T580-Root-Barrier_S+S_3.13.25.pdf
PDF 206 KB Posted
- Solicitation number
- IFB26-8
- Issued by
- Orange County, Florida
About this file
This is a Technical Special Provision document issued by Protean Design Group, a professional engineering firm in Orlando, Florida, for the City of Winter Park's Hungerford Elementary School Sidewalk Gaps Safe Routes to School project (FPID 443395-1-58-01). The specification details the furnishing and installation of 24-inch tree root barriers designed to protect surrounding hardscapes from root damage. The root barriers are constructed of high-density polyethylene (HDPE) or equivalent material and must be installed at the edge of sidewalks to a minimum depth of 24 inches in continuous lines with properly aligned panels. Installation requirements include site preparation with trench excavation, placement of barrier panels with vertical root-deflecting ribs facing the tree, securing panels using integrated zipper joining systems or Engineer-approved methods, and backfilling in 6-inch layers with clean soil free of debris and contaminants. The root barrier panels must remain flush with the final grade with no exposed portions above the surrounding surface, and all connections must be tight and gap-free to ensure seamless installation. Measurement and payment for the root barrier work is based on completed linear feet of installed barrier at the unit price for Item No. 580-12-35, with the specified price representing full compensation for all materials, installation, equipment, and incidentals necessary to complete the work.
The Technical Special Provision was professionally sealed and signed by Michelle Melo, P.E. (License No. 86379) on March 13, 2025, establishing the engineering standards and construction methodology for the root barrier installation component of the broader sidewalk improvement project. The root barrier specification ensures protection of newly constructed sidewalk infrastructure from tree root intrusion, which is a critical element of the overall pedestrian safety and accessibility improvements planned for the school access routes. No pricing information is contained within this technical provision document, as it establishes construction and material standards rather than cost parameters, with actual pricing to be submitted by bidders responding to the project invitation for bid.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 3 FPID: 443395-1-58-01
TECHNICAL SPECIAL PROVISION
FOR
ROOT BARRIER – 24”
SECTION T580
FINANCIAL PROJECT ID: 443395-1-58-01
This item has been digitally signed and sealed by Michelle Melo, P.E. on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Date: March 13, 2025
State of Florida, Professional Engineer, License No.: 86379
Firm/Agency Name: Protean Design Group
Firm Agency Address: 100 E Pine Street, Suite 600
City, State, Zip Code: Orlando, FL, 32801
Page 2 of 3 FPID: 443395-1-58-01
SECTION T580
T580-1 Description.
Furnish and install 24-inch tree Root Barrier to protect surrounding hardscapes from root damage as shown in the Plans and in accordance with the requirements in this
Section.
T580-2 Materials.
Use a 24-inch root barrier constructed of high-density polyethylene (HDPE) or equivalent material designed to withstand soil pressure and resist degradation. The barrier must be flexible and resist puncturing or tearing during installation and throughout its service life. Ensure that the root barrier is chemically resistant to common soil and groundwater conditions and effectively blocks root penetration.
T580-3 Construction Methods.
T580-3.1 Site Preparation: Excavate a trench at the edge of the sidewalk to a minimum depth of 24 inches and sufficient width to accommodate the 24-inch tree Root
Barrier panels. Remove debris, rocks, and roots that could interfere with the installation of the barrier. Compact and level the trench bottom to ensure stability for the barrier installation.
T580-3.2 Installation of Root Barrier Panels
T580-3.2.1 Placement of Panels: Place the 24-inch tree Root Barrier panels in the trench abutting the sidewalk with the vertical root deflecting ribs facing towards the tree. Position the panels in a continuous line, ensuring complete coverage of the root zone as indicated in the Plans. Align the panels with the hardscape to be protected.
T580-3.2.2 Joining Panels: Securely connect panels using an integrated zipper joining system or a method approved by the Engineer to form a continuous root barrier. Ensure all connections are tight and free of gaps, maintaining alignment with previously installed panels to ensure a seamless installation.
T580-3.2.3 Panel Alignment and Depth: Position the top of the root barrier flush with the final grade, or as specified in the Plans. Install the panels at the proper depth, aligned with the surrounding soil or hardscape. No part of the barrier may be exposed above the surrounding surface.
T580-3.2.4 Securing Panels: Secure the panels using the built-in anti-lift ground lock tabs, ensuring that the panels remain stable and immobile under root pressure or soil movement.
T580-3.3 Backfilling and Compaction
T580-3.3.1 Backfilling: Backfill the trench with clean, suitable soil or other material which is free of debris, rocks, and contaminants that could interfere with the barrier’s function. Backfill in layers, ensuring that the root barrier remains secure during the process and no backfill is placed between the sidewalk and the barrier.
T580-3.3.2 Compaction: Compact the backfill in layers no thicker than 6 inches, ensure the compaction process does not damage the root barrier.
T580-3.3.3 Final Grading: Grade the backfill to match the surrounding soil or hardscape, ensuring that the top of the root barrier remains flush with grade.
Page 3 of 3 FPID: 443395-1-58-01
T580-4 Method of Measurement.
The quantities to be paid for will be the plan quantity in linear feet completed and accepted.
T580-5 Basis of Payment.
Price and payment will be full compensation for all work specified in this Section, including installation, equipment, and all incidentals necessary to complete the work.
Payment will be made under:
Item No. 580-12-35 Root Barrier – 24-inch – per linear foot.
| 2025-03-13T15:27:31-0400 | |
| Michelle Melo |
File details come from the government source that posted it. Updated .