Specifications- Full Set.pdf
PDF 5 MB Posted
- Attached to
- Fort Avenue Sewer Replacement
- Solicitation number
- IFB-117610
- Issued by
- New Kent County, Virginia
About this file
This is a complete set of bidding and contract documents prepared by B&B Consultants, Inc. for the Town of Blackstone, Virginia for the Fort Avenue Sewer Replacement project. The scope of work includes installation of 145 linear feet of 10-inch SDR-35 PVC sanitary gravity sewer, 135 linear feet of 10-inch SDR-18 PVC sanitary gravity sewer in casing, 37 linear feet of 10-inch SDR-18 PVC sanitary gravity sewer, and 131 linear feet of 18-inch bored casing beneath railroad crossings. Additional work includes one manhole replacement (5-10 feet depth), one new manhole (5-10 feet depth), one new manhole (10-15 feet depth), two manhole abandonments, asphalt removal and disposal, and restoration with 8 tons of 2-inch asphalt surface mix. Sealed bids must be submitted to Town Hall, 100 West Elm Street, Blackstone, Virginia 23824, by May 12, 2026, at 2:00 p.m. local time. A non-mandatory pre-bid conference is scheduled for April 30, 2026, at 10:00 a.m. at the same location. The project has an expected duration of 120 days to final completion, with substantial completion required within 90 days and final completion within 120 days. Bidding documents are available for purchase from B&B Consultants, Inc. for $175 and can be obtained electronically through the vendor portal or by contacting Randy Jones at 434-447-7621 or rjones@bandbcons.com.
Bids must be submitted on a unit price basis with bid security of 5 percent of the bidder's maximum bid price in the form of a bid bond or certified check. The contract is a federally assisted project subject to American Iron and Steel requirements mandating that all iron and steel products be produced in the United States. All contractors must comply with the Davis Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, Executive Order 11246 as amended, Title VI of the Civil Rights Act of 1964, and the Immigration Reform and Control Act of 1986. Bidders must also comply with President's Executive Orders #12138 and #11625 regarding Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) utilization and maintain non-segregated facilities for employees. The successful bidder must execute the agreement and provide performance and payment bonds within 15 days of receiving the Notice of Award. Liquidated damages are established at $300 per day for failure to achieve substantial completion and $300 per day for failure to complete remaining work after substantial completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Full Set (Bid).pdf | ||
| Planholders List.pdf | ||
| C-2_ADD_01.pdf | ||
| 02-CONTENTS (Add No. 1).pdf | ||
| Prebid Minutes.pdf | ||
| 012200 - UNIT PRICES (Add No. 1).pdf | ||
| 06 Bid Frm (Add No. 1).pdf | ||
| Addendum No. 1.pdf | ||
| PREBID ATTENDANCE.pdf | ||
| C-1_ADD_01.pdf | ||
| 03-advertisement for bids-C-111.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
FOR
FORT AVENUE SEWER REPLACEMENT
TOWN OF BLACKSTONE, VIRGINIA
Prepared For:
Philip Vannoorbeeck, Town Manager
Town of Blackstone 100 West Elm Street
Blackstone, Virginia 23824
Prepared By:
B & B Consultants, Inc.
Engineers-Surveyors-Laboratory Analysts
Environmental Services P. O. Box 429
212 E Ferrell Street South Hill, Virginia 23970
January 2026 i
CONTENTS
BIDDING AND CONTRACT DOCUMENTS
ADVERTISEMENT FOR BIDS (C-111) .......................................................................... AB-1 - 2
INSTRUCTIONS TO BIDDERS (C-200)....................................................................... ITB-1 – 14
CONTRACTOR’S QUALIFICATIONS STATEMENT (C-451) ...................................... QS-1-12
BID FORM (C-410) ................................................................................................................ B-1 -7
BID BOND (C-430) ............................................................................................................ BB-1 – 2
NOTICE OF AWARD (C-510) ............................................................................................... NA-1
FORM OF AGREEMENT (C-520) ....................................................................................... A-1 - 7
STANDARD GENERAL CONDITIONS (C-700) ................................................................. 1 - 77
SUPPLEMENTARY CONDITIONS (C-800) ................................................................. SC-1 – 29
VCWRLF CONDITIONS
• ENVIRONMENTAL AUTHORITIES…………………………………………….……. 1
• ECONOMIC AND MISCELLANEOUS AUTHORITIES………………………………1-2
• CIVIL RIGHTS AND NONDISCRIMINATION REQUIREMENTS……………..…2-13
• FEDERAL REQUIREMENTS………………………………………………………..14-15
- ATTACHMENT #1-Procurement Requirements for Small Purchase………………..16-17
- ATTACHMENT #2-WAGE DECISION………………………………………..WD 18-23
- ATTACHMENT #3-Davis-Bacon Payroll Certification, Form WH-347…………....24-26
- ATTACHMENT #4-American Iron and Steel (AIS) Initial Certification Statement...….27
- ATTACHMENT #5-American Iron and Steel (AIS) Waiver Request……………….….28
- ATTACHMENT #6-American Iron and Steel (AIS) Waiver Request Checklist.…….29-30
- ATTACHMENT #7-American Iron and Steel (AIS) Final Certification Statement...…..31 ii
NOTICE TO PROCEED (C-550) ............................................................................................. NP-1
PERFORMANCE BOND (C-610) ..................................................................................... PB-1 – 4
PAYMENT BOND (C-615) ................................................................................................... P-1 - 4
APPLICATION FOR PAYMENT FORM .......................................................................... AP-1 - 4
CHANGE ORDER (C-941) ...................................................................................................... CO-1
WORK CHANGE DIRECTIVE (C-940) ............................................................................. WCD-1
CERTIFICATE OF SUBSTANTIAL COMPLETION (C-625) ............................................ CSC-1
NOTICE OF ACCEPTABILITY OF WORK (C-626) ……………………………………NOAW-1
TECHNICAL SPECIFICATIONS
DIVISION 01-GENERAL REQUIREMENTS
SECTION 011000 SUMMARY .............................................................................. 011000-1-07 SECTION 012220 UNIT PRICES ......................................................................... 012200- 1-05 SECTION 012500 SUBSTITUTION PROCESS.................................................... 012500-1-03
SECTION 012600 CONTRACT MODIFICATION PROCEDURES .................... 012600-1-03
SECTION 012900 PAYMENT PROCEDURES .................................................... 012900-1-05
SECTION 013100 PROJECT MANAGEMENT AND COORDINATION .......... 013100-1-08
SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION .......... 013200-1-05
SECTION 013300 SUBMITTAL PROCEDURES ................................................. 013300-1-09 SECTION 014000 QUALITY REQUIREMENTS ................................................. 014000-1-07 SECTION 014200 REFERENCES ......................................................................... 014200-1-03 SECTION 016000 PRODUCT REQUIREMENTS ................................................ 016000-1-05 SECTION 017300 EXECUTION ............................................................................ 017300-1-08 SECTION 017700 CLOSEOUT PROCEDURES ................................................... 017700-1-05 SECTION 017839 PROJECT RECORD DOCUMENTATION ............................ 017839-1-03
DIVISION 02-EXISTING CONDITIONS
SECTION 024119 SELECTIVE DEMOLITION ................................................... 024119-1-04
DIVISION 03-CONCRETE
SECTION 033000 CAST-IN-PLACE CONCRETE ............................................... 033000-1-18
SECTION 034100 PRECAST STRUCTURAL CONCRETE…………………….034100-1-12
DIVISION 09-FINISHES
SECTION 099656 EPOXY COATINGS ................................................................ 099656-1-14 iii
DIVISION 31-EARTHWORK
SECTION 311000 SITE CLEARING ..................................................................... 311000-1-06
SECTION 311500 EROSION AND SEDIMENTATION CONTROL .................. 311500-1-04
SECTION 312000 EARTH MOVING…………………………………………….312000-1-18
SECTION 312319 DEWATERING……………………………………………….312319-1-04
SECTION 315000 EXCAVATION SUPPORT AND PROTECTION……………315000-1-05
DIVISION 32-EXTERIOR IMPROVEMENTS
SECTION 321216 ASPHALT PAVING ................................................................ 321216-1-07 SECTION 329200 TURF AND GRASSES ............................................................ 329200-1-07
DIVISION 33-UTILITIES
SECTION 333000.20 BYPASS PUMPING AND PIPING FOR SEWER SYSTEM.333000.20-1-06
SECTION 333200 SEPARATION OF WATERLINES & SANITARY
(OR COMBINED SEWERS & STORM SEWER ................... 333200-1-02
SECTION 333313 FACILITY SANITARY SEWERS .......................................... 333313-1-21
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
ADVERTISEMENT FOR BIDS
FORT AVENUE SEWER REPAIRS
TOWN OF BLACKSTONE, VIRGINIA
General Notice
Town of Blackstone (Owner) is requesting Bids for the construction of the following Project:
FORT AVENUE SEWER REPLACEMENT
TOWN OF BLACKSTONE, VIRGINIA
Bids for the construction of the Project will be received at the Town of Blackstone at the Town Hall located at 100 West Elm Street, Blackstone, Virginia 23824, until May 12, 2026, at 2:00 pm local time.
At that time the Bids received will be publicly opened and read.
The Project includes the following Work but is not limited to:
• 145 LF of 10-inch SDR-35 PVC Sanitary Gravity Sewer
• 135 LF of 10-inch SDR-18 PVC Sanitary Gravity Sewer in Casing
• 37 LF of 10-inch SDR-18 PVC Sanitary Gravity Sewer
• 131 LF of 18-inch Bored Casing beneath Railroad
• 1 EA Manhole Replaced in Place (> 5 Ft. to 10 Ft.)
• 1 EA Manholes (> 5 Ft. to 10 Ft.)
• 1 EA Manholes (> 10 Ft. to 15 Ft.)
• 2 EA Manholes Abandonment
• Asphalt Removal
• 8 Tons of 2-inch Asphalt Surface Mix Restoration
Bids are requested for the following Contract: FORT AVENUE SEWER REPLACEMENT
The Project has an expected duration of 120 days to Final.
Obtaining the Bidding Documents
The Issuing Office for the Bidding Documents is:
B&B Consultants, Inc.
212 East Ferrell Street, South Hill, Virginia Contact: Randy Jones Phone Number: 434-447-7621 Email: rjones@bandbcons.com Or Electronic copy can be obtained by going directly to site below and type in Blackstone https://mvendor.cgieva.com/Vendor/public/AllOpportunities.jsp mailto:rjones@bandbcons.com https://mvendor.cgieva.com/Vendor/public/AllOpportunities.jsp
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:15 am-5:00 pm and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office.
Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Upon the Issuing Office’s receipt of payment, printed Bidding Documents will be sent. The shipping charge amount will depend on the shipping method chosen. Bidding Documents are available for purchase in the following formats:
Format Cost Bidding Documents $175
Pre-bid Conference
A pre-bid conference for the Project will be held on April 30, 2026, at 10:00 am at Town of Blackstone’s Town Hall located at 100 West Elm Street, Blackstone, Virginia 23824. Attendance at the pre-bid conference is encouraged but it is not mandatory.
Instructions to Bidders.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Instructions to Bidders.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
American Iron and Steel requirement tall a part of this project. All iron and steel products used in this project must be produced in the United States. The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.
This is a federally assisted project. Bidders and contractors performing work under this Invitation to Bid are bound, wherever applicable, by the requirements of: President’s Executive Orders #12138 and #11625 regarding utilization of MBE/WBE firms, Davis Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, President’s Executive Order 11246 as amended by Executive Order 11375, Title VI of the Civil Rights Act of 1964 and Immigration Reform and Control Act of 1986.
Further the bidder agrees to abide by the requirements under Executive Order No. 11246, as amended.
Bidders and contractors performing work under this Invitation to Bid are bound that they do not or will not maintain or provide for their employees any facilities that are segregated on the basis of race, color, creed, or national origin.
This Advertisement is issued by:
Owner: Town of Blackstone, Virginia By: Philip Vannoorbeeck Title: Town Manager Date: April 12, 2026
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page1 of 1
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Contracts to Be Assigned
Article 23 - Federal Requirements…………………………………………………………………………………………………..……10
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 1 of 13 ITB-1
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office.
Bidders may rely on that sets of Bidding Documents obtained from the Issuing Office are complete unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 10 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 2 of 13 ITB-2
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.04.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within [Five 5] days of Owner’s request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 3 of 13 ITB-3
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 4 of 13 ITB-4
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidders visiting the Site are required to arrange their own transportation to the Site.
C. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
D. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
E. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
F. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions. Contractor shall also comply with OSHA regulations.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 5 of 13 ITB-5 such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
Randy Jones B & B Consultants, Inc.
212 East Ferrell Street South Hill, Virginia 23970 Fax: (434)-447-4257 Email: rjones@bandbcons.com
7.03 interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
mailto:rjones@bandbcons.com
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 6 of 13 ITB-6
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of [Five 5] percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
Bid security must be at least 5% of the Bidder’s maximum Bid price. A certified check or bank money order will be allowed in lieu of the Bid Bond.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 7 of 13 ITB-7
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer within 10 days of the issuance of the Advertisement for Bids or invitation to Bidders. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. Each such request shall include the Manufacturer’s Certification for Compliance with AIS. Refer to the Manufacturer’s Certification form provided in these documents’ construction Contract Documents. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders. Bidders cannot rely upon approvals made in any other manner. Substitutes and “or-equal” materials and equipment may be proposed by Contractor in accordance with Paragraph 7.05 and 7.06 of the General Conditions after the Effective Date of the Contract. Each such request shall include Manufacturer’s Certification letter to document compliance with AIS requirements. Refer to Manufacturer’s Certification Letter provided in these Contract Documents.
10.03 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening:
11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 8 of 13 ITB-8
11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
11.04 The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC 7.07A.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 9 of 13 ITB-9
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 10 of 13 ITB-10
ARTICLE 14—SUBMITTAL OF BID
14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated on the Bid Form.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid,
15.04 and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 11 of 13 ITB-11
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but the Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared based on the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 12 of 13 ITB-12
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
Owner is exempt from Virginia state sales and use taxes on materials and equipment to be incorporated in the work.
ARTICLE 22—CONTRACTS TO BE ASSIGNED (N/A)
ARTICLE 23—ARTICLE 23- FEDERAL REQUIREMENTS
23.01 Federal Requirements of Article 19 of the Supplementary Conditions apply to this Contract.
23.02 American Iron and Steel requirements apply to this project.
23.02 The contractor and its subcontractors shall maintain a small business solicitation list and make appropriate attempts to procure needed equipment, supplies, and material from small businesses in rural areas of the Commonwealth of Virginia wherever they are practical source for solicitation. Each Contractor or Subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make a GOOD Faith effort to achieve each goal under the Plan in each trade in which it has employees. The
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 13 of 13 ITB-13
Plan does not excuse any covered Contract’s or Subcontractor’s failure to good faith efforts to Achieve the Plan goals and timetables. Goals are published periodically in the Federal Register In notice form, and such notices may be obtained from any Office of Federal Contract Compliance programs office or from Federal procurement contracting officers. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified. See Federal Contracts inserted in Contract Documents.
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 1 of 12 QS-1
QUALIFICATIONS STATEMENT
ARTICLE 1—GENERAL INFORMATION
1.01 Provide contact information for the Business:
Legal Name of Business:
Corporate Office
Name: Phone number:
Title: Email address:
Business address of corporate office:
Local Office
Name: Phone number:
Title: Email address:
Business address of local office:
1.02 Provide information on the Business’s organizational structure:
Form of Business: ☐ Sole Proprietorship ☐ Partnership ☐ Corporation
☐ Limited Liability Company ☐ Joint Venture comprised of the following companies:
1.
2.
3.
Provide a separate Qualification Statement for each Joint Venturer.
Date Business was formed: State in which Business was formed:
Is this Business authorized to operate in the Project location? ☐ Yes ☐ No ☐ Pending
1.03 Identify all businesses that own Business in whole or in part (25% or greater), or that are wholly or partly (25% or greater) owned by Business:
Name of business: Affiliation:
Address:
Name of business: Affiliation:
Address:
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 2 of 12 QS-2
Name of business: Affiliation:
Address:
1.04 Provide information regarding the Business’s officers, partners, and limits of authority.
Name: Title:
Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $
Name: Title:
Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $
Name: Title:
Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $
Name: Title:
ARTICLE 2—LICENSING
2.01 Provide information regarding licensure for Business:
Name of License:
Licensing Agency:
License No: Expiration Date:
Name of License:
Licensing Agency:
License No: Expiration Date:
ARTICLE 3—DIVERSE BUSINESS CERTIFICATIONS
3.01 Provide information regarding Business’s Diverse Business Certification, if any. Provide evidence of current certification.
Certification Certifying Agency Certification Date
☐ Disadvantaged Business Enterprise
☐ Minority Business Enterprise
☐ Woman-Owned Business Enterprise
☐ Small Business Enterprise
☐ Disabled Business Enterprise
☐ Veteran-Owned Business Enterprise
☐ Service-Disabled Veteran-Owned Business ☐ HUBZone Business (Historically Underutilized) Business
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 3 of 12 QS-3
☐ Other
☐ None
ARTICLE 4—SAFETY
4.01 Provide information regarding Business’s safety organization and safety performance.
Name of Business’s Safety Officer:
Safety Certifications
Certification Name Issuing Agency Expiration
4.02 Provide Worker’s Compensation Insurance Experience Modification Rate (EMR), Total Recordable Frequency Rate (TRFR) for incidents, and Total Number of Recorded Manhours (MH) for the last 3 years and the EMR, TRFR, and MH history for the last 3 years of any proposed Subcontractor(s) that will provide Work valued at 10% or more of the Contract Price. Provide documentation of the EMR history for Business and Subcontractor(s).
Year
Company EMR TRFR MH EMR TRFR MH EMR TRFR MH
ARTICLE 5—FINANCIAL
5.01 Provide information regarding the Business’s financial stability. Provide the most recent audited financial statement, and if such audited financial statement is not current, also provide the most current financial statement.
Financial Institution:
Business address:
Date of Business’s most recent financial statement: ☐ Attached Date of Business’s most recent audited financial statement: ☐ Attached Financial indicators from the most recent financial statement
Contractor’s Current Ratio (Current Assets ÷ Current Liabilities)
Contractor’s Quick Ratio ((Cash and Cash Equivalents + Accounts Receivable + Short Term Investments) ÷ Current Liabilities)
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page 4 of 12 QS-4
ARTICLE 6—SURETY INFORMATION
6.01 Provide information regarding the surety company that will issue required bonds on behalf of the Business, including but not limited to performance and payment bonds.
Surety Name:
Surety is a corporation organized and existing under the laws of the state of:
Is surety authorized to provide surety bonds in the Project location? ☐ Yes ☐ No Is surety listed in “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” published in Department Circular 570 (as amended) by the Bureau of the Fiscal Service, U.S. Department of the Treasury?
☐ Yes ☐ No Mailing Address (principal place of business):
Physical Address
Phone (main): Phone (claims):
ARTICLE 7—INSURANCE
7.01 Provide information regarding Business’s insurance company(s), including but not…