SOW Attach 3_Contractor Production Report Form.doc
DOC document 63 KB Posted
- Attached to
- Bldg 1000 Lab Server Rooms Cooling Units Federal contract opportunity
- Solicitation number
- N6449821R4037
About this file
This document contains a contractor production report template and details of a federal contract opportunity with the Naval Surface Warfare Center, Philadelphia Division. The production report form requires contractors to provide daily reports on work performed, safety inspections, staffing levels, materials received and used, and remarks.
The federal contract opportunity involves removing existing temporary cooling units and installing new Computer Room Air Conditioning units in three server rooms at Building 1000. The contractor must use an authorized Automated Logic installer and complete the work within 120 days of the notice to proceed during normal duty hours from 0700 to 1600, Monday through Friday. The Naval Sea Systems Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449821R4037-Amendment 0001.pdf | ||
| Brand Name Justification Bldg 1000 Lab Server Room--1_Redacted.pdf | ||
| PPQ (Attachment 13).doc | DOC document | |
| SOW Attach 7_Photographs B-1000 Lab Server Room CRAC units installation_rev01.docx | DOCX document | |
| SOW Attach 4_Contractor Lift Plan Form.pdf | ||
| SOW Attach 6_AHA Form.docx | DOCX document | |
| Construction Cost Estimate (Attachment 12).xlsx | XLSX spreadsheet | |
| SOW Attachment (10) Contract Progress Report.pdf | ||
| SOW Attach 1_SiteMap PNBC.pdf | ||
| SOW Attach 9_Power Riser Diagram.pdf | ||
| SOW Attachment (11) COVID Questionnaire.pdf | ||
| SOW Attach 5_Mobile Equipment Check List.pdf | ||
| SOW Attach 2_NSWCPD ENTRY SCREENING ASSESSMENT.pdf | ||
| SOW Attach 8_PPE Lab Rm 410.pdf | ||
| N6449821R4037.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
Building 1000 – Air Handlers AS-5 and 6 Repairs
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule
Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS ON JOB SITE,
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
Schedule
Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| FORMCHECKBOX |
SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule
Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule
Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule
Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW ATTACHMENT 3
SHEET 1 OF 1