W50NH925C0006 DRAFT.pdf

PDF 3 MB Posted

Attached to
INSCOM Engineering and Technical Assistance (ETA)
Solicitation number
W50NH925R0006
Issued by

About this file

This is a draft Performance Work Statement (PWS) for Engineering Technical Assistance (ETA) services in support of the U.S. Army Intelligence and Security Command (INSCOM) G-7 directorate. The contract will provide ETA support, intelligence surveillance and reconnaissance modernization, and innovation support activities across program management, senior/technical advisement, test and evaluation, data visualization, and program administration.

The contract is structured as a 100% small business set-aside with a one-year base period and four one-year options, utilizing a Firm Fixed Price Level of Effort (FFP-LOE) contract type. Key personnel requirements include one Senior Advisor/Program Manager, six Technical Advisor III positions, and three Senior Test Engineers, all based at Fort Belvoir, VA. Contractors must have a Top Secret Facility Level Clearance upon proposal submission and personnel must maintain TS/SCI clearances. The work involves supporting INSCOM's mission across 180 locations in 45 countries, focusing on operational intelligence, security operations, and specialized capabilities for Army, Joint, Coalition Commands and the U.S. Intelligence Community. Core responsibilities include strategic modernization planning, technology engagement, innovation support, and test/evaluation of intelligence systems and capabilities.

View the file

Other files

File Type Posted
W50NH925R0006 Questions and Answers.pdf PDF
W50NH925R0006 Amendment 01.pdf PDF
Attachment 0002 Amendment 1 Past Performance Questionnaires.docx DOCX document
Attachment 0001 FINAL V2.xlsx XLSX spreadsheet
Attachment 0001 ETA GFPM FINAL.xlsx XLSX spreadsheet
W50NH925R0006 Final.pdf PDF
Attachment 0001 ETA GFPM.xlsx XLSX spreadsheet
Attachment 0002 Past Performance Questionnaire .docx DOCX document
Attachment 0003 - Past Performance Matrix.xlsx XLSX spreadsheet
Attachment 0001 ETA GFPM.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local t ime

X

A X B X C

D

EX

X G F 67 - 75

76 - 83 X H 84 - 90

RATING P AGE OF P AGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official writ ten notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 90

(If other than Item 7)

15A. NAME 16. NAME AND TIT LE OF PERSON AUT HORIZED T O

AND

ADDRESS

SIGN OFFER (T ype or print)

OF

OFFEROR

AMENDMENT NO. DAT E

15B. T ELEPHONE NO (Include area code) 17. SIGNAT URE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DAT E

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W50NH9 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUT ION - LAT E Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and condit ions contained in this solicitat ion.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. T ABLE OF CONT ENT S

SOLICITAT ION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COST S

2 - 6

X I CONT RACT CLAUSES

DESCRIPT ION/ SPECS./ WORK ST AT EMENT X

PACKAGING AND MARKING

7 - 52 J LIST OF AT TACHMENT S

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

54 - 55

X K

REPRESENT AT IONS, CERT IFICAT IONS AND

OTHER ST ATEMENT S OF OFFERORS

CONT RACT ADMINISTRATION DAT A 56 - 58 X

SPECIAL CONT RACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 59 X M

L INST RS., CONDS., AND NOTICES T O OFFERORS

EVALUAT ION FACT ORS FOR AWARD

NOT E: Item 12 does not apply if the solicitat ion includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENT S

(T he offeror acknowledges receipt of amendments

AMENDMENT NO. DAT E

to the SOLICIT ATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPT ION (X) SEC. DESCRIPT ION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEP HONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND AP P ROP RIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMP ETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES T O ADDRESS SHOWN IN IT EM

24. ADMINISTERED BY (If other than Item 7) CODE 25. P AYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

60 - 65

PART II - CONTRACT CLAUSES

ACC - INSCOM

8825 BEULAH STREET

FORT BELVOIR VA 22060

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

17 Jan 2025

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W50NH925R0006

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months

Labor

FFP-LOE

Engineering Technical Assistance (ETA) Labor FOB: Destination

PSC CD: R425

NET AMT

CEILING PRICE

0002 Each

ODCs / Travel

COST

ETA Other Direct Costs and Travel Costs

ESTIMATED COST

0003 Each

CDRLS

DATA in accordance with the Contract Data Requirements List (CDRL) DDForm

1001 12 Months OPTION Labor

FFP-LOE

Engineering Technical Assistance (ETA) Labor

1002 Each OPTION ODCs / Travel

COST

ETA Other Direct Costs and Travel Costs

1003 Each

OPTION CDRLS

DATA in accordance with the Contract Data Requirements List (CDRL) DDForm

2001 12 Months OPTION Labor

FFP-LOE

Engineering Technical Assistance (ETA) Labor

2002 Each OPTION ODCs / Travel

COST

ETA Other Direct Costs and Travel Costs

2003 Each

3001 12 Months OPTION Labor

FFP-LOE

Engineering Technical Assistance (ETA) Labor

3002 Each OPTION ODCs / Travel

COST

ETA Other Direct Costs and Travel Costs

3003 Each

4001 12 Months OPTION Labor

FFP-LOE

Engineering Technical Assistance (ETA) Labor

4002 Each OPTION ODCs / Travel

COST

ETA Other Direct Costs and Travel Costs

4003 Each

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

US Army Intelligence and Security Command (INSCOM)

G-7 Engineering Technical Assistance (ETA) Support Services

Part 1

General Information

1. GENERAL: This is a non-personal services contract to provide Engineering Technical Assistance (ETA) Support. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel and supervision, necessary to perform ETA support as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Headquartered at Fort Belvoir, Virginia, with 17,500 Soldiers, Department of the Army (DA) civilians and contractors, located at 180 locations in 45 countries, INSCOM executes mission command of operational intelligence and security forces; conducts and synchronizes worldwide multidiscipline and all-source intelligence and security operations; and delivers linguist support and intelligence-related advanced skills training, acquisition support, logistics, communications, and other specialized capabilities in support of Army, Joint, Coalition Commands and the U.S. Intelligence Community.

1.2.1 Organization: The G-7 is comprised of three divisions and an admin branch:

1.2.1.1 The Operational Support Division (OSD) leads requirement collection (w/G-3), synchronization, and resourcing allocation/oversight. Provides operational support to G-7 elements. Manages the G-7 Comms Plan, Command Modernization Strategy, and Modernization Process Map execution. Administratively oversees all Liaison Officers/Integrators.

1.2.1.2 The Capabilities Division (CD) plans, develops, and delivers rapid capabilities to address validated operational gaps within INSCOM or, if directed, across the US MI Corps. Oversees technological pilots, experimentation, and lessons learned to inform future capability development. Oversees targeted commercial engagements.

1.2.1.3 The Futures and Integration Division (FID) leads strategic planning, synchronization, and coordination with MSCs, INSCOM Staff, and Intel Modernization Stakeholders. Ensures future capability planning is informed by INSCOM equities and shap -facing concepts. Directly supports AFC CFT DOTMLPF-P analysis and program requirement writing through time. Ensures G-7 Capabilities Division capabilities integrate into future planning

1.2.1.4 The Admin Branch oversees all administrative requirements within the directorate.

1.3 Objectives: The contractor shall provide the necessary products and services required by INSCOM and the Intelligence Community (IC) as outlined in this PWS. The PWS outlines requirements to support mission to anticipate requirements and employ innovative techniques to equip and sustain Soldiers, Civilians, systems, and facilities, as well as to enhance readiness as part of a Combined, Joint, and IC interdependent team.

The contractor should recognize that the G-7, as a leader in innovation and modernization for the HQ, must provide

-evolving nature.

1.4 Scope: The scope of this acquisition is for the contractor to provide a wide range of ETA support, intelligence surveillance and reconnaissance (ISR) modernization and innovation support activities. The contractor will assist the G-7 Directorate in Multi-Domain Operations (MDO) areas, Test and Evaluation (T&E), Data Literacy and modernization/innovation. Contractor support to the G-7 is organized into the following task areas: Program Management; Senior/Technical Advisement; T&E, Data Visualization; and Program Administration.

Additionally, there are two optional task areas that may be required to support the contract. These positions are subject to mission need and availability of funding. These areas include Operations Research/Systems Analysis (ORSA) and Data Analysis.

1.4.1 During the performance period for this contract, the contractor shall maintain all systems and facilities in accordance with (IAW) the applicable Army Regulations, Army Doctrine Reference Publications, Army Doctrine Publications, and Department of the Army Pamphlets, Technical Bulletins, Technical Manuals, and Original Equipment Manufacturers (OEMs) guidelines and/or recommendations.

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years.

1.6 General Information

1.6.1 Quality Control Plan (QCP): The contractor shall develop and maintain an effective QCP to ensure services are performed IAW this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective s -inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and ll submit the QCP to the Contracting Officer (KO), COR, and ACOR within fifteen (15) workdays following contract award.

Thereafter, if corrective actions are required or if otherwise necessary, the contractor shall submit a revised QCP within five workdays following any changes to the plan. The revised QCP shall provide the inspection timeline and findings and the status of all open corrective action plans until the action plan is closed (i.e., the discrepancy is under control), if applicable. The contractor shall update the QCP annually. After Government approval of the QCP, the contractor shall receive the KO acceptance in writing of any proposed changes to the QCP.

Deliverable A001 Quality Control Plan

1.6.2 Quality Assurance Surveillance Plan (QAS

exhibit 1, which outlines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: No work is to be performed during the following federally recognized holidays, unless otherwise specified in this PWS.

Labor Day Martin Luther Kin Columbus Day

Memorial Day Thanksgiving Day Juneteenth Independence Day Christmas Day Independence Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the core hours of 0900- 1500 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will not be reimbursed when the government facility is closed for the above reasons. Depending on the location/requirement, the contractor may be required to provide basic work week (40 hours), and extended work week support up to seven days a week. This contract supports multiple locations and as such, contractors should adhere to the normal operating hours for the site they support. The normal core duty hours may be adjusted with COR/ACOR approval to meet mission requirements. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind the stability and continuity of the workforce are essential.

1.6.4.1 Extended Work Week (EWW) hours: This contract may require the use of EWW hours to support deployments, contingency operations, hostilities, war, national emergencies, critical mission systems and facilities repairs, or other unusual, critical operations. EWW hours are defined as that time exceeding the normal hours of operation per work week or pay period. The projected EWW hours shall be within budget and will not exceed the additional hours. Without approval, the contractor's invoice for those hours worked will be reduced or rejected by the Government. Justification shall be provided for all EWW requests per labor category, listing each contractor(s)

-up detail. Approved EWW hours shall apply only to the contractor(s) named in the request and are not transferable to others. If request is approved, all EWW hours worked shall be billed at the labor category proposed billing rate and as depicted in the contract.

Deliverable A002 EWW Approval Request

1.6.4.2 Tour of Duty: The first day a contractor is assigned to a position and reports to work under this contract shall be considered the beginning date for new personnel.

1.6.4.3. Any contractor personnel leaving the contract are expected to follow all out-processing and security requirements IAW their local site.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at Government sites and at contractor facilities worldwide. Technical Exhibit 3A and 3B identifies current expected CONUS locations.

The contractor may be required to support additional locations subject to an increase in mission requirements as defined in section 1.6.14 Surge Requirement.

1.6.6 Type of Contract: The government will award a Firm Fixed Price, Level of Effort (FFP-LOE).

1.6.7 Security: The Commander, U.S. Army INSCOM, through the Contractor Support Element (CSE), acting on behalf of DCS, G-2, as the cognizant security authority (CSA) for the Army, has exclusive administrative security oversight responsibility for all SCI released to the contractor or developed under the Army contract. All Army SCI contracts will be processed through the Army Centralized Contract System (ACCS) portal, which is overseen by the INSCOM CSE. Mandatory Security Training: Initial Security Briefing, Annual Refresher Training, Classified Marking, Controlled Unclassified Information (CUI) Awareness Training, and Threat Awareness & Reporting Program (TARP) are required. Contractor must also maintain the level of security required for the life of the contract, and be able to obtain SI, TK, G, HCS, and NATO Top Secret. Personnel must sign a Non-Disclosure Statement. Depending on the location, additional security requirements, such as the ability to obtain and maintain a government provided Counterintelligence (CI) Polygraph will be required. The security requirements are in accordance with the attached DD254.

have been granted a Top Secret security clearance with eligibility for Special Compartmented Information (SCI) access from the Defense Industrial Security Clearance Office at time of proposal.

between the contractor, the COR/ACORs, and INSCOM CSE on all matters pertaining to security.

1.6.7.3 The contractor shall obtain and maintain user accounts for Army Enterprise Service Account (AESA), G-7 Portal, NIPRNET, SIPRNET, JWICS, TDN2 and accounts including email when required.

1.6.8 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured IAW Army, INSCOM, or local policies or regulations.

1.6.8.1 The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.8.2 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.8.3. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.8.4 The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be

1.6.8.5. The contractor may be required to establish and maintain COMSEC accounts. When required, the contractor shall act as a sub-hand receipt holder of COMSEC material, prepare requisite COMSEC shipping documents, provide all safeguards required for the material and receive the training deemed necessary by the Government.

1.6.9 Post Award Conference/Periodic Progress Meetings: The contractor shall attend a post award conference convened by the contracting activity IAW Federal Acquisition Regulation Subpart 42.5 to be scheduled seven (7) workdays following contract award. In addition, the KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government. The first Post-Award Periodic Progress Meeting shall be held within 10 workdays of award. The contractor shall schedule and conduct this meeting, in coordination with the COR and KO. The Periodic Progress Meetings shall be conducted on a quarterly basis. No later than three business days before the Periodic Progress Meetings, the contractor shall provide the COR and KO with the briefing slides. Within three business days after the meetings, the contractor shall provide the meeting minutes and list of attendees to the COR and KO.

Deliverable A003 - Post Award Conference/Periodic Progress Meeting Minutes

1.6.9.1 Monthly Status Report (MSR): The contractor shall provide a MSR to the KO and COR identifying work completed from the previous month, any significant circumstances posing a threat to the security of DoD personnel, contractor personnel, resources and classified or unclassified defense information; safety incidents, on-going activities, issues and mitigation plans, forecasted future activities, and remaining open actions/decisions from the previous MSR. The MSR shall provide the number of employees on duty, planned new hires, a monthly roll up of funding and, at a minimum, shall provide the following information: funding received, funding invoiced to date, outstanding invoices, current and projected burn rates and funds remaining. MSR shall be provided to the KO and COR Monthly by the 15th calendar day of the month.

Deliverable A004 Monthly Status Report (MSR)

1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key/Non-Key Personnel:

1.6.11.1 Key Personnel: The following ten (10) positions are considered key personnel by the government for this contract.

(1) Senior Advisor/Program Manager at Fort Belvoir, VA (1 CMEs)

(2) Technical Advisor III at Fort Belvoir, VA (6 CMEs)

(3) Senior Test Engineer (System Evaluator) at Fort Belvoir, VA (3 CMEs)

1.6.11.1.1 All Key contractor personnel shall be identified by labor category and name at the conclusion of the transition period to the COR by electronic mail. The COR will review proposed contractor personnel resumes to ensure skills and requirements are met IAW the requirements of the PWS and provide a recommendation to the KO.

Resumes should be no more than three pages. All contractor personnel accepted by the COR will start no later than 30 calendar days after contract award. The contractor may not substitute or exchange contractor personnel without prior written approval by the COR. Before replacing any contractor personnel, the contractor shall notify the COR no less than 10 business days in advance, submit written justification for replacement of contractor personnel, and provide the name and resume with requirements of any proposed contractor personnel. The contractor shall not replace contractor personnel without written approval from the COR. The COR will ensure that any replacement contractor Personnel under this contract shall possess requirements equal to or greater than the requirements within Part 7, Technical Exhibit 3, for Personnel Requirements.

1.6.11.1.2 Key Personnel Hiring: All Key positions must be approved by the Government prior to hiring. The contractor shall fill all key positions within 15 days of the contract Period of Performance (PoP). Written notification shall be provided to COR/ACOR immediately upon a key personnel vacancy.

1.6.11.1.3 The contractor shall identify and provide resumes of all proposed Key positions. The Government CORs and ACORs of impacted programs will review and approve proposed billets to ensure personnel and replacement personnel meet the qualifications prior to performing under this contract. The Government reserves the right to review/approve all resumes upon request. Except as indicated in the appropriate position descriptions, all personnel working on this contract shall be U.S. Citizens and have a final TS security clearance based upon a TIER 5 Background Investigation, and favorable eligibility determination for access to SCI IAW ICD 704. Some positions will require HCS, Gamma access, and CI Polygraph. Security Clearance exception determination will be solely provided by the COR upon request by the PM. The contractor shall maintain and administer a security program IAW the National Industrial Security Program Operating Manual (NISPOM).

1.6.11.2 Non-Key Personnel Hiring: The contractor shall fill all positions within 30 days. Written notification shall be provided to COR/ACOR immediately upon a vacancy.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.12.1 All contractor personnel are required to obtain and maintain a Common Access Card (CAC) for computer access. The contractor shall ensure all badges and cards are returned and Government accounts are closed upon termination of contractor employment.

1.6.12.2 The contractor shall be responsible for ensuring that employees assigned to this contract comply with the applicable laws and regulations of the host country and any political subdivisions thereof. The contractor is also responsible for ensuring that such employees comply with military rules and regulations when employed in areas under the jurisdiction of the applicable U.S. Army Commander. The Government also reserves the right to remove any contractor for the purpose of conducting an investigation of alleged misconduct that may, in the opinion of the KO, jeopardize the security of the project. Loss or suspension of required facility security clearance as set forth on

IAW the terms and conditions of this contract. As a direct result, the contractor is subject to termination under the appropriate termination clause.

1.6.13 Contractor Travel: Contractor will be required to travel CONUS and OCONUS during the performance of this contract to provide support, attend meetings, conferences, and training. All contractor travel for this contract shall be listed in the G-7 Portal for COR or ACOR validation as required. The COR and ACOR must have visibility of all personnel traveling and its associated expenses. The contractor may be required to travel to off-site training locations and to ship training aids to these locations in support of this PWS. Contractor will be authorized travel expenses on a not to exceed amount consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR.

1.6.13.1 Travel Request: A travel request shall be submitted 10 workdays days prior to the date of travel. For unforeseen travel requirements a travel request shall be submitted prior travel commencement. All travel requests (including plans, agenda, itinerary, dates and estimated cost) must be submitted for signature to the Program Manager, Government requestor, and the COR. All travel must be pre-approved by the Government prior to commencing travel. The travel request should also include the current remaining funded ODC balance at the time of the request.

Deliverable A005 Travel Requests

1.6.13.2 Post Travel Requirements: The contractor shall provide a trip report to the COR or ACOR for each trip completed within five workdays upon return. All Trip reports shall include name of traveler, location, and trip duration. POC at location and summary of meetings/actions taken on trip.

Deliverable A006 Trip Reports

1.6.13.3 The contractor shall provide actual cost and expense category information to facilitate COR review and approval at time of invoice.

1.6.13.4 Local travel is considered travel within a 50-mile radius of the home station to perform official duties.

Travel outside the 50-mile radius, as tasked by the Government, will be reimbursed at the applicable Joint Travel Regulations (JTR) rate. When available and appropriate, Government vehicles shall be used for official duties and travel.

1.6.13.5 Travel outside the 50-mile radius requires Government issued Letters of Authorization (LOAs) and for OCONUS travel Letters of Instruction (LOI) are required for official travel and shall comply with the JTR. All travel costs will be reimbursed IAW the Government JTR.

1.6.13.6 The contractor shall ensure employees comply with NISPOM, Title 32 CFR Part 117, NISPOM Rule, requirements for notification and obtaining authorization prior to travel to areas listed by the State Department or locations may be required for short periods of time as directed by the COR. Travel to these locations may require country clearances prior to travel and shall comply with the JTR.

1.6.14 Surge Requirements: The Government may require in scope surge support during the base or any option period to provide increased support for the defined task areas of the PWS. Surge support is not a contractual guarantee and will only apply for hours incurred via an exercised option. If the Government determines that an increased quantity of support is required for the task areas defined in the PWS, the contractor will be notified by the KO. Surge support is defined as work required to support increased mission requirements, emergencies, natural disasters, terrorist threats or events, elevation of threat levels or unscheduled/short notice exercises, unit activations, contingency operations or deployments, critical mission systems repairs, or other unusual, critical operations. Surge support may require some or all of the following: movement of/or additional contractor support, contractor travel, or movement/shipment of contract supported equipment.

1.6.14.1 The Government will make every effort to identify potential surge support requirements as soon as possible. KO will provide written notice to the contractor prior to any exercise of the surge option. In the event the Government does elect to exercise the surge option, surge support will be provided under optional CLINs for the relevant task areas identified in the PWS. Surge support will be provided at the same labor rates proposed and found fair and reasonable at time of contract award for the applicable period.

1.6.14.2 Notification of surge support requirements will include locations, durations, specific services required, suggested number of personnel, and any other surge unique information. The Government will make every effort to give the contractor advance notice of requirements, but the services for which this contract will be used could address an emergent requirement with little or no advance notice.

1.6.14.3 All Labor Categories (LCATs) on this contract are subject to potential surge requirements. In addition to called on for potential surge requirements. These four (4) LCATs will not be on the base contract at award but pricing needs to be identified if a surge requirement is identified. The four (4) LCATs in this category are Technical Advisor I, Technical Advisor II, ORSA, and Data Analyst. Requirements and other details for each of these positions are outlined in Technical Exhibit 3B.

1.6.14.4 The contractor shall provide the Government proposal for surge support within 48 hours from the time of notification. The contractor will ensure that its proposed solution does not delay the execution of mission or cause mission failure. Surge support will be provided at the labor rates proposed and found fair and reasonable at time of contract award for the applicable period of performance. Upon validation of an internal surge requirement or receipt of the cont modification will be issued incorporating the surge support efforts. Under emergency circumstances, the KO may issue modifications orally, by facsimile, or by electronic commerce methods including, but not limited to, sending by e-mail to the contractor. The KO must confirm the oral modification or order in writing within 14 days. If the contractor proceeds with work without KO written approval, all costs associated with the surge support will be unallowable and therefore not reimbursed.

Deliverable A007 - Surge Proposal

1.6.15 Other Direct Costs (ODC): Contractor ODCs shall be approved by the COR, in writing, prior to use. ODCs will consist of travel and material cost as approved to perform the support requirements of the G-7. The contractor shall provide estimated cost, to include contract burdens, item specifications, and other pertinent information to facilitate COR review and approval. Travel cost estimates shall be based on allowable cost(s) identified within the Joint Travel Regulation; an only material necessary in the performance of this contract shall be acquired.

1.6.15.1 Defense Base Act (DBA): Contractor must have Defense Base Act (DBA) insurance for any trip or work in which it is required. ODCs will be used to cover DBA costs incurred.

1.6.16 Data Rights: Per DFARS 252.227-7013 and 252.227-7014, the Government shall have unlimited rights to all studies, analyses, test data, or similar data produced for this contract, when that item was specified as an element of performance. Per DFARS 252.227-7020, the Government shall have unlimited rights to all works (such as training materials, training programs, computer data bases, computer software documentation) first produced, created, or generated and required to be delivered under this contract.

1.6.17 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.18 Training: This PWS requires training that is unique to INSCOM or the Government. The contractor shall pay for any required training for their employees to achieve required certification levels required by the contract. Any current training, remedial, refresher, maintenance, or advancement to the next certification level, and all associated costs are the responsibility of the contractor. The Government may offer specific duty related training opportunities to the contractor at no cost to the Government. All such training will be coordinated with the COR/ACOR and approved by the KO and charged via ODCs. INSCOM contractors require the following additional training:

(1) Information Assurance Related Training (Cyber Awareness)

(2) Intelligence Oversight and Civil Liberties

(3) Operations Security (OPSEC)

(4) Threat Awareness & Reporting Program (TARP)

(5) Derivative Classification

(6) Anti-Terrorism (AT) Training (Contractor)

(7) Foreign Disclosure, Rules of Road

(8) Information Security (Annual Security Refresher Training INSCOM)

(9) DoD Mandatory Controlled Unclassified Information (CUI) Training

(10) Records Management

1.6.18.1 Antiterrorism (AT) Considerations: In accordance with DFARS 252.225-7043 Antiterrorism/Force Protection (AT/FP), and DoD Instruction O-2000.16, Volume 1, DoD Antiterrorism Standards, the contractor is hereby advised that it shall comply with the policies and procedures of the U.S. Antiterrorism Officer (ATO) at each installation/organization where work is being performed. A modification to the contract will be the instrument of notification for this action. The contractor may submit a request for an equitable adjustment for any directly incurred costs for compliance with these policies and procedures, following the modification incorporating the policy and procedures guidance. Equitable adjustment requests shall be in compliance with clauses.

1.6.18.2 Antiterrorism and Force Protection (AT/FP): AR 350-1, Army Training and Leadership Development, Section II, G-3/5/7, Antiterrorism and Force Protection (AT/FP). Specific Army standards for AT/FP training are listed in chapter 5, AR 525-13, Individual AT/FP training is mandatory for all soldiers, Department of the Army civilians (DAC) and DoD contractors and is strongly recommended for family members prior to travelling outside the 50 United States and its territories and possessions for any reason, including mobilization, temporary duty, permanent change of station, and leave. There is also an AT/FP training requirement for personnel stationed outside the United States. Individual AT/FP training is valid for one (1) year and must be documented.

1.6.18.3 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level 1 awareness training is available at the following website: https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf.

1.6.18.4 Access and General Protection/Security Policy and Procedures: Contractor and all associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor and all associated subcontractor employees shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office (PMO), Director of Emergency Services (DES) or Security Office.

1.6.18.4.1 Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA, and INSCOM policy.

1.6.18.4.2 In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(1) For Contractors Requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following:

(a) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely.

(b) Remote access, via logon, to a DoD network using DoD-approved remote access procedures;

or

(c) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more (Army Trusted Associate Sponsorship System (TASS) Policy, 08 Nov 17, paragraph 8(2), page 12). At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

(2) For Contractors that Do Not require Common Access card (CAC) but Require Access to a DoD Facility or Installation: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); comply with applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.

1.6.18.5 Mission Partner Identity, Credential and Access Management (MP-ICAM):

1.6.18.5.1 The contract company is responsible for providing the appropriate documentation to the government to process applications for Common Access Cards (CAC) for every contractor employee who deploys with the military force, or who has a need to access any government computer network in accordance with FAR 52.204-multiple non-DoD facilities on behalf of the sponsoring government organization for a period of 6-months or more, requires both physical and logical (network logon) access to both DoD networks on site or remotely, OR requires logical (network logon) access to DoD networks on site or remotely.

1.6.18.5.2 The contractor is responsible for managing requests for new, renew and reverification of CACs in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract.

The norm is at least ten calendar business days advance notice to the Mission Partner Affiliation Sponsor (MPAS), Contracting Officer. *The COR will be the MPAS for this contract.

processing to G-2 and Government COR. If a FSO is not established, each contractor employee requiring a CAC card will be required to manage their own applications.

1.6.18.5.4 CAC applications must be processed through Mission Partner Identity, Credential and Access Management (MP-requests via secure means such as DoD SAFE, encrypted email, password protected documents etc. to the COR. The COR will provide the request package to the command G-2 to be processed. The COR will provide the AHRC TASS Form1, version 1.3 to the MPAS once CAC Application is approved. The list of required documents to complete the request package for an INITIAL CAC:

(1) G-2 Contractor PSI Worksheet Emp Hist Worksheet

(2) OF 306, Declaration for Federal Employment

(3) Copy of birth certificate or passport or naturalization certificate (if foreign born)

(4) AHRC TASS Form V1.3 dated 1 May 2021

1.6.18.5.5 The government MPAS will establish a MP-ICAM application account for each CAC request. MP-ICAM will generate two emails to the applicant, one with the application number and the second email with a password.

The contractor employee shall access the MP-ICAM site and complete the CAC application (entering/editing contractor information as applicable) at MP ICAM - Mission Partner Registration Web Application - DMDC (osd.mil)

-ICAM. MP-ICAM will inform via email to the MPAS the application has b

1.6.18.5.7 The MPAS will process the request, MP-

email of one of the following:

(1) Approved*. Upon approval, the information is transferred to the Defense Enrollment Eligibility Reporting System (DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time Automated Personnel Identification System (RAPIDS) station (https://www.dmdc.osd.mil/rsl/provides RAPIDS locations).

(2) Rejected*. Government in separate correspondence will provide reason(s) for rejection.

(3) Returned. Additional information, or correction to the application, required by the contractor employee.

*The contractor will maintain records of all approved and rejected applications.

1.6.18.5.8 At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN, and two forms of identification, one of which must be a picture ID. The Verification Officer will capture primary and alternate fingerprints and picture, and updates to DEERS and will then issue a CAC. CACs require reverification every 180 days. The MPAS will be notified via MP-ICAM generated email when the reverification date is approaching. The contract FSO will provide the electronically signed AHRC TASS Form 2.1 to the MPAS. The MPAS will re-verify the employee in MP-ICAM.

contract end date (inclusive of any options) whichever is earlier. Prior to the three (3) year expiration, MP-ICAM will notify both the contractor and the MPAS of the expiration date. The FSO or appointed personnel will submit the AHRC TASS Form 1, version 1.3 indicating REISSUE on the form.

new CAC, or when employment is terminated. The FSO or other appointed personnel shall provide the electronically signed AHRC TASS Form 2.1 to the MPAS. The MPAS will revoke the contractors CAC in MP-

ICAM.

1.6.18.5.11 A CAC cannot be issued without evidence that a T-1 investigation has at least been initiated by the Government, G-2. Per DODI 5200.46 Section 3.d: A CAC may be issued on an interim basis based on a favorable National Agency Check and a Federal Bureau of Investigation (FBI) National Criminal History Check (fingerprint check) adjudicated by appropriate approving authority, and successful submission to the investigative service provider (ISP) of a T1 or a personnel security investigation (PSI) equal to or greater in scope than a T1. Once the fingerprints are done and the applicant has submitted the T1 (or other applicable investigation) in PSIP, a CAC can and should be issued to applicant on an interim basis to prevent delay of work and excess cost to the government as a result. If the employee does not have a valid background investigation, the government will initiate the T1 as long as the contract does NOT require the contractor to have access to classified information. Once the TI investigation is open in Defense Information Security System (DISS), (between 2-4 weeks) an interim CAC eligibility is either granted or denied and an email will go out to the Supervisor, FSO, Sponsor, COR, MPASM and MPAS advising eligibility.

1.6.18.6 AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language requires U.S.

based contractor employees and associated subcontractor employees to make available and to receive Government-provided area of responsibility (AOR) specific AT and other security awareness training as directed by AR 525-13 and FAR 2-101. Specific AOR training content is directed by the combatant commander, with the unit protection program security representative being the local point of contact.

1.6.18.7 iWATCH Training (This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility, or area): The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Authorization to Operate (ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 60 calendar training results shall be reported to the COR not later than 30 calendar days after contract award.

1.6.18.8 Threat Awareness Reporting Program (TARP) Training: For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-receive annual TARP training by a CI agent or other trainer as specified in 2-4b AR 381-12 Threat Awareness and Reporting Program (TARP).

1.6.18.9 For Contract Requiring Performance or Delivery in a Foreign Country: DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense contractors outside the US (OCONUS). The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.

(1) Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall:

(a) Provide, to contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States (DFARS Clause 252.225-7043).

(b) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel (DFARS Clause 252.225-7043).

1.6.18.10 For Contractors Authorized to Accompany the Force (CAAF): DFARS Clause 252.225-7040, contractor Personnel Authorized to Accompany U.S. Armed Forces Deployed Outside the United States (OCONUS). CAAF deployed outside the United States in contingency operations (humanitarian or peacekeeping operations; or other military operations or exercises), must receive personnel security training as part of the preliminary requirements.

The following requirements must be met prior to deploying CAAF (specific requirements for each category will be specified in the statement of work or elsewhere in the contract):

(1) All required security and background checks are complete and acceptable.

(2) All CAAF deploying in support of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .