CDRL_A030_-_Phase-Out_Plan.pdf

PDF 206 KB Posted

Attached to
Distribution and Warehouse Services Federal contract opportunity
Solicitation number
SP3300-18-R-5004
Issued by
Defense Logistics Agency Distribution

About this file

CDRL A030

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehouse Services, newest first.
File Type Posted
SP3300-18-R-5004-A002.docx DOCX document
Attachment_J.1_Section_C_(2-12-18)_TRACKED.docx DOCX document
Attachment J.9, Contractor Equipment List —
Attachment J.24, TE 5.1 DDGM Historical Workload XLS spreadsheet
A034 - MPC and Local Delivery Refusal Log.pdf PDF
Attachment J.1, Section C —
Attachment J.1, Section C —
RFP_SP3300-18-R-5004_Sections_B_-_M_(1-22-18)_TRACKED.docx DOCX document
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
Attachment J.33, Proposed Productive Hours —
Attachment J.2, DDGM Site Specific DOC document
A015 - Monthly Cost Report for Special Projects and SS CLIN.pdf PDF
Attachment_J.14,_TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
CDRL_A017_-_Government_Cargo_Recovery_Effort_Program.pdf PDF
Attachment_J.25,_TE_5.2_Projected_Workload_20_Dec_17.xlsx XLSX spreadsheet
Attachment_J.31,_TE_5.7N_Local_Delivery.doc DOC document
Attachment_J.13,_TE_1.2_CAC_Procedures.docx DOCX document
CDRL_A026_-_Wood_Packaging_Material.pdf PDF
CDRL_A028_-_Floor_to_Book_Report.pdf PDF
CDRL_A005_-_Internal_Order_Number_Reporting.pdf PDF
Attachment_J.17,_TE_3.3_Government_Data_Systems.doc DOC document
Attachment_J.33_Proposed_Productive_Hours.xlsx XLSX spreadsheet
CDRL_A035_-_MPC_Non-Delivery_Log.pdf PDF
Attachment_J.12,_TE_1.1_Contractor_Personnel_Security.docx DOCX document
CDRL_A014_-_Cost_Report_for_Travel_and_Training_CLIN.pdf PDF
CDRL_A024_-_Physical_Security_Plan.pdf PDF
Attachment_J.32,_TE_5.8N_Leak_Monitoring_Detection_and_Transfer_Procdures.docx DOCX document
CDRL_A033_-_ODS_Leak_Detection_Report.pdf PDF
CDRL_A013_-_Cost_Report_for_Material_Support_CLIN.pdf PDF
Attachment_J.6,_GE_-_Material_Handling_Equipment.doc DOC document
CDRL_A019_-_Storage_Space_Management_Report.pdf PDF
CDRL_A012_-_Cost_Report_for_Non-Capital_Equip_Replacement_CLIN.pdf PDF
Attachment_J.29,_TE_6.1_Government_Forms.docx DOCX document
Attachment_J.34_Proposed_Training_Hours_(3-31-17).xlsx XLSX spreadsheet
Attachment_J.13,_TE_1.2_CAC_Procedures.docx DOCX document
Attachment_J.5,_CLIN_X006_Labor_Rate_Table.xlsx XLSX spreadsheet
Attachment_J.22,_TE_4.5_Other_Equipment_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.12,_TE_1.1_Contractor_Personnel_Security.docx DOCX document
Attachment_J.27,_TE_5.5_Type_Physical_Inventory_Code_Matrix.docx DOCX document
Attachment_J.10,_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.15,_TE_3.1_Government_Facilities.doc DOC document
Attachment_J.32,_TE_5.8N_Leak_Monitoring_Detection_and_Transfer_Procdures.docx DOCX document
Attachment_J.19,_TE_4.2_Gov_Operated_Equipment_for_Contractor_Maintenance.xlsx XLSX spreadsheet
Attachment_J.3,_Wage_Determination.pdf PDF
Attachment_J.26,_TE_5.11_Transshipment_of_Hazardous_Assets.doc DOC document
Attachment_J.16,_TE_3.2_Government_Training.docx DOCX document
Attachment_J.7,_GE_-_Miscellaneous.docx DOCX document
Attachment_J.30,_TE_5.6N_MPC_Homeported_Ships.docx DOCX document
Attachment_J.33_Proposed_Productive_Hours.xlsx XLSX spreadsheet
DDGM_Preproposal_Conference_Instructions.docx DOCX document
Show all 50

Distribution and Warehouse Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Continuation Page, Blk 16 Remarks

i MeetinventoryAPLsthroughouttransition‐outtonewContractor.
ii Participateinjointmissionstockinventories.
iii Performallcausativeresearchactionsresultingfrommissionstockinventory.

(h) Facilities

i Turnoverthefacilitiesinacceptablecondition.
ii Repairalldamageduetonegligence.
iii Maintaincleanliness
(i) WorkinProcess(WIP)
i Reduceallbacklogthatincludes,butisnotlimitedto,completingthefollowingIAW
therequirementsinC‐5andTE5.0APLs:
(a) Materialoff‐loadedfromconveyanceandawaitingreceiptinductionand

inspection.

(b) Materialreceiptsstarted,notcompleted.
(c) Materialreceiptsposted,notstowed.
(d) MROsinqueandrejects.
(e) DROsthatareawaitinganMROcycle.
(f) RCPsthatareawaitinganMROcycle.
(g) SpecialProjectMROsthatareawaitinganMROcycle.
(h) RCPA5Jtransactionspendinginventory.
(i) OpenSDRswithdispositionreceived,notcompleted.
(j) OpenDDForm1225swithdispositionreceived,notcompleted.
(k) MonthlyCOSISworkloadnotcompleted.
(l) Inventoriesnotcompleted.
(m) LocationSurveysnotcompletedIAWtheannualschedule.
(n) Opencausativeresearchactions.
(o) OpenISDRs.
(p) Openpackagingactions.
(q) Assetswaitingde‐packanddetrashthatarenotincludedintheDSSwork‐in‐
progress,ifapplicable.
ii Coordinateatransition‐outwiththeKOordesigneeandthenewContractorfor
transferofresponsibilityandworkforfinaldayoftransition.
(j) MaterialsandSupplies‐Retainaminimumofa30dayinventoryofdistribution

operations and maintenance supplies and materials to turn over to the successor contractor.

(k) ReportingRequirements‐Submitweeklystatusreportsdetailingthestatusof
transition‐outtasksthatareon‐going.
1_DATA_ITEM_NO: A030
2_TITLE_OF_DATA_ITEM: Phase-out Plan
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.1, C-1.11
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT:
10_FREQUENCY: See Block 16
11_AS_OF_DATE:
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1:
repro1: 1
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: The Contractor shall participate in a transition-out period in order to allow for a smooth and orderly transfer of responsibility for warehousing and distribution operations to a successor Contractor. The KO or designee will request the Contractor to submit a Contract Transition-Out Plan six (6) months prior to the end of the contract. The plan shall set forth actions, plans, procedures, and timelines necessary to ensure a smooth and orderly transition-out. In this plan the Contractor shall address responsibilities for continuity of service and tasks related to the closure of the contract. The plan shall identify how the Contractor shall:

1. Coordinate with the incoming Contractor on personnel actions including, but not limited to:

(a) Providing workforce with availability to attend interviews during normal hours of operation.

(b) Providing personnel training, certifications and licenses, and providing workforce with availability to attend training during normal hours of operation.

2. Government Property Inventory:

(a) Cooperate in the preparations for the pre-proposal site visit by staging GE in a limited number of areas for inspection by offerors and providing access to all Government Facilities (GF).

(b) Prepare for joint GP inventory by:

i Ensuring the automated equipment management control system records are up-to-date.

ii Validating the information in the Government’s Accountability Property System is accurate and notify the KO or designee of required updates.

iii Ensuring disposal records are up-to-date.

(c) Participate in joint inventory of GP.

(d) Resolve discrepancies.

i Identify disposition of missing equipment.

ii Replace or repair equipment damaged based on the results of the DD Form 200 (See paragraphs C-5.1.1.2 Liability for Government Property/Equipment and ensure all maintenance on equipment is up-to-date.

(e) Ensure support equipment such as racks and bins are kept in functional condition throughout transition and repair as needed or identified by the KO or designee.

(f) Account for all Government property/equipment identified on the hand receipt, including equipment identified for turn-in to the Government, identifying equipment that was disposed and provide the appropriate documentation.

(g) Mission Stock Inventory:

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X007
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2017-12-01T15:45:03-0500
CRUSEY.SHANE.M.1287981151
2017-12-04T13:34:07-0500
FLICK.CLIFFORD.C.1032268311

File details come from the government source that posted it.