Draft In-line SLIS Template.xlsx
XLSX spreadsheet 814 KB Posted
- Solicitation number
- TSA25-04-03883
About this file
The draft document provides a statement of work for checked baggage screening equipment deployment services for the Transportation Security Administration. Key details include that the statement of work relates to a request for information released in the second quarter of fiscal year 2020, with the request for proposal to be issued in December 2019. Offerors are requested to review the draft and provide any questions or comments by January 6, 2020. The statement of work also references explosive detection systems, pricing sheets, deliverables, and other contract documentation requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SEDS Draft Labor Categories.pdf | ||
| TEDS overview of work performed_r1.pdf | ||
| Draft SEDS FFP Labor Categories.xlsx | XLSX spreadsheet | |
| Draft SEDS FFP Labor Categories.xlsx | XLSX spreadsheet | |
| CB SEDS IDIQ SOW_Final Draft_r1-2.6.20.docx | DOCX document | |
| Draft SEDS FFP Labor Categories.xlsx | XLSX spreadsheet | |
| Checked Baggage-SEDS Pricing Template.xlsx | XLSX spreadsheet | |
| CB SEDS IDIQ SOW_Final Draft_r1-2.6.20.docx | DOCX document | |
| Eval Criteria to post.docx | DOCX document | |
| DRAFT CDRL A003 Template - Monthly Status Report.docx | DOCX document | |
| TEDS overview of work performed.pdf | ||
| DRAFT CDRL B0001 Template - OTA Invoice Review Report.docx | DOCX document | |
| Draft CDRL A004 Template - In-line Weekly Status Report.xlsx | XLSX spreadsheet | |
| CB-SEDS Pricing Template r2.xlsx | XLSX spreadsheet | |
| Draft CDRL D0001 template - In-line Decommission Report and Checklist.xlsx | XLSX spreadsheet | |
| Checked Baggage SEDS IDIQ SOW.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLIS
Transportation Security Administration Explosive Detection System (EDS) TSA Site Lead Input Sheet (SLIS) EBSP Checked Baggage Systems
| Form Version: 3/10/16 | ||||
| For Multiple Vendors or Terminal Locations Complete a Separate SLIS for each Vendor or each Location. | ||||
| Use the comments section at the end of this document for any additional entries. | ||||
| Do not insert additional rows or columns | ||||
| Project Description (e.g. Install, Integrate, and Network (3) CTX-9800s at LAX T4): | ||||
| Initial Submission Date: | ReMag #s: | |||
| Revision Date: | Revision Number: | |||
| General Information | Lodging | IE | ||
| Selecting Airport Code will auto populate the Airport Name, City, and State | ||||
| EDS Manufacturer (Dropdown): | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | |
| Airport Code (Dropdown): | ||||
| CBIS Type (Dropdown): | Project City: | ERROR:#N/A | ||
| Integration Type (Dropdown): | State: | ERROR:#N/A | ||
| Project Name / Terminal / Location / Zone: | ||||
| Scope of Services | ||||
| List Project Details under "Primary Work to be Performed" Use the "Secondary Work to be Performed" fields when additional work is required (e.g. A project requires an EDS install and decom: EDS install info. is entered as the Primary Scope, and the decom is the Secondary Scope) | ||||
| Primary Work to be Performed | Secondary Work to be Performed | |||
| Model (Dropdown): | Model (Dropdown): | |||
| Number of EDS Units: | Number of EDS Units: | |||
| Installation: | Installation: | |||
| Integration: | Integration: | |||
| Multiplex Networking: | Multiplex Networking: | |||
| Upgrade: | Upgrade: | |||
| Testing: | Testing: | |||
| Relocation: | Relocation: | |||
| Deinstallation (Code X): | Deinstallation (Code X): | |||
| Decommission (Code4): | Decommission (Code 4): | |||
| Reinstallations: | Reinstallations: | |||
| List any additional work or upgrades: | ||||
| Facility Modification Information | ||||
| OTA Number: | TBD | |||
| Current Design Level (Dropdown): | 100% | |||
| EDS Equipment Delivery / Install / Testing Schedule / Milestone Schedule | ||||
| Requested Pre-Planning Meeting (Site walk-through) Date: | ||||
| Construction Start Date: | ||||
| Power Available Date: | ||||
| Network Install Date: | ||||
| Use "Unit 1" section when all EDS have the same dates. When EDS dates vary by unit or phase, enter dates from "Unit 1" through "Unit 10" respectively | ||||
| Are any EDS units Installed/Operational at the site?: | Yes | |||
| Unit 1 (Use if all EDS have the same dates) | Unit 2 | |||
| Serial Number(s): |
Biggs, Andrew <CTR>: Enter all serial numbers in this cell if all dates are the same. (Separate with a comma)
| Serial Number: | |||||||||||||||||||||||||||||||||||||||||||||||||
| EDS Delivery Date: | EDS Delivery Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Installation Date: | Installation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| SAT Date: | SAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| TRR Date: | TRR Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| iSAT Date: | iSAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Live Bag Screening: | Live Bag Screening: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Relocation or Reinstallation Date: | Requested Relocation or Reinstallation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Deinstallation (Code X) Date: | Requested Deinstallation (Code X) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Decom (Code 4) Date: | Requested Decom (Code 4) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Unit 3 | Unit 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Serial Number(s): | Serial Number: | ||||||||||||||||||||||||||||||||||||||||||||||||
| EDS Delivery Date: | EDS Delivery Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Installation Date: | Installation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| SAT Date: | SAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| TRR Date: | TRR Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| iSAT Date: | iSAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Live Bag Screening: | Live Bag Screening: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Relocation or Reinstallation Date: | Requested Relocation or Reinstallation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Deinstallation (Code X) Date: | Requested Deinstallation (Code X) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Decom (Code 4) Date: | Requested Decom (Code 4) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Unit 5 | Unit 6 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | ||||||||||||||||||||||||
| Serial Number(s): | Serial Number: | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .