The file is a PowerPoint presentation for the DLA Distribution Industry Day, providing details about an upcoming industry engagement event. The event is scheduled for May 14, 2025, at the Susquehanna Club in New Cumberland, PA, targeting industry representatives, prospective vendors, and businesses across service and supply-related sectors including storage, distribution, construction, material handling, janitorial services, and office supplies. The primary purpose is to facilitate an open dialogue between DLA Distribution and industry partners, offering insights into the agency's strategic and operational objectives, mission, and opportunities to do business with the organization.

Registration for the event is open through Eventbrite and closes on May 1, 2025, at 3:00 PM Eastern time or when capacity is reached. DLA Distribution, America's combat logistics support agency, aims to provide integrated logistics solutions to armed forces globally. The industry day will feature presentations from organizational staff, focusing on the agency's mission to support storage, distribution, transportation planning, logistics, and contingency operations through a worldwide network of distribution centers. Interested parties with questions are directed to contact DistributionJ7@dla.mil.

View the file

Other files

File Type Posted
1500 Business Opportunities Forecast - May 2025.pptx PPTX presentation
1400 DIBBS Overview - Distribution Industry Day.pptx PPTX presentation
0800 Admin and Welcome and Command V2.pptx PPTX presentation
0820 Distribution Day IPR 2 (Mr. Atwood) v6.pptx PPTX presentation
0850 J3 Managing Production Industry Day 2025.pptx PPTX presentation
1145 Engaging with Industry - Legal Presentation 2025.pptx PPTX presentation
1010 J4 Industry Day.pptx PPTX presentation
0915 J7 2025 Industry Day Director Brief V2.pptx PPTX presentation
1530 Open Q and A and Wrap-up V2.pptx PPTX presentation
1115 SB Brief Industry Day 2025.pptx PPTX presentation
1010 CA Industry Day 2025.pptx PPTX presentation
1300 J6 AMHE Industry Day 20250502v2.pptx PPTX presentation
1300 DLA Industry Day SEDA COG Presentation Selling to the Government 051425.pptx PPTX presentation
1400 20250304_DLAJ72_CMMC_IndustryDay_FINAL.pptx PPTX presentation
1400 Industry Day - PIEE Solicitation_V1.pptx PPTX presentation
DLA Distribution Industry Day Agenda- Final v2.doc DOC document
DLA Distribution Industry Day Agenda (Draft).doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA Distribution Industry Day Plans, Training, & Modernization

Mr. Joe Faris, Director

May 14, 2025

Plans, Training, and Modernization DLA Distribution Industry Day

Provide a Modernization and Network Optimization overview to attendees of Industry day DLA Mission & Vision The Need For Modernization: Big Picture Modernization Efforts

WMS/WES

Research & Development Projects (R&D) Network Optimization

Purpose:

Informatio Other

Guidance

Decision

Agenda:

Purpose:

Information Other

Guidance

Decision

Agenda:

Warfighter Always

PEOPLE PRECISION POSTURE PARTNERSHIPS

NetOps Strategy

2030 CONUS Vision DDSP: Centralized & Modernized S&D for all DLA-Owned Wholesale DDJC: High Density Storage of Inactive Inventory

San Joaquin Building 17 San Joaquin Building 18A Re-warehouse inventory & storage to maintain inactive weapon system inventory Commercial Air shipments from DDSP outperform avg transportation time for 8 out of the top 10 OCONUS customers

Leverage USTC contracts to support contingency requirements & contested logistics as needed

Maintenance significant parts Inactive stock Active stock

Retail: High Velocity Service Owned Industrial Materials, New Systems & Commercial Insourcing

Reduce fulfillment of global demand from Retail Sites by realigning Active & Inactive wholesale inventory and supporting maintenance significant parts NetOps aligns positions DLA to support a National Defense posture transition from competition to conflict EDC Modernization Gains Pick rates by 239% Throughput by 139% a

Streamlined support & improved delivery times for DoD customers, Preserved warfighter readiness 3 Network Optimization Initiatives: Inactive to San Joaquin | Active to Susquehanna | Reshape Industrial for New Weapons Systems

Briefer: Joe Faris

PEOPLE PRECISION POSTURE PARTNERSHIPS

Big Picture The Need for Modernization

Paper Pick

Manual Labor

Human Verification

Stationary Terminal

1980s – 2000s

2000s – Future Picking inaccuracy Inefficient use of human resources Loss of time traveling between work floor and terminal.

Human errors Inefficient Processes Accurate picks / increase productivity Goods to person automation Conduct bin face transactions/limits travel Increase accuracy / Reduce human error Efficient Processes Design, Build, Automate & Equip around Simplified Processes & Leverage Technology

DSS

Outdated COBOL system Lacks automated recon Business process re-engineering needed Brains of network capabilities

Voice Pick Process

Automation Tablets & Printers/Wearables

SAP-WMS

COBOL to industry standard Significant cost savings Inherent commercial best practices Robust operating system / audit ready

Modernization Benchmarking – Develop partnerships and learn best practices from industry and government partners

Automated Inventory/ Drone

Modernization is a major Distribution focus which enables the 4 DLA Imperatives: People, Precision, Posture, and Partnerships

Modernization Distribution Network Transformation

EDC Modernization Benefits:

Increased throughput of 139% Increased surge capacity for contingencies

Hardened cyber secure order fulfillment center

Decreased FTE requirement (159 FTEs)

TENETS

Accuracy Efficiency

Visibility

Productivity

Modernizing Equipment & Infrastructure:

Enables Network Optimization Achieves an unmodified audit opinion Top 7 DCs will receive an automation modernization upgrade

Mobile Handhelds:

Incorporates wireless & mobile technologies, including voice technology Enables bin face transactions vs. fixed workstations Integrates with WMS seamlessly Simplify processes to reduce cost, improve productivity, performance and relevancy

Automated Inventory/Drones:

Reduces complexity through DoD & industry standardization Increases material visibility Reduces manual processes & inventory research

Augmented Reality (AR)/Optical Character Recognition (OCR):

Supports efficient, & user-friendly processes Reduces dual certification of serialized assets Conducted OCR pilot at DDAA to capture weapons serial numbers

New order fulfillment center Hardware connected to WMS Upgraded infrastructure

7 Site Survey

OklahomaNorfolkRed RiverCorpus ChristiHillWarner Robbins
Cost$37M (FY24/25)$34M (FY26/27)$6.4M (FY27)$5.1M (FY28)$22.5M (FY29)$23.4M (FY29)
OpportunitiesReplace & reconfigure legacy AMHS
New High Density Bin StorageMPC (PH 1)

Replace/Augment Legacy AMHS High Density Bin Storage System Replace legacy tilt tray sorter & Towline system w/ AGVs Install new DAWs Reconfigure medium bulk area New AMHS (Goods to Person) Optimized VLM & Shipping

Automated Receiving BufferReplace Central Automated Storage Module
Reconfigure & Replace All Legacy AMHSReconfigure & Replace All Legacy AMHS

New High Density Bin Storage System

GSF Space Savings152K312K--89K160K
FTE Savings61202151311
FTE Avoidance1445--2531

Infrastructure Improvements

WMS & WES

DEMATIC IQ

EDC WES

WMS

Enterprise WES

Transformational plan for largest and most impactful facility in the network A robust WES is key to achieving productivity & savings Rollout plan for ECS2.0 & MFS at additional sites New WMS that enables auditability New WES that enables modernization & improved efficiency at all DCs

R & D

Personnel/Production Management Increased Productivity Reduced Resource Requirements Improved Operational Performance

Benefits Improved connectivity and reduced latency for current and future technologies Improved inventory accuracy & reduced manual audit workload Reduced manual validation and increased accuracy for stow and inventory activities Increased workforce productivity & accountability Augmented Reality / OCR

Fast, effective, error-free and user-friendly picking processes.

Automated Inventory Reduce manual requirement to conduct warehouse inventory Leveraging Bluetooth tagging & drones to:

Increase throughput, save time, reduce costs & reduce worker fatigue Autonomous Warehouse Operations Planned FY25 projects

5G / Smart Warehouse

Automated Picking Solutions Indoor-outdoor mule-style AGV Reduce Leadtime Eliminate Human Error Reduce Labor hours & cost Increase Warehouse Operational Efficiency 5G backbone increases connectivity, information throughput, & reliability of systems enabling:

Commercial technology modernizing the logistics industry that enables:

Providing near real time workload visibility & personnel availability, personnel capability monitoring, etc to drive:

Ghost Dog and TZA ProTrack Reduce manual requirements for material movement Modernizing to remain relevant and to better support the Warfighter Meet audit requirements Improve workforce efficiency

Public Private Partnership Authorities Created a pilot (5) program for partnership for contractors of production, modification, maintenance, or repair of a weapon system

Sec 883 FY17 NDAA Sec 862 FY25 NDAA = Permanent PPP Program

The program to provide storage and distribution services to a contractor is made permanent and expanded

Sec 862 FY25 NDAA Removes the pilot status Authorizes PPP for any contractor Sec 883 was weapons systems only Number of PPPs is uncapped No sunset Annual report to Congress through 2029

Questions image26.png image27.png image28.png image29.svg image30.jpeg image31.emf image32.emf image33.emf image34.jpeg image18.png image35.jpeg image36.png image37.png image38.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image47.jpeg image48.png image49.jpeg image50.png image51.jpeg image52.jpeg image53.png image54.jpeg image55.jpeg image39.jpg image40.jpeg image41.jpeg image42.png image43.png image44.png image45.jpeg image46.jpeg image63.png image56.jpeg image57.jpeg image58.png image59.svg

.MsftOfcThm_Accent4_lumMod_50_Fill_v2 { fill:#7F6000;

image60.png image61.jpeg image62.png image64.png image65.png image66.png

Microsoft_Excel_Worksheet.xlsx Phase 1 - Active Tracking

WCS / WES Phase 1 - IOC Programmatic Milestones

SequenceDistribution Center (DC) / SiteCapability
ApproachTarget
TRRTarget
PRR★

Target Local Recontrol Go-Live ★ Target WMS Go-Live2

1 DDOO (Oklahoma City, OK)1 Modernization/MFS N/A N/A N/A Jun-25

1 DDWG (Warner-Robins, GA)1 Local Recontrol Jun-24 Jun-24 Jun-24 Mar-25

2 DDRV / DDMA (Richmond-Mapping, VA)1 Local Recontrol Jul-24 Jul-24 Oct-24 Jul-25

1 DDNV (Norfolk, VA) ECS 2.0/MFS Sep-24 Oct-24 N/A Feb-25

2 DDJC (Tracy, CA) ECS 2.0/MFS Dec-24 Jan-25 N/A Apr-25

3 DDDE (Germersheim, Germany) ECS 2.0/MFS Jan-25 Mar-25 N/A Jul-25

4 DDHU (Hill AFB, UT) ECS 2.0/MFS Apr-25 Jun-25 N/A Sep-25

5 DDDK (Camp Carroll, ROK) ECS 2.0/MFS Dec-25 Feb-25 N/A Sep-25

1 DDSP (Susquehanna, PA) WES (DiQ) TBD TBD N/A Nov-25

Phase 1 Milestone Baseline

WCS / WES Phase 1 - IOC Programmatic Milestones

Deploy
SequenceDistribution Center (DC) / SiteCapability
ApproachBrown Out StartedTarget
CDRTarget
TRRTarget
PRR★

Target Local Recontrol Go-Live ★ Target WMS Go-Live2

1 DDOO (Oklahoma City, OK)1 Local Recontrol Aug-23 Oct-23 Feb-24 Apr-24 Apr-24 Aug-24

2 DDWG (Warner-Robins, GA)1 Local Recontrol Oct-23 Dec-23 Mar-24 May-24 May-24 Sep-24

3 DDRV / DDMA (Richmond-Mapping, VA)1 Local Recontrol Dec-23 Mar-24 Aug-24 Sep-24 Oct-24 Aug-25

4 DDNV (Norfolk, VA) ECS 2.0 Aug-23 Nov-23 Jul-24 Sep-24 N/A Jan-25

5 DDSP (Susquehanna, PA) WES (DiQ) N/A Sep-23 Feb-24 Apr-25 N/A May-25

6DDDE (Germersheim, Germany)Undetermined
(Local Recontrol or ECS 2.0)Dec-23Sep-24Mar-25May-25TBDJul-25

7 DDJC (Tracy, CA) ECS 2.0 Sep-23 Sep-24 Apr-25 Jul-25 N/A Mar-25

8 DDHU (Hill AFB, UT) ECS 2.0 Dec-23 Dec-24 Jun-25 Sep-25 N/A Sep-25

9DDDK (Camp Carrol, ROK)Undetermined
(Local Recontrol or ECS 2.0)Aug-24Sep-24Mar-25Jun-25TBDSep-25

1 Local Recontrol must be at least one (1) month in advance of WMS go-live to prevent problems at site when DSS is decommissioned

2 WMS Go-Live at ECS 2.0 or WES (DiQ) sites must be done jointly. Site can be ready for Go-Live in advance, but cannot depoy ECS 2.0 or WES (DiQ) without WMS.

★ Projected Go-Live schedule is based upon successful alignment of all Phase 1 elements (Local Recontrol, ECS 2.0, & WES). Any slip in critical path will affect target dates.

* Milestone At Risk

** Milestone NOT met / "Off Track" image67.emf image68.png image69.png image70.emf image71.png image72.png image73.png image74.png image75.png image9.png image13.jpeg image14.png image3.png image4.png image15.jpeg image16.png image17.png image10.png image11.png image1.jpeg image2.png image7.png image8.png image12.png

File details come from the government source that posted it. Updated .