PDF 133 KB Posted

Attached to
EM2624 Yaeger Structural Stabilization and Repairs
Solicitation number
IFB1 GJTA 2027000021 1
Issued by
Pueblo County, Colorado

About this file

This is an Advertisement for Bids (AFB) issued by the State of Colorado through Colorado Northwestern Community College (CNCC) for the EM2624 Yaeger Structural Stabilization and Repairs project. The project involves structural repairs to the Yaeger Building at CNCC's Rangely campus, which houses the Aviation Maintenance Program and has experienced structural shifting on north, east, and south walls due to landscaping creating lateral pressure on the foundation. The scope of work includes excavation, stormwater management installation around the three affected walls, investigation and repair of walls and door thresholds, and restoration of finishes. A mandatory Pre-Bid Conference and site tour will be held on September 4, 2026, at 1:00 PM at 500 Kennedy Drive, Rangely, Colorado. Bids are due electronically by 3:00 PM MST on September 14, 2026, via BidNet Direct, with a virtual public bid opening scheduled for 4:00 PM MST that same day. The anticipated contract award date is September 15, 2026, with contract approval expected between September 16 and 18, 2026. Construction is anticipated to start October 1, 2026, and finish by December 1, 2026.

The estimated project cost is $500,000, making it subject to Colorado prevailing wage requirements, the Buy Clean Colorado Act, payment and performance bonds of not less than 50 percent of contract value, and a 5 percent bid bond requirement. Qualified bidders must demonstrate at least two years of operation under the same business name, have completed at least two projects in excess of $400,000 in hard costs of similar scope and complexity, possess demonstrated bonding capacity up to $500,000, have not been previously terminated by the State for non-performance on State Buildings contracts, and must attend the mandatory Pre-Bid Conference. At least 80 percent of the work must be performed by Colorado residents as required by state law. The project requires submission of Environmental Product Declarations for eligible materials and compliance with the LCPTracker cloud-based labor compliance and certified payroll application. Notice of Final Settlement will be required following project completion per C.R.S. 38-26-107(1).

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSA-AFB-1 pg. 1

REV 7/2025

ADVERTISEMENT FOR BIDS

Design / Bid / Build State of Colorado

Colorado Northwestern Community College

Notice Number: CNCC FY27-002 Project Number: EM2624 Project Title: Yaeger Structural Stabilization and Repairs Estimated Project Cost: $500,000

NOTICES

1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.

2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

3. All respondents accept the conditions of this AFB, including but not limited to, the following:

a. All submittals shall become the property of the State of Colorado and will not be returned.

b. Late submittals shall not be evaluated.

c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.

d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.

4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.

5. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential

OSA-AFB-1 pg. 2

(GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.

6. Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.

7. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.

8. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

PROJECT OVERVIEW

Introduction Colorado Northwestern Community College was founded in 1962 as “Rangely College”.

Today CNCC serves 1,700 students between its two campuses and online offerings.

The main campus in Rangely sits atop a mesa overlooking the Rio Blanco river valley.

It is home to top-notch programs in Dental Hygiene, Aviation Flight, Aviation Maintenance, and a National Park Ranger Academy.

The State of Colorado, Colorado Northwestern Community College (CNCC) is soliciting bids from qualified contractors for the EM 2624 Yaeger Structural Stabilization and Repair project.

At CNCC Rangely, the Yaeger Building, which houses the Aviation Maintenance Program, has experienced a structural shift on the north, east, and south walls.

Exterior wall studs in the classroom found in the northeast corner have broken and bowed. Investigation revealed landscaping going above the foundation wall and

OSA-AFB-1 pg. 3 putting lateral pressure on those walls. After investigation, shoring scaffolding has gone up to allow the building to be occupiable for a portion of the building.

This project solicitation is for the next phase, the completion of repairs to the building to return it to full use as it was before this project began.

Scope of Services

Please see the Construction Drawings and associated attachments to this solicitation.

In general, the scope of work is to excavate and provide minimal stormwater management around the three affected walls, investigate and repair walls and door thresholds within the building, and restore finishes.

The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.

Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.

MINIMUM REQUIREMENTS

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:

1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.

2. The bidding contractor must have been in the same business, under the same name for the last two (2) years.

3. Demonstrated specific contracting experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 400,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and

4. Demonstrated bonding capability up to $ 500,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.

OSA-AFB-1 pg. 4

5. Attended and signed in at the Mandatory Pre-Bid Conference

Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.

MANDATORY PRE-BID CONFERENCE AND SITE TOUR

A mandatory Pre-Bid Meeting will be held at:

Building Address: 500 Kennedy Drive, Rangely CO 81648 Room: Weiss Conference Room Date/Time 1:00 PM on September 4, 2026

SCHEDULE

The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.

Advertisement for Bids Issued August 24, 2026 Mandatory Pre-Bid Conference and Site Tour 1:00 PM, Sept. 4, 2026 Request for Clarifications Due 3:00 PM, Sept. 8, 2026 Final Addendum Issued (anticipated) 5:00 PM, Sept. 9, 2026 Bid Submittals Due (date and Time) 3:00 PM, Sept. 14, 2026 Public Bid Opening Virtually, 4PM on Sept. 14, 2026 Award Intent Notification (anticipated) Sept. 15, 2026 Contracting Sept. 16, 2026 Contract Approval (anticipated) Sept. 16 to 18, 2026 Anticipated Construction Start October 1, 2026 Anticipated Construction Finish December 1, 2026

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on [ColoradoVSS & Bidnet/Rocky Mountain E- Purchasing System (RMEPS)] website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

QUESTIONS, CLARIFICATIONS AND ADDENDA

Owner initiated changes to this AFB will be issued under numerically sequenced addenda.

Owner initiated changes to this AFB will be posted in the form of addenda on [ColoradoVSS / Bidnet/Rocky Mountain E-Purchasing System (RMEPS)].

OSA-AFB-1 pg. 5

Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.

Communication regarding the project during the procurement, outside of the this submission process or scheduled procurement milestones is not permitted.

POINT OF CONTACT/CLARIFICATION

Name: Aaron Harris Agency: Colorado Northwestern Community College Email Address: aaron.harris@cncc.edu Phone: O: (970) 675-3279 / M: (248) 914-7202

BIDDING

Bids shall be submitted to Bidnet Direct on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix A.

An electronic copy of the sealed bid submittal is due September 14th and shall be received no later than 3:00 PM MST, and shall be submitted/accepted via via the BidNet Direct submission portal, as described in the Information for Bidders (SBP-6.12)

Bid Forms and Appendices to be included with bid submittal:

Bid Form (SBP-6.13) Bid Bond (SBP-6.14) Bid Alternates (SBP-6.131) Unit Pricing (SBP-6.133) CNCC Response Sheet

Late bid submittals will be rejected without consideration. The State of Colorado assume no responsibility for costs related to the preparation of bid submittals.

BID OPENING

Opening of the bid submittals will be a virtual public bid opening via WebEx Virtual Meeting platform:

Date & Time: 9/14/2026 at 4:00PM MST WebEx Link : https://cccs-meetings.webex.com/cccs-meetings/j.php?MTID=m5ad6a454b6cc7f972899d00e8646ae45

Virtual public bid opening will take place at the date and time identified in Schedule

APPENDICES:

https://cccs-meetings.webex.com/cccs-meetings/j.php?MTID=m5ad6a454b6cc7f972899d00e8646ae45 https://cccs-meetings.webex.com/cccs-meetings/j.php?MTID=m5ad6a454b6cc7f972899d00e8646ae45

OSA-AFB-1 pg. 6

Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) (if Applicable) Appendix B2: Unit Pricing (SBP-6.133) (if Applicable) Appendix B3: Bid Bond (SBP-6.14) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe

Rates (if Applicable) Appendix E: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s

Agreement and General Conditions of the Contract) Appendix F: CNCC Response Sheet

File details come from the government source that posted it. Updated .