This federal contract opportunity is a solicitation to replace the existing HVAC and HVAC controls systems in Building 316 at an Army National Guard facility. The project includes demolishing all existing HVAC equipment other than the new chiller and chilled water pumps and associated piping. It also requires demolishing all HVAC controls and replacing them with an Automated Logic Controls system, as justified in the solicitation. The electrical components serving the systems must be replaced as well. Bidders must perform all work according to the drawings and specifications provided. Offerors are invited to submit proposals in response to solicitation number W50S8U-20-B-0002 by the date specified for award of a firm fixed price contract for HVAC repair and replacement services at a National Guard facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sealed Bid OF 1419A B316 HVAC.pdf | ||
| Sealed Bid OF 1419 B316 HVAC.pdf | ||
| Bid Opening Sign In Sheet 9Sep20_Redacted.pdf | ||
| Pre-Bid RFI 316 HVAC Project 09-01-2020.pdf | ||
| Bid Bond Checklist Sealed Bid.pdf | ||
| Compliance Checklist Sealed Bids.pdf | ||
| B316 Site Visit Minutes.pdf | ||
| Site Visit Slides 316 HVAC.ppt | PPT presentation | |
| B316 Site Visit Sign In Redacted.pdf | ||
| 138FW Safety Accident Prevention Guide_2018.pdf | ||
| B316 XHZG182005 - Spec Manual.pdf | ||
| NDI Floor Drain Demo Plan.pdf | ||
| W50S8U-20-B-0002.pdf | ||
| Bldg 316 Interior Drains.pdf | ||
| 316 HVAC AF 66 modified 1.2.pdf | ||
| Brand Name 316 HVAC JA 1.4_Redacted.pdf | ||
| NDI floor drain plan.pdf | ||
| SOW 1.07 316 HVAC Repair 2020.pdf | ||
| EMS Commitment Statement.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t G d w g
P
M
P l o t t e d
B y j b o w m a n
P e n
T a b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
N D
S
I G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I L E
A
T
H
O
F F
I C
E
O
F
T
B
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
G-001.DWG
ENGINEER OF RECORD
W912L6-13-D-0002/0020
T Y
P
N
U B
M I T
T A
L
J U
I S
S U
R
S
S U
C
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
BUILDING 316 HVAC RENOVATION
PROJECT NO. XHZG182005
OKLAHOMA AIR NATIONAL GUARD
TULSA, OKLAHOMA
COMBA
A I R
MAND
COM
T
PROJECT KEY MAP
PROJECT LOCATION
COVER SHEET
G-001
SHEET INDEX
GENERAL
G-001
COVER SHEET
ARCHITECTURE
A-101
REFLECTED CEILING PLAN
M-001
MECHANICAL SYMBOLS AND ABBREVIATIONS
MD101
MECHANICAL DEMOLITION PLAN
MD401
MECHANICAL ENLARGED DEMOLITION PLANS
M-101
MECHANICAL ENLARGED DEMOLITION PLANS
M-102
MECHANICAL PLAN
M-401
MECHANICAL PIPING PLAN
M-402
MECHANICAL ENLARGED PLANS
M-501
MECHANICAL ENLARGED PLANS
ELECTRICAL
E-001
ELECTRICAL NOTES AND SYMBOLS
ED101
ELECTRICAL DEMOLITION PLAN
ED401
ELECTRICAL ENLARGED DEMOLITION PLAN
ED501
ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
E-101
ELECTRICAL PLAN
E-501
ELECTRICAL ONE-LINE DIAGRAM
E-601
ELECTRICAL SCHEDULES
M-002
MECHANICAL NOTES AND KEYNOTES
M-502
MECHANICAL DETAILS
MECHANICAL
MD402
M-504
M-601
M-602
M-701
M-702
M-703
M-704
M-705
M-706
MECHANICAL DETAILS
MECHANICAL DETAILS
MECHANICAL SCHEDULES
MECHANICAL SCHEDULES
MECHANICAL CONTROLS
MECHANICAL CONTROLS
MECHANICAL CONTROLS
MECHANICAL CONTROLS
MECHANICAL CONTROLS
MECHANICAL CONTROLS
14M-503
MECHANICAL DETAILS
B316 HVAC RENOVATION
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t A d
P
M
P l o t t e d
B y e w h i t e
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
A-101.DWG
ARCHITECT OF RECORD
W912L6-13-D-0002/0020
DFPEEW
EEW
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
DAVID F.
PHELPS
S
T
E
O
F
O K
A
H
T
O
A
M
A
L
L
C
E
N
E
D C
H
E
C
I
S
AR
I
T
T
DAVID F. PHELPS, A.I.A.
REFLECTED CEILING PLAN
A. AREAS DENOTED BY BOUNDARY REPRESENT
SCOPE OF CEILING REMOVAL REQUIRED FOR
REMOVAL OF EXISTING EQUIPMENT AND
DUCTWORK AND INSTALLATION OF NEW
EQUIPMENT AND DUCTWORK AS
DETERMINED BY ENGINEER.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL CEILING REMOVAL AND REPLACEMENT
NECESSARY TO ACHIEVE THE
REQUIREMENTS OF THESE DRAWINGS.
CONTRACTOR TO VERIFY SCOPE OF CEILING
REPLACEMENT PRIOR TO BID.
C. CONTRACTOR SHALL RECORD THE LOCATION
OF EXISTING SERVICES (LIGHTS, SPRINKLER
HEADS, SENSORS, DIFFUSERS, GRILLES,
ETC.) PRIOR TO CEILING REMOVAL. UPON
REPLACEMENT OF CEILING GRID,
CONTRACTOR SHALL REPLACE ALL EXISTING
SERVICES BACK TO THEIR EXISTING
LOCATIONS, EXCEPT AS NOTED IN THESE
DRAWINGS.
D. REMOVE, PROTECT, AND REINSTALL IN SAME
LOCATIONS OR AS INDICATED ON DRAWINGS
FIRE SUPPRESSION AND ALARM EQUIPMENT,
CAMERAS AND EQUIPMENT, SPEAKERS, ETC.
E. REMOVE, PROTECT, AND REINSTALL IN SAME
LOCATIONS OR AS INDICATED ON DRAWINGS
LIGHT FIXTURES.
F. REFER TO MECHANICAL DRAWINGS FOR
SCOPE OF WORK AND DIFFUSER LOCATIONS.
1. THESE DRAWINGS ARE PREPARED FROM
LIMITED FIELD OBSERVATION AND INTERNAL
PLAN FILES PROVIDED BY OWNER.
SELECTED AREAS OF THE EXISTING
CONSTRUCTION WERE INACCESSIBLE FOR
VERIFICATION. CONTRACTOR SHALL
CONFIRM THE WORK IS BUILDABLE TO THE
EXISTING CONDITIONS AS SHOWN.
2. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL GENERAL CONDITIONS AND
PROJECT REQUIREMENTS WITH THE OWNER
PRIOR TO CONSTRUCTION START.
CONTRACTOR IS RESPONSIBLE FOR VISITING
THE SITE AND VERIFYING EXISTING
CONDITIONS AND CONTRACT DOCUMENTS
PRIOR TO BID SUBMITTAL.
3. ALL CONTRACTORS, SUBCONTRACTORS,
VENDORS, AND MATERIAL SUPPLIERS SHALL
BE RESPONSIBLE FOR REVIEWING THE
COMPLETE SET OF DOCUMENTS. FAILURE TO
REVIEW ALL CONSTRUCTION DOCUMENTS
WILL NOT RELIEVE ANY CONTRACTORS OR
SUBCONTRACTORS FROM PERFORMING
WORK OR PROVIDING MATERIALS REQUIRED
FOR THE COMPLETION OF THIS PROJECT AS
DEFINED WITHIN THE DOCUMENTS AT TIME
OF BID. GENERAL CONTRACTOR SHALL
COORDINATE ALL WORK PERFORMED BY
OTHER SUBCONTRACTORS. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE
OWNER'S ATTENTION BEFORE PROCEEDING
WITH WORK.
4. THE CONTRACTOR SHALL COORDINATE
WORK WITH EXISTING FIRE PROTECTION
PIPING AND/OR SPRINKLER HEADS. ANY
WORK ASSOCIATED WITH MODIFYING THESE
SYSTEMS SHALL BE PERFORMED BY A
LICENSED AND APPROVED CONTRACTOR.
NEW SPRINKLER HEADS SHALL MATCH
EXISTING; FIELD VERIFY MANUFACTURER
AND MODEL NUMBER. FIRE PROTECTION
CONTRACTOR SHALL INFORM THE BUILDING
SECURITY OFFICE EVERY DAY WHEN A
SHUTDOWN OF SPRINKLER SYSTEM IS
REQUIRED FOR CONSTRUCTION. THE
CONTRACTOR SHALL RECONNECT AND FILL
THE SPRINKLER SYSTEM INTO WORKING
CONDITION AT THE END OF EACH WORKING
DAY TO ASSURE PROTECTION DURING
UNOCCUPIED PERIODS.
EXISTING SUSPENDED CEILING
EXISTING GYPSUM CEILING
RECESSED CAN LIGHTS
EXIT LIGHTS
LIGHT FIXTURES
EMERGENCY BACK UP
LIGHT FIXTURES
MECHANICAL DIFFUSERS
FIRE SPRINKLER HEADS
A-101
N
REFLECTED CEILING PLAN
NOT TO SCALE
REMOVAL/REPLACEMENT
OF CEILING TILE AND GRID,
ACT1
ACT1
ARMSTRONG; FINE FISSURED #1728;
COLOR: WHITE; SIZE: 24X24X
"; GRID:
PRELUDE XL
"; GRID COLOR: WHITE
MARK DESCRIPTION
RCP LEGEND
RCP LEGEND
GENERAL RCP NOTES
RCP LEGEND
ACT1
ACT1
ACT1
ACT1
1541174164M Rectangle
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-001.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
M-001
MECHANICAL SYMBOLS AND
ABBREVIATIONS
A
AC AIR COMPRESSOR
ACC AIR COOLED CHILLER
ACFM ACTUAL CUBIC FEET PER MINUTE
ADD ADDENDUM
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
APD AIR PRESSURE DROP
AR AIR RECEIVER
AS AIR SEPARATOR
B
B BOILER
BA BREATHING AIR, COMPRESSED
BAC BREATHING AIR COMPRESSOR
BCU BLOWER COIL UNIT
BFPD BACK FLOW PREVENTION DEVICE
BFW BOILER FEED WATER
BTUH BRITISH THERMAL UNIT PER HOUR
C
CA COMPRESSED AIR
CC COOLING COIL
CD CONDENSATE DRAIN
CF CEILING FAN
CFM CUBIC FEET PER MINUTE
CH CHILLER (WATER COOLED)
CHWP CHILLED WATER PUMP
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
CL CENTER LINE
CO CLEANOUT
CONT CONTINUATION
CP PUMPED CONDENSATE
CT COOLING TOWER
CU CONDENSING UNIT
CWP CONDENSER WATER PUMP
CWS CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
D
DCW DOMESTIC COLD WATER
DN DOWN
DOAU DEDICATED OUTDOOR AIR UNIT
DP DEWPOINT
DWG DRAWING
E
(E) EXISTING TO REMAIN
E/A EXHAUST AIR
EAG EXHAUST AIR GRILLE
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EEW EMERGENCY EYE WASH
EF EXHAUST FAN
ENGR ENGINEER
EPO EMERGENCY POWER OFF
ESP EXTERNAL STATIC PRESSURE
EQUIP EQUIPMENT
ET EXPANSION TANK
EWB ENTERING WET BULB
EWT ENTERING WATER TEMPERATURE
F
F FAHRENHEIT
FCU FAN COIL UNIT
FH FUME HOOD
FLR FLOOR
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT, FEET
G
G NATURAL GAS, LOW PRESSURE
GAL GALLON, GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GCO GRADE CLEAN OUT
GWH GAS WATER HEATER
H
HB HOSE BIBB
HD HEAD
HP HORSEPOWER
HPC HIGH PRESSURE CONDENSATE
HPG NATURAL GAS, HIGH PRESSURE
HPS HIGH PRESSURE STEAM
HWP HOT WATER PUMP
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HEX HEAT EXCHANGER
HT HEIGHT
I
IDU INDOOR UNIT
IH INTAKE HOOD
IN INCH, INCHES
INWC INCHES OF WATER COLUMN
K
KW KILOWATT
K THOUSAND
KH KITCHEN HOOD
L
L LOUVER
LAT LEAVING AIR TEMPERATURE
LB POUND, POUNDS
LDB LEAVING DRY BULB
LPC LOW PRESSURE CONDENSATE
LPS LOW PRESSURE STEAM
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
M
M THOUSAND
MBH THOUSAND BTUH
MFG MANUFACTURER
MPG NATURAL GAS, MEDIUM PRESSURE
MIN MINIMUM
MISC MISCELLANEOUS
MOCP MINIMUM OVER CURRENT PROTECTION
MPC MEDIUM PRESSURE CONDENSATE
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
N
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN or NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O/A OUTSIDE AIR
ODU OUTDOOR UNIT
P
PH PHASE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAGE
Q
QT TOTAL CAPACITY
QS SENSIBLE CAPACITY
QL LATENT CAPACITY
R
(R) EXISTING TO REMAIN, RELOCATE
R REFRIGERANT
R/A RETURN AIR
RAD REFRIGERATED AIR DRYER
RAG RETURN AIR GRILLE
RD ROOF DRAIN
RE REFER TO
RG REFRIGERANT GAS
RH RELATIVE HUMIDITY/RELIEF HOOD
RL REFRIGERANT LIQUID
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RPS REVOLUTIONS PER SECOND
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
RV RELIEF VALVE
Ø ROUND, DIAMETER
S
S/A SUPPLY AIR
SAG SUPPLY AIR GRILLE
SCFM STANDARD CUBIC FEET PER MINUTE
SF SUPPLY FAN
SP STATIC PRESSURE
SS STAINLESS STEEL
STM STEAM
SQIN SQUARE INCH/INCHES
SQFT SQUARE FOOT/FEET
T
T/A TRANSFER AIR
TAG TRANSFER AIR GRILLE
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
THRU THROUGH
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TYP TYPICAL
U
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNO UNLESS NOTED OTHERWISE
V
V VOLT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
W
W WATT
WB WET BULB
HVAC ABBREVIATIONS
DUCT SECTION, EXHAUST
DUCTWORK TOE-HEEL TAP
(RECTANGULAR TO
RECTANGULAR)
RETURN GRILLE
EXHAUST GRILLE
DUCTWORK CONICAL TAP
(RECTANGULAR TO ROUND)
5'-0" MAX LENGTH FOR
FLEX DUCT
RIGID ELBOW, FLEXIBLE
ELBOWS NOT ALLOWED
RIGID SUPPLY DUCTWORK
90° RECTANGULAR ELBOW
WITH SINGLE THICKNESS
TURNING VANES
90° ROUND ELBOW,
RADIUS/DIAMETER=1.5
45° RECTANGULAR BEND,
RADIUS/DIAMETER=1.5
45° ROUND BEND,
RADIUS/DIAMETER=1.5
DUCTWORK CONICAL TAP
(ROUND-TO-ROUND)
F=FALL IN DUCT ELEV R=RISE
IN DUCT ELEV
NOTE: AIR DISTRIBUTION DEVICES ARE
ARE DENOTED AS ILLUSTRATED BELOW:
90° RECTANGULAR ELBOW
DOWN WITH SINGLE
THICKNESS TURNING VANES
90° RECTANGULAR ELBOW
UP WITH SINGLE THICKNESS
TURNING VANES
LINEAR DIFFUSER, NO ARROWS
INDICATE 2-WAY AIR PATTERN
SIDEWALL REGISTER OR GRILLE
CEILING DIFFUSER SQUARE
PATTERN. NO ARROWS INDICATE
4-WAY AIR PATTERN
DUCT SECTION, RETURN
MVD
SUPPLY DIFFUSER
MAIN DUCTWORK
DIFFUSER
NOTE: SINGLE LINE DUCT TAP SYMBOLS ARE DENOTED
AS ILLUSTRATED BELOW:
RECTANGULAR TO RECTANGULAR
ROUND TO ROUND
RECTANGULAR TO ROUND
DUCT SIZE TRANSITION
CEILING DIFFUSER ROUND
PATTERN. NO ARROWS
INDICATE 4-WAY AIR PATTERN
DUCT SECTION, SUPPLY
90° ROUND ELBOW DOWN
90° ROUND ELBOW UP
S/A DIFFUSER WITH FACTORY
INSTALLED QUADRANT BLANKS.
PROVIDE BLANKS AS SHOWN ON
DRAWINGS.
FIRE/SMOKE DAMPER
DEFINITION OF LINEWEIGHTS AND LINETYPES:
OUTLINE OF NEW EQUIPMENT
INSTALLED ABOVE THE FLOOR
SHOWN (I.E., ROOF)
XXX-X
EQUIPMENT TAG
EQUIPMENT NUMBER
BFW
CHWS
CHWR
BA
CA
CD
CP
LPC
MPC
HPC
CWS
CWR
HWS
HWR
S
MPS
HPS
RG
RL
RS REFRIGERANT SUCTION
REFRIGERANT LIQUID
REFRIGERANT GAS
STEAM, HIGH PRESS 125 PSI & ABOVE
STEAM, MED PRESS 16-124 PSI
STEAM, LOW PRESS 0-15 PSI
HEATING WATER RETURN
HEATING WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
CONDENSATE, HIGH PRESS
125 PSI & ABOVE
CONDENSATE, MED PRESS 16-124 PSI
CONDENSATE, LOW PRESS 0-15 PSI
CONDENSATE, PUMPED
CONDENSATE, DRAIN
COMPRESSED AIR
COMPRESSED AIR, BREATHING AIR
CHILLED WATER RETURN
CHILLED WATER SUPPLY
BOILER FEED WATER
PIPE LABEL DESCRIPTION
SYMBOL DESCRIPTION
SYMBOL DESCRIPTION
AUTOMATIC AIR VENT
BACKFLOW PREVENTER
BALL VALVE
BASKET STEAM TRAP
BLIND FLANGE
BUTTERFLY VALVE
CAP
CHECK VALVE
CHECK VALVE, SILENT
CIRCUIT SETTER
COMPRESSED AIR CONNECTION
CONTROL VALVE, 2-WAY
CONTROL VALVE, 3-WAY
FLEXIBLE CONNECTOR
GATE VALVE
GATE VALVE, ANGLE
GENERAL VALVE, SEE SPECS
GLOBE VALVE
GLOBE VALVE, ANGLE
PLUG VALVE
PRESSURE AND TEMPERATURE RELIEF
PRESSURE REDUCING STATION, STEAM
PRESSURE REDUCING VALVE
RELIEF VALVE, ASME
SOLENOID VALVE
STRAINER
SUCTION DIFFUSER
THERMOSTAT, HUMIDISTAT
TRIPLE DUTY VALVE
UNION
VENTURI
RISER DOWN (ELBOW)
RISER UP (ELBOW)
RISE OR DROP
TEE DOWN
TEE UP
TOP CONNECTION
BOTTOM CONNECTION
SIDE CONNECTION
FLOW IN DIRECTION OF ARROW
PIPE SLOPE IN DIRECTION OF ARROW
TIE-IN TO EXISTING AT THIS POINT
REMOVE EXISTING TO THIS POINT
PUMP
DEVICE TYPE, REFER TO SCHEDULE
AIRFLOW IN CFM
NECK SIZE IN INCHES
XXxXX
XXX
NEW CONSTRUCTION
EXISTING TO REMAIN
DEMOLITION
PRS
PSD
T H
45° RECTANGULAR BEND
END CAP
F
AAV
TYPICAL RUNOUT:
S
HT CO2
TEMPERATURE, HUMIDITY & CO2 SENSOR
X
FS
FIRE DAMPERF
SMOKE DAMPERS
DAMPER SYMBOLS:
MOTORIZED DAMPERM
HVAC SYMBOLS LEGEND
DUCTWORK SPIN-IN TAP
(RECTANGULAR TO ROUND)
R REFRIGERANT
DUCTWORK 45° LATERAL TAP
(ROUND-TO-ROUND)
DUCTWORK 90° TAP
(ROUND-TO-ROUND)
SMOKE DETECTORSD
X"Ø
(e.g., 6"Ø)
ROUND DUCT SIZE IN INCHES
XxX
(e.g., 10x10)
RECTANGULAR DUCT SIZE IN INCHES
SIDEWALL GRILLE
RECTANGULAR TO ROUND
TRANSITION
33 30
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-002.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
MECHANICAL NOTES AND
KEYNOTES
DUCTWORK SEALANT SCHEDULE
DUCT
LOCATION
DUCT TYPE
SUPPLY
EXHAUST RETURN
≤ 2 INWC > 2 INWC
OUTDOOR A A C A
UNCONDITIONED SPACES B A C B
CONDITIONED SPACES C B B C
SEALING REQUIREMENTS:
SEAL LEVEL A - ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL
PENETRATIONS. PRESSURE-SENSITIVE TAPE SHALL NOT BE USED AS THE PRIMARY
SEALANT, UNLESS IT HAS BEEN CERTIFIED TO COMPLY WITH UL-181A OR UL-181B
BY AN INDEPENDENT TESTING LABORATORY AND THE TAPE IS USED IN ACCORDANCE WITH THAT
CERTIFICATION.
SEAL LEVEL B - ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS PRESSURE-SENSITIVE TAPE SHALL NOT BE
USED AS THE PRIMARY SEALANT, UNLESS IT HAS BEEN CERTIFIED
TO COMPLY WITH UL-181A OR UL-181B BY AN INDEPENDENT TESTING LABORATORY
AND THE TAPE IS USED IN ACCORDANCE WITH THAT CERTIFICATION.
SEAL LEVEL C - TRANSVERSE JOINTS ONLY.
M-002
1. DEMOLISH EXISTING AS REQUIRED FOR NEW CONSTRUCTION AS DIRECTED BY
CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR AS NOTED ON
DRAWINGS. AVOID DISRUPTION OF SERVICES DURING NORMAL BUSINESS
HOURS. ALL SYSTEM SHUT-DOWNS AND DISRUPTION OF BUILDING SERVICES
SHALL BE COORDINATED WITH COR AND SCHEDULED AFTER NORMAL BUILDING
HOURS OR AS OTHERWISE APPROVED BY COR.
2. PRIOR TO DEMOLITION FIELD VERIFY AND IDENTIFY ANY EXISTING EQUIPMENT
TO REMAIN IN SERVICE THAT IS SERVED BY SYSTEMS TO BE DEMOLISHED.
NOTIFY COR OF ANY SUCH CONDITIONS AND REMOVE AND/OR RELOCATE THE
SERVICES AS DIRECTED.
3. MEET WITH COR PRIOR TO DEMOLITION TO IDENTIFY WHETHER EXISTING
MATERIALS SYSTEMS, EQUIPMENT, ETC. ARE CONSIDERED SALVAGE OR
DEBRIS. REMOVE DEBRIS FROM SITE AND DISPOSE OF IN AN APPROVED
MANNER. RETURN SALVAGE TO COR IN A LOCATION AND MANNER AS DIRECTED
BY COR.
4. TERMINATE DEMOLISHED SYSTEM SERVICES IN A CONCEALED LOCATION IN AN
APPROVED MANNER. COORDINATE WITH NEW AND EXISTING CONSTRUCTION.
5. FIELD VERIFY EXISTING PIPING LOCATIONS PRIOR TO WORK.
6. VERIFY EXTENT OF DEMOLITION OF SANITARY SEWER, DOMESTIC WATER AND
FIRE PROTECTION PIPING PRIOR TO WORK. ALL DEMOLITION WORK SHALL BE
IN COMPLIANCE WITH APPLICABLE CODES, STANDARDS AND COR.
7. WHERE REQUIRED, COORDINATE EQUIPMENT ELECTRICAL TERMINATION
REQUIREMENTS WITH ELECTRICAL CONTRACTOR.
8. DISPOSE OF METAL AND OTHER WASTE MATERIALS IN PROVIDED RECYCLE
BINS AND FULLY EVACUATE PER BASE ENVIRONMENTAL GUIDELINES.
DEMOLITION NOTES
1. DUCT CONSTRUCTION AND INSTALLATION METHODS SHALL COMPLY WITH
LATEST SMACNA STANDARDS.
2. DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS. DUCT BOARD OR
INTERNALLY LINED DUCT WILL NOT BE ACCEPTED UNLESS NOTED OTHERWISE.
3. ALL WORK AND INSTALLATION SHALL COMPLY WITH APPLICABLE UNIFIED
FACILITIES CRITERIA, BASE DESIGN GUIDES, AND OTHER GOVERNING CODES
AND REGULATIONS OF REGULATORY AGENCIES HAVING JURISDICTION, AND
CONTRACTING OFFICERS REPRESENTATIVE (COR) AND SHALL BE IN
COMPLIANCE WITH ALL INDUSTRY STANDARDS. CODES AND REGULATIONS
SHALL TAKE PRECEDENCE OVER SPECIFICATIONS AND DRAWINGS WHERE
THERE IS A CONFLICT.
4. ROUTING AND MOUNTING LOCATIONS OF HVAC DUCTWORK AND EQUIPMENT
SHALL BE COORDINATED WITH ALL OTHER TRADES.
5. THE DRAWINGS ARE DIAGRAMMATIC BUT SHALL BE FOLLOWED AS CLOSELY AS
ACTUAL CONSTRUCTION AND COORDINATION WITH OTHER TRADES AND
EXISTING CONDITIONS WILL ALLOW. APPROVAL OF COR SHALL BE OBTAINED
BEFORE DEVIATIONS FROM THESE PLANS ARE MADE.
6. OBTAIN AND PAY FOR ALL NECESSARY FEES AND PERMITS.
7. CONTRACTOR SHALL VISIT SITE AND BECOME FULLY INFORMED AS TO THE
EXTENT AND CHARACTER OF THE WORK REQUIRED AND ITS RELATION TO
OTHER WORK. FAILURE TO VISIT SITE SHALL NOT CONSTITUTE A BASIS FOR
FUTURE CLAIMS.
8. PROVIDE ACCESS PANELS WHERE REQUIRED FOR HVAC EQUIPMENT ACCESS
OR WHERE INDICATED ON DRAWINGS. PROVIDE ACCESS PANELS WHERE
INDICATED OR REQUIRED FOR ACCESS TO PIPING AND DUCT WORK
ACCESSORIES; SUCH AS, VALVES, DAMPERS, VENTS, OTHER ACCESSORIES,
ETC. COORDINATE WITH COR.
9. WHERE PRACTICAL TO DO SO, ROUTE HVAC DUCTWORK AS HIGH AS POSSIBLE
ABOVE CEILING TO AVOID CONFLICT WITH LIGHTS.
10. PROVIDE FIRE DAMPERS AT ALL RATED FLOOR PENETRATIONS, RATED WALL
PENETRATIONS AND AS SHOWN FOR ALL SUPPLY AIR, RETURN AIR, TRANSFER
AIR, OUTSIDE AIR, AND EXHAUST AIR DUCTWORK. FIRE DAMPERS AND
INSTALLATIONS SHALL BE PER APPLICABLE FLOOR/WALL RATINGS.
COORDINATE WITH ARCHITECTURAL DRAWINGS. DAMPERS PER UL555/UL555C.
11. ALL SUPPLY, RETURN AND OUTSIDE DUCTS TO BE INSULATED WITH MINIMUM 1
1/2" THICK BLANKET OR BOARD.
12. INSULATED, FLEXIBLE DUCT SHALL BE SUPPORTED PER SMACNA AND
INDUSTRY STANDARDS. MAXIMUM 5'-0" PER HVAC DUCT CONSTRUCTION
STANDARDS, FIGURE 3-9, FLEXIBLE DUCT SUPPORTS.
13. ALL THERMOSTATS, SENSORS, ETC SHALL BE MOUNTED 60" AFF UNLESS NOTED
OTHERWISE (UNO). THERMOSTAT WIRING IS RESPONSIBILITY OF HVAC
CONTRACTOR.
14. ALL HVAC GENERAL NOTES AND KEYNOTES ARE USED FOR ALL HVAC PLANS.
15. MECHANICAL EQUIPMENT SHOWN ON THE PLANS HAVE A SPECIFIC WEIGHT
AND LOCATION. SHOULD THE CONTRACTOR INSTALL EQUIPMENT WITH
DIFFERENT WEIGHTS OR LOCATIONS AS SHOWN, CONTRACTOR SHALL PROVIDE
THIS INFORMATION TO THE STRUCTURAL ENGINEER FOR APPROVAL, PRIOR TO
PURCHASING, CLEARLY INDICATING THE DIFFERENCES IN SIZE, WEIGHT AND
LOCATION. THE ARCHITECT/ENGINEER SHALL NOT BEAR THE COSTS OF SUCH
REVIEWS OR REDESIGNS.
16. THESE DRAWINGS MAKE NO RECOMMENDATION OR ANY OTHER INSTRUCTION
RELATED TO THE PRESENCE OR ABSENCE OF ASBESTOS, LEAD, OR ANY OTHER
MATERIALS REQUIRING REMEDIATION THROUGHOUT THE BUILDING(S) UNDER
CONSIDERATION. IT IS RECOMMENDED THAT THE INTERESTED PARTIES
ENGAGE A FIRM SPECIALIZING IN ABATEMENT AND REMEDIATION FOR THE
PURPOSE OF IDENTIFYING ANY AREAS, SYSTEMS, OR EQUIPMENT REQUIRING
ISOLATION AND ABATEMENT. THE OWNER SHALL DETERMINE THE NEED OF
ANY ABATEMENT AND REMEDIATION AND ADVISE THE CONTRACTOR WHO WILL
BE RESPONSIBLE FOR SAME.
HVAC GENERAL NOTES
INSTALL ALL NECESSARY HARDWARE, SOFTWARE AND WIRING UNDER THIS
CONTRACT TO ALLOW ALL AIR MOVING EQUIPMENT INVOLVED IN THIS PROJECT TO
BE SHUT DOWN AND TO ALLOW ALL OUTSIDE AIR INTAKE, EXHAUST, OR RELIEF
DAMPERS IN THIS PROJECT TO BE CLOSED IN RESPONSE TO ANY PERCEIVED
THREAT OF ATTACK WHERE AIRBORNE AGENTS MAY BE SUSPECTED.
THE SHUTDOWN OF EQUIPMENT AND DAMPER CLOSURES SHALL OCCUR
IMMEDIATELY AND SIMULTANEOUSLY IN RESPONSE TO 1) A MANUAL PUSHBUTTON
SWITCH LOCATED IN THIS FACILITY AS SHOWN ON THE PLANS OR AS DIRECTED OR
2) ACTION TAKEN BY ANY AUTHORIZED PERSONNEL (WITH PROPER USERNAME AND
PASSWORD) THROUGH THE EXISTING BASE HVAC SERVER SOFTWARE FROM ANY
BROWSER ON THE BASE NETWORK.
THE INTENT FOR THIS PROJECT IS TO UTILIZE THE BASE FACILITY ETHERNET LAN
AS THE COMMUNICATION BACKBONE BETWEEN ALL BUILDING AREA CONTROLLERS
AND THE BASE HVAC SERVER AND BETWEEN THE SERVER AND ALL BROWSER THIN
CLIENTS.
THE SHUTDOWN AND DAMPER CLOSURE INITIATED BY THE MANUAL PUSHBUTTON
SWITCH SHALL AFFECT ALL EQUIPMENT IN THIS PROJECT FOR THIS BUILDING ONLY.
THE SHUTDOWNS AND DAMPER CLOSURES INITIATED THROUGH THE BASE HVAC
SERVER SOFTWARE SHALL AFFECT ALL EQUIPMENT IN THIS PROJECT AND SHALL
BE IN CONJUNCTION WITH EQUIPMENT SHUTDOWNS AND DAMPER CLOSURE
ACTIONS IN THIS AND OTHER SURROUNDING BUILDINGS IN THE PERCEIVED THREAT
PLUME AREA (WHERE THE AIRBORNE THREAT RESPONSE SYSTEM HAS BEEN
IMPLEMENTED IN THOSE BUILDINGS). THIS BUILDING SHALL BE ASSIGNED TO
VARIOUS DIFFERENT PLUME AREA GROUPS WITHIN THE BASE HVAC SERVER
SOFTWARE AS DIRECTED AND SHALL BE PROGRAMMED TO SHUT DOWN WITH EACH
GROUP WHEN COMMANDED. WITHIN EACH PLUME GROUP, A SINGLE COMMAND
SHALL SHUT DOWN ALL AIR MOVING EQUIPMENT AND PROVIDE ALL DAMPER
CLOSURES FOR ALL BUILDINGS WITHIN THAT PLUME GROUP.
BUILDING SHUTDOWN AS A RESULT OF THE AIRBORNE THREAT RESPONSE SYSTEM,
WHETHER VIA MANUAL PUSHBUTTON SWITCH OR VIA THE BASE HVAC SERVER
SOFTWARE, IS A CRITICAL ALARM AND SHALL IMMEDIATELY SEND ALARMS TO THE
BASE HVAC SERVER SOFTWARE AND ALL DESIGNATED PERSONNEL (AS DIRECTED
BY THE CONTRACTING OFFICERS REPRESENTATIVE) THROUGH E-MAIL ALERTS TO
PERSONAL COMPUTERS, CELL PHONES, PAGERS, OR OTHER E-MAIL CAPABLE
EQUIPMENT.
AIRBORNE THREAT RESPONSE
SYSTEM (ATRS)
1. FOR EXISTING DUCTWORK NOTED TO REMAIN ON THE PLANS, THE FOLLOWING
SHALL BE COMPLETED PRIOR TO PLACING THE SYSTEM IN SERVICE:
1.1. CLEAN AND RESEAL ALL DUCTWORK. SEALING CLASS SHALL BE PER
DUCTWORK SEALANT SCHEDULE.
1.2. REMOVE AND REPLACE INSULATION.
2. FOR EXISTING PIPING NOTED TO REMAIN, THE FOLLOWING SHALL BE
COMPLETED PRIOR TO CONNECTION TO NEW SYSTEM:
2.1. FLUSH AND CLEAN THOROUGHLY PER BASE STANDARDS.
EXISTING TO REMAIN DUCTWORK AND
PIPING
1. ROOM 127 CURRENTLY IS SERVED BY A GROUND-MOUNTED
PACKAGED UNIT. THIS UNIT SHALL BE REMOVED. ALL
ASSOCIATED DUCTWORK REMOVED. EXISTING WALL
PENETRATIONS SHALL BE PATCHED, SEALED, AND FINISHED
TO MATCH EXISTING WALL CONSTRUCTION.
2. IT IS ASSUMED THAT EXISTING DISTRIBUTION DUCTWORK FOR
ROOM 127 WAS REMOVED WHEN THE PACKAGED UNIT WAS
ADDED.
3. EXISTING HUMIDIFIER AND HUMIDIFICATION WATER PIPING TO
REMAIN. NO CHANGES SHALL BE APPLIED TO EXISTING
HUMIDIFICATION SYSTEM EQUIPMENT OR CONTROLS.
4. EXISTING DX SPLIT FAN COIL AND CONDENSING UNIT AND
ASSOCIATED PIPING, DUCTWORK, DIFFUSERS, AND GRILLES
SHALL BE REMOVED. EXISTING EXTERIOR WALL
PENETRATIONS SHALL BE PATCHED, SEALED, AND FINISHED
TO MATCH EXISTING WALL CONSTRUCTION.
5. EXISTING REHEAT COIL SHALL BE REMOVED. EXISTING
HUMIDIFICATION SYSTEM (WHERE IN EXISTENCE) SHALL
REMAIN.
6. POSITION NEW DIFFUSERS ON THE FRONT SIDE OF AIS
EQUIPMENT.
7. REMOVE EXISTING DIFFUSER RUNOUT CONNECTED TO S/A
MAIN AND RECONNECT TO NEW DUCTWORK AS SHOWN.
8. REMOVE EXISTING S/A PLENUM SERVING EXISTING AHU-1 AND
REMOVE EXISTING S/A TRANSITIONS AND TAPS BACK TO
DUCTWORK OF FULL SIZE AS NOTED.
9. EXISTING R/A MAINS AND DROPS TO REMAIN. REMOVE
EXISTING R/A CONNECTION TO AHU.
10. REMOVE EXISTING 36x18 O/A INTAKE. O/A INTAKE VENTILATOR
ON ROOF TO REMAIN.
11. MOUNT NEW CHILLER ON EXISTING PAD AND SUPPLY WITH
MANUFACTURER'S NEOPRENE ISOLATION PADS.
12. PROVIDE NEW S/A DUCTWORK OF EQUAL SIZE TO EXISTING
AND TRANSITION AS NECESSARY TO MAKE NOTED
CONNECTION TO AHU-1 S/A PLENUM.
13. CONNECT FULL-SIZED R/A PLENUM TO AHU-1.
14. CONNECT EXISTING DROPS FROM R/A MAIN TO NEW R/A
PLENUM.
15. PROVIDE FULL-SIZED O/A INTAKE DN FROM VENTILATOR ON
ROOF. STUB UP FULL-SIZED O/A DUCTWORK PLENUM FROM
AHU-1 AND CONNECT NEW O/A DUCTWORK TO O/A INTAKE
PLENUM AND AHU-1 O/A CONNECTION PLENUM. PROVIDE
OUTDOOR AIR FLOW MONITORING STATION IN O/A PLENUM DN
FROM VENTILATOR. PROVIDE LOW VELOCITY PRE FILTER TO
AVOID CLOGGING PITOT TUBES.
16. EXISTING O/A VENTILATOR ON ROOF.
17. EMERGENCY BOILER SHUT DOWN SWITCH. SWITCH LOCATION
AND OPERATION SHALL MEET THE REQUIREMENTS OF CSD-1.
18. EMERGENCY POWER OFF SWITCH SHALL SHUT DOWN ALL
HVAC EQUIPMENT AS NOTED IN CONTROLS SEQUENCES.
19. REMOVE EXISTING CHWS/R PIPING SERVING FAN COIL UNITS
ABOVE CEILING IN ROOM 110.
20. REMOVE EXISTING CHWS/R AND HWS/R AND ALL PIPING
ACCESSORIES AS NOTED. REMOVE EXISTING HWS/R IN
MECHANICAL ROOM. EXISTING HWS/R PIPING SERVING
BUILDING TO REMAIN, UNO.
21. CONNECT NEW HWS/R TO EXISTING AT LOCATION WHERE
EXISTING ROUTES INTO MECH ROOM. MATCH NEW HWS/R TO
EXISTING.
22. EXISTING GAS PIPING TO REMAIN. IT IS ASSUMED THAT
EXISTING GAS PIPING IS AT LOW PRESSURE (14" W.C.) AT
ENTRANCE TO MECHANICAL ROOM.
23. PROVIDE NEW 2 1/2" GAS PIPE TO SERVE BOILERS. GAS
RUNOUTS TO BOILERS SHALL BE 1 1/2".
24. REPLACE EXISTING FLOOR DRAIN AT AIR HANDLER WITH NEW
FLOOR SINK (REFER TO FLOOR SINK SCHEDULE, M-601).
ROUTE NEW FULL-SIZED TRAPPED CONDENSATE DRAIN FROM
AHU CONDENSATE CONNECTION TO NEW FLOOR SINK.
25. NEW CHILLED WATER BYPASS. RE: 5/M-501 FOR SIZING
DETAILS.
26. NEW 2" CHWS/R TO CRAC-1. RE: 1/M-102 FOR CONT.
27. NEW 2" HWS/R TO VAV SYSTEM, RE: 1/M-102 FOR CONT.
28. PROVIDE NEW 3" CIRCUIT SETTER IN NEW PIPING CONNECTING
TO EXISTING 3" HWS/R SERVING EXISTING UNIT HEATERS AND
OTHER EXISTING HOT WATER LOADS. PRIOR TO BEGINNING
HEATING WATER SYSTEM WORK, CONTRACTOR SHALL FORCE
ALL EXISTING HOT WATER VALVES OPEN AND TEST EXISTING
HOT WATER FLOW RATE. CIRCUIT SETTER SHALL BE SET TO
EXISTING HOT WATER FLOW RATE TO MATCH EXISTING
CONDITIONS.
29. REMOVE EXISTING 1 1/2" HWS/R SERVING REHEAT COILS.
30. REMOVE ALL HWS/R PIPING SERVING REHEAT COILS.
31. 4" COMBUSTION AIR INTAKE AND 6" BOILER VENT.
32. PROVIDE PVC VENT AND INTAKE PIPING AND PROVIDE
MANUFACTURER'S SIDEWALL VENT/AIR TERMINATION WALL
KIT. INSTALL PER MANUFACTURER'S INSTALLATION
REQUIREMENTS AND APPLICABLE CODES IN ALL RESPECTS
INCLUDING BUT NOT LIMITED TO: WALL PENETRATION
SLEEVING AND INSULATION SHIELDING; FIREPROOFING;
SUPPORT OF PIPING. TERMINATIONS SHALL BE PER
MANUFACTURER'S INSTALLATION REQUIREMENTS,
APPLICABLE CODES, AND THE FOLLOWING:
32.1. VENT SHALL BE AT LEAST 6'-0" FROM ADJACENT WALLS.
32.2. VENT SHALL BE NO CLOSER THAN 12" BELOW
OVERHANGS.
32.3. VENT SHALL BE AT LEAST 7-0" FEET ABOVE PUBLIC
WALKWAYS.
32.4. VENT SHALL BE AT LEAST 3'-0" ABOVE FORCED AIR
INTAKES WITHIN 10'-0" OF VENT TERMINATION.
32.5. VENT SHALL BE NO CLOSER THAN 12" BELOW OR
HORIZONTALLY FROM ANY DOOR OR WINDOW OR ANY
GRAVITY INLET.
32.6. COMBUSTION AIR INLET SHALL BE AT LEAST 12" ABOVE
GRADE OR SNOW LINE AS DETERMINED BY AHJ.
32.7. COMBUSTION AIR INLET SHALL BE NOT CLOSER THAN 4'-0"
HORIZONTALLY FROM ANY ELECTRIC METER, GAS METER,
REGULATOR, RELIEF VALVE, OR OTHER EQUIPMENT.
32.8. VENT/AIR TERMINATION WALL KITS SHALL BE LOCATED
NOT LESS THAN 12" AWAY FROM EACH OTHER.
33. TERMINATE 4" COMBUSTION AIR PIPING AND 6" VENT PIPING AT
BOILER IN AN APPROVED MANNER AND IN COMPLIANCE WITH
MANUFACTURER'S INSTALLATION REQUIREMENTS.
34. CONNECT NEW HWS/R PIPING TO EXISTING UNIT HEATER. NEW
HWS/R PIPING SHALL BE OF EQUAL SIZE TO EXISTING.
EXISTING VALVE AND CONTROLS TO REMAIN.
35. GAS DN TO EXISTING DOMESTIC HOT WATER HEATER TO
REMAIN.
36. DOOR CUT MAY BE NECESSARY TO BRING AHU SECTIONS INTO
MECHANICAL ROOM; RESTORE BACK TO ORIGINAL
CONDITIONS AFTER INSTALLATION OF AHU.
37. NEW MAKEUP WATER TO HYDRONIC SYSTEM. REMOVE
EXISTING MAKEUP WATER SYSTEM. REFER TO 5/M-501 AND
1/M-504 FOR DETAILS. CONNECT TO EXISTING DOMESTIC COLD
WATER SYSTEM IN MECHANICAL ROOM.
38. PROVIDE DIFFERENTIAL PRESSURE SENSOR AS REQUIRED BY
CONTROLS SEQUENCES. SHOULD ADJUSTMENT OF
DIFFERENTIAL PRESSURE SENSOR BE REQUIRED TO MEET
THE REQUIREMENTS OF THE CONTROLS SEQUENCES AND
FLOW REQUIREMENTS OF ALL EQUIPMENT, CONTRACTOR
SHALL RELOCATE, REWIRE, AND REPROGRAM AS NECESSARY.
KEYNOTES
1. COORDINATE ALL REQUIRED SHUT DOWNS OF EQUIPMENT, HVAC SYSTEMS,
AND ANY OTHER ACTIVITIES AFFECTING OCCUPANTS WITH THE COR.
2. PHASING AS FOLLOWS. CONTRACTOR TO VERIFY PHASING PLAN AND PROVIDE
FINAL PHASING PLAN TO THE COR FOR REVIEW PRIOR TO BEGINNING WORK.
2.2. COMPLETE CENTRAL SYSTEM HVAC COMPONENTS SYSTEM FLUSHING
SHALL BE CONDUCTED TO PREVENT NEW COILS AND OTHER EQUIPMENT
FROM BEING FOULED AFTER CONNECTION TO EXISTING HYDRONIC
SYSTEMS.
2.2.1. COMPLETE MECHANICAL ROOM SCOPE INCLUDING REPLACEMENT OF
AIR HANDLING UNIT, LOCATION OF BOILERS, ETC.
2.2.2. REMOVE CHILLER AND REPLACE WITH NEW. RECONNECT CHILLED
WATER SYSTEM.
2.2.3. REMOVE EXISTING EQUIPMENT SERVING ECM POD STORAGE AND
MAINTENANCE AND REPLACE WITH NEW CRAC UNIT.
2.3. COMPLETE CEILING, DUCTWORK, AND VAV SCOPE ROOM-BY-ROOM.
HVAC PHASING NOTES
TYPE B3 FINAL SUBMITTAL
TYPE B2 PREFINAL SUBMITTAL 05/15/2018
06/29/2018
ECM SHOP
VAULT
ECM OFFICE
BRANCH ADMIN
BRANCH OFFICE
CORRIDOR
AIS OFFICE
AIS SHOP
POWER ROOM
LOCKER
MECHANICAL
MEN'S
WOMEN'S
WEAPONS RELEASE MAINTENANCE
GUN MAINTENANCE
STORAGE
VEST
EXPOSURE ROOM
NDI PENETRATION
FILM PROCESS
NDI STORAGE
NDI ADMIN
NDI ROOM
CLASSROOM
SENSOR OFFICE
130A
SENSOR SHOP
MATERIAL CONTROL
PMEL OFFICE
PMEL STORAGE
MUNITIONS SERVICES
MUNITIONS ADMIN
MUNITIONS CHIEF
123A
VEST
CLASSROOM
WEAPONS LOADING STORAGE
x x x
34x12
16x12 20x14
16x16 20x18
22x22 x x
20x20
34x12 x x x x x
18x1414x14 14x14
36x16
30x30
12x24 x x x x
16x12 x
40x14 x x
28x12 24x12 x
14Ø x x
14Ø
38x14
20x20 x x x x
32x22 x
30x18 x x x x
36x12 x
32x12 28x12 24x12
24x14 30x14
36x16
32x22
12Ø34x12
20x12
48x16
20x12
14Ø
10x10
126A
MATERIAL CONTROL SUPERVISOR
x x x x x
MD402
REMOVE EXISTING CHILLER AND
CHILLED WATER PIPING BACK TO
MECHANICAL ROOM
EXISTING CONCRETE PAD
TO REMAIN
MD401
EXISTING TO
REMAIN, TYP
EXISTING TO
REMAIN, TYP
EXISTING TO
REMAIN, TYP
REMOVE DUCTWORK TO
NOTED LOCATIONS, TYP
REMOVE AIR
TERMINAL, TYP
NOTE: NO COOLING
EXISTS IN THIS ROOM PER
AS-BUILT DRAWINGS
REMOVE ALL THREE (3) FAN COILS
SERVING ROOM 110 ALONG WITH ALL
ASSOCIATED DUCTWORK, GRILLES,
DIFFUSERS, AND PIPING
30x30
MD402
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M
D d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
MD101.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
N
MECHANICAL DEMOLITION PLAN
1/8" = 1'-0"
MD101
MECHANICAL DEMOLITION
PLAN
SCALE: 1/8''= 1'-0"
0 8'8' 4'
KEYPLAN
ECM POD MAINTENANCE
ECM POD STORAGE
REMOVE EXISTING
DUCTWORK TO
NOTED LOCATION
EXISTING
HOUSEKEEPING
PAD TO REMAIN
EXISTING S/A
DUCTWORK TO
REMAIN, TYP
EXISTING S/A
DIFFUSER TO
REMAIN, TYP
REMOVE EXISTING CARRIER
AHU-1 AND S/A RISER UP TO
CONNECTION WITH S/A MAIN
REMOVE EXISTING
LIEBERT AHU-2
REMOVE EXISTING CARRIER
CU-1 AND ASSOCIATED
REFRIGERANT PIPING
REMOVE EXISTING LIEBERT
CU-2 AND ASSOCIATED
REFRIGERANT PIPING
R/A
S
A
S
A
S/A AND R/A DUCTWORK CONNECTIONS
FOR AHU-2 ROUTE THROUGH WALL AND
TERMINATE IN SIDEWALL
GRILLE/DIFFUSER HIGH AND LOW ON
WALL, RESPECTIVELY; DUCTWORK
CONNECTIONS TO REMAIN
x x x x
NOTE:
REMOVE AND CAP BACK TO
MAIN EXISTING HWS/R
SERVING AHU'S IN THIS AREA
20x20 S/A
22x22 S/A
20x14 S/A
Z O x
S
A
Z O x
S
A
Z O x
S
A
Z O x
S
A
Z O x
S
A
REMOVE EXISTING
AHU
76x26 R/A
48x16 R/A
ZONE 2
ZONE 1
Z
O
Z O x
S
A
TYP 7
30x30 R/A x
R
A
EXISTING 114x20 R/A
DROP TO REMAIN
EXISTING 30x20 R/A
DROP TO REMAIN
EXISTING PAD TO
REMAIN, TYP
MECHANICAL
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M
D d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
MD401.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
N
ECM POD MAINTENANCE AND STORAGE
ENLARGED HVAC DEMOLITION PLAN
1/4" = 1'-0"
MECHANICAL ENLARGED
DEMOLITION PLANS
MECHANICAL ENLARGED
DEMOLITION PLANS
KEYPLAN
N
MECHANICAL ROOM ENLARGED
HVAC DEMOLITION PLAN
1/4" = 1'-0"
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
RE: 1/MD101
FOR CONT
MD401
SCALE: 1/4''= 1'-0"
0 4'4' 2'
SCALE: 1/4''= 1'-0"
0 4'4' 2'
REMOVE
AHU
6" CHWS(E)
6" CHWR(E)
C
H W
R E
C
H W
S E
RE: 1/MD101
FOR CONT
H
W S
E
REMOVE
BOILER
REMOVE
CHWP
REMOVE
HWP
2 1/2" G(E)
EXISTING GAS
PIPE TO REMAIN
EXISTING 2 1/2" GAS ISOLATION
VALVE IN VERTICAL
REMOVE
EXISTING ET, TYP
EXISTING
COMPRESSOR
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M
D d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
MD402.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
MECHANICAL ENLARGED
DEMOLITION PLANS
MECHANICAL ENLARGED
DEMOLITION PLANS
N
MECHANICAL ROOM ENLARGED
PIPING DEMOLITION PLAN
1/4" = 1'-0"
MD402
REMOVE EXISTING
HWS/R TO THIS
POINT
REMOVE EXISTING
HWS/R TO THIS
POINT
SCALE: 1/4''= 1'-0"
4'4' 2'
VAULT
ECM OFFICE
BRANCH ADMIN
BRANCH OFFICE
CORRIDOR
AIS OFFICE
AIS SHOP
POWER ROOM
LOCKER
MECHANICAL
MEN'S
WOMEN'S
WEAPONS RELEASE MAINTENANCE
GUN MAINTENANCE
STORAGE
VEST
EXPOSURE ROOM
NDI PENETRATION
FILM PROCESS
NDI STORAGE
NDI ADMIN
NDI ROOM
CLASSROOM
SENSOR OFFICE
130A
SENSOR SHOP
MATERIAL CONTROL
PMEL OFFICE
PMEL STORAGE
126A
MATERIAL CONTROL SUPERVISOR
MUNITIONS SERVICES
MUNITIONS ADMIN
MUNITIONS CHIEF
123A
VEST 122
BREAKROOM
WEAPONS LOADING STORAGE
x x x
16x12 20x14
16x16 20x18
22x22 x
X
20x20
34x12 x x x x x x
18x1414x14
14x14
36x16
30x30
12x24 x x x x x x
40x14 x x
28x12 24x12
X
16Ø x x
14Ø x x x x
38x14
20x20
X
32x14 x x
32x22 x x
30x18 x x x x
12Ø x
24x1430x1436x16
32x22
X1
12"Ø
X1
12"Ø
X1
12"Ø
X1
10"Ø
X2
10"Ø
X1
10"Ø
34x12
Y1
48x20
RAG
48x16
16x14
20x12
T
VAV-109
32x12 28x12 24x12 14Ø
A
10"Ø
TYP 8
Ø
T Y
P
36x12
VAV-108
T
22x16
16Ø
X2
10"Ø
X1
12"Ø
Y1
48x20
RAG
Y1
22x22
RAG
B
22x22
RAG
PROVIDE FULL-SIZED R/A TAP
AND CONNECT TO BOTTOM OF
EXISTING R/A DUCT
A
12"Ø
X1
10"Ø
X1
10"Ø
A
12"Ø
X1
8"Ø
X1
8"Ø
14Ø
VAV-107
24x12
Ø
VAV-106
X1
10"Ø
TYP 3
VAV-105A
X1
12"Ø
A
12"Ø
X1
12"Ø
X1
12"Ø
TYP 3
TYP 2
A
8"Ø
X1
8"Ø
VAV-105B
10Ø
18Ø
14x10
X1
8"Ø
X1
8"Ø
TYP 8
Ø
VAV-104B
28x12
Ø
V A
V
C
A
12"Ø
TYP 2
14x14
28x12
VAV-104A
X1
8"Ø
X1
10"Ø
X1
8"Ø
X1
10"Ø
X1
10"Ø
X2
10"Ø
X1
10"Ø
X1
10"Ø
X1
10"Ø
X1
10"Ø
X1
10"Ø x
V
A
V
34x12
VAV-102A
Ø
16Ø
X1
8"Ø
TYP 6
X1
8"Ø
X1
8"Ø
X1
8"Ø
TYP 2
X1
8"Ø
14Ø
VAV-102B
VAV-104D
10Ø 10x12
X1
8"Ø
TYP 3
T
T
T
T
T
T
T
T
T
T
T
M-402
X1
8"Ø
TYP 18
X1
12"Ø
V
A
V
24Ø
ACC-1
MAINTAIN MFG REQUIRED
CLEARANCES FOR AIRFLOW
AND MAINTENANCE
EPO
20x12
30x30
18x12
B
22x22
RAG
B
22x22
RAG
TYP 2
TYP
Y1
22x12
RAG
TYP
Ø
30x30
M-401
30x30 x
T
T
14Ø10Ø
12x12
B
22x12
RAG
TYP 2
A
12"Ø
TYP 2
VAV-110
M-401
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-101.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
N
MECHANICAL PLAN
1/8" = 1'-0"
MECHANICAL PLAN
RE: 1/MD401,
1/M-401 FOR
CONT
1. COORDINATE NEW DIFFUSER/RETURN GRILLE LOCATIONS WITH
EXISTING LIGHTS, SPRINKLER HEADS, FIRE ALARM, OCCUPANCY
SENSORS, AND ANY OTHER CEILING-MOUNTED EQUIPMENT. ADJUST
DIFFUSER/RETURN GRILLE LOCATIONS AS NECESSARY TO
COORDINATE WITH EXISTING CONDITIONS.
2. REBALANCE EXISTING DIFFUSERS (DENOTED AS X1 AND X2) TO NOTED
CFM.
3. THE FOLLOWING ROOMS SHALL BE EQUIPPED WITH CO2 SENSORS AND
RELATIVE HUMIDITY SENSORS IN ADDITION TO THERMOSTATS.
CONTROLS CONTRACTOR TO COORDINATE LOCATION OF ADDITIONAL
SENSORS WITH EXISTING CONDITIONS TO PRODUCE THE MOST
RELIABLE READINGS. NOTE THAT EXISTING HUMDIFIERS SERVING
ROOM 110 AND ROOM 130A SHALL BE PROVIDED WITH SIGNAL FROM
NEW HUMIDITY SENSORS. OTHERWISE, CONTROL OF EXISTING
HUMIDIFIERS SHALL BE UNCHANGED.
3.1. CO2 SENSORS: BREAKROOM (RM 122), CLASSROOM (131)
3.2. HUMIDITY SENSORS: AIS SHOP (110), SENSOR SHOP (130A)
4. WHERE NEW VAV BOXES CONNECT TO EXISTING DUCTWORK, PROVIDE
TRANSITIONS AS NOTED IN DETAILS (RE: 2/M-502).
5. CONTRACTOR SHALL COORDINATE LOCATIONS OF ALL EQUIPMENT
REQUIRING SERVICE WITH OWNER PRIOR TO PLACEMENT.
CONTRACTOR SHALL CLEARLY INDICATE THE SERVICE ACCESS
PROVIDED FOR EACH PIECE OF EQUIPMENT.
GENERAL NOTES
M-101
RE: 1/M-401
FOR CONT
RE: 1/M-401 FOR
DUCTWORK SIZE
SCALE: 1/8''= 1'-0"
0 8'8' 4'
VAULT
ECM OFFICE
BRANCH ADMIN
BRANCH OFFICE
CORRIDOR
AIS OFFICE
AIS SHOP
POWER ROOM
LOCKER
MECHANICAL
MEN'S
WOMEN'S
WEAPONS RELEASE MAINTENANCE
GUN MAINTENANCE
STORAGE
VEST
EXPOSURE ROOM
NDI PENETRATION
FILM PROCESS
NDI STORAGE
NDI ADMIN
NDI ROOM
CLASSROOM
SENSOR OFFICE
130A
SENSOR SHOP
MATERIAL CONTROL
PMEL OFFICE
PMEL STORAGE
126A
MATERIAL CONTROL SUPERVISOR
MUNITIONS SERVICES
MUNITIONS ADMIN
MUNITIONS CHIEF
123A
VEST
BREAKROOM
WEAPONS LOADING STORAGE
DP
VAV-109
VAV-108
VAV-106
VAV-105A
VAV-105B
VAV-104B
V A
V
C
VAV-104A
VAV-103
VAV-102A
VAV-104D
M-401
VAV-101
ACC-1
4" CHWS/R TO
MECHANICAL ROOM
ISOLATION
VALVE, TYP
BT-1, MOUNT ON 6"
HOUSEKEEPING PAD,
RE: 4/M-502 FOR DETAIL
3/4" HWS/R
RE: 2/M-502 FOR COIL
CONNECTION DETAIL, TYP
VAV-107
2" HWS/R
1" HWS/R
1 1/2" HWS/R
1 1/4" HWS/R
1 1/2" HWS/R
3/4" HWS/R
RE: 1/M-402
FOR CONT
VAV-102B
2" CHWS/R
1 1/4" HWS/R
2" HWS/R
1" HWS/R
ISOLATION BALL
VALVE, TYP
VAV-110
M-402
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-102.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
N
MECHANICAL PIPING PLAN
1/8" = 1'-0"
MECHANICAL PIPING PLAN
1. ALL HWS/R RUNOUTS SHALL CONFORM IN SIZING TO THE FOLLOWING:
1.1. BELOW 1.5 GPM - 1/2"
1.2. BELOW 3.5 GPM - 3/4"
1.3. BELOW 7 GPM - 1"
1.4. BELOW 14 GPM - 1 1/4"
2. DO NOT ROUTE NEW HWS/R OR CHWS/R PIPING OVER EXISTING
TESTING STATIONS OR OTHER ELECTRONIC EQUIPMENT. WHERE IT IS
NOT POSSIBLE TO AVOID THIS CONDITION, RECEIVE APPROVAL FROM
OWNER PRIOR TO ROUTING PIPING OVER EQUIPMENT. PIPING PASSING
OVER EQUIPMENT SHALL BE PROVIDED WITH DRAIN PAN UNDER PIPING
EXTENDING 5'-0" ON EITHER SIDE OF EQUIPMENT. A MOISTURE SENSOR
SHALL BE INSTALLED IN DRAIN PAN AND A MOISTURE ALARM SHALL BE
PROVIDED AT THE BMCS UPON MOISTURE DETECTION.
GENERAL NOTES
M-102
SCALE: 1/8''= 1'-0"
0 8'8' 4'
ECM POD MAINTENANCE
ECM POD STORAGE
x x x
X2
14x8
X2
14x8
X2
14x8 x
T T
B
42x20
RAG
36x24
C
42x20
C
42x20
C
42x20
C
42x20
EXISTING
HOUSEKEEPING
PAD TO REMAIN
EXISTING S/A
DUCTWORK TO
REMAIN, TYP
CRAC-1, MOUNT ON EXISTING
HOUSEKEEPING PAD AND CONNECT
TO EXISTING S/A AND R/A DUCTWORK
THROUGH WALL
PROVIDE PLENUM SIZED EQUAL TO EXISTING
WALL PENETRATION AND TURN UP ALONG
WALL AS HIGH AS POSSIBLE; TAP NEW 36x24
OFF NEW PLENUM USING HEEL-TOE TAP TO
SERVE SPACE
20x20 S/A
22x22 S/A
20x14 S/A x
S
A x
S
A x
S
A x
S
A x
S
A x
S
A
76x26 R/A x
R
A
EPO
CHWP-1
B-1
B-2
AHU-1
EXISTING
COMPRESSOR
HWP-1,2
36x24 O/A
BMCS
EXISTING
EXHAUST FAN
EXISTING
INTAKE
CHWP-2
MECHANICAL
NEW MVD,
TYP 9
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-401.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
ECM POD MAINTENANCE AND STORAGE
ENLARGED HVAC PLAN
1/4" = 1'-0"
MECHANICAL ENLARGED
PLANS
RE: 1/M-101
FOR CONT
KEYPLAN
N
MECHANICAL ROOM
ENLARGED HVAC PLAN
1/4" = 1'-0"
RE: 1/M-101
FOR CONT
RE: 1/M-101
FOR CONT
N
RE: 1/M-101
FOR CONT
RE: 1/M-101
FOR CONT
RE: 1/M-101
FOR CONT
RE: 1/M-101
FOR CONT
RE: 1/M-101
FOR CONT
RE: 1/M-101
FOR CONT
TYP 9
RE: 1/M-101
FOR CONT
M-401
SCALE: 1/4''= 1'-0"
0 4'4' 2'
SCALE: 1/4''= 1'-0"
0 4'4' 2'
TYPE B3 FINAL SUBMITTAL
4" CHWS
4" CHWR
C
H W
R
C
H W
S
RE: 1/M-102
FOR CONT
ET-1
2 1/2" G(E)
4"
2 1/2" HWS4" HWS
H
W S
3" HWR
H
W R
3/4" HWS
3/4" HWR
3/4" HWS/R TO
VAV-109
RE: 1/M-102
FOR CONT
2" CHWR
2" CHWS
UH(E)
AS-2
B-1
B-2
ET-2
DP
CHWP-1
CHWP-2
AHU-1
EXISTING
COMPRESSOR
BOILER SECONDARY
PUMPS HWP-1 AND
HWP-2
BOILER PRIMARY
PUMPS HWP-3 AND
HWP-4, IN VERTICAL
1 1/2" G DN
TO BOILER
1 1/2" G DN
TO BOILER
4" HWR
AS-1
FS-1
4" COMMON
PIPE
MECHANICAL
ECM POD MAINTENANCE
ECM POD STORAGE
RE: 1/M-102
FOR CONT
RE: 1/M-102
FOR CONT
2" CHWR
2" CHWR
H
W R
H
W S
CRAC-1, RE: 4/M-501
FOR COIL CONNECTION
DETAILS
CONNECT UNIT TO EXISTING
DOMESTIC COLD WATER
(DCW) PIPING SERVING
EXISTING UNIT; DCW SHALL
BE CONNECTED FOR
HUMIDIFICATION PURPOSES
ROUTE FULL-SIZED
TRAPPED CONDENSATE
TO EXISTING FLOOR
DRAIN
PROJECT NUMBER: XHZG182005
VOLUME 1 OF 1
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-402.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
MECHANICAL ENLARGED
PLANS
N
MECHANICAL ROOM
ENLARGED PIPING PLAN
1/4" = 1'-0"
ECM POD MAINTENANCE AND STORAGE
ENLARGED PIPING PLAN
1/4" = 1'-0"
KEYPLAN
N
M-402
SCALE: 1/4''= 1'-0"
0 4'4' 2'
SCALE: 1/4''= 1'-0"
0 4'4' 2'
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-501.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
MECHANICAL DETAILS
4"
NOTES:
1. PROVIDE UNIONS OR FLANGES AS
NECESSARY TO ALLOW FOR
REMOVAL OF PIPING FROM
EQUIPMENT AND ACCESSORIES
REQUIRING PERIODIC
MAINTENANCE.
2. THERMOMETERS TO BE SOLAR
POWERED DIGITAL TYPE.
3. PROVIDE TEST WELLS ADJACENT
TO THERMOMETERS OR CONTROL
SENSORS.
4. REFER TO SPECIFICATIONS FOR
VALVE TYPES.
CHWS
4"
4"
3/4"
3/4"
RE: 1/M501,
TYP
CHEMICAL
FEEDER
RE: 5/M-503
ACC-1
4"
CHWP-1
FROM BLDG
TO BLDG
4"
TO FD
CHWP-2
4"
3/4" DCW MAKE-UP
3/4"
3/4"
TO FD
M
1-1/4"
PRE-CHARGING AIR
CONNECTION
RPZ BACK FLOW
PREVENTER
W/ STRAINER
PRESSURE REDUCING
VALVE SET @ 20 PSI
WATER METER
GLOBE VALVE
BY-PASS
HIGH CAPACITY FLOAT TYPE
AIR VENT
AUTOMATIC
AIR VENT
PRESSURE GAUGE
CONNECT TO SIDE OF MAIN.
AVOID TOP OR BOTTOM
CONNECTION TO PREVENT AIR
OR DEBRIS FROM ENTERING
PIPE TO TANK.
PROVIDE ANTI-THERMOSYPHON
LOOP TO PREVENT GRAVITY
HEATING OF TANK. 12" DROP
MINIMUM.
SHUT-OFF VALVE
DRAIN-VALVE WITH
HOSE CONNECTION
AS-1
ET-1
AIR HANDLING UNIT COIL PIPING (TWO-WAY)
(SINGLE COIL CONNECTIONS)
NOT TO SCALE
AIR VENT (3/4" GATE
VALVE WITH CAP)
THERMOMETER WITH
SEPARABLE SOCKET
COIL AIR VENT
VALVE W/PLUG
HOT WATER OR
COOLING COIL
PRESSURE INDEPENDENT
FLOW CONTROL VALVE
REDUCER
UNION
CHWR & HWR
PIPING
CHWS & HWS PIPING
BALL VALVE (UP TO 1-1/2")
GATE VALVE (2" & OVER)
Y-STRAINER w/ BLOW-OFF
VALVE
PRESSURE GAUGE
W/GATE VALVE
3/4" DRAIN W/GATE VALVE
& HOSE COUPLING
3/4" COIL DRAIN VALVE
W/HOSE COUPLING
CHILLED WATER SYSTEM PIPING SCHEMATIC
NOT TO SCALE
BASE ELBOW DETAIL
NOT TO SCALE
CENTERLINE
OF PIPE
WELD SUPPORT
TO CENTERLINE
OF ELBOW
2" PIPE
ANCHORED
FLOOR FLANGE
BASE MOUNTED END SUCTION PUMP DETAIL
NOT TO SCALE
P & T PLUG
(TYP)
FLEXIBLE
CONNECTION
SUCTION DIFFUSER W/
STRAINER AND BLOW-OFF
VALVE
SHUT-OFF VALVE,
TYP
CHECK VALVE
PRESSURE GAUGE
W/ GATE VALVES
CONCENTRIC
REDUCER
SHAFT COUPLING
GUARD
END SUCTION BASE
MOUNTED PUMP
LEVEL, SHIM, ANCHOR AND
GROUT BASE PER MFG
REQUIREMENTS
6" HOUSEKEEPING
PAD
MAINTAIN CLEARANCE FOR
REMOVING STRAINER
DETAIL NOTE:
1. INSTALL PUMP PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
RECOMMENDATIONS. THE PUMP MANUFACTURER'S INSTALLATION
INSTRUCTIONS SHALL HAVE PRECEDENCE OVER SPECIFICATIONS AND
DRAWINGS WHERE THERE IS A CONFLICT.
3/4" HOSE BIBB DRAIN
WITH CAP
STANCHION SUPPORT ON
SUCTION END AS
REQUIRED
FINISHED FLOOR
INLINE PUMP DETAIL
NOT TO SCALE
CHECK
VALVE
CIRCUIT SETTER
(HWP-3,4 ONLY)
FLANGED OR UNION
CONNECTION, TYP
INLINE
PUMP
ROUTE TO
NEAREST FD
Y-STRAINER W/
SCREWED END
SHUT-OFF
VALVE
PRESSURE
GAUGE
PIPE HANGERS - PROVIDE
DOUBLE DEFLECTION
NEOPRENE FOR FIRST TWO
ON EACH SIDE OF PUMP.
DETAIL NOTE:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM
MOTOR.
FM
FLOW METER FOR
MINIMUM PUMP
FLOW CONTROL
TO BUILDING
FROM BUILDING
P
DIFFERENTIAL
PRESSURE
TRANSMITTER
3/4"
4"
MINIMUM FLOW
BYPASS VALVE
CIRCUIT
SETTER SET
AT 160 GPM
BT-1
M-501
B316 HVAC RENOVATION
JDFSKG
HGFEDCBA
V O
K A
N G
B
H
V A
C
U p g r a d e
D r a w i n g s S h e e t M d
P
M
P l o t t e d
B y j b o w m a n
P b l e
C
Y N
T
P
L O
T c t b
O R
I G
I N
A L
S
E A
L E
D
A
G
N E
D
D
R A
W I N
G S
A R
E
O
N
F
I
T
F
I C
E
O
F
T
S
E
C I V
I L
E
N G
I N
E E
R
138TH FIGHTER WING
ApprovedDate DescriptionSymbol
DATE:
FILE NAME:
DESIGNED BY:
DWN BY: CHK BY:
PLOT DATE: 06/29/2018
PLOT SCALE: AS INDICATED
CONTRACT NUMBER:
SHEET
REFERENCE
NUMBER
Sheet of
06/29/2018
VOLUME 1 OF 1
COMBA
A I R
MAND
COM
T
OKLAHOMA AIR NATIONAL GUARD
TULSA I.A.P. OK.
BCE: MAJOR PHILIP DELONG, P.E.
SKG
810 S CINCINNATI, SECOND FLOOR
TULSA, OK 74019
918.877.6000
M-502.DWG
ENGINEER OF RECORD
CYNTERGY ENGINEERING, PLLC
CA # 3537
EXPIRES 6/30/2020
W912L6-13-D-0002/0020
T Y
N
B
M I T
T A
L
J U
I S
S U
S
S U
N
S T
R U
C T
I O
N
TYPE B-2 PRE-FINAL SUBMITTAL 05/15/2018
TYPE B-3 FINAL SUBMITTAL 06/29/2018
L
I
C
E
N S
E
D
P
R
O
F
E
SS
I O
N
A
L
E
N
G
I N
E
E
R
O
K
L
A H
O
M
A
JEFFERY
DON
FERGUSON
19755
JEFFERY D. FERGUSON, P.E.
MECHANICAL DETAILS
CHILLER PIPING DETAIL
NOT TO SCALE
TYPICAL VAV BOX WITH HOT
WATER REHEAT DETAIL
NOT TO SCALE
VAV MOUNTING DETAIL
NOT TO SCALE
H
W
S
H
W
R
INSULATED (WRAPPED)
MEDIUM PRESSURE S/A
DUCT
CONICAL
REDUCER
RIGID SPIRAL DUCT
PROVIDE REDUCER AS SHOWN ON DRAWINGS AND PROVIDE A
SECTION OF STRAIGHT RIGID DUCT AT THE UNIT INLET WITH
LENGTH AS RECOMMENDED BY THE MANUFACTURER, BUT IN
NO CASE LESS THAN FOUR (4) TIMES THE DIAMETER OF THE
UNIT INLET CONNECTION. REDUCERS CONNECTED TO THE
INLET OF THE VAV BOX ARE NOT ALLOWED.
1/2" AIR
VENT
PROVIDE TRANSITION
TO FIT VAV BOX. MAX
ANGLE PER SMACNA
INSULATED (WRAPPED)
RECTANGULAR LOW
PRESSURE DUCT. SEE
PLANS FOR DUCT
CONTINUATION AND SIZES
VAV DAMPER
OPERATOR
AUTOFLOW CONTROL
VALVE
SHUT-OFF
VALVE (TYP)
STRAINER W/
BLOW-OFF
VALVE TYP
3/4" DRAINPRESSURE-INDEPENDENT
CONTROL VALVE
WITH INTEGRAL
FLOW CONTROL
SIDE VIEW
CONNECTION TO STRUCTURAL
SUPPORTING MEMBER
TYPE 48 SPRING CUSHION
VIBRATION ISOLATOR (TYP)
FCU/CRAC/VAV
1/2"Ø THREADED
ROD (TYP)
CHWR
CHWS
AAV
FLANGED UNION
(TYP 2)
BUTTERFLY
ISOLATION
VALVE, TYP
FLEXIBLE CONNECTION, LOCATE
AS CLOSE TO CHILLER AS
CONDITIONS PERMIT (TYP 2)
THERMOMETER
(TYP 2)
AUTOMATIC AIR VENT
(TYP 2)
PRESSURE GAUGE
(TYP 2)
AAV
DRAIN VALVE WITH
HOSE BIBB, TYP 2
DETAIL NOTES:
1. PIPING LOCATIONS ARE SHOWN FOR SCHEMATIC PURPOSES ONLY AND MAY NOT REFLECT THE…