SP330017B0004

ATTACHMENT 4- SOW- SYSTEM FURNITURE

DEFENSE DISTRIBUTION CENTER

FACILITIES ENGINEERING

DEFENSE DEPOT, TRACY, CA.

Date: 31 January 2017 Subject: New System Furniture Location: Building 17 Prepared by: Norm Dalsis

STATEMENT OF WORK

Contractor is to furnish all labor, material, transportation, supplies and supervision necessary to purchase and install new system furniture in the office bubble area on the west side of Building 17 (see drawings attached). Scope of work includes, but is not limited to, the following:

1.0 Install twenty (20) new system furniture cubicles in the Building 17 office area. The typical workstation will be 8’ by 8’. New chairs and conference tables will be installed with the system furniture.

2.0 Site Preparation: The existing office furniture will be removed by the general contractor providing renovations prior to installation of the new furniture.

3.0 The furniture installation must be coordinated closely with the general contractor who will install the electrical and LAN computer lines to be integrated with the system furniture in the raceways.

4.0 The Government representative shall perform an inspection of work upon completion.

5.0 Provide any other material and/or perform any other labor necessary to make the office area fully operational and ready for use.

6.0 Any work outside this scope shall be approved in advance by the Engineering

Technician or Contracting Officer Representative.

7.0 All material shall be in new condition unless otherwise specified, shall be “Made in

USA”, and shall meet the Buy American Act requirements.

8.0 The electrical installation shall be performed in a neat and professional manner. All conduit shall be installed level/plumb; run parallel/perpendicular to the building and/or column lines, and be sized ¾” or larger. All conduit couplings shall be of the compression type. All conduit, fixtures and junction boxes shall be properly secured to the building structure.

9.0 The job site shall be left in a clean and orderly condition during construction and all construction debris and excess material shall be removed upon completion of the job.

The use of Government trash cans, dumpsters, or other waste receptacles is prohibited unless work is performed exclusively by WOLVERINE personnel.

10.0 All work shall comply with Unified Facility Guide Specifications and OSHA 29 CFR 1910.

11.0 All work shall conform to the current NFPA/NEC code, including NFPA 70E.

12.0 Construction shall be in compliance with all applicable local, state and federal standards.

13.0 Contractor is subject to all DDJC health and safety regulations and DLA security requirements.

SP330017B0004

ATTACHMENT 4- SOW- SYSTEM FURNITURE

END OF STATEMENT OF WORK