A01_SEPM_QASP_30_NOV_2016.docx

DOCX document 34 KB Posted

Attached to
SEPM Support Services
Solicitation number
W15P7T-18-R-0005
Issued by

About this file

SEPM Re-compete QASP

View the file

Other files

File Type Posted
A07_W15P7T-18-R-0005_Q_and_A_15_June_2018.pdf PDF
A01_SEPM_TO_0001__DD254_CONTINUATION.pdf PDF
A01_SEPM_IDIQ_DD254_CONTINUATION.pdf PDF
A01_SEPM_TO_0001_DD254_SCI_ADDENDUM.PDF PDF
A01_PWS_IDIQ_12_June_2018.docx DOCX document
A07_PEOC3T_Additional_Info_for_the_CandP_Proposal__Revised_21_MAY_2018.xlsx XLSX spreadsheet
A07_W15P7T-18-R-0005_Q_and_A_13_June_2018.pdf PDF
A07_PEO_C3T__SEPM_LABOR_CATEGORY_DESCRIPTIONS_Final_04_June_2018.xlsx XLSX spreadsheet
A01_SEPM_IDIQ_DD254_SIGNED.PDF PDF
A01_SEPM_IDIQ__DD254_SCI_ADDENDUM.PDF PDF
A07_W15P7T-18-R-0005_Amendment_0002_13_June_2018.pdf PDF
A01_PWS_TO_0001__12_June_2018.docx DOCX document
A01_SEPM_TO_0001__DD254_SIGNED.PDF PDF
A07_W15P7T-18-R-0005_Amended_0001_06_June_2018.pdf PDF
A07_Proposal_Adequacy_Checklist.docx DOCX document
A07_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM.docx DOCX document
A01_CDRL__A002_19_APR_2018.docx DOCX document
A01_CDRL__A003_19_APR_2018.docx DOCX document
A01_SEPM_DD254_IDIQ_APPENDIX_A-G.pdf PDF
A01_CDRL__A001_19_APR_2018.docx DOCX document
A07_Past_Performance_Consent_Letter.pdf PDF
A07_W15P7T-18-R-0005_Final_Solicitation_10_MAY_2018.pdf PDF
A07_PEO_C3T_Additional_Info_for_the_Cost_and_Price_Proposal_Final_04_MAY_2018.xlsx XLSX spreadsheet
A01_SEPM_TO_0001__DD254_APPENDIX_A-G.pdf PDF
A01_PWS_TO_0001__20_APR_2018.docx DOCX document
A01_PWS_IDIQ_20_APR_2018.docx DOCX document
A07_W15P7T-15-D-0010_Consolidated_GFP_Attachment_v3__23_Mar_2018.pdf PDF
A07_PEO_C3T__SEPM_LABOR_CATEGORY_DESCRIPTIONS_Final_07_MAY_2018.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As of 11/30/2016 Quality Assurance Surveillance Plan (QASP)

1. Contract (W15P7T-18-R-0005): System Engineering and Program Support (SEPM)

2. Work Requirements:

· Task 1 - Management Transition In (Staffing) and Transition Out Plan

· Task 2 Program Management Support

· Task 3 General System Engineering Support

· Task 4 - Integrated Product Support and Readiness Services

3. Primary Method of Surveillance:

There will be periodic inspection in accordance with performance standards for items 1-5 and random sampling for item 6. Further, on not less than on a quarterly basis customer satisfaction surveys will be sent and analyzed in addition to any unscheduled inspections in response to validated customer complaints received.

4. Scope of Performance:

The Contractor shall provide support in a diverse range of acquisition management, business management, engineering, architecture, integration and readiness support services that span the total life-cycle of PEO C3T systems. The required services include all C3T programs and program management offices, systems to include but not be limited to, system of systems (SoS) engineering and integration, network engineering, architecture development, interoperability engineering, information assurance, technology transition/insertion, testing, fielding and training. All must be planned and executed in coordination with multiple units and organizations, with special consideration for the US Army war-fighting mission and the current operations tempo (OPTEMPO) of US Army warfighting units as they undergo exercises and training events, deployment, operations, redeployment and reset. PEO C3T must also support a series of Army, Joint, and Combined experiments, demonstrations and exercises that will help define the concepts, requirements, doctrine, and equipment for the continued digitization and transformation of the Army.

The Government may require surge support during the base or any option period, and surge modifications will be within the scope of the contract and provide increased support for the defined task areas of this PWS. Surge support over the life of the contract will not exceed 5% of the contractor’s total proposed cost/price for the base and all option periods, excluding any six-month extension of services pursuant to FAR 52.217-8.

5. Performance Standards: The Performance Standards Summary Matrix below, includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance

1. Management Transition In (Staffing) and Transition Out Plan

Must provide acceptable candidate within 30 days of being provided the requirement and have that candidate on-boarded and fully functional within 60 days of notification.
Staffing requirements successfully satisfied within 60 days
2. Provide Monthly Program Status and Financial reports (IAW CDRL A001)
Performance occurs with no required re-performance or re-work at least 90% of the time. Problems that occur are minor and are resolved in a satisfactory manner.
Monthly inspection of deliverable products and services.
3. Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training
Contract Employee list with OPSEC Training certification provided within 30 days of contract award and maintained current.
Compliance Review not less than quarterly
4. CMRA will be done timely and completed correctly
Performance occurs with no required re-performance or re-work at least 100% of the time. Problems that occur are minor and are resolved quickly in a satisfactory manner.
COR conduct annual CMRA review
5. Operations Security Requirement The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure this individual becomes OPSEC Level II certified per AR 530-1.
OPSEC SOP contains all required information and is delivered on time. Revisions that occur are minor and are resolved in a satisfactory manner.
Annual inspection of the SOP
6. Applicable Tasks/Subtasks (i.e. Briefing materials, technical/business reports, studies and documentation, training material, schedules, meetings, trip reports, white papers, etc., will be delivered on time, be correct, and be delivered in appropriate electronic media, IAW Government POC guidance
Materials contain required information and are delivered on time at least 90% of the time. Revisions that occur are minor and are resolved in a satisfactory manner.
TPOCs to do 100% inspection of the materials when delivered. COR to validate compliance and customer satisfaction quarterly.

Table 5.1 Performance Standards and AQL

6. Mandatory or regulatory compliance items:

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.

7. Acceptable Quality Level (AQL):

The AQL for this project is as provided in Table 5.1 above due to the critical support provided by mainframe operations.

8. Evaluation Method:

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the KS, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

a. DIRECT OBSERVATION. All applicable Tasks/Subtasks Will be performed through 100% surveillance. This will include the Management Transition In (Staffing) and Transition Out Plan

b. PERIODIC INSPECTION. the Monthly Program Status and Financial reports will be 100% monitored on a monthly basis to ensure that it is complete, current and correct. Also to ensure that there is no differential between what is being reported in the monthly financials and the resulting invoice. If invoices are to be presented on a bi-weekly basis then the financial reports must coincide.

c. USER SURVEY. Random survey will be provided to the TPOCs not less than semi-annually to determine adequacy of support for all applicable performance aspects.

d. VALIDATED USER/CUSTOMER COMPLAINTS. Any complaints received in the surveys or independent of the surveys from the TPOC or related parties shall be investigated and validated within 90 days of receipt of the complaint.

e. 100% INSPECTION. Will be conducted on all deliverables identified in the PWS

f. PROGRESS OR STATUS MEETINGS. Shall be held monthly to review the Monthly Status and Monthly Financial Reports and the associated invoice for the time period in question.

Surveillance results may be used as the basis for actions against the contractor up to and including termination.

9. Incentives (Positive and/or Negative):

The COR shall meet with the contractor not less than monthly to assess performance and shall provide a written assessment of the determined contractor performance for each monthly period. It will be documented if the contractor exceeds, meets, or does not meet a given standard and acceptable quality level. The following ratings shall be used based upon the Acceptable Quality Level (AQL) shown in the performance standards table:

EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY:
Performance meets contractual requirements.
UNSATISFACTORY:
Performance does not meet contractual requirements.

Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2

SEPM, QASP