETAILS

B316 HVAC RENOVATION

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t A d

P

M

P l o t t e d

B y e w h i t e

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

A-101.DWG

ARCHITECT OF RECORD

W912L6-13-D-0002/0020

DFPEEW

EEW

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

DAVID F.

PHELPS

S

T

E

O

F

O K

A

H

T

O

A

M

A

L

L

C

E

N

E

D C

H

E

C

I

S

AR

I

T

T

DAVID F. PHELPS, A.I.A.

REFLECTED CEILING PLAN

A. AREAS DENOTED BY BOUNDARY REPRESENT

SCOPE OF CEILING REMOVAL REQUIRED FOR

REMOVAL OF EXISTING EQUIPMENT AND

DUCTWORK AND INSTALLATION OF NEW

EQUIPMENT AND DUCTWORK AS

DETERMINED BY ENGINEER.

B. CONTRACTOR SHALL BE RESPONSIBLE FOR

ALL CEILING REMOVAL AND REPLACEMENT

NECESSARY TO ACHIEVE THE

REQUIREMENTS OF THESE DRAWINGS.

CONTRACTOR TO VERIFY SCOPE OF CEILING

REPLACEMENT PRIOR TO BID.

C. CONTRACTOR SHALL RECORD THE LOCATION

OF EXISTING SERVICES (LIGHTS, SPRINKLER

HEADS, SENSORS, DIFFUSERS, GRILLES,

ETC.) PRIOR TO CEILING REMOVAL. UPON

REPLACEMENT OF CEILING GRID,

CONTRACTOR SHALL REPLACE ALL EXISTING

SERVICES BACK TO THEIR EXISTING

LOCATIONS, EXCEPT AS NOTED IN THESE

DRAWINGS.

D. REMOVE, PROTECT, AND REINSTALL IN SAME

LOCATIONS OR AS INDICATED ON DRAWINGS

FIRE SUPPRESSION AND ALARM EQUIPMENT,

CAMERAS AND EQUIPMENT, SPEAKERS, ETC.

E. REMOVE, PROTECT, AND REINSTALL IN SAME

LOCATIONS OR AS INDICATED ON DRAWINGS

LIGHT FIXTURES.

F. REFER TO MECHANICAL DRAWINGS FOR

SCOPE OF WORK AND DIFFUSER LOCATIONS.

1. THESE DRAWINGS ARE PREPARED FROM

LIMITED FIELD OBSERVATION AND INTERNAL

PLAN FILES PROVIDED BY OWNER.

SELECTED AREAS OF THE EXISTING

CONSTRUCTION WERE INACCESSIBLE FOR

VERIFICATION. CONTRACTOR SHALL

CONFIRM THE WORK IS BUILDABLE TO THE

EXISTING CONDITIONS AS SHOWN.

2. CONTRACTOR IS RESPONSIBLE FOR

VERIFYING ALL GENERAL CONDITIONS AND

PROJECT REQUIREMENTS WITH THE OWNER

PRIOR TO CONSTRUCTION START.

CONTRACTOR IS RESPONSIBLE FOR VISITING

THE SITE AND VERIFYING EXISTING

CONDITIONS AND CONTRACT DOCUMENTS

PRIOR TO BID SUBMITTAL.

3. ALL CONTRACTORS, SUBCONTRACTORS,

VENDORS, AND MATERIAL SUPPLIERS SHALL

BE RESPONSIBLE FOR REVIEWING THE

COMPLETE SET OF DOCUMENTS. FAILURE TO

REVIEW ALL CONSTRUCTION DOCUMENTS

WILL NOT RELIEVE ANY CONTRACTORS OR

SUBCONTRACTORS FROM PERFORMING

WORK OR PROVIDING MATERIALS REQUIRED

FOR THE COMPLETION OF THIS PROJECT AS

DEFINED WITHIN THE DOCUMENTS AT TIME

OF BID. GENERAL CONTRACTOR SHALL

COORDINATE ALL WORK PERFORMED BY

OTHER SUBCONTRACTORS. ANY

DISCREPANCIES SHALL BE BROUGHT TO THE

OWNER'S ATTENTION BEFORE PROCEEDING

WITH WORK.

4. THE CONTRACTOR SHALL COORDINATE

WORK WITH EXISTING FIRE PROTECTION

PIPING AND/OR SPRINKLER HEADS. ANY

WORK ASSOCIATED WITH MODIFYING THESE

SYSTEMS SHALL BE PERFORMED BY A

LICENSED AND APPROVED CONTRACTOR.

NEW SPRINKLER HEADS SHALL MATCH

EXISTING; FIELD VERIFY MANUFACTURER

AND MODEL NUMBER. FIRE PROTECTION

CONTRACTOR SHALL INFORM THE BUILDING

SECURITY OFFICE EVERY DAY WHEN A

SHUTDOWN OF SPRINKLER SYSTEM IS

REQUIRED FOR CONSTRUCTION. THE

CONTRACTOR SHALL RECONNECT AND FILL

THE SPRINKLER SYSTEM INTO WORKING

CONDITION AT THE END OF EACH WORKING

DAY TO ASSURE PROTECTION DURING

UNOCCUPIED PERIODS.

EXISTING SUSPENDED CEILING

EXISTING GYPSUM CEILING

RECESSED CAN LIGHTS

EXIT LIGHTS

LIGHT FIXTURES

EMERGENCY BACK UP

LIGHT FIXTURES

MECHANICAL DIFFUSERS

FIRE SPRINKLER HEADS

A-101

N

REFLECTED CEILING PLAN

NOT TO SCALE

REMOVAL/REPLACEMENT

OF CEILING TILE AND GRID,

ACT1

ACT1

ARMSTRONG; FINE FISSURED #1728;

COLOR: WHITE; SIZE: 24X24X

"; GRID:

PRELUDE XL

"; GRID COLOR: WHITE

MARK DESCRIPTION

RCP LEGEND

RCP LEGEND

GENERAL RCP NOTES

RCP LEGEND

ACT1

ACT1

ACT1

ACT1

1541174164M Rectangle

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-001.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

M-001

MECHANICAL SYMBOLS AND

ABBREVIATIONS

A

AC AIR COMPRESSOR

ACC AIR COOLED CHILLER

ACFM ACTUAL CUBIC FEET PER MINUTE

ADD ADDENDUM

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

APD AIR PRESSURE DROP

AR AIR RECEIVER

AS AIR SEPARATOR

B

B BOILER

BA BREATHING AIR, COMPRESSED

BAC BREATHING AIR COMPRESSOR

BCU BLOWER COIL UNIT

BFPD BACK FLOW PREVENTION DEVICE

BFW BOILER FEED WATER

BTUH BRITISH THERMAL UNIT PER HOUR

C

CA COMPRESSED AIR

CC COOLING COIL

CD CONDENSATE DRAIN

CF CEILING FAN

CFM CUBIC FEET PER MINUTE

CH CHILLER (WATER COOLED)

CHWP CHILLED WATER PUMP

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

CL CENTER LINE

CO CLEANOUT

CONT CONTINUATION

CP PUMPED CONDENSATE

CT COOLING TOWER

CU CONDENSING UNIT

CWP CONDENSER WATER PUMP

CWS CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

D

DCW DOMESTIC COLD WATER

DN DOWN

DOAU DEDICATED OUTDOOR AIR UNIT

DP DEWPOINT

DWG DRAWING

E

(E) EXISTING TO REMAIN

E/A EXHAUST AIR

EAG EXHAUST AIR GRILLE

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EEW EMERGENCY EYE WASH

EF EXHAUST FAN

ENGR ENGINEER

EPO EMERGENCY POWER OFF

ESP EXTERNAL STATIC PRESSURE

EQUIP EQUIPMENT

ET EXPANSION TANK

EWB ENTERING WET BULB

EWT ENTERING WATER TEMPERATURE

F

F FAHRENHEIT

FCU FAN COIL UNIT

FH FUME HOOD

FLR FLOOR

FP FIRE PROTECTION

FPM FEET PER MINUTE

FT FOOT, FEET

G

G NATURAL GAS, LOW PRESSURE

GAL GALLON, GALLONS

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GCO GRADE CLEAN OUT

GWH GAS WATER HEATER

H

HB HOSE BIBB

HD HEAD

HP HORSEPOWER

HPC HIGH PRESSURE CONDENSATE

HPG NATURAL GAS, HIGH PRESSURE

HPS HIGH PRESSURE STEAM

HWP HOT WATER PUMP

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HEX HEAT EXCHANGER

HT HEIGHT

I

IDU INDOOR UNIT

IH INTAKE HOOD

IN INCH, INCHES

INWC INCHES OF WATER COLUMN

K

KW KILOWATT

K THOUSAND

KH KITCHEN HOOD

L

L LOUVER

LAT LEAVING AIR TEMPERATURE

LB POUND, POUNDS

LDB LEAVING DRY BULB

LPC LOW PRESSURE CONDENSATE

LPS LOW PRESSURE STEAM

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

M

M THOUSAND

MBH THOUSAND BTUH

MFG MANUFACTURER

MPG NATURAL GAS, MEDIUM PRESSURE

MIN MINIMUM

MISC MISCELLANEOUS

MOCP MINIMUM OVER CURRENT PROTECTION

MPC MEDIUM PRESSURE CONDENSATE

MPS MEDIUM PRESSURE STEAM

MVD MANUAL VOLUME DAMPER

N

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN or NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O/A OUTSIDE AIR

ODU OUTDOOR UNIT

P

PH PHASE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAGE

Q

QT TOTAL CAPACITY

QS SENSIBLE CAPACITY

QL LATENT CAPACITY

R

(R) EXISTING TO REMAIN, RELOCATE

R REFRIGERANT

R/A RETURN AIR

RAD REFRIGERATED AIR DRYER

RAG RETURN AIR GRILLE

RD ROOF DRAIN

RE REFER TO

RG REFRIGERANT GAS

RH RELATIVE HUMIDITY/RELIEF HOOD

RL REFRIGERANT LIQUID

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RPS REVOLUTIONS PER SECOND

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

RV RELIEF VALVE

Ø ROUND, DIAMETER

S

S/A SUPPLY AIR

SAG SUPPLY AIR GRILLE

SCFM STANDARD CUBIC FEET PER MINUTE

SF SUPPLY FAN

SP STATIC PRESSURE

SS STAINLESS STEEL

STM STEAM

SQIN SQUARE INCH/INCHES

SQFT SQUARE FOOT/FEET

T

T/A TRANSFER AIR

TAG TRANSFER AIR GRILLE

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

THRU THROUGH

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

U

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNO UNLESS NOTED OTHERWISE

V

V VOLT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

W

W WATT

WB WET BULB

HVAC ABBREVIATIONS

DUCT SECTION, EXHAUST

DUCTWORK TOE-HEEL TAP

(RECTANGULAR TO

RECTANGULAR)

RETURN GRILLE

EXHAUST GRILLE

DUCTWORK CONICAL TAP

(RECTANGULAR TO ROUND)

5'-0" MAX LENGTH FOR

FLEX DUCT

RIGID ELBOW, FLEXIBLE

ELBOWS NOT ALLOWED

RIGID SUPPLY DUCTWORK

90° RECTANGULAR ELBOW

WITH SINGLE THICKNESS

TURNING VANES

90° ROUND ELBOW,

RADIUS/DIAMETER=1.5

45° RECTANGULAR BEND,

RADIUS/DIAMETER=1.5

45° ROUND BEND,

RADIUS/DIAMETER=1.5

DUCTWORK CONICAL TAP

(ROUND-TO-ROUND)

F=FALL IN DUCT ELEV R=RISE

IN DUCT ELEV

NOTE: AIR DISTRIBUTION DEVICES ARE

ARE DENOTED AS ILLUSTRATED BELOW:

90° RECTANGULAR ELBOW

DOWN WITH SINGLE

THICKNESS TURNING VANES

90° RECTANGULAR ELBOW

UP WITH SINGLE THICKNESS

TURNING VANES

LINEAR DIFFUSER, NO ARROWS

INDICATE 2-WAY AIR PATTERN

SIDEWALL REGISTER OR GRILLE

CEILING DIFFUSER SQUARE

PATTERN. NO ARROWS INDICATE

4-WAY AIR PATTERN

DUCT SECTION, RETURN

MVD

SUPPLY DIFFUSER

MAIN DUCTWORK

DIFFUSER

NOTE: SINGLE LINE DUCT TAP SYMBOLS ARE DENOTED

AS ILLUSTRATED BELOW:

RECTANGULAR TO RECTANGULAR

ROUND TO ROUND

RECTANGULAR TO ROUND

DUCT SIZE TRANSITION

CEILING DIFFUSER ROUND

PATTERN. NO ARROWS

INDICATE 4-WAY AIR PATTERN

DUCT SECTION, SUPPLY

90° ROUND ELBOW DOWN

90° ROUND ELBOW UP

S/A DIFFUSER WITH FACTORY

INSTALLED QUADRANT BLANKS.

PROVIDE BLANKS AS SHOWN ON

DRAWINGS.

FIRE/SMOKE DAMPER

DEFINITION OF LINEWEIGHTS AND LINETYPES:

OUTLINE OF NEW EQUIPMENT

INSTALLED ABOVE THE FLOOR

SHOWN (I.E., ROOF)

XXX-X

EQUIPMENT TAG

EQUIPMENT NUMBER

BFW

CHWS

CHWR

BA

CA

CD

CP

LPC

MPC

HPC

CWS

CWR

HWS

HWR

S

MPS

HPS

RG

RL

RS REFRIGERANT SUCTION

REFRIGERANT LIQUID

REFRIGERANT GAS

STEAM, HIGH PRESS 125 PSI & ABOVE

STEAM, MED PRESS 16-124 PSI

STEAM, LOW PRESS 0-15 PSI

HEATING WATER RETURN

HEATING WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

CONDENSATE, HIGH PRESS

125 PSI & ABOVE

CONDENSATE, MED PRESS 16-124 PSI

CONDENSATE, LOW PRESS 0-15 PSI

CONDENSATE, PUMPED

CONDENSATE, DRAIN

COMPRESSED AIR

COMPRESSED AIR, BREATHING AIR

CHILLED WATER RETURN

CHILLED WATER SUPPLY

BOILER FEED WATER

PIPE LABEL DESCRIPTION

SYMBOL DESCRIPTION

SYMBOL DESCRIPTION

AUTOMATIC AIR VENT

BACKFLOW PREVENTER

BALL VALVE

BASKET STEAM TRAP

BLIND FLANGE

BUTTERFLY VALVE

CAP

CHECK VALVE

CHECK VALVE, SILENT

CIRCUIT SETTER

COMPRESSED AIR CONNECTION

CONTROL VALVE, 2-WAY

CONTROL VALVE, 3-WAY

FLEXIBLE CONNECTOR

GATE VALVE

GATE VALVE, ANGLE

GENERAL VALVE, SEE SPECS

GLOBE VALVE

GLOBE VALVE, ANGLE

PLUG VALVE

PRESSURE AND TEMPERATURE RELIEF

PRESSURE REDUCING STATION, STEAM

PRESSURE REDUCING VALVE

RELIEF VALVE, ASME

SOLENOID VALVE

STRAINER

SUCTION DIFFUSER

THERMOSTAT, HUMIDISTAT

TRIPLE DUTY VALVE

UNION

VENTURI

RISER DOWN (ELBOW)

RISER UP (ELBOW)

RISE OR DROP

TEE DOWN

TEE UP

TOP CONNECTION

BOTTOM CONNECTION

SIDE CONNECTION

FLOW IN DIRECTION OF ARROW

PIPE SLOPE IN DIRECTION OF ARROW

TIE-IN TO EXISTING AT THIS POINT

REMOVE EXISTING TO THIS POINT

PUMP

DEVICE TYPE, REFER TO SCHEDULE

AIRFLOW IN CFM

NECK SIZE IN INCHES

XXxXX

XXX

NEW CONSTRUCTION

EXISTING TO REMAIN

DEMOLITION

PRS

PSD

T H

45° RECTANGULAR BEND

END CAP

F

AAV

TYPICAL RUNOUT:

S

HT CO2

TEMPERATURE, HUMIDITY & CO2 SENSOR

X

FS

FIRE DAMPERF

SMOKE DAMPERS

DAMPER SYMBOLS:

MOTORIZED DAMPERM

HVAC SYMBOLS LEGEND

DUCTWORK SPIN-IN TAP

(RECTANGULAR TO ROUND)

R REFRIGERANT

DUCTWORK 45° LATERAL TAP

(ROUND-TO-ROUND)

DUCTWORK 90° TAP

(ROUND-TO-ROUND)

SMOKE DETECTORSD

X"Ø

(e.g., 6"Ø)

ROUND DUCT SIZE IN INCHES

XxX

(e.g., 10x10)

RECTANGULAR DUCT SIZE IN INCHES

SIDEWALL GRILLE

RECTANGULAR TO ROUND

TRANSITION

33 30

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-002.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

MECHANICAL NOTES AND

KEYNOTES

DUCTWORK SEALANT SCHEDULE

DUCT

LOCATION

DUCT TYPE

SUPPLY

EXHAUST RETURN

≤ 2 INWC > 2 INWC

OUTDOOR A A C A

UNCONDITIONED SPACES B A C B

CONDITIONED SPACES C B B C

SEALING REQUIREMENTS:

SEAL LEVEL A - ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL

PENETRATIONS. PRESSURE-SENSITIVE TAPE SHALL NOT BE USED AS THE PRIMARY

SEALANT, UNLESS IT HAS BEEN CERTIFIED TO COMPLY WITH UL-181A OR UL-181B

BY AN INDEPENDENT TESTING LABORATORY AND THE TAPE IS USED IN ACCORDANCE WITH THAT

CERTIFICATION.

SEAL LEVEL B - ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS PRESSURE-SENSITIVE TAPE SHALL NOT BE

USED AS THE PRIMARY SEALANT, UNLESS IT HAS BEEN CERTIFIED

TO COMPLY WITH UL-181A OR UL-181B BY AN INDEPENDENT TESTING LABORATORY

AND THE TAPE IS USED IN ACCORDANCE WITH THAT CERTIFICATION.

SEAL LEVEL C - TRANSVERSE JOINTS ONLY.

M-002

1. DEMOLISH EXISTING AS REQUIRED FOR NEW CONSTRUCTION AS DIRECTED BY

CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR AS NOTED ON

DRAWINGS. AVOID DISRUPTION OF SERVICES DURING NORMAL BUSINESS

HOURS. ALL SYSTEM SHUT-DOWNS AND DISRUPTION OF BUILDING SERVICES

SHALL BE COORDINATED WITH COR AND SCHEDULED AFTER NORMAL BUILDING

HOURS OR AS OTHERWISE APPROVED BY COR.

2. PRIOR TO DEMOLITION FIELD VERIFY AND IDENTIFY ANY EXISTING EQUIPMENT

TO REMAIN IN SERVICE THAT IS SERVED BY SYSTEMS TO BE DEMOLISHED.

NOTIFY COR OF ANY SUCH CONDITIONS AND REMOVE AND/OR RELOCATE THE

SERVICES AS DIRECTED.

3. MEET WITH COR PRIOR TO DEMOLITION TO IDENTIFY WHETHER EXISTING

MATERIALS SYSTEMS, EQUIPMENT, ETC. ARE CONSIDERED SALVAGE OR

DEBRIS. REMOVE DEBRIS FROM SITE AND DISPOSE OF IN AN APPROVED

MANNER. RETURN SALVAGE TO COR IN A LOCATION AND MANNER AS DIRECTED

BY COR.

4. TERMINATE DEMOLISHED SYSTEM SERVICES IN A CONCEALED LOCATION IN AN

APPROVED MANNER. COORDINATE WITH NEW AND EXISTING CONSTRUCTION.

5. FIELD VERIFY EXISTING PIPING LOCATIONS PRIOR TO WORK.

6. VERIFY EXTENT OF DEMOLITION OF SANITARY SEWER, DOMESTIC WATER AND

FIRE PROTECTION PIPING PRIOR TO WORK. ALL DEMOLITION WORK SHALL BE

IN COMPLIANCE WITH APPLICABLE CODES, STANDARDS AND COR.

7. WHERE REQUIRED, COORDINATE EQUIPMENT ELECTRICAL TERMINATION

REQUIREMENTS WITH ELECTRICAL CONTRACTOR.

8. DISPOSE OF METAL AND OTHER WASTE MATERIALS IN PROVIDED RECYCLE

BINS AND FULLY EVACUATE PER BASE ENVIRONMENTAL GUIDELINES.

DEMOLITION NOTES

1. DUCT CONSTRUCTION AND INSTALLATION METHODS SHALL COMPLY WITH

LATEST SMACNA STANDARDS.

2. DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS. DUCT BOARD OR

INTERNALLY LINED DUCT WILL NOT BE ACCEPTED UNLESS NOTED OTHERWISE.

3. ALL WORK AND INSTALLATION SHALL COMPLY WITH APPLICABLE UNIFIED

FACILITIES CRITERIA, BASE DESIGN GUIDES, AND OTHER GOVERNING CODES

AND REGULATIONS OF REGULATORY AGENCIES HAVING JURISDICTION, AND

CONTRACTING OFFICERS REPRESENTATIVE (COR) AND SHALL BE IN

COMPLIANCE WITH ALL INDUSTRY STANDARDS. CODES AND REGULATIONS

SHALL TAKE PRECEDENCE OVER SPECIFICATIONS AND DRAWINGS WHERE

THERE IS A CONFLICT.

4. ROUTING AND MOUNTING LOCATIONS OF HVAC DUCTWORK AND EQUIPMENT

SHALL BE COORDINATED WITH ALL OTHER TRADES.

5. THE DRAWINGS ARE DIAGRAMMATIC BUT SHALL BE FOLLOWED AS CLOSELY AS

ACTUAL CONSTRUCTION AND COORDINATION WITH OTHER TRADES AND

EXISTING CONDITIONS WILL ALLOW. APPROVAL OF COR SHALL BE OBTAINED

BEFORE DEVIATIONS FROM THESE PLANS ARE MADE.

6. OBTAIN AND PAY FOR ALL NECESSARY FEES AND PERMITS.

7. CONTRACTOR SHALL VISIT SITE AND BECOME FULLY INFORMED AS TO THE

EXTENT AND CHARACTER OF THE WORK REQUIRED AND ITS RELATION TO

OTHER WORK. FAILURE TO VISIT SITE SHALL NOT CONSTITUTE A BASIS FOR

FUTURE CLAIMS.

8. PROVIDE ACCESS PANELS WHERE REQUIRED FOR HVAC EQUIPMENT ACCESS

OR WHERE INDICATED ON DRAWINGS. PROVIDE ACCESS PANELS WHERE

INDICATED OR REQUIRED FOR ACCESS TO PIPING AND DUCT WORK

ACCESSORIES; SUCH AS, VALVES, DAMPERS, VENTS, OTHER ACCESSORIES,

ETC. COORDINATE WITH COR.

9. WHERE PRACTICAL TO DO SO, ROUTE HVAC DUCTWORK AS HIGH AS POSSIBLE

ABOVE CEILING TO AVOID CONFLICT WITH LIGHTS.

10. PROVIDE FIRE DAMPERS AT ALL RATED FLOOR PENETRATIONS, RATED WALL

PENETRATIONS AND AS SHOWN FOR ALL SUPPLY AIR, RETURN AIR, TRANSFER

AIR, OUTSIDE AIR, AND EXHAUST AIR DUCTWORK. FIRE DAMPERS AND

INSTALLATIONS SHALL BE PER APPLICABLE FLOOR/WALL RATINGS.

COORDINATE WITH ARCHITECTURAL DRAWINGS. DAMPERS PER UL555/UL555C.

11. ALL SUPPLY, RETURN AND OUTSIDE DUCTS TO BE INSULATED WITH MINIMUM 1

1/2" THICK BLANKET OR BOARD.

12. INSULATED, FLEXIBLE DUCT SHALL BE SUPPORTED PER SMACNA AND

INDUSTRY STANDARDS. MAXIMUM 5'-0" PER HVAC DUCT CONSTRUCTION

STANDARDS, FIGURE 3-9, FLEXIBLE DUCT SUPPORTS.

13. ALL THERMOSTATS, SENSORS, ETC SHALL BE MOUNTED 60" AFF UNLESS NOTED

OTHERWISE (UNO). THERMOSTAT WIRING IS RESPONSIBILITY OF HVAC

CONTRACTOR.

14. ALL HVAC GENERAL NOTES AND KEYNOTES ARE USED FOR ALL HVAC PLANS.

15. MECHANICAL EQUIPMENT SHOWN ON THE PLANS HAVE A SPECIFIC WEIGHT

AND LOCATION. SHOULD THE CONTRACTOR INSTALL EQUIPMENT WITH

DIFFERENT WEIGHTS OR LOCATIONS AS SHOWN, CONTRACTOR SHALL PROVIDE

THIS INFORMATION TO THE STRUCTURAL ENGINEER FOR APPROVAL, PRIOR TO

PURCHASING, CLEARLY INDICATING THE DIFFERENCES IN SIZE, WEIGHT AND

LOCATION. THE ARCHITECT/ENGINEER SHALL NOT BEAR THE COSTS OF SUCH

REVIEWS OR REDESIGNS.

16. THESE DRAWINGS MAKE NO RECOMMENDATION OR ANY OTHER INSTRUCTION

RELATED TO THE PRESENCE OR ABSENCE OF ASBESTOS, LEAD, OR ANY OTHER

MATERIALS REQUIRING REMEDIATION THROUGHOUT THE BUILDING(S) UNDER

CONSIDERATION. IT IS RECOMMENDED THAT THE INTERESTED PARTIES

ENGAGE A FIRM SPECIALIZING IN ABATEMENT AND REMEDIATION FOR THE

PURPOSE OF IDENTIFYING ANY AREAS, SYSTEMS, OR EQUIPMENT REQUIRING

ISOLATION AND ABATEMENT. THE OWNER SHALL DETERMINE THE NEED OF

ANY ABATEMENT AND REMEDIATION AND ADVISE THE CONTRACTOR WHO WILL

BE RESPONSIBLE FOR SAME.

HVAC GENERAL NOTES

INSTALL ALL NECESSARY HARDWARE, SOFTWARE AND WIRING UNDER THIS

CONTRACT TO ALLOW ALL AIR MOVING EQUIPMENT INVOLVED IN THIS PROJECT TO

BE SHUT DOWN AND TO ALLOW ALL OUTSIDE AIR INTAKE, EXHAUST, OR RELIEF

DAMPERS IN THIS PROJECT TO BE CLOSED IN RESPONSE TO ANY PERCEIVED

THREAT OF ATTACK WHERE AIRBORNE AGENTS MAY BE SUSPECTED.

THE SHUTDOWN OF EQUIPMENT AND DAMPER CLOSURES SHALL OCCUR

IMMEDIATELY AND SIMULTANEOUSLY IN RESPONSE TO 1) A MANUAL PUSHBUTTON

SWITCH LOCATED IN THIS FACILITY AS SHOWN ON THE PLANS OR AS DIRECTED OR

2) ACTION TAKEN BY ANY AUTHORIZED PERSONNEL (WITH PROPER USERNAME AND

PASSWORD) THROUGH THE EXISTING BASE HVAC SERVER SOFTWARE FROM ANY

BROWSER ON THE BASE NETWORK.

THE INTENT FOR THIS PROJECT IS TO UTILIZE THE BASE FACILITY ETHERNET LAN

AS THE COMMUNICATION BACKBONE BETWEEN ALL BUILDING AREA CONTROLLERS

AND THE BASE HVAC SERVER AND BETWEEN THE SERVER AND ALL BROWSER THIN

CLIENTS.

THE SHUTDOWN AND DAMPER CLOSURE INITIATED BY THE MANUAL PUSHBUTTON

SWITCH SHALL AFFECT ALL EQUIPMENT IN THIS PROJECT FOR THIS BUILDING ONLY.

THE SHUTDOWNS AND DAMPER CLOSURES INITIATED THROUGH THE BASE HVAC

SERVER SOFTWARE SHALL AFFECT ALL EQUIPMENT IN THIS PROJECT AND SHALL

BE IN CONJUNCTION WITH EQUIPMENT SHUTDOWNS AND DAMPER CLOSURE

ACTIONS IN THIS AND OTHER SURROUNDING BUILDINGS IN THE PERCEIVED THREAT

PLUME AREA (WHERE THE AIRBORNE THREAT RESPONSE SYSTEM HAS BEEN

IMPLEMENTED IN THOSE BUILDINGS). THIS BUILDING SHALL BE ASSIGNED TO

VARIOUS DIFFERENT PLUME AREA GROUPS WITHIN THE BASE HVAC SERVER

SOFTWARE AS DIRECTED AND SHALL BE PROGRAMMED TO SHUT DOWN WITH EACH

GROUP WHEN COMMANDED. WITHIN EACH PLUME GROUP, A SINGLE COMMAND

SHALL SHUT DOWN ALL AIR MOVING EQUIPMENT AND PROVIDE ALL DAMPER

CLOSURES FOR ALL BUILDINGS WITHIN THAT PLUME GROUP.

BUILDING SHUTDOWN AS A RESULT OF THE AIRBORNE THREAT RESPONSE SYSTEM,

WHETHER VIA MANUAL PUSHBUTTON SWITCH OR VIA THE BASE HVAC SERVER

SOFTWARE, IS A CRITICAL ALARM AND SHALL IMMEDIATELY SEND ALARMS TO THE

BASE HVAC SERVER SOFTWARE AND ALL DESIGNATED PERSONNEL (AS DIRECTED

BY THE CONTRACTING OFFICERS REPRESENTATIVE) THROUGH E-MAIL ALERTS TO

PERSONAL COMPUTERS, CELL PHONES, PAGERS, OR OTHER E-MAIL CAPABLE

EQUIPMENT.

AIRBORNE THREAT RESPONSE

SYSTEM (ATRS)

1. FOR EXISTING DUCTWORK NOTED TO REMAIN ON THE PLANS, THE FOLLOWING

SHALL BE COMPLETED PRIOR TO PLACING THE SYSTEM IN SERVICE:

1.1. CLEAN AND RESEAL ALL DUCTWORK. SEALING CLASS SHALL BE PER

DUCTWORK SEALANT SCHEDULE.

1.2. REMOVE AND REPLACE INSULATION.

2. FOR EXISTING PIPING NOTED TO REMAIN, THE FOLLOWING SHALL BE

COMPLETED PRIOR TO CONNECTION TO NEW SYSTEM:

2.1. FLUSH AND CLEAN THOROUGHLY PER BASE STANDARDS.

EXISTING TO REMAIN DUCTWORK AND

PIPING

1. ROOM 127 CURRENTLY IS SERVED BY A GROUND-MOUNTED

PACKAGED UNIT. THIS UNIT SHALL BE REMOVED. ALL

ASSOCIATED DUCTWORK REMOVED. EXISTING WALL

PENETRATIONS SHALL BE PATCHED, SEALED, AND FINISHED

TO MATCH EXISTING WALL CONSTRUCTION.

2. IT IS ASSUMED THAT EXISTING DISTRIBUTION DUCTWORK FOR

ROOM 127 WAS REMOVED WHEN THE PACKAGED UNIT WAS

ADDED.

3. EXISTING HUMIDIFIER AND HUMIDIFICATION WATER PIPING TO

REMAIN. NO CHANGES SHALL BE APPLIED TO EXISTING

HUMIDIFICATION SYSTEM EQUIPMENT OR CONTROLS.

4. EXISTING DX SPLIT FAN COIL AND CONDENSING UNIT AND

ASSOCIATED PIPING, DUCTWORK, DIFFUSERS, AND GRILLES

SHALL BE REMOVED. EXISTING EXTERIOR WALL

PENETRATIONS SHALL BE PATCHED, SEALED, AND FINISHED

TO MATCH EXISTING WALL CONSTRUCTION.

5. EXISTING REHEAT COIL SHALL BE REMOVED. EXISTING

HUMIDIFICATION SYSTEM (WHERE IN EXISTENCE) SHALL

REMAIN.

6. POSITION NEW DIFFUSERS ON THE FRONT SIDE OF AIS

EQUIPMENT.

7. REMOVE EXISTING DIFFUSER RUNOUT CONNECTED TO S/A

MAIN AND RECONNECT TO NEW DUCTWORK AS SHOWN.

8. REMOVE EXISTING S/A PLENUM SERVING EXISTING AHU-1 AND

REMOVE EXISTING S/A TRANSITIONS AND TAPS BACK TO

DUCTWORK OF FULL SIZE AS NOTED.

9. EXISTING R/A MAINS AND DROPS TO REMAIN. REMOVE

EXISTING R/A CONNECTION TO AHU.

10. REMOVE EXISTING 36x18 O/A INTAKE. O/A INTAKE VENTILATOR

ON ROOF TO REMAIN.

11. MOUNT NEW CHILLER ON EXISTING PAD AND SUPPLY WITH

MANUFACTURER'S NEOPRENE ISOLATION PADS.

12. PROVIDE NEW S/A DUCTWORK OF EQUAL SIZE TO EXISTING

AND TRANSITION AS NECESSARY TO MAKE NOTED

CONNECTION TO AHU-1 S/A PLENUM.

13. CONNECT FULL-SIZED R/A PLENUM TO AHU-1.

14. CONNECT EXISTING DROPS FROM R/A MAIN TO NEW R/A

PLENUM.

15. PROVIDE FULL-SIZED O/A INTAKE DN FROM VENTILATOR ON

ROOF. STUB UP FULL-SIZED O/A DUCTWORK PLENUM FROM

AHU-1 AND CONNECT NEW O/A DUCTWORK TO O/A INTAKE

PLENUM AND AHU-1 O/A CONNECTION PLENUM. PROVIDE

OUTDOOR AIR FLOW MONITORING STATION IN O/A PLENUM DN

FROM VENTILATOR. PROVIDE LOW VELOCITY PRE FILTER TO

AVOID CLOGGING PITOT TUBES.

16. EXISTING O/A VENTILATOR ON ROOF.

17. EMERGENCY BOILER SHUT DOWN SWITCH. SWITCH LOCATION

AND OPERATION SHALL MEET THE REQUIREMENTS OF CSD-1.

18. EMERGENCY POWER OFF SWITCH SHALL SHUT DOWN ALL

HVAC EQUIPMENT AS NOTED IN CONTROLS SEQUENCES.

19. REMOVE EXISTING CHWS/R PIPING SERVING FAN COIL UNITS

ABOVE CEILING IN ROOM 110.

20. REMOVE EXISTING CHWS/R AND HWS/R AND ALL PIPING

ACCESSORIES AS NOTED. REMOVE EXISTING HWS/R IN

MECHANICAL ROOM. EXISTING HWS/R PIPING SERVING

BUILDING TO REMAIN, UNO.

21. CONNECT NEW HWS/R TO EXISTING AT LOCATION WHERE

EXISTING ROUTES INTO MECH ROOM. MATCH NEW HWS/R TO

EXISTING.

22. EXISTING GAS PIPING TO REMAIN. IT IS ASSUMED THAT

EXISTING GAS PIPING IS AT LOW PRESSURE (14" W.C.) AT

ENTRANCE TO MECHANICAL ROOM.

23. PROVIDE NEW 2 1/2" GAS PIPE TO SERVE BOILERS. GAS

RUNOUTS TO BOILERS SHALL BE 1 1/2".

24. REPLACE EXISTING FLOOR DRAIN AT AIR HANDLER WITH NEW

FLOOR SINK (REFER TO FLOOR SINK SCHEDULE, M-601).

ROUTE NEW FULL-SIZED TRAPPED CONDENSATE DRAIN FROM

AHU CONDENSATE CONNECTION TO NEW FLOOR SINK.

25. NEW CHILLED WATER BYPASS. RE: 5/M-501 FOR SIZING

DETAILS.

26. NEW 2" CHWS/R TO CRAC-1. RE: 1/M-102 FOR CONT.

27. NEW 2" HWS/R TO VAV SYSTEM, RE: 1/M-102 FOR CONT.

28. PROVIDE NEW 3" CIRCUIT SETTER IN NEW PIPING CONNECTING

TO EXISTING 3" HWS/R SERVING EXISTING UNIT HEATERS AND

OTHER EXISTING HOT WATER LOADS. PRIOR TO BEGINNING

HEATING WATER SYSTEM WORK, CONTRACTOR SHALL FORCE

ALL EXISTING HOT WATER VALVES OPEN AND TEST EXISTING

HOT WATER FLOW RATE. CIRCUIT SETTER SHALL BE SET TO

EXISTING HOT WATER FLOW RATE TO MATCH EXISTING

CONDITIONS.

29. REMOVE EXISTING 1 1/2" HWS/R SERVING REHEAT COILS.

30. REMOVE ALL HWS/R PIPING SERVING REHEAT COILS.

31. 4" COMBUSTION AIR INTAKE AND 6" BOILER VENT.

32. PROVIDE PVC VENT AND INTAKE PIPING AND PROVIDE

MANUFACTURER'S SIDEWALL VENT/AIR TERMINATION WALL

KIT. INSTALL PER MANUFACTURER'S INSTALLATION

REQUIREMENTS AND APPLICABLE CODES IN ALL RESPECTS

INCLUDING BUT NOT LIMITED TO: WALL PENETRATION

SLEEVING AND INSULATION SHIELDING; FIREPROOFING;

SUPPORT OF PIPING. TERMINATIONS SHALL BE PER

MANUFACTURER'S INSTALLATION REQUIREMENTS,

APPLICABLE CODES, AND THE FOLLOWING:

32.1. VENT SHALL BE AT LEAST 6'-0" FROM ADJACENT WALLS.

32.2. VENT SHALL BE NO CLOSER THAN 12" BELOW

OVERHANGS.

32.3. VENT SHALL BE AT LEAST 7-0" FEET ABOVE PUBLIC

WALKWAYS.

32.4. VENT SHALL BE AT LEAST 3'-0" ABOVE FORCED AIR

INTAKES WITHIN 10'-0" OF VENT TERMINATION.

32.5. VENT SHALL BE NO CLOSER THAN 12" BELOW OR

HORIZONTALLY FROM ANY DOOR OR WINDOW OR ANY

GRAVITY INLET.

32.6. COMBUSTION AIR INLET SHALL BE AT LEAST 12" ABOVE

GRADE OR SNOW LINE AS DETERMINED BY AHJ.

32.7. COMBUSTION AIR INLET SHALL BE NOT CLOSER THAN 4'-0"

HORIZONTALLY FROM ANY ELECTRIC METER, GAS METER,

REGULATOR, RELIEF VALVE, OR OTHER EQUIPMENT.

32.8. VENT/AIR TERMINATION WALL KITS SHALL BE LOCATED

NOT LESS THAN 12" AWAY FROM EACH OTHER.

33. TERMINATE 4" COMBUSTION AIR PIPING AND 6" VENT PIPING AT

BOILER IN AN APPROVED MANNER AND IN COMPLIANCE WITH

MANUFACTURER'S INSTALLATION REQUIREMENTS.

34. CONNECT NEW HWS/R PIPING TO EXISTING UNIT HEATER. NEW

HWS/R PIPING SHALL BE OF EQUAL SIZE TO EXISTING.

EXISTING VALVE AND CONTROLS TO REMAIN.

35. GAS DN TO EXISTING DOMESTIC HOT WATER HEATER TO

REMAIN.

36. DOOR CUT MAY BE NECESSARY TO BRING AHU SECTIONS INTO

MECHANICAL ROOM; RESTORE BACK TO ORIGINAL

CONDITIONS AFTER INSTALLATION OF AHU.

37. NEW MAKEUP WATER TO HYDRONIC SYSTEM. REMOVE

EXISTING MAKEUP WATER SYSTEM. REFER TO 5/M-501 AND

1/M-504 FOR DETAILS. CONNECT TO EXISTING DOMESTIC COLD

WATER SYSTEM IN MECHANICAL ROOM.

38. PROVIDE DIFFERENTIAL PRESSURE SENSOR AS REQUIRED BY

CONTROLS SEQUENCES. SHOULD ADJUSTMENT OF

DIFFERENTIAL PRESSURE SENSOR BE REQUIRED TO MEET

THE REQUIREMENTS OF THE CONTROLS SEQUENCES AND

FLOW REQUIREMENTS OF ALL EQUIPMENT, CONTRACTOR

SHALL RELOCATE, REWIRE, AND REPROGRAM AS NECESSARY.

KEYNOTES

1. COORDINATE ALL REQUIRED SHUT DOWNS OF EQUIPMENT, HVAC SYSTEMS,

AND ANY OTHER ACTIVITIES AFFECTING OCCUPANTS WITH THE COR.

2. PHASING AS FOLLOWS. CONTRACTOR TO VERIFY PHASING PLAN AND PROVIDE

FINAL PHASING PLAN TO THE COR FOR REVIEW PRIOR TO BEGINNING WORK.

2.2. COMPLETE CENTRAL SYSTEM HVAC COMPONENTS SYSTEM FLUSHING

SHALL BE CONDUCTED TO PREVENT NEW COILS AND OTHER EQUIPMENT

FROM BEING FOULED AFTER CONNECTION TO EXISTING HYDRONIC

SYSTEMS.

2.2.1. COMPLETE MECHANICAL ROOM SCOPE INCLUDING REPLACEMENT OF

AIR HANDLING UNIT, LOCATION OF BOILERS, ETC.

2.2.2. REMOVE CHILLER AND REPLACE WITH NEW. RECONNECT CHILLED

WATER SYSTEM.

2.2.3. REMOVE EXISTING EQUIPMENT SERVING ECM POD STORAGE AND

MAINTENANCE AND REPLACE WITH NEW CRAC UNIT.

2.3. COMPLETE CEILING, DUCTWORK, AND VAV SCOPE ROOM-BY-ROOM.

HVAC PHASING NOTES

TYPE B3 FINAL SUBMITTAL

TYPE B2 PREFINAL SUBMITTAL 05/15/2018

06/29/2018

ECM SHOP

VAULT

ECM OFFICE

BRANCH ADMIN

BRANCH OFFICE

CORRIDOR

AIS OFFICE

AIS SHOP

POWER ROOM

LOCKER

MECHANICAL

MEN'S

WOMEN'S

WEAPONS RELEASE MAINTENANCE

GUN MAINTENANCE

STORAGE

VEST

EXPOSURE ROOM

NDI PENETRATION

FILM PROCESS

NDI STORAGE

NDI ADMIN

NDI ROOM

CLASSROOM

SENSOR OFFICE

130A

SENSOR SHOP

MATERIAL CONTROL

PMEL OFFICE

PMEL STORAGE

MUNITIONS SERVICES

MUNITIONS ADMIN

MUNITIONS CHIEF

123A

VEST

CLASSROOM

WEAPONS LOADING STORAGE

x x x

34x12

16x12 20x14

16x16 20x18

22x22 x x

20x20

34x12 x x x x x

18x1414x14 14x14

36x16

30x30

12x24 x x x x

16x12 x

40x14 x x

28x12 24x12 x

14Ø x x

14Ø

38x14

20x20 x x x x

32x22 x

30x18 x x x x

36x12 x

32x12 28x12 24x12

24x14 30x14

36x16

32x22

12Ø34x12

20x12

48x16

20x12

14Ø

10x10

126A

MATERIAL CONTROL SUPERVISOR

x x x x x

MD402

REMOVE EXISTING CHILLER AND

CHILLED WATER PIPING BACK TO

MECHANICAL ROOM

EXISTING CONCRETE PAD

TO REMAIN

MD401

EXISTING TO

REMAIN, TYP

EXISTING TO

REMAIN, TYP

EXISTING TO

REMAIN, TYP

REMOVE DUCTWORK TO

NOTED LOCATIONS, TYP

REMOVE AIR

TERMINAL, TYP

NOTE: NO COOLING

EXISTS IN THIS ROOM PER

AS-BUILT DRAWINGS

REMOVE ALL THREE (3) FAN COILS

SERVING ROOM 110 ALONG WITH ALL

ASSOCIATED DUCTWORK, GRILLES,

DIFFUSERS, AND PIPING

30x30

MD402

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M

D d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

MD101.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

N

MECHANICAL DEMOLITION PLAN

1/8" = 1'-0"

MD101

MECHANICAL DEMOLITION

PLAN

SCALE: 1/8''= 1'-0"

0 8'8' 4'

KEYPLAN

ECM POD MAINTENANCE

ECM POD STORAGE

REMOVE EXISTING

DUCTWORK TO

NOTED LOCATION

EXISTING

HOUSEKEEPING

PAD TO REMAIN

EXISTING S/A

DUCTWORK TO

REMAIN, TYP

EXISTING S/A

DIFFUSER TO

REMAIN, TYP

REMOVE EXISTING CARRIER

AHU-1 AND S/A RISER UP TO

CONNECTION WITH S/A MAIN

REMOVE EXISTING

LIEBERT AHU-2

REMOVE EXISTING CARRIER

CU-1 AND ASSOCIATED

REFRIGERANT PIPING

REMOVE EXISTING LIEBERT

CU-2 AND ASSOCIATED

REFRIGERANT PIPING

R/A

S

A

S

A

S/A AND R/A DUCTWORK CONNECTIONS

FOR AHU-2 ROUTE THROUGH WALL AND

TERMINATE IN SIDEWALL

GRILLE/DIFFUSER HIGH AND LOW ON

WALL, RESPECTIVELY; DUCTWORK

CONNECTIONS TO REMAIN

x x x x

NOTE:

REMOVE AND CAP BACK TO

MAIN EXISTING HWS/R

SERVING AHU'S IN THIS AREA

20x20 S/A

22x22 S/A

20x14 S/A

Z O x

S

A

Z O x

S

A

Z O x

S

A

Z O x

S

A

Z O x

S

A

REMOVE EXISTING

AHU

76x26 R/A

48x16 R/A

ZONE 2

ZONE 1

Z

O

Z O x

S

A

TYP 7

30x30 R/A x

R

A

EXISTING 114x20 R/A

DROP TO REMAIN

EXISTING 30x20 R/A

DROP TO REMAIN

EXISTING PAD TO

REMAIN, TYP

MECHANICAL

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M

D d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

MD401.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

N

ECM POD MAINTENANCE AND STORAGE

ENLARGED HVAC DEMOLITION PLAN

1/4" = 1'-0"

MECHANICAL ENLARGED

DEMOLITION PLANS

MECHANICAL ENLARGED

DEMOLITION PLANS

KEYPLAN

N

MECHANICAL ROOM ENLARGED

HVAC DEMOLITION PLAN

1/4" = 1'-0"

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

RE: 1/MD101

FOR CONT

MD401

SCALE: 1/4''= 1'-0"

0 4'4' 2'

SCALE: 1/4''= 1'-0"

0 4'4' 2'

REMOVE

AHU

6" CHWS(E)

6" CHWR(E)

C

H W

R E

C

H W

S E

RE: 1/MD101

FOR CONT

H

W S

E

REMOVE

BOILER

REMOVE

CHWP

REMOVE

HWP

2 1/2" G(E)

EXISTING GAS

PIPE TO REMAIN

EXISTING 2 1/2" GAS ISOLATION

VALVE IN VERTICAL

REMOVE

EXISTING ET, TYP

EXISTING

COMPRESSOR

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M

D d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

MD402.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

MECHANICAL ENLARGED

DEMOLITION PLANS

MECHANICAL ENLARGED

DEMOLITION PLANS

N

MECHANICAL ROOM ENLARGED

PIPING DEMOLITION PLAN

1/4" = 1'-0"

MD402

REMOVE EXISTING

HWS/R TO THIS

POINT

REMOVE EXISTING

HWS/R TO THIS

POINT

SCALE: 1/4''= 1'-0"

4'4' 2'

VAULT

ECM OFFICE

BRANCH ADMIN

BRANCH OFFICE

CORRIDOR

AIS OFFICE

AIS SHOP

POWER ROOM

LOCKER

MECHANICAL

MEN'S

WOMEN'S

WEAPONS RELEASE MAINTENANCE

GUN MAINTENANCE

STORAGE

VEST

EXPOSURE ROOM

NDI PENETRATION

FILM PROCESS

NDI STORAGE

NDI ADMIN

NDI ROOM

CLASSROOM

SENSOR OFFICE

130A

SENSOR SHOP

MATERIAL CONTROL

PMEL OFFICE

PMEL STORAGE

126A

MATERIAL CONTROL SUPERVISOR

MUNITIONS SERVICES

MUNITIONS ADMIN

MUNITIONS CHIEF

123A

VEST 122

BREAKROOM

WEAPONS LOADING STORAGE

x x x

16x12 20x14

16x16 20x18

22x22 x

X

20x20

34x12 x x x x x x

18x1414x14

14x14

36x16

30x30

12x24 x x x x x x

40x14 x x

28x12 24x12

X

16Ø x x

14Ø x x x x

38x14

20x20

X

32x14 x x

32x22 x x

30x18 x x x x

12Ø x

24x1430x1436x16

32x22

X1

12"Ø

X1

12"Ø

X1

12"Ø

X1

10"Ø

X2

10"Ø

X1

10"Ø

34x12

Y1

48x20

RAG

48x16

16x14

20x12

T

VAV-109

32x12 28x12 24x12 14Ø

A

10"Ø

TYP 8

Ø

T Y

P

36x12

VAV-108

T

22x16

16Ø

X2

10"Ø

X1

12"Ø

Y1

48x20

RAG

Y1

22x22

RAG

B

22x22

RAG

PROVIDE FULL-SIZED R/A TAP

AND CONNECT TO BOTTOM OF

EXISTING R/A DUCT

A

12"Ø

X1

10"Ø

X1

10"Ø

A

12"Ø

X1

8"Ø

X1

8"Ø

14Ø

VAV-107

24x12

Ø

VAV-106

X1

10"Ø

TYP 3

VAV-105A

X1

12"Ø

A

12"Ø

X1

12"Ø

X1

12"Ø

TYP 3

TYP 2

A

8"Ø

X1

8"Ø

VAV-105B

10Ø

18Ø

14x10

X1

8"Ø

X1

8"Ø

TYP 8

Ø

VAV-104B

28x12

Ø

V A

V

C

A

12"Ø

TYP 2

14x14

28x12

VAV-104A

X1

8"Ø

X1

10"Ø

X1

8"Ø

X1

10"Ø

X1

10"Ø

X2

10"Ø

X1

10"Ø

X1

10"Ø

X1

10"Ø

X1

10"Ø

X1

10"Ø x

V

A

V

34x12

VAV-102A

Ø

16Ø

X1

8"Ø

TYP 6

X1

8"Ø

X1

8"Ø

X1

8"Ø

TYP 2

X1

8"Ø

14Ø

VAV-102B

VAV-104D

10Ø 10x12

X1

8"Ø

TYP 3

T

T

T

T

T

T

T

T

T

T

T

M-402

X1

8"Ø

TYP 18

X1

12"Ø

V

A

V

24Ø

ACC-1

MAINTAIN MFG REQUIRED

CLEARANCES FOR AIRFLOW

AND MAINTENANCE

EPO

20x12

30x30

18x12

B

22x22

RAG

B

22x22

RAG

TYP 2

TYP

Y1

22x12

RAG

TYP

Ø

30x30

M-401

30x30 x

T

T

14Ø10Ø

12x12

B

22x12

RAG

TYP 2

A

12"Ø

TYP 2

VAV-110

M-401

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-101.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

N

MECHANICAL PLAN

1/8" = 1'-0"

MECHANICAL PLAN

RE: 1/MD401,

1/M-401 FOR

CONT

1. COORDINATE NEW DIFFUSER/RETURN GRILLE LOCATIONS WITH

EXISTING LIGHTS, SPRINKLER HEADS, FIRE ALARM, OCCUPANCY

SENSORS, AND ANY OTHER CEILING-MOUNTED EQUIPMENT. ADJUST

DIFFUSER/RETURN GRILLE LOCATIONS AS NECESSARY TO

COORDINATE WITH EXISTING CONDITIONS.

2. REBALANCE EXISTING DIFFUSERS (DENOTED AS X1 AND X2) TO NOTED

CFM.

3. THE FOLLOWING ROOMS SHALL BE EQUIPPED WITH CO2 SENSORS AND

RELATIVE HUMIDITY SENSORS IN ADDITION TO THERMOSTATS.

CONTROLS CONTRACTOR TO COORDINATE LOCATION OF ADDITIONAL

SENSORS WITH EXISTING CONDITIONS TO PRODUCE THE MOST

RELIABLE READINGS. NOTE THAT EXISTING HUMDIFIERS SERVING

ROOM 110 AND ROOM 130A SHALL BE PROVIDED WITH SIGNAL FROM

NEW HUMIDITY SENSORS. OTHERWISE, CONTROL OF EXISTING

HUMIDIFIERS SHALL BE UNCHANGED.

3.1. CO2 SENSORS: BREAKROOM (RM 122), CLASSROOM (131)

3.2. HUMIDITY SENSORS: AIS SHOP (110), SENSOR SHOP (130A)

4. WHERE NEW VAV BOXES CONNECT TO EXISTING DUCTWORK, PROVIDE

TRANSITIONS AS NOTED IN DETAILS (RE: 2/M-502).

5. CONTRACTOR SHALL COORDINATE LOCATIONS OF ALL EQUIPMENT

REQUIRING SERVICE WITH OWNER PRIOR TO PLACEMENT.

CONTRACTOR SHALL CLEARLY INDICATE THE SERVICE ACCESS

PROVIDED FOR EACH PIECE OF EQUIPMENT.

GENERAL NOTES

M-101

RE: 1/M-401

FOR CONT

RE: 1/M-401 FOR

DUCTWORK SIZE

SCALE: 1/8''= 1'-0"

0 8'8' 4'

VAULT

ECM OFFICE

BRANCH ADMIN

BRANCH OFFICE

CORRIDOR

AIS OFFICE

AIS SHOP

POWER ROOM

LOCKER

MECHANICAL

MEN'S

WOMEN'S

WEAPONS RELEASE MAINTENANCE

GUN MAINTENANCE

STORAGE

VEST

EXPOSURE ROOM

NDI PENETRATION

FILM PROCESS

NDI STORAGE

NDI ADMIN

NDI ROOM

CLASSROOM

SENSOR OFFICE

130A

SENSOR SHOP

MATERIAL CONTROL

PMEL OFFICE

PMEL STORAGE

126A

MATERIAL CONTROL SUPERVISOR

MUNITIONS SERVICES

MUNITIONS ADMIN

MUNITIONS CHIEF

123A

VEST

BREAKROOM

WEAPONS LOADING STORAGE

DP

VAV-109

VAV-108

VAV-106

VAV-105A

VAV-105B

VAV-104B

V A

V

C

VAV-104A

VAV-103

VAV-102A

VAV-104D

M-401

VAV-101

ACC-1

4" CHWS/R TO

MECHANICAL ROOM

ISOLATION

VALVE, TYP

BT-1, MOUNT ON 6"

HOUSEKEEPING PAD,

RE: 4/M-502 FOR DETAIL

3/4" HWS/R

RE: 2/M-502 FOR COIL

CONNECTION DETAIL, TYP

VAV-107

2" HWS/R

1" HWS/R

1 1/2" HWS/R

1 1/4" HWS/R

1 1/2" HWS/R

3/4" HWS/R

RE: 1/M-402

FOR CONT

VAV-102B

2" CHWS/R

1 1/4" HWS/R

2" HWS/R

1" HWS/R

ISOLATION BALL

VALVE, TYP

VAV-110

M-402

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-102.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

N

MECHANICAL PIPING PLAN

1/8" = 1'-0"

MECHANICAL PIPING PLAN

1. ALL HWS/R RUNOUTS SHALL CONFORM IN SIZING TO THE FOLLOWING:

1.1. BELOW 1.5 GPM - 1/2"

1.2. BELOW 3.5 GPM - 3/4"

1.3. BELOW 7 GPM - 1"

1.4. BELOW 14 GPM - 1 1/4"

2. DO NOT ROUTE NEW HWS/R OR CHWS/R PIPING OVER EXISTING

TESTING STATIONS OR OTHER ELECTRONIC EQUIPMENT. WHERE IT IS

NOT POSSIBLE TO AVOID THIS CONDITION, RECEIVE APPROVAL FROM

OWNER PRIOR TO ROUTING PIPING OVER EQUIPMENT. PIPING PASSING

OVER EQUIPMENT SHALL BE PROVIDED WITH DRAIN PAN UNDER PIPING

EXTENDING 5'-0" ON EITHER SIDE OF EQUIPMENT. A MOISTURE SENSOR

SHALL BE INSTALLED IN DRAIN PAN AND A MOISTURE ALARM SHALL BE

PROVIDED AT THE BMCS UPON MOISTURE DETECTION.

GENERAL NOTES

M-102

SCALE: 1/8''= 1'-0"

0 8'8' 4'

ECM POD MAINTENANCE

ECM POD STORAGE

x x x

X2

14x8

X2

14x8

X2

14x8 x

T T

B

42x20

RAG

36x24

C

42x20

C

42x20

C

42x20

C

42x20

EXISTING

HOUSEKEEPING

PAD TO REMAIN

EXISTING S/A

DUCTWORK TO

REMAIN, TYP

CRAC-1, MOUNT ON EXISTING

HOUSEKEEPING PAD AND CONNECT

TO EXISTING S/A AND R/A DUCTWORK

THROUGH WALL

PROVIDE PLENUM SIZED EQUAL TO EXISTING

WALL PENETRATION AND TURN UP ALONG

WALL AS HIGH AS POSSIBLE; TAP NEW 36x24

OFF NEW PLENUM USING HEEL-TOE TAP TO

SERVE SPACE

20x20 S/A

22x22 S/A

20x14 S/A x

S

A x

S

A x

S

A x

S

A x

S

A x

S

A

76x26 R/A x

R

A

EPO

CHWP-1

B-1

B-2

AHU-1

EXISTING

COMPRESSOR

HWP-1,2

36x24 O/A

BMCS

EXISTING

EXHAUST FAN

EXISTING

INTAKE

CHWP-2

MECHANICAL

NEW MVD,

TYP 9

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-401.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

ECM POD MAINTENANCE AND STORAGE

ENLARGED HVAC PLAN

1/4" = 1'-0"

MECHANICAL ENLARGED

PLANS

RE: 1/M-101

FOR CONT

KEYPLAN

N

MECHANICAL ROOM

ENLARGED HVAC PLAN

1/4" = 1'-0"

RE: 1/M-101

FOR CONT

RE: 1/M-101

FOR CONT

N

RE: 1/M-101

FOR CONT

RE: 1/M-101

FOR CONT

RE: 1/M-101

FOR CONT

RE: 1/M-101

FOR CONT

RE: 1/M-101

FOR CONT

RE: 1/M-101

FOR CONT

TYP 9

RE: 1/M-101

FOR CONT

M-401

SCALE: 1/4''= 1'-0"

0 4'4' 2'

SCALE: 1/4''= 1'-0"

0 4'4' 2'

TYPE B3 FINAL SUBMITTAL

4" CHWS

4" CHWR

C

H W

R

C

H W

S

RE: 1/M-102

FOR CONT

ET-1

2 1/2" G(E)

4"

2 1/2" HWS4" HWS

H

W S

3" HWR

H

W R

3/4" HWS

3/4" HWR

3/4" HWS/R TO

VAV-109

RE: 1/M-102

FOR CONT

2" CHWR

2" CHWS

UH(E)

AS-2

B-1

B-2

ET-2

DP

CHWP-1

CHWP-2

AHU-1

EXISTING

COMPRESSOR

BOILER SECONDARY

PUMPS HWP-1 AND

HWP-2

BOILER PRIMARY

PUMPS HWP-3 AND

HWP-4, IN VERTICAL

1 1/2" G DN

TO BOILER

1 1/2" G DN

TO BOILER

4" HWR

AS-1

FS-1

4" COMMON

PIPE

MECHANICAL

ECM POD MAINTENANCE

ECM POD STORAGE

RE: 1/M-102

FOR CONT

RE: 1/M-102

FOR CONT

2" CHWR

2" CHWR

H

W R

H

W S

CRAC-1, RE: 4/M-501

FOR COIL CONNECTION

DETAILS

CONNECT UNIT TO EXISTING

DOMESTIC COLD WATER

(DCW) PIPING SERVING

EXISTING UNIT; DCW SHALL

BE CONNECTED FOR

HUMIDIFICATION PURPOSES

ROUTE FULL-SIZED

TRAPPED CONDENSATE

TO EXISTING FLOOR

DRAIN

PROJECT NUMBER: XHZG182005

VOLUME 1 OF 1

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-402.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

MECHANICAL ENLARGED

PLANS

N

MECHANICAL ROOM

ENLARGED PIPING PLAN

1/4" = 1'-0"

ECM POD MAINTENANCE AND STORAGE

ENLARGED PIPING PLAN

1/4" = 1'-0"

KEYPLAN

N

M-402

SCALE: 1/4''= 1'-0"

0 4'4' 2'

SCALE: 1/4''= 1'-0"

0 4'4' 2'

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-501.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

MECHANICAL DETAILS

4"

NOTES:

1. PROVIDE UNIONS OR FLANGES AS

NECESSARY TO ALLOW FOR

REMOVAL OF PIPING FROM

EQUIPMENT AND ACCESSORIES

REQUIRING PERIODIC

MAINTENANCE.

2. THERMOMETERS TO BE SOLAR

POWERED DIGITAL TYPE.

3. PROVIDE TEST WELLS ADJACENT

TO THERMOMETERS OR CONTROL

SENSORS.

4. REFER TO SPECIFICATIONS FOR

VALVE TYPES.

CHWS

4"

4"

3/4"

3/4"

RE: 1/M501,

TYP

CHEMICAL

FEEDER

RE: 5/M-503

ACC-1

4"

CHWP-1

FROM BLDG

TO BLDG

4"

TO FD

CHWP-2

4"

3/4" DCW MAKE-UP

3/4"

3/4"

TO FD

M

1-1/4"

PRE-CHARGING AIR

CONNECTION

RPZ BACK FLOW

PREVENTER

W/ STRAINER

PRESSURE REDUCING

VALVE SET @ 20 PSI

WATER METER

GLOBE VALVE

BY-PASS

HIGH CAPACITY FLOAT TYPE

AIR VENT

AUTOMATIC

AIR VENT

PRESSURE GAUGE

CONNECT TO SIDE OF MAIN.

AVOID TOP OR BOTTOM

CONNECTION TO PREVENT AIR

OR DEBRIS FROM ENTERING

PIPE TO TANK.

PROVIDE ANTI-THERMOSYPHON

LOOP TO PREVENT GRAVITY

HEATING OF TANK. 12" DROP

MINIMUM.

SHUT-OFF VALVE

DRAIN-VALVE WITH

HOSE CONNECTION

AS-1

ET-1

AIR HANDLING UNIT COIL PIPING (TWO-WAY)

(SINGLE COIL CONNECTIONS)

NOT TO SCALE

AIR VENT (3/4" GATE

VALVE WITH CAP)

THERMOMETER WITH

SEPARABLE SOCKET

COIL AIR VENT

VALVE W/PLUG

HOT WATER OR

COOLING COIL

PRESSURE INDEPENDENT

FLOW CONTROL VALVE

REDUCER

UNION

CHWR & HWR

PIPING

CHWS & HWS PIPING

BALL VALVE (UP TO 1-1/2")

GATE VALVE (2" & OVER)

Y-STRAINER w/ BLOW-OFF

VALVE

PRESSURE GAUGE

W/GATE VALVE

3/4" DRAIN W/GATE VALVE

& HOSE COUPLING

3/4" COIL DRAIN VALVE

W/HOSE COUPLING

CHILLED WATER SYSTEM PIPING SCHEMATIC

NOT TO SCALE

BASE ELBOW DETAIL

NOT TO SCALE

CENTERLINE

OF PIPE

WELD SUPPORT

TO CENTERLINE

OF ELBOW

2" PIPE

ANCHORED

FLOOR FLANGE

BASE MOUNTED END SUCTION PUMP DETAIL

NOT TO SCALE

P & T PLUG

(TYP)

FLEXIBLE

CONNECTION

SUCTION DIFFUSER W/

STRAINER AND BLOW-OFF

VALVE

SHUT-OFF VALVE,

TYP

CHECK VALVE

PRESSURE GAUGE

W/ GATE VALVES

CONCENTRIC

REDUCER

SHAFT COUPLING

GUARD

END SUCTION BASE

MOUNTED PUMP

LEVEL, SHIM, ANCHOR AND

GROUT BASE PER MFG

REQUIREMENTS

6" HOUSEKEEPING

PAD

MAINTAIN CLEARANCE FOR

REMOVING STRAINER

DETAIL NOTE:

1. INSTALL PUMP PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND

RECOMMENDATIONS. THE PUMP MANUFACTURER'S INSTALLATION

INSTRUCTIONS SHALL HAVE PRECEDENCE OVER SPECIFICATIONS AND

DRAWINGS WHERE THERE IS A CONFLICT.

3/4" HOSE BIBB DRAIN

WITH CAP

STANCHION SUPPORT ON

SUCTION END AS

REQUIRED

FINISHED FLOOR

INLINE PUMP DETAIL

NOT TO SCALE

CHECK

VALVE

CIRCUIT SETTER

(HWP-3,4 ONLY)

FLANGED OR UNION

CONNECTION, TYP

INLINE

PUMP

ROUTE TO

NEAREST FD

Y-STRAINER W/

SCREWED END

SHUT-OFF

VALVE

PRESSURE

GAUGE

PIPE HANGERS - PROVIDE

DOUBLE DEFLECTION

NEOPRENE FOR FIRST TWO

ON EACH SIDE OF PUMP.

DETAIL NOTE:

1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM

MOTOR.

FM

FLOW METER FOR

MINIMUM PUMP

FLOW CONTROL

TO BUILDING

FROM BUILDING

P

DIFFERENTIAL

PRESSURE

TRANSMITTER

3/4"

4"

MINIMUM FLOW

BYPASS VALVE

CIRCUIT

SETTER SET

AT 160 GPM

BT-1

M-501

B316 HVAC RENOVATION

JDFSKG

HGFEDCBA

V O

K A

N G

B

H

V A

C

U p g r a d e

D r a w i n g s S h e e t M d

P

M

P l o t t e d

B y j b o w m a n

P b l e

C

Y N

T

P

L O

T c t b

O R

I G

I N

A L

S

E A

L E

D

A

G

N E

D

D

R A

W I N

G S

A R

E

O

N

F

I

T

F

I C

E

O

F

T

S

E

C I V

I L

E

N G

I N

E E

R

138TH FIGHTER WING

ApprovedDate DescriptionSymbol

DATE:

FILE NAME:

DESIGNED BY:

DWN BY: CHK BY:

PLOT DATE: 06/29/2018

PLOT SCALE: AS INDICATED

CONTRACT NUMBER:

SHEET

REFERENCE

NUMBER

Sheet of

06/29/2018

VOLUME 1 OF 1

COMBA

A I R

MAND

COM

T

OKLAHOMA AIR NATIONAL GUARD

TULSA I.A.P. OK.

BCE: MAJOR PHILIP DELONG, P.E.

SKG

810 S CINCINNATI, SECOND FLOOR

TULSA, OK 74019

918.877.6000

M-502.DWG

ENGINEER OF RECORD

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2020

W912L6-13-D-0002/0020

T Y

N

B

M I T

T A

L

J U

I S

S U

S

S U

N

S T

R U

C T

I O

N

TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018

TYPE B-3 FINAL SUBMITTAL 06/29/2018

L

I

C

E

N S

E

D

P

R

O

F

E

SS

I O

N

A

L

E

N

G

I N

E

E

R

O

K

L

A H

O

M

A

JEFFERY

DON

FERGUSON

19755

JEFFERY D. FERGUSON, P.E.

MECHANICAL DETAILS

CHILLER PIPING DETAIL

NOT TO SCALE

TYPICAL VAV BOX WITH HOT

WATER REHEAT DETAIL

NOT TO SCALE

VAV MOUNTING DETAIL

NOT TO SCALE

H

W

S

H

W

R

INSULATED (WRAPPED)

MEDIUM PRESSURE S/A

DUCT

CONICAL

REDUCER

RIGID SPIRAL DUCT

PROVIDE REDUCER AS SHOWN ON DRAWINGS AND PROVIDE A

SECTION OF STRAIGHT RIGID DUCT AT THE UNIT INLET WITH

LENGTH AS RECOMMENDED BY THE MANUFACTURER, BUT IN

NO CASE LESS THAN FOUR (4) TIMES THE DIAMETER OF THE

UNIT INLET CONNECTION. REDUCERS CONNECTED TO THE

INLET OF THE VAV BOX ARE NOT ALLOWED.

1/2" AIR

VENT

PROVIDE TRANSITION

TO FIT VAV BOX. MAX

ANGLE PER SMACNA

INSULATED (WRAPPED)

RECTANGULAR LOW

PRESSURE DUCT. SEE

PLANS FOR DUCT

CONTINUATION AND SIZES

VAV DAMPER

OPERATOR

AUTOFLOW CONTROL

VALVE

SHUT-OFF

VALVE (TYP)

STRAINER W/

BLOW-OFF

VALVE TYP

3/4" DRAINPRESSURE-INDEPENDENT

CONTROL VALVE

WITH INTEGRAL

FLOW CONTROL

SIDE VIEW

CONNECTION TO STRUCTURAL

SUPPORTING MEMBER

TYPE 48 SPRING CUSHION

VIBRATION ISOLATOR (TYP)

FCU/CRAC/VAV

1/2"Ø THREADED

ROD (TYP)

CHWR

CHWS

AAV

FLANGED UNION

(TYP 2)

BUTTERFLY

ISOLATION

VALVE, TYP

FLEXIBLE CONNECTION, LOCATE

AS CLOSE TO CHILLER AS

CONDITIONS PERMIT (TYP 2)

THERMOMETER

(TYP 2)

AUTOMATIC AIR VENT

(TYP 2)

PRESSURE GAUGE

(TYP 2)

AAV

DRAIN VALVE WITH

HOSE BIBB, TYP 2

DETAIL NOTES:

1. PIPING LOCATIONS ARE SHOWN FOR SCHEMATIC PURPOSES ONLY AND MAY NOT REFLECT THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .