DEPARTMENT OF DEFENSE
CONTRACT SECURITY CLASSIFICATION SPECIFICATION
(The requirements of the DoD Industrial Security Manual apply to all security aspects of this effort.)
1. CLEARANCE AND SAFEGUARDING
a. FACILITY CLEARANCE REQUIRED
b. LEVEL OF SAFEGUARDING REQUIRED
2. THIS SPECIFICATION IS FOR: (X and complete as applicable)
a. PRIME CONTRACT NUMBER
b. SUBCONTRACT NUMBER
c. SOLICITATION OR OTHER NUMBER DUE DATE (YYYYMMDD)
3. THIS SPECIFICATION IS: (X and complete as applicable)
a. ORIGINAL (Complete date in all cases)
REVISION NO.
c. FINAL (Complete Item 5 in all cases)
DATE (YYYYMMDD)
b. REVISED (Supersedes all previous specs)
DATE (YYYYMMDD)
DATE (YYYYMMDD)
4. IS THIS A FOLLOW-ON CONTRACT? YES NO. If Yes, complete the following:
Classified material received or generated under (Preceding Contract Number) is transferred to this follow-on contract.
5. IS THIS A FINAL DD FORM 254? YES NO. If Yes, complete the following:
In response to the contractor's request dated , retention of the classified material is authorized for the period of
6. CONTRACTOR (Include Commercial and Government Entity (CAGE) Code)
a. NAME, ADDRESS, AND ZIP CODE b. CAGE CODE c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)
7. SUBCONTRACTOR
a. NAME, ADDRESS, AND ZIP CODE b. CAGE CODE c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)
8. ACTUAL PERFORMANCE
a. LOCATION b. CAGE CODE c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)
9. GENERAL IDENTIFICATION OF THIS PROCUREMENT
10. CONTRACTOR WILL REQUIRE ACCESS TO: 11. IN PERFORMING THIS CONTRACT, THE CONTRACTOR WILL:YES NO YES NO
a. COMMUNICATIONS SECURITY (COMSEC) INFORMATION
b. RESTRICTED DATA
c. CRITICAL NUCLEAR WEAPON DESIGN INFORMATION
d. FORMERLY RESTRICTED DATA
e. INTELLIGENCE INFORMATION
(1) Sensitive Compartmented Information (SCI)
(2) Non-SCI
f. SPECIAL ACCESS INFORMATION
g. NATO INFORMATION
h. FOREIGN GOVERNMENT INFORMATION
i. LIMITED DISSEMINATION INFORMATION
j. FOR OFFICIAL USE ONLY INFORMATION
k. OTHER (Specify)
a. HAVE ACCESS TO CLASSIFIED INFORMATION ONLY AT ANOTHER
CONTRACTOR'S FACILITY OR A GOVERNMENT ACTIVITY
b. RECEIVE CLASSIFIED DOCUMENTS ONLY
c. RECEIVE AND GENERATE CLASSIFIED MATERIAL
d. FABRICATE, MODIFY, OR STORE CLASSIFIED HARDWARE
e. PERFORM SERVICES ONLY
f. HAVE ACCESS TO U.S. CLASSIFIED INFORMATION OUTSIDE THE U.S., PUERTO RICO, U.S. POSSESSIONS AND TRUST TERRITORIES
g. BE AUTHORIZED TO USE THE SERVICES OF DEFENSE TECHNICAL INFORMATION
CENTER (DTIC) OR OTHER SECONDARY DISTRIBUTION CENTER
h. REQUIRE A COMSEC ACCOUNT
i. HAVE TEMPEST REQUIREMENTS
j. HAVE OPERATIONS SECURITY (OPSEC) REQUIREMENTS
k. BE AUTHORIZED TO USE THE DEFENSE COURIER SERVICE
l. OTHER (Specify)
DD FORM 254, DEC 1999 PREVIOUS EDITION IS OBSOLETE.
12. PUBLIC RELEASE. Any information (classified or unclassified) pertaining to this contract shall not be released for public dissemination except as provided by the Industrial Security Manual or unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release
a. TYPED NAME OF CERTIFYING OFFICIAL
Direct Through (Specify)
d. ADDRESS (Include Zip Code)
Yes No to the Directorate for Freedom of Information and Security Review, Office of the Assistant Secretary of Defense (Public Affairs)* for review.
*In the case of non-DoD User Agencies, requests for disclosure shall be submitted to that agency.
13. SECURITY GUIDANCE. The security classifiection guidance needed for this classified effort is identified below. If any difficulty is encountered in applying this guidance or if any other contributing factor indicates a need for changes in this guidance, the contractor is authorized and encouraged to provide recommended changes; to challenge the guidance or the classification assigned to any information or material furnished or generated under this contract;
and to submit any questions for interpretation of this guidance to the official identified below. Pending final decision, the information involved shall be handled and protected at the highest level of classification assigned or recommended. (Fill in as appropriate for the classified effort. Attach, or forward under separate correspondence, any documents/guides/extracts referenced herein. Add additional pages as needed to provide complete guidance.)
14. ADDITIONAL SECURITY REQUIREMENTS. Requirements, in addition to ISM requirements, are established for this contract.
(If Yes, identify the pertinent contractual clauses in the contract document itself, or provide an appropriate statement which identifies the additional requirements. Provide a copy of the requirements to the cognizant security office. Use Item 13 if additional space is needed.)
Yes No15. INSPECTIONS. Elements of this contract are outside the inspection responsibility of the cognizant security office.
(If Yes, explain and identify specific areas or elements carved out and the activity responsible for inspections. Use Item 13 if additional space is needed.)
16. CERTIFICATION AND SIGNATURE. Security requirements stated herein are complete and adequate for safeguarding the classified information to be released or generated under this classified effort. All questions shall be referred to the official named below.
b. TITLE c. TELEPHONE (Include Area Code)
e. SIGNATURE
17. REQUIRED DISTRIBUTION
a. CONTRACTOR
b. SUBCONTRACTOR
c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR
d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION
e. ADMINISTRATIVE CONTRACTING OFFICER
f. OTHERS AS NECESSARY
DD FORM 254 (BACK), DEC 1999
CONTRACT: #TBD
APPENDIX A
ADDITIONAL SECURITY GUIDELINES FOR COMSEC
Provided by the CECOM LCMC Director of Intelligence & Security/G2
(Updated: 14 July 2008)
Contractor Generated Communications Security (COMSEC) Material: Any material generated by the contractor (including, but not limited to, correspondence, drawings, models, mockups, photographs, schematics, status programs and special inspection reports, engineering notes, computations and training aids) will be classified according to its own content. Classification guidance will be taken from other elements of this Contract Security Classification Specification, DD Form 254, Government furnished equipment or data, or special instructions issued by the Contracting Officer, or his/her duly appointed representative.
REQUIREMENTS:
1. The requirements of DoD 5220.22-M and NSA/CSS Policy Manual 3-16 are applicable to this effort.
2. All contractor personnel to be granted access to classified COMSEC information must be U.S. citizens granted FINAL clearance by the government prior to being given access. Immigrant aliens, interim cleared personnel, or personnel holding a contractor granted CONFIDENTIAL clearance are not eligible for access to classified COMSEC information released or generated under this contract without the express permission of the Director, NSA.
3. Contractor employees or cleared commercial carriers shall not carry classified COMSEC material on commercial passenger aircraft anywhere in the world without the approval of the procuring contracting officer.
4. No contractor generated COMSEC or government furnished material may be provided to the Defense Technical Information Center (DTIC). Contractor generated technical reports will bear the statement "Not Releasable to the Defense Technical Information Center per DoD Directive 5100-38."
5. Classified paper COMSEC material may be destroyed by burning, disintegration, chopping or high security crosscut shredding.
Cryptographic key tapes must be “terminally” destroyed (destroyed to the point where it cannot be reconstructed)utilizing devices listed on the Evaluated Products List (EPL) for Punched Tape Destruction Devices or the EPL for High-Security Disintegrators. A listing of EPLs can be found at http://www.nsa.gov/ia/government/mdg.cfm. When a method other than burning is used, all residue must be reduced to pieces 5mm or smaller in any dimension. When classified COMSEC material other than paper is to be destroyed, specific guidance must be obtained from the User Agency.
6. Unclassified COMSEC information released or generated under this contract shall be restricted in its dissemination to personnel involved in the contract. Release in open literature or exhibition of such information without the express written permission of the Director, NSA, is strictly prohibited.
7. Recipients of COMSEC information under this contract may not release information to subcontractors without permission of the
User Agency.
8. Additional notices to be affixed to the cover and title or first page of contractor generated COMSEC documents:
a. "COMSEC MATERIAL - ACCESS BY CONTRACTOR PERSONNEL RESTRICTED TO U.S. CITIZENS
HOLDING FINAL GOVERNMENT CLEARANCE."
b. "THIS PUBLICATION OR INFORMATION IT CONTAINS MAY NOT BE RELEASED TO FOREIGN
NATIONALS WITHOUT PRIOR SPECIFIC APPROVAL FROM THE DIRECTOR, NSA. ALL APPROVALS
WILL IDENTIFY THE SPECIFIC INFORMATION AND COPIES OF THIS PUBLICATION AUTHORIZED FOR
RELEASE TO SPECIFIC FOREIGN HOLDERS. ALL REQUESTS FOR ADDITIONAL ISSUANCES MUST
RECEIVE PRIOR SPECIFIC APPROVAL FROM THE DIRECTOR, NSA."
9. Point of contact is CECOM LCMC G2, ATTN: AMSEL-MI.
CONTRACT: #SEPM TBD
APPENDIX B
US ARMY SCI ADDENDUM TO DD FORM 254, 31 May 2005
XXX (1) This contract requires access to Sensitive Compartmented Information (SCI). The Commander, US Army Intelligence and Security Command (INSCOM), acting on behalf of the DA Deputy Chief of Staff (DCS), G-2 as the Cognizant Security Authority (CSA) for the US Army, has exclusive security responsibility for all SCI released to the contractor or developed under the contract and held within the Contractor's SCI Facility (SCIF) or Co-utilization Agreement (CUA) SCIF. The Defense Intelligence Agency (DIA) has security inspection responsibility for SCI and the Defense Security Service (DSS) retains responsibility for all collateral information released or developed under the contract and held within the DoD Contractor's SCIF. The manuals, regulations and directives checked below provide the necessary guidance for physical, personnel, and information security for safeguarding SCI, and are part of the security classification specification for this contract:
XXX DoD 5105.21-M-1, SCI Security Manual, Administrative Security XXX Signals Intelligence Security Regulations (SISR) (Available from the CM) XXX Imagery Policy Series (Available from the CM) _____ DCID 6/3, Protecting Sensitive Compartmented Information within Information Systems _____ DCID 6/9, Physical Security Standards for Sensitive Compartmented Information Facilities _____ AR 25-2, Information Assurance XXX AR 380-28, DA Special Security System _____ AR 380-381, Special Access Programs (SAPS).
XXX Army Handbook for SCI Contracts.
_____ Other
XXX (2) Contract estimated completion date July 2022 (NOTE: Section “F” of the contract normally provides the Period of Performance. Option years are not to be included, as an option is not valid until exercised by the government.)
XXX (3) The name, telephone number, email address and mailing address of the Contract Monitor (CM) for the SCI portion of this contract is:
CM: Randy Young, (443) 395-8401, randy.s.young.civ@mail.mil
SCTY POC: tbd, Office#:, Mobile#:,email
(The Contract Monitor and the contractor security officer must be registered in the Army Contractor Automated Verification System (ACAVS) in order to process SCI actions)
XXX (4) All DD Forms 254 prepared for subcontracts involving access to SCI under this contract must be forwarded to the CM for approval and then to HQ INSCOM, ACofS Security, G2, Contractor Support Element (CSE) for review and concurrence prior to award of the subcontract.
XXX (5) The contractor will submit the request for SCI visit certifications through the CM for approval of the visit. The certification request must arrive at the Contractor Support Element at least ten (10) working days prior to the visit. Visit certification requests will be processed through ACAVS.
XXX (6) The contractor will not reproduce any SCI related material without prior written permission of the CM.
XXX (7) Security Classification Guides or extracts are attached or will be provided under separate cover.
XXX (8) Electronic processing of SCI requires accreditation of the equipment in accordance with DCID 6/3 and AR 25-2 (Note:
Check only if item 11l indicates that a requirement exists for SCI IS processing.)
_____(9) This contract requires a contractor SCIF.
XXX (10) This contract requires __X_ (SI) _X__ (TK) X___ (G) __X_ (HCS) (Add others as required) mailto:randy.s.young.civ@mail.mil
CONTRACT: #SEPM TBD
XXX (11) The contractor will perform SCI work under this contract at the following locations: All locations where work is to be performed under this contract.
CONTRACT: SEPM TBD
APPENDIX C
INTELLIGENCE MATERIALS ACCESS REQUIREMENTS
Provided by CECOM LCMC G2
1. No Intelligence materials are to be provided in support of the contract without the prior approval of the CECOM Life Cycle Management Command (CECOM LCMC) G2 Director of Intelligence and Security. Any intelligence materials so provided will be disseminated solely by the CECOM LCMC G2, and will be accompanied by both a Letter of Instruction governing control of the materials provided, and a Letter of Transmittal, identifying the materials loaned and the duration of the loan. This service only pertains to elements supported by the CECOM LCMC G2.
2. All requests for access to intelligence materials will adhere to the following guidelines:
a. Prime contractor requests for intelligence materials access will be sent to the Program/Project Manager (PM) of the User Activity on official business letterhead with an enclosed copy of the approved DD Form 254.
b. Subcontractor requests for access to intelligence materials will be forwarded by the prime contractor to the PM on official business letterhead with an enclosed, approved DD Form 254 for the relevant subcontract.
c. PM of the User Activity will forward request through the Contracting Officer (KO) on official letterhead with the appropriate DD Form 254 and all substantiating documents attached, to be forwarded to the CECOM LCMC G2 for review and concurrence.
3. Point of contact is CECOM LCMC G2, AMSEL-MI (ATTN: Current Intelligence)
APPENDIX D
SAFEGUARDING “FOR OFFICIAL USE ONLY” (FOUO) INFORMATION
Provided by the CECOM Director of Intelligence & Security/G2
Reference: AR 25-55, Chapter IV
1. The “FOR OFFICIAL USE ONLY” marking is assigned to information at the time of its creation in a
DOD User Agency. It is not authorized as a substitute for a security classification marking but it is used on official Government Information that may be withheld from the public under exemptions 2 through 9 of the Freedom of Information Act.
2. Other non-security markings such as “Limited Official Use” and “Official Use Only” are used by non DOD User Agencies for the same type of information and should be safeguarded and handled in accordance with instructions received from such agencies.
3. Use of the above markings does not mean that the information cannot be released to the public, only that it must be reviewed by the Government prior to its release, to determine whether a significant and legitimate Government purpose is served by withholding the information or portions of it.
4. IDENTIFICATION MARKINGS:
a. An unclassified document containing FOUO information shall be marked “For Official Use Only” in bold letters at least 3/16 of an inch high at the bottom of the front cover (if any), on each page containing FOUO information, and on the outside of the back cover (if any). No portion marking will be shown.
b. Within a classified document, an individual page that contains both FOUO and classified information will be marked at the top and bottom with the highest security classification appearing on the page. If an individual portion contains FOUO information but no classified information, the portion will be marked ‘FOUO.’
c. Any “FOR OFFICIAL USE ONLY” information released to a contractor by a DOD User Agency is required to be marked with the following statement prior to transfer:
THIS DOCUMENT CONTAINS INFORMATION EXEMPT FROM MANDATORY DISCLOSURE
UNDER THE FOIA. EXEMPTIONS APPLY.
d. Removal of the “FOR OFFICIAL USE ONLY” marking can only be accomplished by the originator or other competent authority. When “FOR OFFICIAL USE ONLY” status is terminated, all known holders will be notified to the extent possible.
5. DISSEMINATION: Contractors may disseminate “FOR OFFICIAL USE ONLY” information to their employees and subcontractors who have a need for the information in connection with a classified contract.
6. STORAGE: During normal working hours “FOR OFFICIAL USE ONLY” information shall be placed in an out-of-sight location if the work area is accessible to persons who do not have a need for the information. During non-working hours, the information shall be stored to preclude unauthorized access.
Filing such material with other unclassified records in unlocked files or desks is adequate when internal building security is provided during non-working hours. When such internal security control is not exercised, locked buildings or rooms will provide adequate after hours protection or the material can be stored in locked receptacles such as file cabinets, desks or bookcases.
7. TRANSMISSION: “FOR OFFICIAL USE ONLY” information may be sent via first-class mail or parcel post. Bulky shipments may be sent fourth-class mail.
8. DISPOSITION: When no longer needed, FOUO information may be disposed of by tearing each copy into pieces to preclude reconstructing, and placing it in a trash container or as directed by the User Agency.
9. UNAUTHORIZED DISCLOSURE: Unauthorized disclosure of “FOR OFFICIAL USE ONLY” information does not constitute a security violation but the releasing agency should be informed of any unauthorized disclosure. The unauthorized disclosure of FOUO information protected by the Privacy Act may result in criminal sanctions.
10. Point of contact is CECOM LCMC Director of Intelligence & Security/G2, ATTN: AMSEL-MI.
CONTRACT: #
FOR OFFICIAL USE ONLY
APPENDIX F
SCI CONTRACT MONITOR (CM)/ALTERNATE CONTRACT MONITIOR (ACM)
INFORMATION
(Updated: 4 June 2007)
Under the provisions of DoD 5105.21-M1, a Contract Monitor must be designated as soon as possible for all SCI Contracts. Appointment orders will be prepared by the Senior Intelligence Officer (SIO) for all CECOM LCMC contracts. Request the following information be submitted to the Director of Intelligence & Security/G2, ATTN: AMSEL-MI. All appointment orders will then be forwarded to the appropriate activities/personnel.
CONTRACT MONITOR
NAME: TBD SSN: XXX-XX-XXXX
ADDRESS: PEO C3T
ABERDEEN PROVING GROUND, MD
TELEPHONE: Commercial: DSN:
ALTERNATE CONTRACT MONITOR
NAME: TBD SSN:
ADDRESS: (Activity, Office Symbol, Bldg No.)
TELEPHONE: Commercial: DSN:
CONTRACT COMPANY INFORMATION
CONTRACT NUMBER:
EXPIRATION DATE:
CONTRACT COMPANY NAME AND ADDRESS:
TELEPHONE NUMBER:
CAGE CODE:
CONTRACT: #
SCI CONTRACTS REQUIREMENT CHECKLIST
APPENDIX G
(Updated 14 July 2008)
ITEM YES NO DATE
COMPLETED
1. Obtain draft statement of work (SOW) X
2. Does the SOW reflect the SCI requirements? X
3. Does the SOW identify the level of classification for contract? If yes, what is the classification level? Top Secret/SCI
X
4. Does the SOW identify the contractor's need for SCI access?
a. If yes, provide the SCI Contract Monitor's (CM) name and phone number
b. Has the CM received appropriate training in the duties of administering an SCI contract? Date?
X
X
5. Verify documentation prepared by the SCI CM to support the need for contractor access to SCI
a. Does documentation fully justify the type of sensitive compartmented information needed? Why can't the contract be completed without the access? How will the information be used?
b. Does the draft SOW work reflect the SCI requirements?
c. Does the documentation provide estimates of the number of contractor personnel requiring access to SCI?
d. What is the projected number of contractor personnel requiring SCI access?
e. Has the supporting documentation and name of SCI CM been provided to the Senior Intelligence Officer or appropriate security office for review of SCI requirements and preparation of SCI CM appointment orders?
X
X X X
X
X
6. Has the approved checklist, supporting documentation, and SOW been provided to the Contracting Officer or his/her security representative for preparation of and inclusion in the initial DD Form 254?
X
7. Has the contract documentation been submitted to the INSCOM Contractor Support Element (CSE) for review and concurrence?
X
SCI Contract Monitor Approval: ________
| A01_SEPM DD254 IDIQ_ |
| A01_SEPM DD254 APPENDIX A |
| A01_SEPM DD254 APPENDIX B |
| A01_SEPM DD254 APPENDIX C |
| A01_SEPM DD254 APPENDIX D |
| A01_SEPM DD254 APPENDIX F |
| A01_SEPM DD254 APPENDIX G |
| a_FACILITY_CLEARANCE_REQU: TOP SECRET |
| b_LEVEL_OF_SAFEGUARDING_R: None |
| FillText1: Off |
| a_PRIME_CONTRACT_NUMBER: |
| FillText3: Off |
| b_SUBCONTRACT_NUMBER: |
| FillText5: Yes |
| c_SOLICITATION_OR_OTHER_N: W15P7T-18-R-0005 |
| DUE_DATE_YYYYMMDD: TBD |
| 3_A: Off |
| DATE_YYYYMMDD: |
| 3_B: Off |
| REVISION_NO: |
| DATE_YYYYMMDD1: |
| 3_C: Off |
| DATE_YYYYMMDD2: |
| 4_Yes: Off |
| 4_No: No |
| YES1: N/A |
| 5_Yes: Off |
| 5_No: No |
| FillText12: |
| FillText11: |
| a_NAME_ADDRESS_AND_ZIP_CO: This DD 254 is for Solicitation purposes only. An original DD 254 will be provided upon contract award. |
| b_CAGE_CODE: |
| c_COGNIZANT_SECURITY_OFFI: |
| a_NAME_ADDRESS_AND_ZIP_C1: |
| b_CAGE_CODE1: |
| c_COGNIZANT_SECURITY_OFF1: |
| a_LOCATION: SEE ITEM 13 BELOW |
| b_CAGE_CODE2: |
| c_COGNIZANT_SECURITY_OFF2: |
| 9_GENERAL_IDENTIFICATION: Support services to include System of Systems Engineering and Integration, Network Engineering, Architecture Development, Interoperability Engineering, Information Assurance, Technology Transition/Insertion, Testing, Fielding and Training. |
| a_COMMUNICATIONS_SECURIT1: Yes |
| a_COMMUNICATIONS_SECURIT2: Off |
| b_RESTRICTED_DATA1: Off |
| b_RESTRICTED_DATA2: Yes |
| c_CRITICAL_NUCLEAR_WEAPO1: Off |
| c_CRITICAL_NUCLEAR_WEAPO2: Yes |
| d_FORMERLY_RESTRICTED_DA1: Off |
| d_FORMERLY_RESTRICTED_DA2: Yes |
| 1_Sensitive_Compartmente1: Yes |
| 1_Sensitive_Compartmente2: Off |
| 2_NonSCI1: Yes |
| 2_NonSCI2: Off |
| f_SPECIAL_ACCESS_INFORMA1: Off |
| f_SPECIAL_ACCESS_INFORMA2: Yes |
| g_NATO_INFORMATION1: Yes |
| g_NATO_INFORMATION2: Off |
| h_FOREIGN_GOVERNMENT_INF1: Yes |
| h_FOREIGN_GOVERNMENT_INF2: Off |
| i_LIMITED_DISSEMINATION_1: Off |
| i_LIMITED_DISSEMINATION_2: Yes |
| j_FOR_OFFICIAL_USE_ONLY_I: Yes |
| j_FOR_OFFICIAL_USE_ONLY_1: Off |
| k_OTHER_Specify: Yes |
| k_OTHER_Specify1: Off |
| other1: SIPRNET,NIPRNET, networks at Government facilities only |
| a_COMMUNICATIONS_SECURIT3: Yes |
| a_COMMUNICATIONS_SECURIT4: Off |
| b_RESTRICTED_DATA3: Off |
| b_RESTRICTED_DATA4: Yes |
| c_CRITICAL_NUCLEAR_WEAPO3: Off |
| c_CRITICAL_NUCLEAR_WEAPO4: Yes |
| d_FORMERLY_RESTRICTED_DA3: Off |
| d_FORMERLY_RESTRICTED_DA4: Yes |
| e_INTELLIGENCE_INFORMATI3: Off |
| e_INTELLIGENCE_INFORMATI4: Yes |
| 1_Sensitive_Compartmente3: Yes |
| 1_Sensitive_Compartmente4: Off |
| 2_NonSCI3: Off |
| 2_NonSCI4: Yes |
| f_SPECIAL_ACCESS_INFORMA3: Off |
| f_SPECIAL_ACCESS_INFORMA4: Yes |
| g_NATO_INFORMATION3: Off |
| g_NATO_INFORMATION4: Yes |
| h_FOREIGN_GOVERNMENT_INF3: Off |
| h_FOREIGN_GOVERNMENT_INF4: Yes |
| i_LIMITED_DISSEMINATION_3: Off |
| i_LIMITED_DISSEMINATION_4: Yes |
| FillText13: Yes |
| FillText14: Off |
| 1_OTHER_Specify: IT Sensitive duties required (See Block 13, Item 13a) |
SCI IT processing required (See Appendix B item (8)
| 12_Public_Release_Direct: Off |
| 12_Public_Release_Through: Through. |
| release: Requests for release of information must be submitted through the Contract Monitor, Randy Young, PEO C3T HQ, Bldg. 6010, Aberdeen Proving Ground, MD; PEO C3T HQ Operations Officer; through PEO C3T, OPSEC OFFICER, Jacqueline Gooding, jacqueliner.gooding.civ@mail.mil, 443-395-8315; TO Aberdeen Proving Ground Public Affairs Office, Kyle Bond, kyle.w.bond.civ@mail.mil, 443-395-6489, APG, MD 21005 |
| 13_Rules: |
| 13_2: |
| security: 8a: Performance locations CONUS: • Fort Wainwright, AK • Joint Base Elmendorf-Richardson, AK • Huntsville, AL • Redstone Arsenal, AL • Fort Huachuca, AZ • NTC Fort Irwin, CA • Santa Clara, CA • Fort Carson, CO • Washington, DC • Orlando, FL • Fort Benning, GA • Fort Gordon, GA • Fort Stewart, GA • Schofield Barracks, HI • Camp Dodge, IA • Fort Leavenworth, KS • Fort Riley, KS • Fort Campbell, KY • Fort Polk, LA • APG, MD • Fort Bragg, NC • Joint Base McGuire-Dix-Lakehurst, NJ • White Sands, NM • Fort Leonard Wood, MO • Fort Drum, NY • Fort Sill, OK • Fort Indiantown Gap, PA • Tobyhanna Army Depot, PA • Fort Washington, PA• Fort Hood, TX • Fort Belvoir, VA • Fort Eustis, VA • Fort Monroe, VA |
• Quantico, VA • Joint Base Lewis-McChord, WA • Yuma Proving Ground, AZ • China Lake, CA • Fort Meade, MD
Performance locations OCONUS: • Afghanistan • Germany • Italy • Japan • Korea • Kuwait • Jordan • Egypt • Cuba • Pakistan
• Qatar • United Arab Emirates • Bahrain • Australia
10a: Classified COMSEC material is not releasable to contractor employees who have not received a FINAL clearance at the appropriate security level. COMSEC access shall be IAW DoD 5220.22-M, Chapter 9, Section 4, AR 380-40 and Additional Security Guidelines for COMSEC, Appendix A. When access is required at Government facilities, contractor personnel will adhere to COMSEC rules and regulations as mandated by Command policy and procedures. Concurrence of the KO is required prior to subcontractors working on the program. Copies of the subcontract DD Form 254 will be forwarded to the KO for the Contract file and to CECOM G2 for DD Form 254 tracker information. Per AR 380-40, Chapter 4: Contractor personnel are subject to the Department of Army Cryptographic Access Program (DACAP).
| 14_Yes: Yes |
| 14_No: Off |
| addit_sec: Program protection plans will be provided as government furnished information if CPI is identified. See SCI Addendum, Appendix B |
| 15_Yes: Yes |
| 15_No: Off |
| Inspections: Contractors performing OCONUS will be serviced by the Servicing Security Activity for the country being visited. The SSO is responsible for inspection and oversight of SCIF at Government Facilities. DCS, G–2 will provide oversight to ensure program protection plans implementation and CPI protection. |
| a_TYPED_NAME_OF_CERTIFYIN: |
| b_TITLE: Command Industrial Security Representative |
| c_TELEPHONE_Include_Area: |
| d_ADDRESS_Include_Zip_Cod: HQ CECOM AMSEL-MI G2 |
6002 Combat Drive, D2-101 Aberdeen Proving Ground, MD 21005
| e_SIGNATURE: |
| FillText21: Yes |
| FillText22: Off |
| FillText23: Yes |
| FillText24: Yes |
| FillText25: Yes |
| FillText26: Yes |
| f_OTHERS_AS_NECESSARY: |
| Reset: |
| FillText15: |
| FillText16: |
| 13_cont1: 10e(1). SCI Access is required and is only authorized for contractors who require SCI access to perform their duties No public release of information authorized, public disclosure or confirmation of any subject related to the support contract is not authorized without first obtaining approval from the KO. Access to Intelligence information requires a U.S. Government clearance at the appropriate level. See US Army SCI Addendum to DD Form 254, Appendix B. Access to SCI intelligence information requires a final U.S. Government clearance to TOP SECRET and indoctrinated for SCI access; which includes indoctrination to SI/TK/G/HCS and indoctrination to NATO Secret, as relayed by the Ground Intelligence Support Activity (GISA). Contractor is not authorized to further disclose or release SCI (including release to a subcontractor) without prior written authorization of the releasing agency. The contractor shall gain authorization from DIA prior to downloading or destruction of any JWICS material. A copy of the written authorization will be sent to the Contracting Officer to be included in the file and a copy sent to CECOM G2 to be included in the tracker contract file under the Prime contract number. |
10e(2) Non-SCI Intelligence Materials access required for performance by contractor. Non-SCI Information is not releasable to contractor employees who have not received a clearance at the appropriate security level. Written concurrence of the KO is required prior to subcontracting, Appendix C.
10g. Personnel not assigned to a NATO staff position, but requiring access to NATO classified information, NATO Secret or access to the NATO accredited SIPRNET terminals, must possess the equivalent FINAL U.S. Security Clearance based upon the appropriate personnel security investigation required. Personnel with access to NATO ATOMAL information must have the appropriate level FINAL U.S. Security Clearance. The government program/project manager is the designated representative that will ensure the contractor security manager and concerned employees are NATO briefed prior to access being granted. The contractor will maintain strict compliance in regards to NATO information IAW NISPOM Ch 10, Section 7. Prior approval from the KO is required for subcontracting. All Contractor facilities approved for SCI Networks must send a copy of the Facility Checklist, Co-Use Agreements, MOA/MOUs and Facility and Network Accreditations documents to CECOM G2, Industrial Security.
10h. Foreign Government Information (FGI) is not releasable to contractor employees who have not received a FINAL clearance at the appropriate U.S. Government clearance at the appropriate level. Refer to AR 380-5, Chapter 4, Section VII for additional guidance. Written concurrence of the KO is required prior to subcontracting.
10j. Safeguarding "For Official Use Only” (FOUO) information, Appendix D. FOUO Information generated and/or provided under this contract shall be safeguarded and marked as specified in AR 25-55 and DoD 5200.1-M (Marking is in Volume 2).
10k. NIPRNet, SIPRNet, Security Classification Guide(s) Army Tactical Automated Information System Security Classification Guide April 2008.
SIPRNET ACCESS: All contractors requiring access to the SIPRNET MUST HAVE A FINAL SECRET CLEARANCE OR Interim Top Secret clearance. All contractors with SIPRNET access MUST receive COMSEC and NATO Awareness briefings from their FSO prior to being granted access. COMSEC and NATO Awareness Briefing dates must be recorded on all visit requests. The NATO Awareness Briefing is required to inform personnel how to protect NATO information in the event they come across it while accessing SIPRNET. The contractor shall not access, download or further disseminate any special access date (i.e., intelligence, NATO, COMSEC, etc.) outside the execution of the defined contract requirements. All contractors will read the NATO Central Registry awareness briefing located at: https://secureweb.hqda.pentagon.mil/cusr/forms.aspx prior to being issued a SIPRNet account. This briefing does not authorize NATO access, and is solely for the purpose of awareness. Access to SIPRNet is required at Government facilities only. All contractors granted SIPRNet access must be aware that they are not authorized to download ANY classified material without the guidance and written permission of the Cognizant Security Agency.
11a. Contractor performance is restricted to Government facilities. Government agency or activity will provide security classification guidance for performance of this contract. Submit visit request to the KO and/or Security Management Office for need-to-know verification.
11f. Personnel Recovery Program for Contractor Personnel Traveling Overseas.US based contractor employees and associated sub-contractor employees will submit an Isolated Personnel Report (ISOPREP) prior to deployment, in accordance with AR 525-28, Personnel Recovery. The contractor is required to fill out the surveyon NIPRNET at https://medinah.sed.apg.army.mil/PRO-File prior to deployment.
11l. Contractor personnel performing IT sensitive duties are subject to investigative and assignment requirements IAW AR 25-2, AR 380-67, DoD 8570.0 and affiliated regulations. Army regulation available at www.apd.army.mil. SCI IS Processing required (See Appendix B, Item 8)
13a. Contractor personnel performing IT sensitive duties are subject to investigative and assignment requirements IAW AR 25-2, AR 380-67, DoD 8570.0 and affiliated regulations. Army regulation available at www.apd.army.mil. Contractor personnel performing IT sensitive duties are subject to investigative and assignment requirements IAW DoD 8570.0 and Service/Agency regulations.
13b: Foreign subcontractors, foreign vendors and/or visitors that are not cleared US Companies, participating in Army foreign disclosure issues will be handled in accordance with AR 380-10, Foreign Disclosure and Contacts with Foreign Representatives, dated 4 DEC 2013.
o All disclosures (i.e., oral, visual, briefing, documents) to foreign nationals require prior approval by the foreign disclosure officer.
o All requests for non-US cleared Foreign subcontractor and/or Foreign own companies to perform on this contract must be requested from the Prime Contract to the KO through Program Office and approved by Foreign Disclosure Officer.
13c. Classified information will be protected IAW the NISPOM, Chapter 5. All security incidents involving classified information will be reported to the CECOM G2 Industrial Security Office, and DSS Industrial Security Representative. Information will be forwarded to KO and the PM for a program damage assessment to be conducted IAW AR 380-49
13d. All subcontractor DD Form 254s and subcontractor tier DD Form 254s will be sent to the KO. Any Contractors/subcontractors owned by Foreign Companies and that have a clearance issued by the Defense Security Service under a Special Security Agreement need to have a National Interest Determination (NID) approved if access is required to: Top Secret; COMSEC; Restricted Data; SCI and/or SAP. NID requirements and justification must be sent through CECOM G2 to be forwarded to the approving agencies.
Only after a NID approval is received will a FOCI contracting firm be authorized to work on the program.
13e.The contractor FSO will include Threat Awareness and Reporting Program (TARP) requirements in their initial and refresher training IAW AR 381-12, paragraph 1-14 and Chapter 2.
13f.The contractor must submit subcontracts to DD Form 254’s to the KO for the contract file and forward to CECOM G2 for review to insure Army requirements flow down to the subcontractor.
13g. All Facility Clearance sponsorships for subcontractors must have Government approval and certification on the subcontractor’s DD Form 254. Submit all requests to the CECOM G2 Industrial Security.
13h. Records of security related training of contractors and embedded contractors must be available for review.
| solic_con1: TBD |
| page1: 3 |
File details come from the government source that posted it.