A038 - Small Business Participation Quarterly Progress Report.pdf

PDF 170 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA Federal contract opportunity
Solicitation number
SP3300-20-R-5001
Issued by
Defense Logistics Agency Distribution

About this file

This document outlines a contract data requirements list (CDRL) for a small business participation quarterly progress report required under solicitation number SP3300-20-R-5001 for warehousing services at DLA Distribution San Diego, California. The Defense Logistics Agency requires the contractor to submit a report on a quarterly basis detailing the actual small business participation during the reporting period, including company names, CAGE codes, business categories, product/service descriptions, and NAICS codes for each small business concern. The report must also include the contractor's original proposed small business participation and rationale for any differences from actual participation. A table is required comparing the contractor's proposed dollar values and percentages for various small business categories against actual performance during the reporting period.

View the file

Other files for this federal contract opportunity

Other files attached to Warehousing Services at DLA Distribution San Diego, CA, newest first.
File Type Posted
Attachment J.1 DDDC Performance Work Statement 3-12-2020.docx DOCX document
SP330020R5001 Amend 0005 3-9-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
Attachment J.33, TE 5.6, Local Delivery and Pick Up Points.rtf RTF text file
Physical Security v2.pdf PDF
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update thru FY19.docx DOCX document
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Physical Security v1.pdf PDF
SP330020R5001 Amend 0001 (w tracked changes).docx DOCX document
Final PPC Instructions DDDC Jan 2020 V1.pdf PDF
Final PPC Instructions DDDC Jan 2020.pdf PDF
Attachment J.1 DDDC PWS.docx DOCX document
Attachment J.4, Wage Determination San Diego, Ca.docx DOCX document
Attachment J.35, TE 6.3N, MPC Home Ported Ships.rtf RTF text file
Attachment J.36, TE 5.9 DSS Load and Maintain.docx DOCX document
Attachment J.30, TE 5.5 Type Physical Inventory Code (TPIC) Matrix 07.02.2019.docx DOCX document
Attachment J.13, TE 1.2 CAC Procedures.docx DOCX document
A002 - SOH Plan and Reporting.pdf PDF
A012 - Monthly Cost Rpt for Non-Capital Equip New or Replacement CLIN.pdf PDF
A022 - RPO Quarterly Audit Checklist 9.25.19 (003).pdf PDF
Attachment J.20 TE 3.6 GE Office Equipment.xlsx XLSX spreadsheet
A037 - MPC Non-Delivery Log.pdf PDF
A005 - Internal Order Number (ION) Reporting.pdf PDF
Attachment J.42, Past Performance Questionnaire.docx DOCX document
Attachment J.14, TE 2.1 Definitions, Acronyms, and Abbreviations.docx DOCX document
A003 - Electrostatic Discharge (ESD) Control Program.pdf PDF
Attachment J.5 DD254 DDDC 2019 Continuation Pages.pdf PDF
Attachment J.33, TE 5.6, Local Delivery and Pick Up Points.rtf RTF text file
SF33 SP330020R5001.pdf PDF
Attachment J.41, Limitation on Subcontracting Report.xls XLS spreadsheet
A011 - Montly Cost Report for Scheduled and Unscheduled Equip Main CLIN.pdf PDF
Attachment J.34, TE 6.2N, Delivery Schedule Greater 10 miles.rtf RTF text file
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
Attachment J.19, TE 3.5 GE Misc Equipment.xlsx XLSX spreadsheet
A026 - Wood Packaging Material (WPM) Report.pdf PDF
Attachment J.32, TE 4.6, Contractor Equipment List.xlsx XLSX spreadsheet
A031 - Non-Accountable Engine Issue Report.pdf PDF
A035 - Daily Boat Movement Report.pdf PDF
Attachment J.17 TE 3.3 Government Data Systems 9.9.19.docx DOCX document
Attachment J.15, TE 3.1 Government Facilities.rtf RTF text file
A025 - Container Reclamation Report.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.23, TE 4.2 Gov Operated Equipment for Contractor Maintenance.xlsx XLSX spreadsheet
Attachment J.25, TE 4.5 Other Equipment PM Tasks REV.xls XLS spreadsheet
Attachment J.37, TE 6.1 Government Forms.docx DOCX document
Attachment J.44 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update July 22 2019 12 PM.docx DOCX document
Show all 50

Warehousing Services at DLA Distribution San Diego, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

Untitled

1_DATA_ITEM_NO: A038
2_TITLE_OF_DATA_ITEM: Small Business Participation Quarterly Progress Report
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE:
6_REQUIRING_OFFICE: J7
7_DID_250_REQ:
8_APP_CODE:
DIST_STATEMENT:
10_FREQUENCY: Quarterly
11_AS_OF_DATE: See Block 16
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: Contract Spec
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format.

Submit electronically no later than the the tenth (10th) working day after the end of each quarter. The following are the Quarterly end dates applicable to each year during the life of the contract: March 31st, June 30th, September 30th, December 31st.

Contract shall include the actual small business participation during the reporting period to include the following information: Company name, Cage Code, business category(ies), description of products or services, and NAICS code for each Small Business Concern (SBC) and the current commitment with the SBC. The contractor shall include their original proposed Small Business Participation information. The contractor shall provide rationale for differences between what was proposed and the contractor's actuals.

In addition, the contractor shall include a table identifying the proposed dollar value and proposed percent of total contract value and the contractor's actual dollar value and percent of total contract value for the reporting period for each category below. The table shall also provide a column with the difference (percentage) between what the contractor proposed and the actual data for the reporting period. The contractor shall include rationale for differences between what was proposed and the contractor's actuals.

Business Category:

Total Proposed Contract Value – Prime Offeror Total Small Business Small Disadvantaged Business Woman-Owned Small Business HUBZone Small Business Veteran-Owned Small Business Service-Disabled Veteran-Owned Small Business

Block 7-Inspection and acceptance requirements:

The KO will review and accept CDRL A038.

Block 14-Distribution-Contractor to submit original to the Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE: 11/21/2019
1_APPROVED_BY:
J_DATE: 11/21/2019
Page:
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO: SP3300-20-R-5001
FCONTRACTOR:
16_REMARKS_Continued:
Page2:
of_pages:
Reset:
2019-11-21T13:37:07-0500
TULLI.ANDREW.W.1547418316
2019-11-21T14:13:12-0500
ROSS.MARGARET.K.1239520312

File details come from the government source that posted it. Updated .