Submittal_List_-_Comfort_Station.pdf

PDF 89 KB Posted

Attached to
CUVA - Comfort Station Construction Federal contract opportunity
Solicitation number
140P6421R0018
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document provides details for a federal solicitation seeking construction services. The National Park Service intends to issue a Request for Proposal for renovations and upgrades to an existing comfort station at Cuyahoga Valley National Park in Brecksville, Ohio. Work includes converting a wood vault toilet into a temperature-controlled flush toilet system with potable water and septic tank/drain field, and constructing a new water main. The project magnitude is estimated between $800,000 to $2,000,000. This will be a firm-fixed price contract subject to Construction Wage Rate Requirements for Summit County, Ohio. Evaluation factors are technical approach, past performance, and price. The NAICS code is 236220 for commercial and institutional building construction with a small business size standard of $39.5 million. The project is set aside 100% for small businesses. Offerors must have a DUNS number and be registered in SAM.gov to be eligible for award. The point of contact for the solicitation is Craig D Bryant at the National Park Service Midwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to CUVA - Comfort Station Construction, newest first.
File Type Posted
Site_Visit_Sign-in_Sheet_0001.pdf PDF
Product_Specs_for_Approval__2_0001.pdf PDF
Sol_140P6421R0018_Amd_0001.pdf PDF
Product_Specs_for_Approval__1_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Specifications_-_Comfort_Station.pdf PDF
Drawings.pdf PDF
Sol_140P6421R0018.pdf PDF
Notice_to_Contractors.pdf PDF
Technical_Questionnaire.pdf PDF
Technical_Questionnaire.docx DOCX document
Past_Performance_Questionnaire.pdf PDF
Bid_Schedule_-_Comfort_Station.xlsx XLSX spreadsheet
Past_Performance_Questionnaire.docx DOCX document
Wage_Determination_-_Summit_County_OH.pdf PDF
Updated_-_COVID-19_Mask_Policy.pdf PDF
Bid_Schedule_-_Comfort_Station.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

ER

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

01 31 00 1.3 Preconstruction Conference info required x

01 32 16 1.3 Construction Schedule x

01 40 00 1.4 Quality Requirements

Quality Control Plan x

Qualification Data x

Contractor's Quality Control Daily Reports x

Test Reports x

Permits, Licenses, and Certificates x

01 74 19 1.4 Waste Management Plan x

04 20 00 1.4 Unit Masonry x x

06 19 00 1.3 Prefabricated Wood Trusses and Joists x x

07 20 00 1.3 Building Insulation x

07 60 00 1.3 Flashing and Sheet Metal Standing Seam Roof Panel System x x x

08 11 13 Metal Doors and Frames x

08 71 00 1.5 Hardware and Specialties x

09 90 00 1.8 Painting

Paint Product Data x

Paint Samples x

10 28 13 1.4 Toilet Accessories x

SUBMITTAL LIST

Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.

Spec.

Sec. Par. No. Description

INFORMATIONAL ACTION

CUVA / 257393 / Comfort Station Upgrade

SUBMITTAL REQUIREMENTS (indicate with an "X")

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

221505 Ductile Iron Pipe and Fittings X

220523 Water Main Gate Valves X X

221514 Pipe Hangers and Supports X X

211116 Fire Hydrants X X

221505 Tapping Saddle X

Sht C5/C6 HDPE pipe X

Sht C7 Curb Stop X

Sht C8 Flush Hydrant, Check Valve, Pressure Regulator X X

221353 Septic Tank X

221353 Distribution Boxes X

Sht C9 Mound System Lateral Lines X X X X

Sht C9 Sanitary Sewer PVC Pipe X

322831 Fencing and Gates X

Sht C10 J-1000 Treatment System X X X X

SUBMITTAL LIST

Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.

Spec.

Sec. Par. No. Description

INFORMATIONAL ACTION

CUVA / 257393 / Comfort Station Upgrade

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

22 0400 Common Requireemnts for Plumbing X

22 0519 Meters and Gages for Pluming Piping

Product Data X

22 0719 Plumbing Piping Insulation

Product Data X

Manufacturer's Instructions X

22 1005 Plumbing Piping

Product Data X

22 1006 Plumbing Piping Specialties

Product Data X

Maintenance Data X

22 3300 Commercial Electric Domestic Water Heaters

Product Data X

Operation and Maintenance Data X

Warranty X

22 4000 Plumbing Fixtures

Product Data X

Manufacturer's Instructions X

Maintenance Data X

Warranty X

23 0400 Common Requireemnts for HVAC X

23 0593 Testing, Adjusting, and Balancing for HVAC

Installer Qualifications X

Contract Documents Examination Report X

Final Report X

Instrument Calibration X

23 0713 Duct Insulation

Product Data X

Manufacturer's Instructions X

23 3100 HVAC Ducts and Casings

Product Data X

SUBMITTAL LIST

Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.

Spec. Sec. Par. No. Description

INFORMATIONAL ACTION

Park/PMIS/Project Title

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SUBMITTAL LIST

Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.

Spec. Sec. Par. No. Description

INFORMATIONAL ACTION

Park/PMIS/Project Title

SUBMITTAL REQUIREMENTS (indicate with an "X")

Manufacturer's Installation Instructions X

23 3300 Air Duct Accessories

Product Data X

23 3700 Air Outlets and Inlets

Product Data X

23 7223 Packaged Air-To-Air Energy Recovery Units

Product Data X

Manufacturer's Instructions X X

Operation and Maintenance Data X X

Warranty X

23 8200 Convection Heating and Cooling Units

Product Data X

Manufacturer's Instructions X

Operation and Maintenance Data X

Warranty X

26 0400 Common Requirements for Electrical Operation and Maintenance Manuals X

26 0526 Grounding and Bonding

Product Data-Ground Bars X X

26 2416 Panelboards

Product Data X

Shop Drawings X

Project Record Documents X

Maintenance Data X

26 2726 Wiring Devices

Product Data X X

26 2813 Fuses

Product Data X X

Extra Fuses X

26 5100 Interior Lighting

Shop Drawings X

Product Data X

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

SUBMITTAL LIST

Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.

Spec. Sec. Par. No. Description

INFORMATIONAL ACTION

Park/PMIS/Project Title

Operation and Maintenance Data X

Submittal List Template
Blank Page
Section 013323_attachment (3) Civil.pdf
Submittal List Template
Section 013323_attachment (4) Elec.pdf
Submittal List Template
Section 013323_attachment (2) Arch.pdf
Submittal List Template
Section 013323_attachment (3) Civil.pdf
Submittal List Template
Section 013323_attachment (4) Elec.pdf
Submittal List Template

File details come from the government source that posted it. Updated .