Document 4 Quality Assurance Surveillance Plan (QASP)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TIRNO10R00006-A0006 1 .rtf | RTF text file | |
| TIRNO10R00006-A0005 1 .rtf | RTF text file | |
| TIRNO10R00006-A0004 1 .rtf | RTF text file | |
| TIRNO10R00006-A0003 1 .rtf | RTF text file | |
| TE-5 Revision 1.xls | XLS spreadsheet | |
| TIRNO10R00006-A0002 1 .rtf | RTF text file | |
| TIRNO10R00006-A0001 1 .rtf | RTF text file | |
| TE - 2 Revision 1.doc | DOC document | |
| TE-6 Revision 1.doc | DOC document | |
| TE-10.doc | DOC document | |
| TE-8.doc | DOC document | |
| Wage Determination DC.doc | DOC document | |
| TE-1.doc | DOC document | |
| TE-5.xls | XLS spreadsheet | |
| TE-11.doc | DOC document | |
| TE-9.doc | DOC document | |
| CBA Wash DC.pdf | ||
| TE-2.doc | DOC document | |
| TIRNO10R00006 1 SF1449.rtf | RTF text file | |
| TE-6.doc | DOC document | |
| TE-4.doc | DOC document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| COTR MONTHLY QASP SUMMARY REPORT | |||||||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||||||
| CONTRACT | AQL | Max | AQL SCORE | Inspection | Sub | Contract | Recommended | Recommended | |
| Score | Summary | CLIN | Full | Payment | Payment | ||||
| Sub-CLIN | RESERVED | Score | Score % | Payment | Reduction | ||||
| Facility Ops | 95% | 285 | $ - 0 | ||||||
| Water Treatment | 95% | 95 | |||||||
| Service Calls | 95% | 95 | |||||||
| PM | 95% | 95 | |||||||
| Annual Deliverables | 95% | 95 | |||||||
| IDIQ Work | 95% | 95 | |||||||
| Totals | 760 | $ - 0 | $ - 0 | ||||||
| INSPECTION SUMMAY SCORE FOR 100% CONTRACT PAYMENT | |||||||||
| * Maximum Score is the AQL | |||||||||
| ** Scores in red are below the AQL | |||||||||
| See attached worksheets 1 through 6 for sub-CLIN elements | |||||||||
| Charge Back Due To | |||||||||
| Contractor Non-Performance | Insert Site | ||||||||
| Gov't Re-Do Expense | |||||||||
| Gov't Adm. Cost | |||||||||
| Totals | $ - 0 | $ - 0 |
&LQASP Summary Report Solicition #TIRNO-095-R-00018 &C&F&RPage 1 of 7 slgcb:
The amounts shown here are for example purposes only. The correct figures will need to be added after the contract is awarded (from the bid sheet) based on the contract CLIN values.
slgcb:
Sample scores slgcb:
Based on reinspection and other related administation expenses incurred by the Government
FACILITY OPS
| FACILITY OPERATIONS MONTHLY SUMMARY REPORT - MAXIMUM AQL 100% | |||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||
| INSPECTION | AQL SCORE | RESERVED | COMMENTS | CONTRACT TOTAL | |
| CHECKLIST # /AQL | |||||
| #1 | 95 | 0 | |||
| #5 | 95 | 0 | |||
| #7 | 95 | 0 | |||
| 90% ACL Score = 100% PAYMENT | |||||
| INSPECTION | |||||
| TOTAL | 285 | 0 | TOTAL | 285 | |
| % PERCENT | |||||
| TO BE PAYED | 100.00% | 0.00% | TOTAL | 100.00% | |
| BASIC SERVICE |
MONTHLY CONTRACT
| PAYMENT | TOTAL | $ - 0 | |||
| EARNED PAYMENT | TOTAL | $ - 0 | |||
| TOTAL DEDUCTIONS | $ - 0 | TOTAL | $ - 0 | ||
| * Maximum Score is the AQL | |||||
| ** Scores in red are below the AQL |
&C&F&RPage 2 of 7
Water Treatment
| WATER TREATMENT MONTHLY SUMMARY REPORT - MAXIMUM AQL 100% | |||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||
| INSPECTION | AQL SCORE | RESERVED | COMMENTS | CONTRACT TOTAL | |
| CHECKLIST # /AQL | |||||
| #2 | 95 | 0 | |||
| 90% ACL Score = 100% PAYMENT | |||||
| INSPECTION | |||||
| TOTAL | 95 | 0 | TOTAL | 95 | |
| % PERCENT | |||||
| TO BE PAYED | 100.00% | 0.00% | TOTAL | 100.00% | |
| BASIC SERVICE |
MONTHLY CONTRACT
| PAYMENT | TOTAL | $ - 0 | |||
| EARNED PAYMENT | TOTAL | $ - 0 | |||
| TOTAL DEDUCTIONS | $ - 0 | TOTAL | $ - 0 | ||
| * Maximum Score is the AQL | |||||
| ** Scores in red are below the AQL |
&C&F&RPage 4 of 7
Service calls
| SERVICE CALLS MONTHLY SUMMARY REPORT - MAXIMUM AQL 100% | |||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||
| INSPECTION | AQL SCORE | RESERVED | COMMENTS | CONTRACT TOTAL | |
| CHECKLIST # /AQL | |||||
| #3 | 95 | 0 | |||
| 90% ACL Score = 100% PAYMENT | |||||
| INSPECTION | |||||
| TOTAL | 95 | 0 | TOTAL | 95 | |
| % PERCENT | |||||
| TO BE PAYED | 100.00% | 0.00% | TOTAL | 100.00% | |
| BASIC SERVICE |
MONTHLY CONTRACT
| PAYMENT | TOTAL | $ - 0 | |||
| EARNED PAYMENT | TOTAL | $ - 0 | |||
| TOTAL DEDUCTIONS | $ - 0 | TOTAL | $ - 0 | ||
| * Maximum Score is the AQL | |||||
| ** Scores in red are below the AQL |
&C&F&RPage 5 of 7
Preventive Maintenance
| PREVENTIVE MAINTENANCE MONTHLY SUMMARY REPORT - MAXIMUM AQL 100% | |||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||
| INSPECTION | AQL SCORE | RESERVED | COMMENTS | CONTRACT TOTAL | |
| CHECKLIST # /AQL | |||||
| #4 | 95 | 0 | |||
| 90% ACL Score = 100% PAYMENT | |||||
| INSPECTION | |||||
| TOTAL | 95 | 0 | TOTAL | 95 | |
| % PERCENT | |||||
| TO BE PAYED | 100.00% | 0.00% | TOTAL | 100.00% | |
| BASIC SERVICE |
MONTHLY CONTRACT
| PAYMENT | TOTAL | $ - 0 | |||
| EARNED PAYMENT | TOTAL | $ - 0 | |||
| TOTAL DEDUCTIONS | $ - 0 | TOTAL | $ - 0 | ||
| * Maximum Score is the AQL | |||||
| ** Scores in red are below the AQL |
&C&F&RPage 6 of 7
Annual Deliverables
| MONTHLY REPORTS MONTHLY SUMMARY REPORT - MAXIMUM AQL 100% | |||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||
| INSPECTION | AQL SCORE | RESERVED | COMMENTS | CONTRACT TOTAL | |
| CHECKLIST # /AQL | |||||
| #6 | 95 | 0 | |||
| 90% ACL Score = 100% PAYMENT | |||||
| INSPECTION | |||||
| TOTAL | 95 | 0 | TOTAL | 95 | |
| % PERCENT | |||||
| TO BE PAYED | 100.00% | 0.00% | TOTAL | 100.00% | |
| BASIC SERVICE |
MONTHLY CONTRACT
| PAYMENT | TOTAL | $ - 0 | ||||
| EARNED PAYMENT | TOTAL | $ - 0 | 300 | |||
| TOTAL DEDUCTIONS | $ - 0 | TOTAL | $ - 0 | |||
| * Maximum Score is the AQL | ||||||
| ** Scores in red are below the AQL |
&L&8I won't sign it "Ed"&C&F&RPage 7 of 7
IDIQ Work
| IDIQ REPAIRS/NEW WORK MONTHLY SUMMARY REPORT - MAXIMUM AQL 100% | |||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | |||||
| INSPECTION | AQL SCORE | RESERVED | COMMENTS | CONTRACT TOTAL | |
| CHECKLIST # /AQL | |||||
| #8 | 95 | 0 | |||
| 90% ACL Score = 100% PAYMENT | |||||
| INSPECTION | |||||
| TOTAL | 95 | 0 | TOTAL | 95 | |
| % PERCENT | |||||
| TO BE PAYED | 100.00% | 0.00% | TOTAL | 100.00% | |
| BASIC SERVICE |
MONTHLY CONTRACT
| PAYMENT | TOTAL | $ - 0 | |||
| EARNED PAYMENT | TOTAL | $ - 0 | |||
| TOTAL DEDUCTIONS | $ - 0 | TOTAL | $ - 0 | ||
| * Maximum Score is the AQL | |||||
| ** Scores in red are below the AQL |
&L&8I won't sign it "Ed"&C&F&RPage 7 of 7
Check Sheet Scores
| CHECK SHEET SCORES | ||||
| {{ Add TECHNICAL EXHIBIT and SOLICITATION # }} | ||||
| Check | ||||
| Sheet # | CHECK SHEET DESCRIPTION | REQUIRED | ||
| AQL | AQL SCORE | COMMENTS | ||
| 1 | Equipment Checks | 95% | 100.00% | |
| 2 | Water Treatment | 95% | 100.00% | |
| 3 | Service Calls | 95% | 100.00% | |
| 4 | PM Program | 95% | 100.00% | |
| 5 | Environmental Management | 95% | 100.00% | |
| 6 | Monthly Reports | 95% | 100.00% | |
| 7 | Annual Deliverables | 95% | 100.00% | |
| 8 | IDIQ Repairs/New Work | 95% | 100.00% | |
| TOTALS | 100.00% | |||
| Red Figures are lower than AQL | ||||
| Black figures are at or above required AQL |