SF30_SP452017R00030001.pdf

PDF 43 KB Posted

Attached to
Hazardous Waste Disposal Services - Qatar
Solicitation number
SP4520-17-R-0003
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
SF30_SP452017R00030003.pdf PDF
SF30_SP452017R00030002.pdf PDF
DLAI_414525.pdf PDF
Att_1_Qatar_Price_Schedule_1.xlsx XLSX spreadsheet
SF1449_SP452017R0003.pdf PDF
Att_12_APL_doc.pdf PDF
Att_3_DD_1155_(Example).pdf PDF
Att_9_Locations.docx DOCX document
Att_13_Certificate_of_Destruction_Sample.pdf PDF
Att_11_Qatar_FGS.pdf PDF
Att_2_Qatar_Price_Schedule_2.xlsx XLSX spreadsheet
Att_5_-_DL2505_Manifest_Tracking_Log.PDF PDF
Att_6a._DL2507-1_Blank_QFL_Application_Form.pdf PDF
Att_8_PPI__Offeror_Questionnaire.pdf PDF
Att_6b._Transporter_Qualifications_Review_Application2.docx DOCX document
Att_7_DL2511_HWPS.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SP4520 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SP452017R0003

X

2017 APR 11

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA DISPOSITION SERVICES J-761

MANNHEIMERSTRASSE

KLEBER KASERNE BLDG 3227 67657

D- KAISERSLAUTERN

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

25 APR 2017

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUED ON NEXT PAGE

Amendment issued to answer received questions.

Q1. Could it be that clin QT2101 on Price Schedule 1 has a typo in the quantity?

A1. There is no typo. The estimated quantity of QT2101 also assumes a quantity of oil removals under Q2260.

Q2. It is understood that Customs requires a blank check as guarantee of payment of taxes for material disposed of in Qatar. Who must provide the blank check?

A2. The contractor is ultimately responsible for providing the blank check to Customs. Customs requires the blank check to be from a Qatari bank.

Q3. How is the amount of taxes calculated?

A3. That is based on Customs calculation at 5% of weight or value of material.

Q4. Is transport abroad possible?

A4. All removals and disposal must comply with Final Governing Standards, Attachment 11. Transport abroad is possible, with all associated costs to be included in Transportation CLINs QTXXXX as well as Basel CLIN Q6615.

Q5. Is on base MHE available for up to 40 ft. HC container?

A5. No. PWS 1.2.4 states Al Udeid Air Base is restricted to handling 20' or less shipping containers.

Q6. Who is responsible for palletizing and loading the trucks/container?

A6. In accordance with PWS 1.2.6 the Government will tailgate load the truck. The generator is responsible for palletizing and loading containers. If a shipping container is used, the generator will initially load the pallets into the container. The contractor is responsible for securing the material in the shipping container.

Q7. Where can DLAI 4541.25 as referenced in part 2.2. be found?

A7. A copy is attached to this amendment.

The solicitation closing is not extended at this time.

PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SP452017R0003-0001

Part 12 Clauses

ADDENDUM TO 52.212-04 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS

(b) Assignment: See DFARS 252.232-7008, ASSIGNMENT OF CLAIMS (OVERSEAS).

(c) Changes:

(1) Changes in terms and conditions of this basic contract may be made only by written agreement of the parties. Formal written agreement of the parties relative to the following terms and conditions is hereby made through contract acceptance or bilateral contract modification, as applicable.

(2) This addendum also serves as the formal written agreement of the parties authorizing revisions to CLIN weights/quantities for task orders issued against the contract. All task order weights are estimated amounts. The contractor can expect that the task order weights will be required to be adjusted upward or downward as removals take place and the actual pounds being removed are measured. Therefore, the Government has the unilateral right to increase the task order weight in those instances where the Government has underestimated the amount of weight that is required to be removed so the contractor can continue performance. The Government has the unilateral right to decrease the task order weight in those instances where the Government has overestimated the amount of weight that is required to be removed. In instances of decreasing weight, these decreases are not subject to FAR 52.212-4(l), Termination for the Government’s convenience. In addition, it is agreed that it is acceptable for the Government to issue task order modifications (e.g., quantity changes, noun descriptions, HIN changes, adding/deleting lines, extending task order end dates, etc.) unilaterally. The contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If, upon receipt of a unilateral task order modification, the contractor does not agree with the change or changes, the contractor reserves the right to seek resolution with the Contracting Officer. These modifications are only against task orders. No changes are made to the terms and conditions of the contract.

(g) Invoice: See PWS Section entitled DOCUMENTATION REQUIREMENTS, ACCEPTANCE, INVOICING, AND TRACKING.

(k) Taxes: Contract prices are exclusive of taxes or duties. See FAR 52.229-06, TAXES – FOREIGN FIXED-PRICE CONTRACTS; DFARS 252.229-7000, INVOICES EXCLUSIVE OF TAXES OR DUTIES; DFARS 252.229-7001, TAX RELIEF.

(t) This paragraph is revised to read as follows:

(t) System for Award Management (SAM).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the SAM database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims).

Assignees shall be separately registered in the SAM database. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.

PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SP452017R0003-0001

https://www.acquisition.gov/

Part 12 Clauses
ADDENDUM TO 52.212-04 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS

File details come from the government source that posted it. Updated .