Construction Cost Estimate (Attachment 12).xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Bldg 1000 Lab Server Rooms Cooling Units Federal contract opportunity
Solicitation number
N6449821R4037
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a construction cost estimate template and details of a related federal contract opportunity to install cooling units in a naval facility building. The cost estimate template provides a breakdown of material, labor, and other direct costs for construction projects. It includes instructions for contractors to complete columns with item descriptions, quantities, unit costs, labor hours, and other financial details. The related federal contract opportunity is a solicitation to remove temporary cooling units and install five CRAC cooling units and one larger CRAC unit in server rooms at the Naval Surface Warfare Center in Philadelphia. The contractor must use an authorized installer for the work, which is to be completed within 120 days and during normal business hours. The solicitation number is N6449821R4037 and is being issued by the Department of the Navy Naval Sea Systems Command.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sht03

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht02

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht01

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

BACK

INSTRUCTIONS FOR COMPLETING

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 3). Items and units of measure will be
furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract
will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 3 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
TOTAL MATERIAL COSTS$0.00
SALES TAX ON MATERIALS%$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD%$0.00
PROFIT%$0.00
SUBTOTAL$0.00
BOND%$0.00
TOTAL PROJECT COST$0.00

DATE FIRM NAME

TITLEBY
(Signature)

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .