06 Bid Frm (Add No. 1).pdf

PDF 332 KB Posted

Attached to
Fort Avenue Sewer Replacement
Solicitation number
IFB-117610
Issued by
New Kent County, Virginia

About this file

This is an Addendum No. 1 Bid Form for Construction Contract (EJCDC C-410) issued by the Town of Blackstone, Virginia for the Fort Avenue Sewer Replacement project located in New Kent County. The project scope encompasses gravity sewer replacement work including installation of 10-inch SDR-18 and SDR-35 PVC sanitary gravity sewer piping totaling 206 linear feet, 10-inch SDR-18 PVC sanitary gravity sewer in casing piping of 135 linear feet, 18-inch bored casing in earth and rock totaling 131 linear feet, three new or replacement manholes at various depths, two manhole abandonments, one doghouse manhole, tracer stations, asphalt removal and disposal, and restoration with 8 tons of 1-1/2-inch VDOT SM-9.5D surface asphalt and 25 tons of 6-inch VDOT 21A aggregate subbase. The bid form is organized into three parts covering general gravity sewer replacement items, construction staking, and unsuitable materials removal and replacement. Sealed bids must be submitted to Town Hall, 100 West Elm Street, Blackstone, Virginia 23824, by May 12, 2026, at 2:00 p.m. local time. A pre-bid conference is scheduled for April 30, 2026, at 10:00 a.m. at the same location. The expected construction duration is 120 calendar days from project commencement to final completion.

The bid pricing is structured as unit price work with estimated quantities provided for comparison purposes only, with final payment based on actual quantities as determined in the contract documents. Each unit price bid must include the contractor's overhead and profit. Bid security is required with submission. All bidders must acknowledge receipt of addenda, provide evidence of authority to do business in Virginia or covenant to obtain such authority, and supply a valid state contractor's license number or covenant to obtain one. The project is federally assisted and subject to American Iron and Steel requirements, Davis Bacon Act prevailing wage requirements, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, Executive Order 11246 regarding non-discrimination, and Title VI of the Civil Rights Act of 1964. Bidders must comply with Minority Business Enterprise and Women Business Enterprise utilization executive orders and the Immigration Reform and Control Act of 1986. The bid remains subject to acceptance for 60 days after opening, extendable by written agreement. Bidders must certify that bids are genuine, non-collusive, and not made in conformity with any anticompetitive agreements.

View the file

Other files

File Type Posted
C-1_ADD_01.pdf PDF
Specifications- Full Set.pdf PDF
Addendum No. 1.pdf PDF
PREBID ATTENDANCE.pdf PDF
Full Set (Bid).pdf PDF
Planholders List.pdf PDF
C-2_ADD_01.pdf PDF
02-CONTENTS (Add No. 1).pdf PDF
Prebid Minutes.pdf PDF
012200 - UNIT PRICES (Add No. 1).pdf PDF
03-advertisement for bids-C-111.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EJCDC® C-410, Bid Form for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 1 of 8 Page B-1 Addendum No. 1

BID FORM FOR CONSTRUCTION CONTRACT

The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 1—OWNER AND BIDDER

1.01 This Bid is submitted to:

TOWN OF BLACKSTONE

100 WEST ELM STREET

BLACKSTONE, VIRGINIA 23824

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2—ATTACHMENTS TO THIS BID

2.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid security;

B. List of Proposed Subcontractors;

C. List of Proposed Suppliers;

D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids;

E. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids;

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 2 of 8 Page B-2 Addendum No. 1

ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES

3.01 Unit Price Bids

A. Bidder will perform the following Work at the indicated unit prices:

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 3 of 8 Page B-3 Addendum No. 1

PART A: General Items for Gravity Sewer Replacement Item No. Description Unit Est

Qty.

Bid Unit

Price Bid Price

1 Mobilization LS 1 $ $

2 Clearing & Grubbing LS 1 $ $

3 Traffic Control LS 1 $ $

4 Asphalt Removal & Disposal LS 1 $ $

5 1-1/2-inch VDOT SM-9.5D Surface Asphalt Tons 8 $ $

6 6-inch VDOT 21A’s Aggregate Subbase Tons 25 $ $

7 10-inch SDR-18 PVC Gravity Sewer (>5 to 10

FT) LF 37 $ $

8 10-inch SDR-35 PVC Gravity Sewer (>5 to 10

FT) LF 76 $ #

9 10-inch SDR-35 PVC Gravity Sewer (>10 to 15

FT) LF 93 $ $

10 10-inch SDR-18 PVC Gravity Sewer in Casing Piping LF 135 $ $

11 18-inch Bored Casing in Earth LF 66 $ $

12 18-inch Bored Casing in Rock LF 65 $ $

13 Doghouse Manhole (>5 to 10 FT) EA 1 $ $

14 Manhole (>5 to 10 FT) EA 2 $ $

15 Manhole (>10 to 15 FT) EA 1 $ $

16 Plug & Abandon Exist. Manhole (>5 to 10 FT) EA 2 $ $

17 Plug & Abandon Exist. 8-inch Sewer Piping EA 2 $ $

18 Abandon Exist. Manhole EA 1 $ $

19 Connect to Existing Manhole EA 1 $ $

20 Tracer Stations EA 2 $ $

PART A: Gravity Sewer Replacement Bid Total $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 4 of 8 Page B-4 Addendum No. 1

PART B: Construction Staking Items Item No.

Description Unit Estimated Quantity

Bid Unit Price

Bid Amount

1 Construction Staking LS 1 $ $

PART B: Construction Staking Bid Total

PART C: Unsuitable Materials Items Item No. Description Unit Est

Qty.

Bid Unit

Price Bid Price

1 Rock Excavation Yd3 25 $ $

2 Unsuitable Subgrade /Backfill Removal & Replacement Yd3 50 $ $

PART C: Unsuitable Materials Items Total $

A. Bidder acknowledges that:

1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and

2. Estimated quantities are not guaranteed and are solely for the purpose of the comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.

3.02 Total Bid Price (Lump Sum and Unit Prices)

Total Base Bid Price (Total of all Lump Sum and Unit Price Bids in Parts A, B, & C)

ARTICLE 4—BASIS OF BID—COST-PLUS FEE - DELETED

ARTICLE 5—PRICE-PLUS-TIME BID - DELETED

ARTICLE 6—TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.02 DELETED Bidder agrees that the Work will be substantially complete on or before [Bidder inserts date], and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before [Bidder inserts date].

6.03 DELETED Bidder agrees that the Work will be substantially complete within [Bidder inserts number] calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within [Bidder inserts number] calendar days after the date when the Contract Times commence to run

6.04 Bidder accepts the provisions of the Agreement as to liquidated damages.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 5 of 8 Page B-5 Addendum No. 1

ARTICLE 7—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF

ADDENDA

7.01 Bid Acceptance Period

A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

7.02 Instructions to Bidders

A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.

7.03 Receipt of Addenda

A. Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number Addendum Date

ARTICLE 8—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

8.01 Bidder’s Representations

A. In submitting this Bid, Bidder represents the following:

1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.

2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.

4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.

5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 6 of 8 Page B-6 Addendum No. 1

6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and

(c) Bidder’s (Contractor’s) safety precautions and programs.

7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.

8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.

10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

8.02 Bidder’s Certifications

A. The Bidder certifies the following:

1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.

2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.

3. Bidder has not solicited or induced any individual or entity to refrain from bidding.

4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 8.02.A:

a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.

b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 7 of 8 Page B-7 Addendum No. 1

c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.

d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 8 of 8 Page B-8 Addendum No. 1

BIDDER hereby submits this Bid as set forth above:

Bidder:

(typed or printed name of organization)

By:

(individual’s signature) Name:

(typed or printed) Title:

(typed or printed)

Date:

(typed or printed)

If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.

Attest:

(individual’s signature)

Name:

(typed or printed)

Title:

(typed or printed)

Date:

(typed or printed)

Address for giving notices:

Bidder’s Contact:

Name:

(typed or printed)

Title:

(typed or printed)

Phone:

Email:

Address:

Bidder’s Contractor License No.: (if applicable)

Article 1— Owner and Bidder
1.01 This Bid is submitted to:
Town of Blackstone
100 West Elm Street
Blackstone, Virginia 23824
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and wit...
Article 2— Attachments to this Bid
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. List of Proposed Subcontractors;
C. List of Proposed Suppliers;
D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids;
E. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids;
Article 3— Basis of Bid—Lump Sum Bid and unit prices
3.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit prices:
A. Bidder acknowledges that:
1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and
2. Estimated quantities are not guaranteed and are solely for the purpose of the comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.

3.02 Total Bid Price (Lump Sum and Unit Prices)

Article 4— Basis of Bid—Cost-Plus Fee - DELETED
Article 5— Price-Plus-Time Bid - DELETED
Article 6— Time of Completion
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in th...
6.02 DELETED Bidder agrees that the Work will be substantially complete on or before [Bidder inserts date], and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before [Bidder inserts date].
6.03 DELETED Bidder agrees that the Work will be substantially complete within [Bidder inserts number] calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and will be completed ...
6.04 Bidder accepts the provisions of the Agreement as to liquidated damages.
Article 7— Bidder’s Acknowledgements: Acceptance Period, Instructions, and Receipt of Addenda
7.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
7.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
7.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda:
Article 8— Bidder’s Representations and Certifications
8.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identifi...
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and d...
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Techni...
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price,...
8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolutio...
10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
8.02 Bidder’s Certifications
A. The Bidder certifies the following:
1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
3. Bidder has not solicited or induced any individual or entity to refrain from bidding.
4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 8.02.A:
a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.
b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of fr...
c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.
d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.