A07_Q&As_11_6_17.pdf
PDF 8 KB Posted
- Attached to
- Work Bench Systems
- Solicitation number
- W25G1V18R0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07_Q&As_11_7_17.pdf | ||
| A07_Q&As_11_2_17.pdf | ||
| A07_Q&As_10_27_17.pdf | ||
| Atch_5_Map.PDF | ||
| Atch_4_1A_Enclosure_Redacted.pdf | ||
| A07_Q&As_10_26_17.pdf | ||
| A07_Q&A__10_18_17.pdf | ||
| Atch_3_Concept_Dwgs.pdf | ||
| A07_W25G1V-18-R-0021.pdf | ||
| Atch_1_Submission_Instructions_and_Evaluation_Criteria.pdf | ||
| Atch_2_PWS_Workbenches.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – 11/6/17
Q1. Will you accept partial quotes to include only:
13.3.4 One Door / 4 Drawer Rolling Cabinets, 13.3.5 Standard Tools Cabinets and not
13.3.1 Workbench, 13.3.2 Extender bench, 13.3.3 Electrical package to be awarded to others?
A1. No, per Solicitation Addendum, Page 3, Paragraph 4, “Offer shall be submitted and award made by the Government on an all-or-none basis. Therefore, offers are solicited on that basis only.”
Q2. 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government (Sep 2006) -- Alternate I OCT 1995
As per the above is there any restriction to outsource any or part or percentage of this project such as labor, Material, Assembling, Etc.?
A2. Please refer to FAR clause 52.219-14, Limitations on Subcontracting.
File details come from the government source that posted it. Updated .