Attachment_3_-_Price_Proposal_Worksheets.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Environmental Services in California
- Solicitation number
- SP0600-13-R-0515
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment 3 - Price Proposal Worksheets.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Norwalk
"Pricing Proposal Worksheet" completed by the offeror. The Firm-Fixed Price rates submitted in Attachment 3 "Pricing Proposal Worksheet" will be incorporated into the resultant contract as ceiling rates to be utilized in the preparation of qoutes at the Task Order level.
| CLIN | Services | Estimates | Unit Price | Total |
| Develop a detailed work plan IAW Task 1 of the PWS | ||||
| 0001 | Lump Sum price for work plan | 5 | $ - 0 | |
| 0002 | Unit Price per hour in excess of those included in work plan | 50 | $ - 0 | |
| Conduct soil/gas survey IAW Task 2 of the PWS | Conduct Soil/Gas Survey IAW Task 2 of SOW | |||
| 0003 | Price per unit (10 points/unit) - 4 fee depth | 1 | $ - 0 | |
| 0004 | Price per unit (10 points/unit) - 14 feet depth | 1 | $ - 0 | |
| 0005 | Soil Gas Survey mobilization cost | 1 | $ - 0 | |
| Conduct geophysical survey IAW Task 3 of the PWS | ||||
| 0006 | Price per unit (10,000 linear feet) to include in report of findings | 1 | $ - 0 | |
| Locate, install, and sample soil borings IAW Task 4 of the PWS | ||||
| 0007 | Price per boring up to 10 feet | 5 | $ - 0 | |
| 0008 | Cost per foot from 11 to 20 feet | 50 | $ - 0 | |
| 0009 | Cost per foot 21 to 60 feet | 200 | $ - 0 | |
| 0010 | Cost per foot 61 to 150 feet | 100 | $ - 0 | |
| 0011 | Mobilization cost for soil boring | 2 | $ - 0 | |
| Locate, install and sample monitoring wells IAW Task 5 of the PWS | ||||
| 0012 | Price per 2" Monitoring Well up to 10 feet | 10 | $ - 0 | |
| 0013 | Cost per foot of 2" monitoring well from 11 to 20 feet | 100 | $ - 0 | |
| 0014 | Cost per foot of 2" monitoring well from 21 to 60 feet | 200 | $ - 0 | |
| 0015 | Cost per foot of 2" monitoring well from 61 to 150 feet | 100 | $ - 0 | |
| 0016 | Price per 4" monitoring well up to 10 feet | 10 | $ - 0 | |
| 0017 | Cost per foot of 4" monitoring well from 11 to 20 feet | 100 | $ - 0 | |
| 0018 | Cost per foot of 4" monitoring well from 21 to 60 feet | 200 | $ - 0 | |
| 0019 | Cost per foot of 4" monitoring well from 61 to150 feet | 100 | $ - 0 | |
| 0020 | Cost per foot to Close/Decommission 2” dia. well | 50 | $ - 0 | |
| 0021 | Cost per foot to Close/Decommission 4” dia. well | 40 | $ - 0 | |
| 0022 | Mobilization cost for monitoring well installation | 2 | $ - 0 | |
| Conduct well development IAW Task 6 of the PWS | ||||
| 0023 | Price for well development | 12 | $ - 0 | |
| Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS | ||||
| 0024 | Cost per unit of DPT (5 bores per unit) | 5 | $ - 0 | |
| 0025 | Mobilization for DPT Testing | 1 | $ - 0 | |
| Perform soil boring survey IAW Task 8 of the PWS | 0 | |||
| 0026 | Price of (10 soil borings/unit) | 1 | $ - 0 | |
| Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures: | ||||
| 0027 | 6010 (Individual metal) | 40 | $ - 0 | |
| 0028 | 6020 (Individual metal) | 40 | $ - 0 | |
| 0029 | 7470 (Mercury) | 1 | $ - 0 | |
| 0030 | 8015 (TPH as JP5 [C9-C16] w/silica gel cleanup) | 615 | $ - 0 | |
| 0031 | 8015 (TPH as Gasoline [C6-12]) | 50 | $ - 0 | |
| 0032 | 8021 (Aromatic Volatile Organic Compounds) | 50 | $ - 0 | |
| 0033 | 8041 (Phenols) | 1 | $ - 0 | |
| 0034 | 8081 (Organochlorine Pesticides) | 1 | $ - 0 | |
| 0035 | 8121 (Chlorinated Hydrocarbons) | 10 | $ - 0 | |
| 0036 | 8151 (Chlorinated Herbicides) | 1 | $ - 0 | |
| 0037 | 8260 (Full List Volatile Organic Compounds) | 400 | $ - 0 | |
| 0038 | 8260 (BTEX/MTBE/Naphthalene) | 20 | $ - 0 | |
| 0039 | 8270 (Full list Semi-Volatile Organic Compounds) | 50 | $ - 0 | |
| 0040 | 8270-SIM (Polyaromatic Hydrocarbons) | 10 | $ - 0 | |
| 0041 | 8310 (Polyaromatic Hydrocarbons) | 10 | $ - 0 | |
| 0042 | 8440 (Total Petroleum Hydrocarbons) | 10 | $ - 0 | |
| 0043 | 601 (Prugeable Halocarbons) | 10 | $ - 0 | |
| 0044 | 602 (Purgeable Aromatics) | 10 | $ - 0 | |
| 0045 | 604 (Phenols) | 6 | $ - 0 | |
| 0046 | 608 (Oranochlorine Pesticides and PCB’s) | 1 | $ - 0 | |
| 0047 | 610 (Polynuclear Aromatic Hydrocarbons) | 10 | $ - 0 | |
| 0048 | 612 (Chlorinated Hydrocarbons) | 1 | $ - 0 | |
| 0049 | 624 (Purgeables) | 1 | $ - 0 | |
| 0050 | 625 (Semivolatile Organic Compounds) | 1 | $ - 0 | |
| 0051 | TCLP Metals | 25 | $ - 0 | |
| 0052 | 9045 (pH) | 12 | $ - 0 | |
| 0053 | 1010 (Ignitability) | 10 | $ - 0 | |
| 0054 | CCR Title 22 Metals (6010/7470) | 1 | $ - 0 | |
| 0055 | 9012 or SM 4500-CN or 335.4 (Cyanide) | 1 | $ - 0 | |
| 0056 | 9023 (Total Organic Halides) | 1 | $ - 0 | |
| 0057 | 9030 or SM 4500-S (Sulfide) | 18 | $ - 0 | |
| 0058 | 300.0 (Chloride, Sulfate, Nitrate) | 1 | $ - 0 | |
| 0059 | SM 2320 (Alkalinity) | 1 | $ - 0 | |
| 0060 | 5520B (Oil & Grease) | 12 | $ - 0 | |
| 0061 | 2130 (Turbidity) | 12 | $ - 0 | |
| 0062 | 2540 (Total Suspended Solids & Seatable Solids) | 24 | $ - 0 | |
| 0063 | 5540 (Surfactant) | 12 | $ - 0 | |
| 0064 | 5210 (BOD) | 12 | $ - 0 | |
| 0065 | TO-15 | 42 | $ - 0 | |
| 0066 | Fixed Gases | 6 | $ - 0 | |
| 0067 | Encore Sample Container or Equivalent | 1 | $ - 0 | |
| Install and maintain recovery well IAW Task 10 of the PWS | Performing monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit) | 0 | ||
| 0068 | Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump) | 1 | $ - 0 | |
| 0069 | Price per 6" recovery well from 11 to 20 Feet | 1 | $ - 0 | |
| 0070 | Price per 6" recovery well from 21 to 60 Feet | 1 | $ - 0 | |
| 0071 | Price per 6" recovery well from 61 to 120 Feet | 1 | $ - 0 | |
| 0072 | Mobilization cost for 6" recovery well | 1 | $ - 0 | |
| 0073 | Monthly price for 6" recovery well system O&M | 1 | $ - 0 | |
| 0074 | Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well | 1 | $ - 0 | |
| 0075 | Mobilization cost for pump installation on existing 4" monitoring well | 1 | $ - 0 | |
| 0076 | Monthly price for 4" recovery well system O&M | 1 | $ - 0 | |
| Conduct pump testing IAW Task 11 of the PWS | 0 | |||
| 0077 | Lump sum price for pump test | 10 | ||
| Annual monitoring and reporting IAW Task 12 of the PWS | 0 | |||
| 0078 | Lump sum price for annual monitoring and reporting | 1 | ||
| Report preparation, duplication, and distribution IAW Task 13 of the PWS | ||||
| 0079 | Lump sum price for report preparation, duplication, and distribution | 35 | ||
| 0080 | Unit price per hour in excess hours for report preparation | 300 | ||
| Miscellaneous services IAW Task 14 of the PWS | ||||
| 0081 | Project Manager price per hour | 800 | $ - 0 | |
| 0082 | Engineer I price per hour | 310 | $ - 0 | |
| 0083 | Engineer II price per hour | 420 | $ - 0 | |
| 0084 | Engineer III price per hour | 100 | $ - 0 | |
| 0085 | Chemist price per hour | 100 | $ - 0 | |
| 0086 | Environmental Scientist I price per hour | 50 | $ - 0 | |
| 0087 | Environmental Scientist II price per hour | 100 | $ - 0 | |
| 0088 | Environmental Scientist III price per hour | 20 | $ - 0 | |
| 0089 | Geologist I price per hour | 140 | $ - 0 | |
| 0090 | Geologist II price per hour | 320 | $ - 0 | |
| 0091 | Geologist III price per hour | 20 | $ - 0 | |
| 0092 | Hydrogeologist I price per hour | 20 | $ - 0 | |
| 0093 | Hydrogeologist II price per hour | 80 | $ - 0 | |
| 0094 | Hydrogeologist III price per hour | 50 | $ - 0 | |
| 0095 | Toxicologist I price per hour | 60 | $ - 0 | |
| 0096 | Toxicologist II price per hour | 80 | $ - 0 | |
| 0097 | Toxicologist III price per hour | 40 | $ - 0 | |
| 0098 | Drafter price per hour | 120 | $ - 0 | |
| 0099 | Traffic Control Engineer price per hour | 300 | $ - 0 | |
| 0100 | Cost Accountant price per hour | 140 | $ - 0 | |
| 0101 | Secretary price per hour | 150 | $ - 0 | |
| 0102 | Buyer | 200 | $ - 0 | |
| 0103 | Site Labor Foreman price per hour | 40 | $ - 0 | |
| 0104 | Remediation System Operator price per hour | 200 | $ - 0 | |
| 0105 | Heavy Equipment Operator price per hour | 10 | $ - 0 | |
| 0106 | Laborer price per hour | 500 | $ - 0 | |
| 0107 | Drill Rig Operator price per hour | 20 | $ - 0 | |
| 0108 | Environmental Technician price per hour | 2,600 | $ - 0 | |
| 0109 | Utility Truck price per day | 20 | $ - 0 | |
| 0110 | 02/Explosimeter price per day | 10 | $ - 0 | |
| 0111 | Groundwater Sampling Pump price per day | 70 | $ - 0 | |
| 0112 | Flame Ionization OCA price per day | 40 | $ - 0 | |
| 0113 | Air Velocity Meter price per day | 20 | $ - 0 | |
| 0114 | Field GC price per day | 1 | $ - 0 | |
| 0115 | Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum | 100 | $ - 0 | |
| 0116 | Furnish and fill with soil roll off bin, price per bin | 100 | $ - 0 | |
| 0117 | Shipping of soil and water samples for analytical testing price per 25lb shipping container | 40 | $ - 0 | |
| 0118 | Disposable Bailers price per unit | 200 | $ - 0 | |
| 0119 | Tedlar Bags price per dozen | 1 | $ - 0 | |
| 0120 | Pickup Truck (1/2 ton) price per day | 40 | $ - 0 | |
| 0121 | Air Compressor (7 cfm) price per day | 1 | $ - 0 | |
| 0122 | Generator (4000 watt) price per day | 10 | $ - 0 | |
| 0123 | CAD Equipment Use Charge price per day | 10 | $ - 0 | |
| 0124 | Photoionization Detector price per day | 40 | $ - 0 | |
| 0125 | Groundwater Multimeter | 70 | $ - 0 | |
| Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15 | ||||
| 0126 | Percent mark-up for overhead and profit | $ - 0 | ||
| Background Review IAW Task 16 | ||||
| 0127 | Lump sum price for reviewing existing documentation | 2 | $ - 0 |
| Total Overall Evaluated Price | $ - 0 | |
| NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level. |
Solicitation No. SP0600-13-R-0515 Price Proposal Worksheet Location: DFSP Norwalk, CA
&P
San Pedro
"Pricing Proposal Worksheet" completed by the offeror. The Firm-Fixed Price rates submitted in Attachment 3 "Pricing Proposal Worksheet" will be incorporated into the resultant contract as ceiling rates to be utilized in the preparation of qoutes at the Task Order level.
| CLIN | Services | Estimates | Unit Price | Total |
| Develop a detailed work plan IAW Task 1 of the PWS | ||||
| 0001 | Lump Sum price for work plan | 6 | $ - 0 | |
| 0002 | Unit Price per hour in excess of those included in work plan | 80 | $ - 0 | |
| Conduct soil/gas survey IAW Task 2 of the PWS | Conduct Soil/Gas Survey IAW Task 2 of SOW | |||
| 0003 | Price per unit (10 points/unit) - 4 fee depth | 1 | $ - 0 | |
| 0004 | Price per unit (10 points/unit) - 14 feet depth | 1 | $ - 0 | |
| 0005 | Soil Gas Survey mobilization cost | 1 | $ - 0 | |
| Conduct geophysical survey IAW Task 3 of the PWS | ||||
| 0006 | Price per unit (10,000 linear feet) to include in report of findings | 8 | $ - 0 | |
| Locate, install, and sample soil borings IAW Task 4 of the PWS | ||||
| 0007 | Price per boring up to 10 feet | 20 | $ - 0 | |
| 0008 | Cost per foot from 11 to 20 feet | 200 | $ - 0 | |
| 0009 | Cost per foot 21 to 60 feet | 800 | $ - 0 | |
| 0010 | Cost per foot 61 to 150 feet | 200 | $ - 0 | |
| 0011 | Mobilization cost for soil boring | 3 | $ - 0 | |
| Locate, install and sample monitoring wells IAW Task 5 of the PWS | ||||
| 0012 | Price per 2" Monitoring Well up to 10 feet | 10 | $ - 0 | |
| 0013 | Cost per foot of 2" monitoring well from 11 to 20 feet | 100 | $ - 0 | |
| 0014 | Cost per foot of 2" monitoring well from 21 to 60 feet | 200 | $ - 0 | |
| 0015 | Cost per foot of 2" monitoring well from 61 to 150 feet | 100 | $ - 0 | |
| 0016 | Price per 4" monitoring well up to 10 feet | 15 | $ - 0 | |
| 0017 | Cost per foot of 4" monitoring well from 11 to 20 feet | 150 | $ - 0 | |
| 0018 | Cost per foot of 4" monitoring well from 21 to 60 feet | 200 | $ - 0 | |
| 0019 | Cost per foot of 4" monitoring well from 61 to150 feet | 100 | $ - 0 | |
| 0020 | Cost per foot to Close/Decommission 2” dia. well | 150 | $ - 0 | |
| 0021 | Cost per foot to Close/Decommission 4” dia. well | 100 | $ - 0 | |
| 0022 | Mobilization cost for monitoring well installation | 3 | $ - 0 | |
| Conduct well development IAW Task 6 of the PWS | ||||
| 0023 | Price for well development | 25 | $ - 0 | |
| Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS | ||||
| 0024 | Cost per unit of DPT (5 bores per unit) | 10 | $ - 0 | |
| 0025 | Mobilization for DPT Testing | 5 | $ - 0 | |
| Perform soil boring survey IAW Task 8 of the PWS | 0 | |||
| 0026 | Price of (10 soil borings/unit) | 1 | $ - 0 | |
| Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures: | ||||
| 0027 | 6010 (Individual metal) | 250 | $ - 0 | |
| 0028 | 6020 (Individual metal) | 20 | $ - 0 | |
| 0029 | 7470 (Mercury) | 1 | $ - 0 | |
| 0030 | 8015 (TPH as JP5 [C9-C16] w/silica gel cleanup) | 250 | $ - 0 | |
| 0031 | 8015 (TPH as Gasoline [C6-12]) | 250 | $ - 0 | |
| 0032 | 8021 (Aromatic Volatile Organic Compounds) | 50 | $ - 0 | |
| 0033 | 8041 (Phenols) | 1 | $ - 0 | |
| 0034 | 8081 (Organochlorine Pesticides) | 1 | $ - 0 | |
| 0035 | 8121 (Chlorinated Hydrocarbons) | 10 | $ - 0 | |
| 0036 | 8151 (Chlorinated Herbicides) | 1 | $ - 0 | |
| 0037 | 8260 (Full List Volatile Organic Compounds) | 24 | $ - 0 | |
| 0038 | 8260 (BTEX/MTBE/Naphthalene) | 24 | $ - 0 | |
| 0039 | 8270 (Full list Semi-Volatile Organic Compounds) | 1,000 | $ - 0 | |
| 0040 | 8270-SIM (Polyaromatic Hydrocarbons) | 10 | $ - 0 | |
| 0041 | 8310 (Polyaromatic Hydrocarbons) | 10 | $ - 0 | |
| 0042 | 8440 (Total Petroleum Hydrocarbons) | 10 | $ - 0 | |
| 0043 | 601 (Prugeable Halocarbons) | 115 | $ - 0 | |
| 0044 | 602 (Purgeable Aromatics) | 1 | $ - 0 | |
| 0045 | 604 (Phenols) | 1 | $ - 0 | |
| 0046 | 608 (Oranochlorine Pesticides and PCB’s) | 1 | $ - 0 | |
| 0047 | 610 (Polynuclear Aromatic Hydrocarbons) | 10 | $ - 0 | |
| 0048 | 612 (Chlorinated Hydrocarbons) | 1 | $ - 0 | |
| 0049 | 624 (Purgeables) | 1 | $ - 0 | |
| 0050 | 625 (Semivolatile Organic Compounds) | 1 | $ - 0 | |
| 0051 | TCLP Metals | 30 | $ - 0 | |
| 0052 | 9045 (pH) | 1 | $ - 0 | |
| 0053 | 1010 (Ignitability) | 10 | $ - 0 | |
| 0054 | CCR Title 22 Metals (6010/7470) | 1 | $ - 0 | |
| 0055 | 9012 or SM 4500-CN or 335.4 (Cyanide) | 1 | $ - 0 | |
| 0056 | 9023 (Total Organic Halides) | 1 | $ - 0 | |
| 0057 | 9030 or SM 4500-S (Sulfide) | 1 | $ - 0 | |
| 0058 | 300.0 (Chloride, Sulfate, Nitrate) | 1 | $ - 0 | |
| 0059 | SM 2320 (Alkalinity) | 1 | $ - 0 | |
| 0060 | 5520B (Oil & Grease) | 100 | $ - 0 | |
| 0061 | 2130 (Turbidity) | 1 | $ - 0 | |
| 0062 | 2540 (Total Suspended Solids & Seatable Solids) | 1 | $ - 0 | |
| 0063 | 5540 (Surfactant) | 1 | $ - 0 | |
| 0064 | 5210 (BOD) | 1 | $ - 0 | |
| 0065 | TO-15 | 1 | $ - 0 | |
| 0066 | Fixed Gases | 1 | $ - 0 | |
| 0067 | Encore Sample Container or Equivalent | 1 | $ - 0 | |
| Install and maintain recovery well IAW Task 10 of the PWS | Performing monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit) | 0 | ||
| 0068 | Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump) | 1 | $ - 0 | |
| 0069 | Price per 6" recovery well from 11 to 20 Feet | 1 | $ - 0 | |
| 0070 | Price per 6" recovery well from 21 to 60 Feet | 1 | $ - 0 | |
| 0071 | Price per 6" recovery well from 61 to 120 Feet | 1 | $ - 0 | |
| 0072 | Mobilization cost for 6" recovery well | 1 | $ - 0 | |
| 0073 | Monthly price for 6" recovery well system O&M | 1 | $ - 0 | |
| 0074 | Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well | 1 | $ - 0 | |
| 0075 | Mobilization cost for pump installation on existing 4" monitoring well | 1 | $ - 0 | |
| 0076 | Monthly price for 4" recovery well system O&M | 1 | $ - 0 | |
| Conduct pump testing IAW Task 11 of the PWS | 0 | |||
| 0077 | Lump sum price for pump test | 10 | ||
| Annual monitoring and reporting IAW Task 12 of the PWS | 0 | |||
| 0078 | Lump sum price for annual monitoring and reporting | 1 | ||
| Report preparation, duplication, and distribution IAW Task 13 of the PWS | ||||
| 0079 | Lump sum price for report preparation, duplication, and distribution | 20 | ||
| 0080 | Unit price per hour in excess hours for report preparation | 75 | ||
| Miscellaneous services IAW Task 14 of the PWS | ||||
| 0081 | Project Manager price per hour | 800 | $ - 0 | |
| 0082 | Engineer I price per hour | 300 | $ - 0 | |
| 0083 | Engineer II price per hour | 60 | $ - 0 | |
| 0084 | Engineer III price per hour | 75 | $ - 0 | |
| 0085 | Chemist price per hour | 100 | $ - 0 | |
| 0086 | Environmental Scientist I price per hour | 50 | $ - 0 | |
| 0087 | Environmental Scientist II price per hour | 150 | $ - 0 | |
| 0088 | Environmental Scientist III price per hour | 40 | $ - 0 | |
| 0089 | Geologist I price per hour | 80 | $ - 0 | |
| 0090 | Geologist II price per hour | 1,500 | $ - 0 | |
| 0091 | Geologist III price per hour | 20 | $ - 0 | |
| 0092 | Hydrogeologist I price per hour | 20 | $ - 0 | |
| 0093 | Hydrogeologist II price per hour | 120 | $ - 0 | |
| 0094 | Hydrogeologist III price per hour | 20 | $ - 0 | |
| 0095 | Toxicologist I price per hour | 20 | $ - 0 | |
| 0096 | Toxicologist II price per hour | 20 | $ - 0 | |
| 0097 | Toxicologist III price per hour | 10 | $ - 0 | |
| 0098 | Drafter price per hour | 120 | $ - 0 | |
| 0099 | Traffic Control Engineer price per hour | 10 | $ - 0 | |
| 0100 | Cost Accountant price per hour | 150 | $ - 0 | |
| 0101 | Secretary price per hour | 120 | $ - 0 | |
| 0102 | Buyer | 40 | $ - 0 | |
| 0103 | Site Labor Foreman price per hour | 40 | $ - 0 | |
| 0104 | Remediation System Operator price per hour | 900 | $ - 0 | |
| 0105 | Heavy Equipment Operator price per hour | 10 | $ - 0 | |
| 0106 | Laborer price per hour | 500 | $ - 0 | |
| 0107 | Drill Rig Operator price per hour | 40 | $ - 0 | |
| 0108 | Environmental Technician price per hour | 800 | $ - 0 | |
| 0109 | Utility Truck price per day | 10 | $ - 0 | |
| 0110 | 02/Explosimeter price per day | 10 | $ - 0 | |
| 0111 | Groundwater Sampling Pump price per day | 20 | $ - 0 | |
| 0112 | Flame Ionization OCA price per day | 20 | $ - 0 | |
| 0113 | Air Velocity Meter price per day | 1 | $ - 0 | |
| 0114 | Field GC price per day | 1 | $ - 0 | |
| 0115 | Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum | 100 | $ - 0 | |
| 0116 | Furnish and fill with soil roll off bin, price per bin | 10 | $ - 0 | |
| 0117 | Shipping of soil and water samples for analytical testing price per 25lb shipping container | 40 | $ - 0 | |
| 0118 | Disposable Bailers price per unit | 150 | $ - 0 | |
| 0119 | Tedlar Bags price per dozen | 8 | $ - 0 | |
| 0120 | Pickup Truck (1/2 ton) price per day | 104 | $ - 0 | |
| 0121 | Air Compressor (7 cfm) price per day | 1 | $ - 0 | |
| 0122 | Generator (4000 watt) price per day | 1,000 | $ - 0 | |
| 0123 | CAD Equipment Use Charge price per day | 10 | $ - 0 | |
| 0124 | Photoionization Detector price per day | 20 | $ - 0 | |
| 0125 | Groundwater Multimeter | 20 | $ - 0 | |
| Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15 | ||||
| 0126 | Percent mark-up for overhead and profit | $ - 0 | ||
| Background Review IAW Task 16 | ||||
| 0127 | Lump sum price for reviewing existing documentation | 1 | $ - 0 |
Total Overall Evaluated Price $ - 0
NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level.
Solicitation No. SP0600-13-R-0515 Price Proposal Worksheet Location: DFSP San Pedro, CA
&P
Ozol
"Pricing Proposal Worksheet" completed by the offeror. The Firm-Fixed Price rates submitted in Attachment 3 "Pricing Proposal Worksheet" will be incorporated into the resultant contract as ceiling rates to be utilized in the preparation of qoutes at the Task Order level.
| CLIN | Services | Estimates | Unit Price | Total |
| Develop a detailed work plan IAW Task 1 of the PWS | ||||
| 0001 | Lump Sum price for work plan | 4 | $ - 0 | |
| 0002 | Unit Price per hour in excess of those included in work plan | 40 | $ - 0 | |
| Conduct soil/gas survey IAW Task 2 of the PWS | Conduct Soil/Gas Survey IAW Task 2 of SOW | |||
| 0003 | Price per unit (10 points/unit) - 4 feet depth | 1 | $ - 0 | |
| 0004 | Price per unit (10 points/unit) - 14 feet depth | 1 | $ - 0 | |
| 0005 | Soil Gas Survey mobilization cost | 1 | $ - 0 | |
| Conduct geophysical survey IAW Task 3 of the PWS | ||||
| 0006 | Price per unit (10,000 linear feet) to include in report of findings | 1 | $ - 0 | |
| Locate, install, and sample soil borings IAW Task 4 of the PWS | ||||
| 0007 | Price per boring up to 10 feet | 10 | $ - 0 | |
| 0008 | Cost per foot from 11 to 20 feet | 100 | $ - 0 | |
| 0009 | Cost per foot 21 to 60 feet | 400 | $ - 0 | |
| 0010 | Cost per foot 61 to 150 feet | 100 | $ - 0 | |
| 0011 | Mobilization cost for soil boring | 2 | $ - 0 | |
| Locate, install and sample monitoring wells IAW Task 5 of the PWS | ||||
| 0012 | Price per 2" Monitoring Well up to 10 feet | 10 | $ - 0 | |
| 0013 | Cost per foot of 2" monitoring well from 11 to 20 feet | 100 | $ - 0 | |
| 0014 | Cost per foot of 2" monitoring well from 21 to 60 feet | 200 | $ - 0 | |
| 0015 | Cost per foot of 2" monitoring well from 61 to 150 feet | 100 | $ - 0 | |
| 0016 | Price per 4" monitoring well up to 10 feet | 2 | $ - 0 | |
| 0017 | Cost per foot of 4" monitoring well from 11 to 20 feet | 20 | $ - 0 | |
| 0018 | Cost per foot of 4" monitoring well from 21 to 60 feet | 80 | $ - 0 | |
| 0019 | Cost per foot of 4" monitoring well from 61 to150 feet | 20 | $ - 0 | |
| 0020 | Cost per foot to Close/Decommission 2” dia. well | 100 | $ - 0 | |
| 0021 | Cost per foot to Close/Decommission 4” dia. well | 100 | $ - 0 | |
| 0022 | Mobilization cost for monitoring well installation | 2 | $ - 0 | |
| Conduct well development IAW Task 6 of the PWS | ||||
| 0023 | Price for well development | 12 | $ - 0 | |
| Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS | ||||
| 0024 | Cost per unit of DPT (5 bores per unit) | 5 | $ - 0 | |
| 0025 | Mobilization for DPT Testing | 1 | $ - 0 | |
| Perform soil boring survey IAW Task 8 of the PWS | 0 | |||
| 0026 | Price of (10 soil borings/unit) | 1 | $ - 0 | |
| Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures: | ||||
| 0027 | 6010 (Individual metal) | 20 | $ - 0 | |
| 0028 | 6020 (Individual metal) | 20 | $ - 0 | |
| 0029 | 7470 (Mercury) | 10 | $ - 0 | |
| 0030 | 8015 (TPH as JP5 [C9-C16] w/silica gel cleanup) | 80 | $ - 0 | |
| 0031 | 8015 (TPH as Gasoline [C6-12]) | 80 | $ - 0 | |
| 0032 | 8021 (Aromatic Volatile Organic Compounds) | 50 | $ - 0 | |
| 0033 | 8041 (Phenols) | 1 | $ - 0 | |
| 0034 | 8081 (Organochlorine Pesticides) | 1 | $ - 0 | |
| 0035 | 8121 (Chlorinated Hydrocarbons) | 10 | $ - 0 | |
| 0036 | 8151 (Chlorinated Herbicides) | 1 | $ - 0 | |
| 0037 | 8260 (Full List Volatile Organic Compounds) | 50 | $ - 0 | |
| 0038 | 8260 (BTEX/MTBE/Naphthalene) | 50 | $ - 0 | |
| 0039 | 8270 (Full list Semi-Volatile Organic Compounds) | 12 | $ - 0 | |
| 0040 | 8270-SIM (Polyaromatic Hydrocarbons) | 10 | $ - 0 | |
| 0041 | 8310 (Polyaromatic Hydrocarbons) | 10 | $ - 0 | |
| 0042 | 8440 (Total Petroleum Hydrocarbons) | 10 | $ - 0 | |
| 0043 | 601 (Prugeable Halocarbons) | 10 | $ - 0 | |
| 0044 | 602 (Purgeable Aromatics) | 10 | $ - 0 | |
| 0045 | 604 (Phenols) | 1 | $ - 0 | |
| 0046 | 608 (Oranochlorine Pesticides and PCB’s) | 1 | $ - 0 | |
| 0047 | 610 (Polynuclear Aromatic Hydrocarbons) | 10 | $ - 0 | |
| 0048 | 612 (Chlorinated Hydrocarbons) | 1 | $ - 0 | |
| 0049 | 624 (Purgeables) | 1 | $ - 0 | |
| 0050 | 625 (Semivolatile Organic Compounds) | 1 | $ - 0 | |
| 0051 | TCLP Metals | 25 | $ - 0 | |
| 0052 | 9045 (pH) | 1 | $ - 0 | |
| 0053 | 1010 (Ignitability) | 10 | $ - 0 | |
| 0054 | CCR Title 22 Metals (6010/7470) | 1 | $ - 0 | |
| 0055 | 9012 or SM 4500-CN or 335.4 (Cyanide) | 1 | $ - 0 | |
| 0056 | 9023 (Total Organic Halides) | 1 | $ - 0 | |
| 0057 | 9030 or SM 4500-S (Sulfide) | 1 | $ - 0 | |
| 0058 | 300.0 (Chloride, Sulfate, Nitrate) | 1 | $ - 0 | |
| 0059 | SM 2320 (Alkalinity) | 1 | $ - 0 | |
| 0060 | 5520B (Oil & Grease) | 0 | $ - 0 | |
| 0061 | 2130 (Turbidity) | 0 | $ - 0 | |
| 0062 | 2540 (Total Suspended Solids & Seatable Solids) | 0 | $ - 0 | |
| 0063 | 5540 (Surfactant) | 0 | $ - 0 | |
| 0064 | 5210 (BOD) | 0 | $ - 0 | |
| 0065 | TO-15 | 0 | $ - 0 | |
| 0066 | Fixed Gases | 0 | $ - 0 | |
| 0067 | Encore Sample Container or Equivalent | 1 | $ - 0 | |
| Install and maintain recovery well IAW Task 10 of the PWS | Performing monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit) | 0 | ||
| 0068 | Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump) | 1 | $ - 0 | |
| 0069 | Price per 6" recovery well from 11 to 20 Feet | 1 | $ - 0 | |
| 0070 | Price per 6" recovery well from 21 to 60 Feet | 1 | $ - 0 | |
| 0071 | Price per 6" recovery well from 61 to 120 Feet | 1 | $ - 0 | |
| 0072 | Mobilization cost for 6" recovery well | 1 | $ - 0 | |
| 0073 | Monthly price for 6" recovery well system O&M | 1 | $ - 0 | |
| 0074 | Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well | 1 | $ - 0 | |
| 0075 | Mobilization cost for pump installation on existing 4" monitoring well | 1 | $ - 0 | |
| 0076 | Monthly price for 4" recovery well system O&M | 1 | $ - 0 | |
| Conduct pump testing IAW Task 11 of the PWS | 0 | |||
| 0077 | Lump sum price for pump test | 10 | ||
| Annual monitoring and reporting IAW Task 12 of the PWS | 0 | |||
| 0078 | Lump sum price for annual monitoring and reporting | 1 | ||
| Report preparation, duplication, and distribution IAW Task 13 of the PWS | ||||
| 0079 | Lump sum price for report preparation, duplication, and distribution | 10 | ||
| 0080 | Unit price per hour in excess hours for report preparation | 40 | ||
| Miscellaneous services IAW Task 14 of the PWS | ||||
| 0081 | Project Manager price per hour | 800 | $ - 0 | |
| 0082 | Engineer I price per hour | 300 | $ - 0 | |
| 0083 | Engineer II price per hour | 600 | $ - 0 | |
| 0084 | Engineer III price per hour | 300 | $ - 0 | |
| 0085 | Chemist price per hour | 100 | $ - 0 | |
| 0086 | Environmental Scientist I price per hour | 50 | $ - 0 | |
| 0087 | Environmental Scientist II price per hour | 100 | $ - 0 | |
| 0088 | Environmental Scientist III price per hour | 20 | $ - 0 | |
| 0089 | Geologist I price per hour | 50 | $ - 0 | |
| 0090 | Geologist II price per hour | 100 | $ - 0 | |
| 0091 | Geologist III price per hour | 20 | $ - 0 | |
| 0092 | Hydrogeologist I price per hour | 20 | $ - 0 | |
| 0093 | Hydrogeologist II price per hour | 80 | $ - 0 | |
| 0094 | Hydrogeologist III price per hour | 20 | $ - 0 | |
| 0095 | Toxicologist I price per hour | 20 | $ - 0 | |
| 0096 | Toxicologist II price per hour | 20 | $ - 0 | |
| 0097 | Toxicologist III price per hour | 20 | $ - 0 | |
| 0098 | Drafter price per hour | 100 | $ - 0 | |
| 0099 | Traffic Control Engineer price per hour | 1 | $ - 0 | |
| 0100 | Cost Accountant price per hour | 200 | $ - 0 | |
| 0101 | Secretary price per hour | 200 | $ - 0 | |
| 0102 | Buyer | 50 | $ - 0 | |
| 0103 | Site Labor Foreman price per hour | 40 | $ - 0 | |
| 0104 | Remediation System Operator price per hour | 2,000 | $ - 0 | |
| 0105 | Heavy Equipment Operator price per hour | 10 | $ - 0 | |
| 0106 | Laborer price per hour | 200 | $ - 0 | |
| 0107 | Drill Rig Operator price per hour | 80 | $ - 0 | |
| 0108 | Environmental Technician price per hour | 500 | $ - 0 | |
| 0109 | Utility Truck price per day | 100 | $ - 0 | |
| 0110 | 02/Explosimeter price per day | 20 | $ - 0 | |
| 0111 | Groundwater Sampling Pump price per day | 50 | $ - 0 | |
| 0112 | Flame Ionization OCA price per day | 40 | $ - 0 | |
| 0113 | Air Velocity Meter price per day | 1 | $ - 0 | |
| 0114 | Field GC price per day | 1 | $ - 0 | |
| 0115 | Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum | 100 | $ - 0 | |
| 0116 | Furnish and fill with soil roll off bin, price per bin | 10 | $ - 0 | |
| 0117 | Shipping of soil and water samples for analytical testing price per 25lb shipping container | 40 | $ - 0 | |
| 0118 | Disposable Bailers price per unit | 100 | $ - 0 | |
| 0119 | Tedlar Bags price per dozen | 1 | $ - 0 | |
| 0120 | Pickup Truck (1/2 ton) price per day | 100 | $ - 0 | |
| 0121 | Air Compressor (7 cfm) price per day | 1 | $ - 0 | |
| 0122 | Generator (4000 watt) price per day | 100 | $ - 0 | |
| 0123 | CAD Equipment Use Charge price per day | 10 | $ - 0 | |
| 0124 | Photoionization Detector price per day | 20 | $ - 0 | |
| 0125 | Groundwater Multimeter | 20 | $ - 0 | |
| Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15 | ||||
| 0126 | Percent mark-up for overhead and profit | $ - 0 | ||
| Background Review IAW Task 16 | ||||
| 0127 | Lump sum price for reviewing existing documentation | 1 | $ - 0 |
Total Overall Evaluated Price $ - 0
NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest skill level, II is the intermediate skill level, and III is the highest skill level.
Solicitation No. SP0600-13-R-0515 Price Proposal Worksheet Location: DFSP Ozol, CA
&P
File details come from the government source that posted it. Updated .