A07_Q&As_10_26_17.pdf
PDF 32 KB Posted
- Attached to
- Work Bench Systems
- Solicitation number
- W25G1V18R0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A07_Q&As_11_7_17.pdf | ||
| A07_Q&As_11_6_17.pdf | ||
| A07_Q&As_11_2_17.pdf | ||
| A07_Q&As_10_27_17.pdf | ||
| Atch_5_Map.PDF | ||
| Atch_4_1A_Enclosure_Redacted.pdf | ||
| A07_Q&A__10_18_17.pdf | ||
| A07_W25G1V-18-R-0021.pdf | ||
| Atch_1_Submission_Instructions_and_Evaluation_Criteria.pdf | ||
| Atch_2_PWS_Workbenches.pdf | ||
| Atch_3_Concept_Dwgs.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – 10/26/17
Q1. 9.0 DELIVERY & Care of Items and Schedule:
Building 1C bay 6 to the point of use in Building 1A (The indoor distance is approximately 1,500 feet to the point of use). Will this project require any Masonite to be placed in the surrounding area?
A1. Answer pending; to be provided shortly.
Q2. The project states that the distance from the bay is 1,500 feet to the final job site, are there any stairs involved?
A2. No. (Also, the raised floor in the Enclosure is only 2-1/2” high and has minimal slope ramps entering the Enclosure area.)
Q3. 9.1.2.1.4.5. Items CAN be delivered EARLIER than the above schedule if coordinated at least 10 days ahead of delivery with the COR. IF the items are delivered early, there shall be no additional cost to the government. According to the solicitation, it states that this will be done in four phases. To keep the cost down, Will it be possible to deliver and install in one phase instead of four?
A3. Yes as long as you’re in accordance with PWS section 9.1.2.1.4. and the delivery notice in PWS section 9.1.1.2.
Q4. Will this project require a prevailing wage schedule?
A4. No.
Q5. Can we obtain a floor plan for the job site?
A5. Yes. The drawings will be provided shortly as a separate attachment.
Q6. An Auto-cad file would be preferred, a PDF with dimensions can also work?
A6. PDF is acceptable. However, all submitted information must be in accordance with the requirements stated in the PWS Sections 9, 10, 12 & 15.
Q7. Due to the size of the project, can we obtain a progressive deposit?
A7. No.
Q8. Can we confirm the quantity and model numbers for the multi drawer cabinets from Vidmar?
A7. All quantities and model numbers as stated in the PWS are accurate. Please refer to the PWS for specific information.