SP330017B0004

ATTACHMENT 3

STATEMENT OF WORK

FOR LAN REQUIREMENTS

Location: Warehouse 17, Tracy, California

Date: 1/05/2017

GENERAL REQUIREMENTS

a. Contractor is to provide all labor, materials, equipment, supplies and transportation to complete the work described herein. DLA Information Operations requires only qualified and experienced telecommunications Contractors perform Upgrade services in the construction of the DLA structured cabling infrastructure. The Contractor, by responding to this PWS, represents that their company possesses the qualifications, certifications, capabilities, test equipment, expertise, and personnel necessary to provide an efficient and successful Upgrade of properly operating components. All cabling and associated infrastructure shall have oversight by BICSI certified Technician. It is required that the

Contractor supervisor/foreman must be a BICSI certified ITS Technician and a BICSI member in good standing. The Contractor supervisor/foreman must be on-site for the duration of the project.

b. A BICSI RCDD will be present during the installation phase of the project. The upgraded infrastructure will be reviewed by a BICSI RCDD for adherence to standards. Random checks by the RCDD of all aspects of infrastructure Upgrade will be performed on a recurring basis during the entire Upgrade process. During the final inspection the RCDD will develop a punch list of items which need correction in order to accomplish certification. The RCDD will conduct a Final walk-through with the customer representative for acceptance.

c. The installation shall comply with, but is not limited to the following codes.

Document Number Title

a. NFPA 70 National Fire Protection Association (NFPA); National

Electric Code

b. ANSI/TIA-568-C Commercial Building Telecommunications Cabling

Standard

c. ANSI/TIA-569-A Commercial Building Standard for Telecommunications

Pathways and Spaces

d. ANSI/TIA-606-B Administrative Standard for the Telecommunications

Infrastructure of Commercial Buildings

e. ANSI/TIA-607-B Commercial Building Grounding and Bonding

Requirements for Telecommunications

f. ANSI/TIA-758-B Customer-Owned Outside Plant Telecommunications

Cabling Standard

ATTACHMENT 3 - SOW- LAN SPECIFICATION

g. ANSI/TIA/EIA-942 Data Centers

h. ANSI/TIA/EIA-526-7 SM Fiber Testing

i. ANSI/TIA/EIA-526-14-A MM Fiber Testing

j. N/A Upgrade Information Infrastructure Architecture (I3A)

Guide

k. UFC-3-580-01 Telecommunications Building Cabling Systems Planning

And Design

l. UFC-3-580-10N Design: Navy and Marine Corp Intranet (NMCI) Standard

Construction Practices

m. UFGS 16710 Building Telecommunications Cabling System

n. UFGS 16402 Interior Distribution System - Electrical Systems Supporting

Structure

o. UFGS 16720N Administrative Telephone Equipment, Inside Plant

p. DOD 5220.22M National Industrial Security Program Operating Manual

(NISPOM)

q. N/A Occupational Safety and Health Act (OSHA), Code of

Federal Regulations Title 29

r. N/A Occupational Safety and Health Act (OSHA), Code of

Federal Regulations Title 40 s

OPNAVINST

5100.23

Navy Occupational Safety and Health

(NAVOSH) Program Manual t

Department of

Defense

Directive

(DODD) 8100.2

Use of Commercial Wireless Devices, Services, and Technologies in the Department of Defense

(DOD) Global Information Grid (GIG)

Interior Work:

TASK 1 – GENERAL

Install 4 CAT6 data circuits each in 20 cubicles and 4 CAT6 data circuits each in the wall locations inside the office areas. Terminate the CAT6 data circuits to new patch panels inside the existing Building Distribution Cabinet located in the bubble area of warehouse 17. Provide an as

Built CAD and Visio drawing of the installation. Perform testing and labeling of the CAT 6 cabling for adherence to TIA/EIA-568-C2.1 standards using a Fluke DTX 1800 Cable Analyzer or equivalent. Provide Test and Inspection Report (TIR) to J64 Engineering Services Project

Manager.

TASK:

Install One Panduit 4-position snap in faceplate with 4 Leviton 61110-RV6 jacks and

CAT6 green plenum rated cable in each cubicle identified in the design map, 80 total.

Use CAT6 green plenum rated CAT6 cable to terminate the jacks inside the existing communications cabinet to a Leviton 69586-U48 patch panel

Install Leviton 41080 single gang 4-position faceplate with 4 Leviton 61110-RV6 green jacks and CAT6 green plenum rated cable in the wall locations in the office areas identified in the design map, 44 total. Terminate the CAT6 green plenum rated cable inside the existing communications cabinet to a Leviton patch panel

Label each faceplate with the jack numbers and BD-17-1-1 cabinet ID

Label Communications Cabinet CAT6 Patch panels to match the jack numbers

Preferred Standard for CAT6 patch panels is Leviton 69586-U48

Preferred Standard for CAT6 jacks is Leviton Extreme 61110-RV6 Green

Preferred Standard for CAT6 cable is Superior Essex 77-240-5B green plenum rated cable