DRAFT_PWS_Attach_3-Hand_Santizer_Loc's_&_Qty_DRAFT.pdf

PDF 67 KB Posted

Attached to
Janitorial Services
Solicitation number
SP330017R0004
Issued by

About this file

DRAFT SOLICITATION, PWS ATTACHMENT 3-HAND SANITIZER LOCATIONS & QTY. THIS DRAFT SOLICITATION AND IT'S ATTACHMENTS ARE BEING PROVIDED AT THIS TIME SOLEY FOR INDUSTRY INFORMATION AS TO THE SIZE AND SCOPE OF THE REQUIREMENT IN ORDER FOR OFFERORS TO MAKE THE DETERMINATION IF THEY WOULD WISH TO ATTEND THE PRE-PROPOSAL CONFERENCE ON MAY 3, 2017, AT DLA DISTRIBUTION, NEW CUMBERLAND, PA. OFFERORS ARE INSTRUCTED TO NOT SUBMIT QUESTIONS OR PROPOSALS AT THIS TIME, AS THEY WILL NOT BE RESPONDED TO. THIS DRAFT.

View the file

Other files

File Type Posted
SF30-Amendment_0003.pdf PDF
Q&A_6-8-17.pdf PDF
Sol_Attach_4-Other_Than_Cert_C&P_Data_For_Recurring_Janitorial_Svcs.xlsx XLSX spreadsheet
Q&As_5-31-17.pdf PDF
PWS_Attach_1-Bldg_SF_Breakdown.xls XLS spreadsheet
PWS_Attach_4-Min_APLs_6-7-17.pdf PDF
PWS_Attach_5-Production_Rate_Staffing.xlsx XLSX spreadsheet
Sol_Attach_1-PWS_6_7_17_Final.docx DOCX document
SF30-Amnd_0002.pdf PDF
SOL_RPF_-17R0004_6-7-17.pdf PDF
SF30-Amnd_0001.pdf PDF
SOL_RPF_-17R0004_5-24-17_(pages_39-59).pdf PDF
Q&As_5-24-17.pdf PDF
RFP_SP330017R0004.pdf PDF
PWS_Attach_1-Bldg_SF_Breakdown.xls XLS spreadsheet
Sol_Attach_1-PWS_5_15_17.pdf PDF
PWS_Attach_3-Hand_Santizr_Loc's_&_Qty.pdf PDF
Sol_Attach_2-WageDetCBA-2017-9934.pdf PDF
Sol_Attach_3-_PPQ.pdf PDF
Sol_Attach_4-Other_Than_Cert_C&P_Data_For_Recurring_Janitorial_Svcs.xlsx XLSX spreadsheet
PWS_Attach_4-Min_APLs.pdf PDF
PWS_Attach_5-Production_Rate_Staffing.xlsx XLSX spreadsheet
PWS_Attach_6-Proposed_Equip_List.xlsx XLSX spreadsheet
PPC_SignedInAttendees.pdf PDF
PPC_Presentaton_DDSP.ppt PPT presentation
DRAFT_Sol_Attach_3-_PPQ_DRAFT.pdf PDF
DRAFT_PWS_Attach_5-Production_Rate_Staffing_DRAFT.xlsx XLSX spreadsheet
DRAFT_PWS_Attach_1-Bldg_SF_Breakdown_DRAFT.xls XLS spreadsheet
DRAFT_SF1449-Custodial_Solicitation_DRAFT.pdf PDF
DRAFT_PWS_Attach_2-Drawings_DRAFT.pdf PDF
DRAFT_Sol_Attach_1-PWS_4_18_17_Final_DRAFT.pdf PDF
DRAFT_PWS_Attach_6-Proposed_Equip_List_DRAFT.xlsx XLSX spreadsheet
DRAFT_PWS_Attach_4-Min_APLs_DRAFT.pdf PDF
DRAFT_Sol_Attach_2-CBA_DRAFT.pdf PDF
DRAFT_Sol_Attach_4-Other_Than_Cert_C&P_Data_For_Recurring_Custodial_Svcs_DRAFT.xlsx XLSX spreadsheet
Pre-Prop_Instr_(synopsis).pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Cumberland Hand Sanitizer Locations

Building number

Type Quantity

Area location description

EDC

Bldg 2001 pedestal 1 Commander’s Break Room pedestal 1 Room 129 (training room) pedestal 1 Employee’s entrance area pedestal 1 Inflight cafeteria pedestal 1 Café annex wall 2 Mezzanine Break rooms: 4 A – 4 B

EDC

Bldg. 2001 wall 10 Break rooms # 1,2,3,5,6,7,8,9,10, 11

Bldg. 750 wall 3 Motor Pool, Roads and Grounds, Break area Bldg. 69 wall 1 Inside Bldg. 14 wall 1 Entrance Bldg. 53 wall 2 Bay 4 break room Bldg. 52 wall 1 Bay 3 breakroom Bldg. 51 wall 2 Bay 1 & bay 3 break rooms Bldg. 50 wall 2 Bay 1 break room Bldg. 55 wall 1 Break room Bldg. 56 wall 1 Break room in small bldg out front Bldg. 57 wall 1 Break room in small bldg out front Bldg. 58 wall 1 Break room in small bldg out front Bldg. 79 pedestal 1 Handicap entrance Bldg. 80 wall 1 Break room Bldg. 82 wall 1 Break room Bldg. 83 wall 1 Break room Bldg. 84 wall 1 Break room Bldg. 85 wall 2 Break rooms Bldg. 87 wall 1 Break room Bldg. 89 wall 1 Break room Bldg. 54 pedestal 4 Bay 1 Entrance

Bay 2 Entrance Bay 3 Entrance Bay 4 Entrance

Bldg. 150 pedestal 1 Entrance Bldg. 250 wall 1 Entrance Bldg. 284 pedestal 1 Conference room Bldg. 286 wall 2 1 in Annex, and 1 in Party room Bldg. 287 pedestal 1 Entrance Bldg. 300 wall 1 Inside Building Bldg. 315 wall 2 1st Floor and down Stairs Bldg. 316 wall 1 Front of Rest room Bldg. 320 pedestal 1 Entrance Bldg. 336 wall 1 Entrance

New Cumberland Hand Sanitizer Locations

Bldg. 400 Clinic pedestal 2 Waiting area and inside office

Bldg. 400 Family

Housing wall 1 Break room

Bldg. 401 wall 1 Break room Bldg. 732 wall 3 1 in Admin Break room, 2 Big Break room Bldg. 753 pedestal 2 Break room Bldg. 760 pedestal 1 Break room Bldg. 765 wall 3 Break room, entrance, inside Bldg. 780 wall 1 Break room Bldg. 789 wall 1 Break room Bldg. 911

Police Dept.

wall 4 Rest room in front and back

Bldg. 911 Fire Dept.

wall 3

Kitchen, Rest rooms

Police post 1 wall 1 Post 1 main shack Police post 2 wall 1 Post 2 main shack Police post 3 wall 1 Post 3 main shack Police post 4 wall 1 Post 4 main shack

Bldg. 250 Auto Ctr wall 2 Rest room

Bldg 351 wall 1 MWR Conference room Bldg. 412 Bowling center wall 1 Main area

Fitness Center wall 1

Main isle

Total Each type

Pedestal mounted

Wall mounted

Total units 89

File details come from the government source that posted it. Updated .