Attachment_14_Transmittal_of_Shop_Drawings.pdf

PDF 49 KB Posted

Attached to
HVAC Cleaning for DDJC
Solicitation number
SP3300-15-B-0005
Issued by

About this file

Attachment 14 - Transmittal of Shop Drawings

View the file

Other files

File Type Posted
See_Award.pdf PDF
Bid_Results_-_SP330015B0005.pdf PDF
Amendment_0004.pdf PDF
Attachment_29_-_Duct_Layout_Bldg_100_NW_ANSI_D.pdf PDF
Attachment_26_-_Duct_Layout_Bldg_30_2nd_Floor_ANSI_D.pdf PDF
Attachment_24_-_Duct_Layout_16B_Mezz_ANSI_D.pdf PDF
Attachment_28_-_Duct_Layout_Bldg_100_SW_ANSI_D.pdf PDF
Attachment_27_-_Duct_Layout_Bldg_100_NE_ANSI_D.pdf PDF
Attachment_30_-_Bldg_100_Mech_Room_ANSI_D.pdf PDF
Amendment_0003.pdf PDF
Attachment_25_-_Duct_Layout_Bldg_30_1st_Floor_ANSI_D.pdf PDF
Attachment_23_-_B100__020515.dwg DWG drawing
Attachment_21_-_16_Mezz_Jan2008.dwg DWG drawing
Amendment_0002.pdf PDF
Attachment_22_-_Whse_30_Office_Mez.dwg DWG drawing
Amendment_0001.pdf PDF
Attachment_20_SCA_Wage_Determination.pdf PDF
Attachment_18_SF25A_Payment_Bond.pdf PDF
Attachment_4_Schedule_of_Supplies.pdf PDF
Attachment_6_Drawing_-_Duct_Layout_Bldg_30_1st_Floor.pdf PDF
Attachment_17_SF25_(Performance_Bond).pdf PDF
Attachment_7_Drawing_-_Duct_Layout_Bldg_30_2nd_Floor.pdf PDF
Attachment_11_Site_Map.pdf PDF
Attachment_19_Standard_Form_1442.pdf PDF
Attachment_15_Davis_Bacon.pdf PDF
Attachment_12_Submittal_Register.pdf PDF
Attachment_3_Environmental_Checklist.pdf PDF
Attachment_9_Drawing_-_Duct_Layout_Bldg_100_NW.pdf PDF
Attachment_2_General_Specs_Clean_HVAC_Systems.pdf PDF
Attachment_10_Drawing_-_Duct_Layout_Bldg_100_SW.pdf PDF
Attachment_5_Drawing_-_Duct_Layout_Bldg_16B_Mezz.pdf PDF
Solicitation.pdf PDF
Attachment_16_SF24_-_Bid_Bond.pdf PDF
Attachment_8_Drawing_-_Duct_Layout_Bldg_100_NE.pdf PDF
Attachment_13_Submittal_Procedures.pdf PDF
Attachment_1_Statment_of_Work_Clean_HVAC.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENG Form 4025 *U.S. Government Printing Office: 1991 – 523.366/400989

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL

SAMPLES, OR MANUFACTURER’S CERTIFICATE OF COMPLIANCE

(Read instructions on the reverse side prior to initiating this form)

DATE TRANSMITTAL NO.

SECTION I – REQUEST FOR APPROVAL FOR THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO: FROM: CONTRACT NO. CHECK ONE:

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

SPECIFICATION SECTION NO.

(Cover only one section with each transmittal)

PROJECT TITLE AND LOCATION

ITEM

NO.

a.

DESCRIPTION OF ITEM SUBMITTED

(Type size, model number/etc.)

b.

MFG. OR CONTR. CAT.,

CURVE DRAWING OR

BROCHURE NO.

(See instruction No. 8) c.

NO. OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

SPEC. DRAWING

PARA. NO. SHEET NO.

e. f.

FOR

CONTRACTOR

USE CODE

g.

VARIATION

(See instruction No. 6.)

h.

FOR

CE USE

CODE

i.

REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME AND SIGNATURE OF CONTRACTOR

SECTION II – APPROVAL ACTION

ENCLOSURES RETURNED (List by Item No.) NAME TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE

SHEET ____ OF ____

Attachment 14

INSTRUCTIONS

Reverse of ENG Form 4025 *U.S. Government Printing Office: 1991 – 523.366/400989

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each transmittal shall be numbered consecutively in the space provided for the “Transmittal No.”. This number, in addition to the contract number, will form a serial number for identifying each submittal. For new submittals or resubmittals mark the appropriate box; on resubmittals, insert transmittal number of last submission as well as the new submittal number.

3. The “Item No.” will be the same “Item No.” as indicated on ENG FORM 4288 for each entry on this form.

4. Submittals requiring expedition handling will be submitted on separate form.

5. Separate transmittal form will be used for submittals under separate sections of the specifications.

6. A check shall be placed in the “Variation” column when a submittal is not in accordance with the plans and specifications – also, a written statement to that effect shall be included in the space provided for “Remarks”.

7. Form is self-transmittal, letter of transmittal is not required.

8. When a sample of material or Manufacturer’s Certificate of Compliance is transmitted, indicate “Sample” or “Certificate” in column c, Section I.

9. U.S. Army Corps of Engineers approving authority will assign action codes as indicated below in space provided in Section I, column I to each item submitted. In addition they will ensure enclosures are indicated and attached to the form prior to return to the contractor. The Contractor will assign action codes as indicated below in Section I, column g, to each item submitted.

THE FOLLOWING ACTION COIDES ARE GIVE TO ITEMS SUBMITTED

A -- Approved as Submitted

B -- Approved, except as noted on drawings

C -- Approved, except as noted on drawings.

Refer to attached sheet resubmission required

D -- Will be returned by separate correspondence

E -- Disapproved (See attached)

F -- Receipt acknowledged

FX -- Receipt acknowledged, does not comply as noted with contract requirements

G -- Other (Specify)

10. Approval of items does not relieve the contractor from complying with all the requirements of the plans and specifications.

File details come from the government source that posted it. Updated .