About this file
This is a Table of Contents document for the bidding and contract documents for the Fort Avenue Sewer Replacement project in Blackstone, Virginia. The project scope includes installation of approximately 448 linear feet of PVC sanitary gravity sewer pipe in various sizes (10-inch and 18-inch), construction of three manholes (one replacement and two new installations at depths ranging from 5 to 15 feet), abandonment of two existing manholes, removal of asphalt, and restoration with 8 tons of 2-inch asphalt surface mix. The expected construction duration is 120 days to final completion. Sealed bids must be submitted by May 12, 2026, at 2:00 pm local time to the Town Hall at 100 West Elm Street, Blackstone, Virginia 23824, where bids will be publicly opened and read. A pre-bid conference is scheduled for April 30, 2026, at 10:00 am at the same location; attendance is encouraged but not mandatory. Bidding documents are available for purchase for $175 from B&B Consultants, Inc., 212 East Ferrell Street, South Hill, Virginia, or electronically through the vendor portal.
This federally assisted project is subject to American Iron and Steel (AIS) requirements, mandating that all iron and steel products including pipes, fittings, manhole covers, valves, and structural steel be produced in the United States. All bidders must comply with the Davis Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, Executive Order 11246 as amended, and Title VI of the Civil Rights Act of 1964. Additionally, bidders are subject to President's Executive Orders #12138 and #11625 regarding Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) utilization, as well as the Immigration Reform and Control Act of 1986 and non-discrimination requirements. The document establishes the complete bidding and contract framework including instructions to bidders, contractor qualifications statements, bid forms and bonds, agreements, general and supplementary conditions, technical specifications, and payment procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-1_ADD_01.pdf | ||
| Prebid Minutes.pdf | ||
| 012200 - UNIT PRICES (Add No. 1).pdf | ||
| Specifications- Full Set.pdf | ||
| 06 Bid Frm (Add No. 1).pdf | ||
| Addendum No. 1.pdf | ||
| PREBID ATTENDANCE.pdf | ||
| Full Set (Bid).pdf | ||
| Planholders List.pdf | ||
| C-2_ADD_01.pdf | ||
| 03-advertisement for bids-C-111.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
CONTENTS
BIDDING AND CONTRACT DOCUMENTS
ADVERTISEMENT FOR BIDS (C-111) .......................................................................... AB-1 - 2
INSTRUCTIONS TO BIDDERS (C-200)....................................................................... ITB-1 – 14
CONTRACTOR’S QUALIFICATIONS STATEMENT (C-451) ...................................... QS-1-12
BID FORM (C-410) ................................................................................................................ B-1 -8
BID BOND (C-430) ............................................................................................................ BB-1 – 2
NOTICE OF AWARD (C-510) ............................................................................................... NA-1
FORM OF AGREEMENT (C-520) ....................................................................................... A-1 - 7
STANDARD GENERAL CONDITIONS (C-700) ................................................................. 1 - 77
SUPPLEMENTARY CONDITIONS (C-800) ................................................................. SC-1 – 29
VCWRLF CONDITIONS
• ENVIRONMENTAL AUTHORITIES…………………………………………….……. 1
• ECONOMIC AND MISCELLANEOUS AUTHORITIES………………………………1-2
• CIVIL RIGHTS AND NONDISCRIMINATION REQUIREMENTS……………..…2-13
• FEDERAL REQUIREMENTS………………………………………………………..14-15
- ATTACHMENT #1-Procurement Requirements for Small Purchase………………..16-17
- ATTACHMENT #2-WAGE DECISION………………………………………..WD 18-23
- ATTACHMENT #3-Davis-Bacon Payroll Certification, Form WH-347…………....24-26
- ATTACHMENT #4-American Iron and Steel (AIS) Initial Certification Statement...….27
- ATTACHMENT #5-American Iron and Steel (AIS) Waiver Request……………….….28
- ATTACHMENT #6-American Iron and Steel (AIS) Waiver Request Checklist.…….29-30
- ATTACHMENT #7-American Iron and Steel (AIS) Final Certification Statement...…..31 ii
NOTICE TO PROCEED (C-550) ............................................................................................. NP-1
PERFORMANCE BOND (C-610) ..................................................................................... PB-1 – 4
PAYMENT BOND (C-615) ................................................................................................... P-1 - 4
APPLICATION FOR PAYMENT FORM .......................................................................... AP-1 - 4
CHANGE ORDER (C-941) ...................................................................................................... CO-1
WORK CHANGE DIRECTIVE (C-940) ............................................................................. WCD-1
CERTIFICATE OF SUBSTANTIAL COMPLETION (C-625) ............................................ CSC-1
NOTICE OF ACCEPTABILITY OF WORK (C-626) ……………………………………NOAW-1
TECHNICAL SPECIFICATIONS
DIVISION 01-GENERAL REQUIREMENTS
SECTION 011000 SUMMARY .............................................................................. 011000-1-07 SECTION 012220 UNIT PRICES ......................................................................... 012200- 1-05 SECTION 012500 SUBSTITUTION PROCESS.................................................... 012500-1-03
SECTION 012600 CONTRACT MODIFICATION PROCEDURES .................... 012600-1-03
SECTION 012900 PAYMENT PROCEDURES .................................................... 012900-1-05
SECTION 013100 PROJECT MANAGEMENT AND COORDINATION .......... 013100-1-08
SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION .......... 013200-1-05
SECTION 013300 SUBMITTAL PROCEDURES ................................................. 013300-1-09 SECTION 014000 QUALITY REQUIREMENTS ................................................. 014000-1-07 SECTION 014200 REFERENCES ......................................................................... 014200-1-03 SECTION 016000 PRODUCT REQUIREMENTS ................................................ 016000-1-05 SECTION 017300 EXECUTION ............................................................................ 017300-1-08 SECTION 017700 CLOSEOUT PROCEDURES ................................................... 017700-1-05 SECTION 017839 PROJECT RECORD DOCUMENTATION ............................ 017839-1-03
DIVISION 02-EXISTING CONDITIONS
SECTION 024119 SELECTIVE DEMOLITION ................................................... 024119-1-04
DIVISION 03-CONCRETE
SECTION 033000 CAST-IN-PLACE CONCRETE ............................................... 033000-1-18
SECTION 034100 PRECAST STRUCTURAL CONCRETE…………………….034100-1-12
DIVISION 09-FINISHES
SECTION 099656 EPOXY COATINGS ................................................................ 099656-1-14 iii
DIVISION 31-EARTHWORK
SECTION 311000 SITE CLEARING ..................................................................... 311000-1-06
SECTION 311500 EROSION AND SEDIMENTATION CONTROL .................. 311500-1-04
SECTION 312000 EARTH MOVING…………………………………………….312000-1-18
SECTION 312319 DEWATERING……………………………………………….312319-1-04
SECTION 315000 EXCAVATION SUPPORT AND PROTECTION……………315000-1-05
DIVISION 32-EXTERIOR IMPROVEMENTS
SECTION 321216 ASPHALT PAVING ................................................................ 321216-1-07 SECTION 329200 TURF AND GRASSES ............................................................ 329200-1-07
DIVISION 33-UTILITIES
SECTION 333000.20 BYPASS PUMPING AND PIPING FOR SEWER SYSTEM.333000.20-1-06
SECTION 333200 SEPARATION OF WATERLINES & SANITARY
(OR COMBINED SEWERS & STORM SEWER ................... 333200-1-02
SECTION 333313 FACILITY SANITARY SEWERS .......................................... 333313-1-21
File details come from the government source that posted it. Updated .