Attachment_3_-_Price_Proposal_Worksheets.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Environmental Services in California
Solicitation number
SP0600-13-R-0515
Issued by

About this file

Price Proposal Worksheets

View the file

Other files

File Type Posted
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Attachment_3_-_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Performance_Work_Statement_05_16_13.pdf PDF
Attachment_2_-_Fill-in_Clauses.pdf PDF
Attachment_3_-_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
Amendment_0001.pdf PDF
Attachment_3_-_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
Attachment_4_-_Wage_Determination_-_DFSP_Norwalk_and_San_Pedro _CA_Wage_Determination.pdf PDF
Attachment_5_-_DLA_Energy_19.3.pdf PDF
Attachment_2_-_Fill-in_Clauses.pdf PDF
Attachment_3_-_Price_Proposal_Worksheets.xlsx XLSX spreadsheet
ATTACHMENT_1_-_Performance_Work_Statement.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.xlsx XLSX spreadsheet
Attachment_7_-_Sample_Scenario.pdf PDF
Attachment_4_-_Wage_Determination_-_DFSP_Ozol _CA.pdf PDF
SP0600-13-R-0525_-_FINAL.pdf PDF
Attachment_2_-_Fill-in_Clauses.pdf PDF
Attachment_7_-_Sample_Scenario.pdf PDF
Attachment_5_-_DLA_Energy_19.3.pdf PDF
DFSP_Norwalk_and_San_Pedro _CA_Wage_Determination.pdf PDF
Solicitation_04_08_13_Draft_Copy.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.xlsx XLSX spreadsheet
DFSP_Ozol _CA_Wage_Determination.pdf PDF
DRAFT_-_Performance_Work_Statement.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Norwalk

"Pricing Proposal Worksheet" completed by the offeror. The Firm-Fixed Price rates submitted in Attachment 3 "Pricing Proposal Worksheet" will be incorporated into the resultant contract as ceiling rates to be utilized in the preparation of qoutes at the Task Order level.

CLINServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
0001Lump Sum price for work plan5$ - 0
0002Unit Price per hour in excess of those included in work plan50$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
0003Price per unit (10 points/unit) - 4 fee depth1$ - 0
0004Price per unit (10 points/unit) - 14 feet depth1$ - 0
0005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
0006Price per unit (10,000 linear feet) to include in report of findings1$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
0007Price per boring up to 10 feet5$ - 0
0008Cost per foot from 11 to 20 feet50$ - 0
0009Cost per foot 21 to 60 feet200$ - 0
0010Cost per foot 61 to 150 feet100$ - 0
0011Mobilization cost for soil boring2$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
0012Price per 2" Monitoring Well up to 10 feet10$ - 0
0013Cost per foot of 2" monitoring well from 11 to 20 feet100$ - 0
0014Cost per foot of 2" monitoring well from 21 to 60 feet200$ - 0
0015Cost per foot of 2" monitoring well from 61 to 150 feet100$ - 0
0016Price per 4" monitoring well up to 10 feet10$ - 0
0017Cost per foot of 4" monitoring well from 11 to 20 feet100$ - 0
0018Cost per foot of 4" monitoring well from 21 to 60 feet200$ - 0
0019Cost per foot of 4" monitoring well from 61 to150 feet100$ - 0
0020Cost per foot to Close/Decommission 2” dia. well50$ - 0
0021Cost per foot to Close/Decommission 4” dia. well40$ - 0
0022Mobilization cost for monitoring well installation2$ - 0
Conduct well development IAW Task 6 of the PWS
0023Price for well development12$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
0024Cost per unit of DPT (5 bores per unit)5$ - 0
0025Mobilization for DPT Testing1$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
0026Price of (10 soil borings/unit)1$ - 0
Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
00276010 (Individual metal)40$ - 0
00286020 (Individual metal)40$ - 0
00297470 (Mercury)1$ - 0
00308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)615$ - 0
00318015 (TPH as Gasoline [C6-12])50$ - 0
00328021 (Aromatic Volatile Organic Compounds)50$ - 0
00338041 (Phenols)1$ - 0
00348081 (Organochlorine Pesticides)1$ - 0
00358121 (Chlorinated Hydrocarbons)10$ - 0
00368151 (Chlorinated Herbicides)1$ - 0
00378260 (Full List Volatile Organic Compounds)400$ - 0
00388260 (BTEX/MTBE/Naphthalene)20$ - 0
00398270 (Full list Semi-Volatile Organic Compounds)50$ - 0
00408270-SIM (Polyaromatic Hydrocarbons)10$ - 0
00418310 (Polyaromatic Hydrocarbons)10$ - 0
00428440 (Total Petroleum Hydrocarbons)10$ - 0
0043601 (Prugeable Halocarbons)10$ - 0
0044602 (Purgeable Aromatics)10$ - 0
0045604 (Phenols)6$ - 0
0046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
0047610 (Polynuclear Aromatic Hydrocarbons)10$ - 0
0048612 (Chlorinated Hydrocarbons)1$ - 0
0049624 (Purgeables)1$ - 0
0050625 (Semivolatile Organic Compounds)1$ - 0
0051TCLP Metals25$ - 0
00529045 (pH)12$ - 0
00531010 (Ignitability)10$ - 0
0054CCR Title 22 Metals (6010/7470)1$ - 0
00559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
00569023 (Total Organic Halides)1$ - 0
00579030 or SM 4500-S (Sulfide)18$ - 0
0058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
0059SM 2320 (Alkalinity)1$ - 0
00605520B (Oil & Grease)12$ - 0
00612130 (Turbidity)12$ - 0
00622540 (Total Suspended Solids & Seatable Solids)24$ - 0
00635540 (Surfactant)12$ - 0
00645210 (BOD)12$ - 0
0065TO-1542$ - 0
0066Fixed Gases6$ - 0
0067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
0068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
0069Price per 6" recovery well from 11 to 20 Feet1$ - 0
0070Price per 6" recovery well from 21 to 60 Feet1$ - 0
0071Price per 6" recovery well from 61 to 120 Feet1$ - 0
0072Mobilization cost for 6" recovery well1$ - 0
0073Monthly price for 6" recovery well system O&M1$ - 0
0074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
0075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
0076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
0077Lump sum price for pump test10
Annual monitoring and reporting IAW Task 12 of the PWS0
0078Lump sum price for annual monitoring and reporting1
Report preparation, duplication, and distribution IAW Task 13 of the PWS
0079Lump sum price for report preparation, duplication, and distribution35
0080Unit price per hour in excess hours for report preparation300
Miscellaneous services IAW Task 14 of the PWS
0081Project Manager price per hour800$ - 0
0082Engineer I price per hour310$ - 0
0083Engineer II price per hour420$ - 0
0084Engineer III price per hour100$ - 0
0085Chemist price per hour100$ - 0
0086Environmental Scientist I price per hour50$ - 0
0087Environmental Scientist II price per hour100$ - 0
0088Environmental Scientist III price per hour20$ - 0
0089Geologist I price per hour140$ - 0
0090Geologist II price per hour320$ - 0
0091Geologist III price per hour20$ - 0
0092Hydrogeologist I price per hour20$ - 0
0093Hydrogeologist II price per hour80$ - 0
0094Hydrogeologist III price per hour50$ - 0
0095Toxicologist I price per hour60$ - 0
0096Toxicologist II price per hour80$ - 0
0097Toxicologist III price per hour40$ - 0
0098Drafter price per hour120$ - 0
0099Traffic Control Engineer price per hour300$ - 0
0100Cost Accountant price per hour140$ - 0
0101Secretary price per hour150$ - 0
0102Buyer200$ - 0
0103Site Labor Foreman price per hour40$ - 0
0104Remediation System Operator price per hour200$ - 0
0105Heavy Equipment Operator price per hour10$ - 0
0106Laborer price per hour500$ - 0
0107Drill Rig Operator price per hour20$ - 0
0108Environmental Technician price per hour2,600$ - 0
0109Utility Truck price per day20$ - 0
011002/Explosimeter price per day10$ - 0
0111Groundwater Sampling Pump price per day70$ - 0
0112Flame Ionization OCA price per day40$ - 0
0113Air Velocity Meter price per day20$ - 0
0114Field GC price per day1$ - 0
0115Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum100$ - 0
0116Furnish and fill with soil roll off bin, price per bin100$ - 0
0117Shipping of soil and water samples for analytical testing price per 25lb shipping container40$ - 0
0118Disposable Bailers price per unit200$ - 0
0119Tedlar Bags price per dozen1$ - 0
0120Pickup Truck (1/2 ton) price per day40$ - 0
0121Air Compressor (7 cfm) price per day1$ - 0
0122Generator (4000 watt) price per day10$ - 0
0123CAD Equipment Use Charge price per day10$ - 0
0124Photoionization Detector price per day40$ - 0
0125Groundwater Multimeter70$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
0126Percent mark-up for overhead and profit$ - 0
Background Review IAW Task 16
0127Lump sum price for reviewing existing documentation2$ - 0
Total Overall Evaluated Price$ - 0
NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level.

Solicitation No. SP0600-13-R-0515 Price Proposal Worksheet Location: DFSP Norwalk, CA

&P

San Pedro

"Pricing Proposal Worksheet" completed by the offeror. The Firm-Fixed Price rates submitted in Attachment 3 "Pricing Proposal Worksheet" will be incorporated into the resultant contract as ceiling rates to be utilized in the preparation of qoutes at the Task Order level.

CLINServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
0001Lump Sum price for work plan6$ - 0
0002Unit Price per hour in excess of those included in work plan80$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
0003Price per unit (10 points/unit) - 4 fee depth1$ - 0
0004Price per unit (10 points/unit) - 14 feet depth1$ - 0
0005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
0006Price per unit (10,000 linear feet) to include in report of findings8$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
0007Price per boring up to 10 feet20$ - 0
0008Cost per foot from 11 to 20 feet200$ - 0
0009Cost per foot 21 to 60 feet800$ - 0
0010Cost per foot 61 to 150 feet200$ - 0
0011Mobilization cost for soil boring3$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
0012Price per 2" Monitoring Well up to 10 feet10$ - 0
0013Cost per foot of 2" monitoring well from 11 to 20 feet100$ - 0
0014Cost per foot of 2" monitoring well from 21 to 60 feet200$ - 0
0015Cost per foot of 2" monitoring well from 61 to 150 feet100$ - 0
0016Price per 4" monitoring well up to 10 feet15$ - 0
0017Cost per foot of 4" monitoring well from 11 to 20 feet150$ - 0
0018Cost per foot of 4" monitoring well from 21 to 60 feet200$ - 0
0019Cost per foot of 4" monitoring well from 61 to150 feet100$ - 0
0020Cost per foot to Close/Decommission 2” dia. well150$ - 0
0021Cost per foot to Close/Decommission 4” dia. well100$ - 0
0022Mobilization cost for monitoring well installation3$ - 0
Conduct well development IAW Task 6 of the PWS
0023Price for well development25$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
0024Cost per unit of DPT (5 bores per unit)10$ - 0
0025Mobilization for DPT Testing5$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
0026Price of (10 soil borings/unit)1$ - 0
Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
00276010 (Individual metal)250$ - 0
00286020 (Individual metal)20$ - 0
00297470 (Mercury)1$ - 0
00308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)250$ - 0
00318015 (TPH as Gasoline [C6-12])250$ - 0
00328021 (Aromatic Volatile Organic Compounds)50$ - 0
00338041 (Phenols)1$ - 0
00348081 (Organochlorine Pesticides)1$ - 0
00358121 (Chlorinated Hydrocarbons)10$ - 0
00368151 (Chlorinated Herbicides)1$ - 0
00378260 (Full List Volatile Organic Compounds)24$ - 0
00388260 (BTEX/MTBE/Naphthalene)24$ - 0
00398270 (Full list Semi-Volatile Organic Compounds)1,000$ - 0
00408270-SIM (Polyaromatic Hydrocarbons)10$ - 0
00418310 (Polyaromatic Hydrocarbons)10$ - 0
00428440 (Total Petroleum Hydrocarbons)10$ - 0
0043601 (Prugeable Halocarbons)115$ - 0
0044602 (Purgeable Aromatics)1$ - 0
0045604 (Phenols)1$ - 0
0046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
0047610 (Polynuclear Aromatic Hydrocarbons)10$ - 0
0048612 (Chlorinated Hydrocarbons)1$ - 0
0049624 (Purgeables)1$ - 0
0050625 (Semivolatile Organic Compounds)1$ - 0
0051TCLP Metals30$ - 0
00529045 (pH)1$ - 0
00531010 (Ignitability)10$ - 0
0054CCR Title 22 Metals (6010/7470)1$ - 0
00559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
00569023 (Total Organic Halides)1$ - 0
00579030 or SM 4500-S (Sulfide)1$ - 0
0058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
0059SM 2320 (Alkalinity)1$ - 0
00605520B (Oil & Grease)100$ - 0
00612130 (Turbidity)1$ - 0
00622540 (Total Suspended Solids & Seatable Solids)1$ - 0
00635540 (Surfactant)1$ - 0
00645210 (BOD)1$ - 0
0065TO-151$ - 0
0066Fixed Gases1$ - 0
0067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
0068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
0069Price per 6" recovery well from 11 to 20 Feet1$ - 0
0070Price per 6" recovery well from 21 to 60 Feet1$ - 0
0071Price per 6" recovery well from 61 to 120 Feet1$ - 0
0072Mobilization cost for 6" recovery well1$ - 0
0073Monthly price for 6" recovery well system O&M1$ - 0
0074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
0075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
0076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
0077Lump sum price for pump test10
Annual monitoring and reporting IAW Task 12 of the PWS0
0078Lump sum price for annual monitoring and reporting1
Report preparation, duplication, and distribution IAW Task 13 of the PWS
0079Lump sum price for report preparation, duplication, and distribution20
0080Unit price per hour in excess hours for report preparation75
Miscellaneous services IAW Task 14 of the PWS
0081Project Manager price per hour800$ - 0
0082Engineer I price per hour300$ - 0
0083Engineer II price per hour60$ - 0
0084Engineer III price per hour75$ - 0
0085Chemist price per hour100$ - 0
0086Environmental Scientist I price per hour50$ - 0
0087Environmental Scientist II price per hour150$ - 0
0088Environmental Scientist III price per hour40$ - 0
0089Geologist I price per hour80$ - 0
0090Geologist II price per hour1,500$ - 0
0091Geologist III price per hour20$ - 0
0092Hydrogeologist I price per hour20$ - 0
0093Hydrogeologist II price per hour120$ - 0
0094Hydrogeologist III price per hour20$ - 0
0095Toxicologist I price per hour20$ - 0
0096Toxicologist II price per hour20$ - 0
0097Toxicologist III price per hour10$ - 0
0098Drafter price per hour120$ - 0
0099Traffic Control Engineer price per hour10$ - 0
0100Cost Accountant price per hour150$ - 0
0101Secretary price per hour120$ - 0
0102Buyer40$ - 0
0103Site Labor Foreman price per hour40$ - 0
0104Remediation System Operator price per hour900$ - 0
0105Heavy Equipment Operator price per hour10$ - 0
0106Laborer price per hour500$ - 0
0107Drill Rig Operator price per hour40$ - 0
0108Environmental Technician price per hour800$ - 0
0109Utility Truck price per day10$ - 0
011002/Explosimeter price per day10$ - 0
0111Groundwater Sampling Pump price per day20$ - 0
0112Flame Ionization OCA price per day20$ - 0
0113Air Velocity Meter price per day1$ - 0
0114Field GC price per day1$ - 0
0115Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum100$ - 0
0116Furnish and fill with soil roll off bin, price per bin10$ - 0
0117Shipping of soil and water samples for analytical testing price per 25lb shipping container40$ - 0
0118Disposable Bailers price per unit150$ - 0
0119Tedlar Bags price per dozen8$ - 0
0120Pickup Truck (1/2 ton) price per day104$ - 0
0121Air Compressor (7 cfm) price per day1$ - 0
0122Generator (4000 watt) price per day1,000$ - 0
0123CAD Equipment Use Charge price per day10$ - 0
0124Photoionization Detector price per day20$ - 0
0125Groundwater Multimeter20$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
0126Percent mark-up for overhead and profit$ - 0
Background Review IAW Task 16
0127Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ - 0

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level.

Solicitation No. SP0600-13-R-0515 Price Proposal Worksheet Location: DFSP San Pedro, CA

&P

Ozol

"Pricing Proposal Worksheet" completed by the offeror. The Firm-Fixed Price rates submitted in Attachment 3 "Pricing Proposal Worksheet" will be incorporated into the resultant contract as ceiling rates to be utilized in the preparation of qoutes at the Task Order level.

CLINServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
0001Lump Sum price for work plan4$ - 0
0002Unit Price per hour in excess of those included in work plan40$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
0003Price per unit (10 points/unit) - 4 feet depth1$ - 0
0004Price per unit (10 points/unit) - 14 feet depth1$ - 0
0005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
0006Price per unit (10,000 linear feet) to include in report of findings1$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
0007Price per boring up to 10 feet10$ - 0
0008Cost per foot from 11 to 20 feet100$ - 0
0009Cost per foot 21 to 60 feet400$ - 0
0010Cost per foot 61 to 150 feet100$ - 0
0011Mobilization cost for soil boring2$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
0012Price per 2" Monitoring Well up to 10 feet10$ - 0
0013Cost per foot of 2" monitoring well from 11 to 20 feet100$ - 0
0014Cost per foot of 2" monitoring well from 21 to 60 feet200$ - 0
0015Cost per foot of 2" monitoring well from 61 to 150 feet100$ - 0
0016Price per 4" monitoring well up to 10 feet2$ - 0
0017Cost per foot of 4" monitoring well from 11 to 20 feet20$ - 0
0018Cost per foot of 4" monitoring well from 21 to 60 feet80$ - 0
0019Cost per foot of 4" monitoring well from 61 to150 feet20$ - 0
0020Cost per foot to Close/Decommission 2” dia. well100$ - 0
0021Cost per foot to Close/Decommission 4” dia. well100$ - 0
0022Mobilization cost for monitoring well installation2$ - 0
Conduct well development IAW Task 6 of the PWS
0023Price for well development12$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
0024Cost per unit of DPT (5 bores per unit)5$ - 0
0025Mobilization for DPT Testing1$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
0026Price of (10 soil borings/unit)1$ - 0
Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
00276010 (Individual metal)20$ - 0
00286020 (Individual metal)20$ - 0
00297470 (Mercury)10$ - 0
00308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)80$ - 0
00318015 (TPH as Gasoline [C6-12])80$ - 0
00328021 (Aromatic Volatile Organic Compounds)50$ - 0
00338041 (Phenols)1$ - 0
00348081 (Organochlorine Pesticides)1$ - 0
00358121 (Chlorinated Hydrocarbons)10$ - 0
00368151 (Chlorinated Herbicides)1$ - 0
00378260 (Full List Volatile Organic Compounds)50$ - 0
00388260 (BTEX/MTBE/Naphthalene)50$ - 0
00398270 (Full list Semi-Volatile Organic Compounds)12$ - 0
00408270-SIM (Polyaromatic Hydrocarbons)10$ - 0
00418310 (Polyaromatic Hydrocarbons)10$ - 0
00428440 (Total Petroleum Hydrocarbons)10$ - 0
0043601 (Prugeable Halocarbons)10$ - 0
0044602 (Purgeable Aromatics)10$ - 0
0045604 (Phenols)1$ - 0
0046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
0047610 (Polynuclear Aromatic Hydrocarbons)10$ - 0
0048612 (Chlorinated Hydrocarbons)1$ - 0
0049624 (Purgeables)1$ - 0
0050625 (Semivolatile Organic Compounds)1$ - 0
0051TCLP Metals25$ - 0
00529045 (pH)1$ - 0
00531010 (Ignitability)10$ - 0
0054CCR Title 22 Metals (6010/7470)1$ - 0
00559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
00569023 (Total Organic Halides)1$ - 0
00579030 or SM 4500-S (Sulfide)1$ - 0
0058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
0059SM 2320 (Alkalinity)1$ - 0
00605520B (Oil & Grease)0$ - 0
00612130 (Turbidity)0$ - 0
00622540 (Total Suspended Solids & Seatable Solids)0$ - 0
00635540 (Surfactant)0$ - 0
00645210 (BOD)0$ - 0
0065TO-150$ - 0
0066Fixed Gases0$ - 0
0067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
0068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
0069Price per 6" recovery well from 11 to 20 Feet1$ - 0
0070Price per 6" recovery well from 21 to 60 Feet1$ - 0
0071Price per 6" recovery well from 61 to 120 Feet1$ - 0
0072Mobilization cost for 6" recovery well1$ - 0
0073Monthly price for 6" recovery well system O&M1$ - 0
0074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
0075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
0076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
0077Lump sum price for pump test10
Annual monitoring and reporting IAW Task 12 of the PWS0
0078Lump sum price for annual monitoring and reporting1
Report preparation, duplication, and distribution IAW Task 13 of the PWS
0079Lump sum price for report preparation, duplication, and distribution10
0080Unit price per hour in excess hours for report preparation40
Miscellaneous services IAW Task 14 of the PWS
0081Project Manager price per hour800$ - 0
0082Engineer I price per hour300$ - 0
0083Engineer II price per hour600$ - 0
0084Engineer III price per hour300$ - 0
0085Chemist price per hour100$ - 0
0086Environmental Scientist I price per hour50$ - 0
0087Environmental Scientist II price per hour100$ - 0
0088Environmental Scientist III price per hour20$ - 0
0089Geologist I price per hour50$ - 0
0090Geologist II price per hour100$ - 0
0091Geologist III price per hour20$ - 0
0092Hydrogeologist I price per hour20$ - 0
0093Hydrogeologist II price per hour80$ - 0
0094Hydrogeologist III price per hour20$ - 0
0095Toxicologist I price per hour20$ - 0
0096Toxicologist II price per hour20$ - 0
0097Toxicologist III price per hour20$ - 0
0098Drafter price per hour100$ - 0
0099Traffic Control Engineer price per hour1$ - 0
0100Cost Accountant price per hour200$ - 0
0101Secretary price per hour200$ - 0
0102Buyer50$ - 0
0103Site Labor Foreman price per hour40$ - 0
0104Remediation System Operator price per hour2,000$ - 0
0105Heavy Equipment Operator price per hour10$ - 0
0106Laborer price per hour200$ - 0
0107Drill Rig Operator price per hour80$ - 0
0108Environmental Technician price per hour500$ - 0
0109Utility Truck price per day100$ - 0
011002/Explosimeter price per day20$ - 0
0111Groundwater Sampling Pump price per day50$ - 0
0112Flame Ionization OCA price per day40$ - 0
0113Air Velocity Meter price per day1$ - 0
0114Field GC price per day1$ - 0
0115Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum100$ - 0
0116Furnish and fill with soil roll off bin, price per bin10$ - 0
0117Shipping of soil and water samples for analytical testing price per 25lb shipping container40$ - 0
0118Disposable Bailers price per unit100$ - 0
0119Tedlar Bags price per dozen1$ - 0
0120Pickup Truck (1/2 ton) price per day100$ - 0
0121Air Compressor (7 cfm) price per day1$ - 0
0122Generator (4000 watt) price per day100$ - 0
0123CAD Equipment Use Charge price per day10$ - 0
0124Photoionization Detector price per day20$ - 0
0125Groundwater Multimeter20$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
0126Percent mark-up for overhead and profit$ - 0
Background Review IAW Task 16
0127Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ - 0

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level.

Solicitation No. SP0600-13-R-0515 Price Proposal Worksheet Location: DFSP Ozol, CA

&P

File details come from the government source that posted it. Updated .