Appendix E-SC6.23 DBB Agrmt Gen Cond R1-2024 (2).docx

DOCX document 142 KB Posted

Attached to
EM2624 Yaeger Structural Stabilization and Repairs
Solicitation number
IFB1 GJTA 2027000021 1
Issued by
Pueblo County, Colorado

About this file

This document is the General Conditions of the Contractor's Design/Bid/Build (D/B/B) Agreement (State Form SC-6.23) established by the State of Colorado Office of the State Architect State Buildings Program. The general conditions outline the contractual framework and operational requirements for construction projects procured through the Design/Bid/Build delivery method. The agreement establishes responsibilities for contractors, subcontractors, the Architect/Engineer, and the Principal Representative (State owner) across all phases of project execution, from mobilization through final acceptance and warranty periods. Key administrative requirements include submission of executed agreements and bonds within ten days of Notice of Award, provision of insurance certificates, apprenticeship program documentation for mechanical and electrical work where applicable, and appointment of qualified project managers and superintendents satisfactory to the Principal Representative. The contractor must submit schedules of values within twenty-one calendar days of Notice to Proceed and maintain critical-path method (CPM) construction schedules with monthly updates. Shop drawings, product data, and samples require submission in accordance with approved schedules, with three copies typically required unless otherwise specified. The agreement requires Colorado labor to constitute at least eighty percent of the work performed.

The agreement establishes comprehensive insurance requirements including Commercial General Liability with minimum limits of $1,000,000 per occurrence and $2,000,000 general aggregate, automobile liability of $1,000,000 combined single limit, workers' compensation coverage with waiver of subrogation, and builder's risk insurance on an all-risk basis in the amount of the contract sum plus modifications. For projects exceeding $10,000,000, umbrella liability insurance of $5,000,000 per occurrence and aggregate is required. Prevailing wage rates apply where applicable, with contractors required to pay employees weekly at rates not less than those specified in the solicitation and submit weekly electronic payroll reports. The contractor bears all costs associated with temporary utilities, facilities, heat, sanitation, and site cleanup unless otherwise specified. Payment is made through applications using State Form SC-7.2 based on the approved schedule of values, with retainage typically withheld and released upon substantial and final completion. The agreement includes provisions for change orders, claims procedures, differing site conditions, liquidated damages for delays, and contractor performance and payment bonds in the full contract amount.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

THE GENERAL CONDITIONS OF THE CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT

(STATE FORM SC-6.23)

SC-6.23

Rev 01/2024

3SC-6.23Rev. 12/2021

SC-6.23Page of 50SC-6.23Rev. 12/2021 Rev. 12/2021

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

THE GENERAL CONDITIONS OF THE CONTRACTOR’S DESIGN/BID/BUILD AGREEMENT

(STATE FORM SC-6.23)

TABLE OF CONTENTS Page

1ARTICLE 1 DEFINITIONS1
1.1CONTRACT DOCUMENTS1
1.2DEFINITIONS OF WORDS AND TERMS USED2
2ARTICLE 2 EXECUTION, CORRELATION, INTENT OF DOCUMENTS, COMMUNICATION AND COOPERATION6
2.1EXECUTION6
2.2CORRELATION7
2.3INTENT OF DOCUMENTS7
2.4PARTNERING, COMMUNICATIONS AND COOPERATION8
3ARTICLE 3 COPIES FURNISHED8
4ARTICLE 4 OWNERSHIP OF DRAWINGS9
5ARTICLE 5 ARCHITECT/ENGINEER’S STATUS9
6ARTICLE 6 ARCHITECT/ENGINEER DECISIONS AND JUDGMENTS, ACCESS TO WORK AND INSPECTION9
6.1DECISIONS9
6.2JUDGMENTS9
6.3ACCESS TO WORK10
6.4INSPECTION10
7ARTICLE 7 CONTRACTOR’S SUPERINTENDENCE AND SUPERVISION11
8ARTICLE 8 MATERIALS AND EMPLOYEES12
9ARTICLE 9 SURVEYS, PERMITS, LAWS, TAXES AND REGULATIONS12
9.1SURVEYS12
9.2PERMITS AND LICENSES12
9.3TAXES12
9.4LAWS AND REGULATIONS13
10ARTICLE 10 PROTECTION OF WORK AND PROPERTY13
10.1GENERAL PROVISIONS13
10.2SAFETY PRECAUTIONS13
10.3EMERGENCIES14
11ARTICLE 11 DRAWINGS AND SPECIFICATIONS ON THE WORK14
12ARTICLE 12 REQUESTS FOR INFORMATION AND SCHEDULES15
12.1REQUESTS FOR INFORMATION15
12.2SCHEDULES15
13ARTICLE 13 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES17
13.1SUBMITTAL PROCESS17
13.2FABRICATION AND ORDERING18
13.3DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS18
13.4CONTRACTOR REPRESENTATIONS18
14ARTICLE 14 SAMPLES AND TESTING19
14.1SAMPLES19
14.2TESTING - GENERAL19
14.3TESTING - CONCRETE AND SOILS19
14.4TESTING - OTHER20
15ARTICLE 15 SUBCONTRACTS20
15.1CONTRACT PERFORMANCE OUTSIDE OF THE UNITED STATES OR COLORADO20
15.2SUBCONTRACTOR LIST20
15.3SUBCONTRACTOR SUBSTITUTIONS20
15.4CONTRACTOR RESPONSIBLE FOR SUBCONTRACTORS21
16ARTICLE 16 RELATIONS OF CONTRACTOR AND SUBCONTRACTOR21
17ARTICLE 17 MUTUAL RESPONSIBILITY OF CONTRACTORS21
18ARTICLE 18 SEPARATE CONTRACTS21
19ARTICLE 19 USE OF PREMISES22
20ARTICLE 20 CUTTING, FITTING OR PATCHING22
21ARTICLE 21 UTILITIES22
21.1TEMPORARY UTILITIES22
21.2PROTECTION OF EXISTING UTILITIES23
21.3CROSSING OF UTILITIES23
22ARTICLE 22 UNSUITABLE CONDITIONS23
23ARTICLE 23 TEMPORARY FACILITIES23
23.1OFFICE FACILITIES23
23.2TEMPORARY HEAT23
23.3WEATHER PROTECTION24
23.4DUST PARTITIONS24
23.5BENCH MARKS24
23.6SIGN24
23.7SANITARY PROVISION24
24ARTICLE 24 CLEANING UP24
25ARTICLE 25 INSURANCE25
25.1GENERAL25
25.2COMMERCIAL GENERAL LIABILITY INSURANCE (CGL)25
25.3AUTOMOBILE LIABILITY INSURANCE26
25.4WORKERS' COMPENSATION INSURANCE26
25.5UMBRELLA LIABILITY INSURANCE26
25.6BUILDER’S RISK INSURANCE26
25.7POLLUTION LIABILITY INSURANCE27
25.8ADDITIONAL MISCELLANEOUS INSURANCE PROVISIONS28
26ARTICLE 26 CONTRACTOR’S PERFORMANCE AND PAYMENT BONDS28
27ARTICLE 27 LABOR AND WAGES28
27.1COLORADO LABOR28
27.2PREVAILING WAGE RATES29
28ARTICLE 28 ROYALTIES AND PATENTS29
29ARTICLE 29 ASSIGNMENT30
30ARTICLE 30 CORRECTION OF WORK BEFORE ACCEPTANCE30
31ARTICLE 31 APPLICATIONS FOR PAYMENTS31
31.1CONTRACTOR’S SUBMITTALS31
31.2ARCHITECT/ENGINEER CERTIFICATION32
31.3RETAINAGE WITHHELD32
31.4RELEASE OF RETAINAGE32
32ARTICLE 32 CERTIFICATES FOR PAYMENTS33
33ARTICLE 33 PAYMENTS WITHHELD34
34ARTICLE 34 DEDUCTIONS FOR UNCORRECTED WORK34
35ARTICLE 35 CHANGES IN THE WORK35
35.1THE VALUE OF CHANGED WORK35
35.2DETAILED BREAKDOWN36
35.3HAZARDOUS MATERIALS38
35.4EMERGENCY FIELD CHANGE ORDERED WORK38
35.5APPROPRIATION LIMITATIONS - C.R.S. § 24-91-103.6, as amended39
36ARTICLE 36 CLAIMS39
37ARTICLE 37 DIFFERING SITE CONDITIONS42
37.1NOTICE IN WRITING42
37.2LIMITATIONS42
38ARTICLE 38 DELAYS AND EXTENSIONS OF TIME42
39ARTICLE 39 NON-BINDING DISPUTE RESOLUTION – FACILITATED NEGOTIATIONS44
40ARTICLE 40 RIGHT OF OCCUPANCY45
41ARTICLE 41 COMPLETION, FINAL INSPECTION, ACCEPTANCE AND SETTLEMENT46
41.1NOTICE OF COMPLETION46
41.2FINAL INSPECTION46
41.3NOTICE OF SUBSTANTIAL COMPLETION46
41.4NOTICE OF ACCEPTANCE48
41.5SETTLEMENT48
42ARTICLE 42 GENERAL WARRANTY AND CORRECTION OF WORK AFTER ACCEPTANCE49
43ARTICLE 43 LIENS50
44ARTICLE 44 ONE-YEAR GUARANTEE AND SPECIAL GUARANTEES AND WARRANTIES50
44.1ONE-YEAR GUARANTEE OF THE WORK50
44.2SPECIAL GUARANTEES AND WARRANTIES51
45ARTICLE 45 GUARANTEE INSPECTIONS AFTER COMPLETION51
46ARTICLE 46 TIME OF COMPLETION AND LIQUIDATED DAMAGES52
47ARTICLE 47 DAMAGES53
48ARTICLE 48 STATE’S RIGHT TO DO THE WORK; TEMPORARY SUSPENSION OF WORK; DELAY DAMAGES54
48.1STATE’S RIGHT TO DO THE WORK54
48.2TEMPORARY SUSPENSION OF WORK54
48.3DELAY DAMAGES55
49ARTICLE 49 STATE’S RIGHTS TO TERMINATE CONTRACT55
49.1GENERAL55
49.2CONDITIONS AND PROCEDURES56
49.3ADDITIONAL CONDITIONS57
50ARTICLE 50 TERMINATION FOR CONVENIENCE OF STATE57
50.1NOTICE OF TERMINATION57
50.2PROCEDURES57
51ARTICLE 51 CONTRACTOR’S RIGHT TO STOP WORK AND/OR TERMINATE CONTRACT59
52ARTICLE 52 COLORADO SPECIAL PROVISIONS59
52.1CONTROLLER’S APPROVAL, C.R.S. § 24-30-202(1)59
52.2FUND AVAILABILITY, C.R.S. § 24-30-202(5.5)59
52.3GOVERNMENTAL IMMUNITY59
52.4INDEPENDENT CONTRACTOR59
52.5COMPLIANCE WITH LAW60
52.6CHOICE OF LAW, JURISDICTION, AND VENUE60
52.7PROHIBITED TERMS60
52.8SOFTWARE PIRACY PROHIBITION. SOFTWARE PIRACY PROHIBITION60
52.9EMPLOYEE FINANCIAL INTEREST/CONFLICT OF INTEREST60
52.10VENDOR OFFSET AND ERRONEOUS PAYMENTS60
53ARTICLE 53 MISCELLANEOUS PROVISIONS61
53.1PROFESSIONAL ASSOCIATION PERMITTED61
53.2DISSOLUTION OF PROFESSIONAL ASSOCIATION61
53.3PUBLIC ART LAW61
53.4ASSIGNMENT61
53.5SUBCONTRACTS61
53.6BINDING EFFECT62
53.7AUTHORITY62
53.8CAPTIONS AND REFERENCES62
53.9COUNTERPARTS62
53.10ENTIRE UNDERSTANDING62
53.11DIGITAL SIGNATURES62
53.12MODIFICATION62
53.13STATUTES, REGULATIONS, FISCAL RULES AND OTHER AUTHORITY62
53.14EXTERNAL TERMS AND CONDITIONS62
53.15SEVERABILITY63
53.16SURVIVIAL AND CERTAIN CONTRACT TERMS63
53.17TAXES63
53.18THIRD PARTY BENEFICIARIES63
53.19WAIVER63
53.20CORA DISCLOSURE63
53.21STANDARD AND MANNER OF PERFORMANCE63
53.22LICENSES, PERMITS, AND OTHER AUTHORIZATIONS63
53.23INDEMNIFICATION64
53.24ACCESSIBILITY64
54ARTICLE 54 CONFIDENTIAL INFORMATION-STATE RECORDS65
54.1CONFIDENTIALITY65
54.2OTHER ENTITY ACCESS AND NONDISCLOSURE AGREEMENTS65
54.3USE, SECURITY, AND RETENTION65
54.4INCIDENT NOTICE AND REMEDIATION65
54.5DATA PROTECTION AND HANDLING66
54.6SAFEGUARDING PERSONAL IDENTIFIABLE INFORMATION (PII)66

SC-6.23

Rev 01/2024 1

SC-6.23

Rev 01/2024 TOC

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

THE GENERAL CONDITIONS OF THE CONTRACTOR’S DESIGN/BID/BUILD AGREEMENT

(STATE FORM SC-6.23)

ARTICLE 1 DEFINITIONS

CONTRACT DOCUMENTS

The Contract Documents consist of the following some of which are procedural documents used in the administration and performance of the Agreement:

Contractor’s Design/Bid/Build Agreement; (SC-6.21);

Performance Bond (SC-6.22) and Labor and Material Payment Bond (SC-6.221);

General Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) and if applicable, Supplementary General Conditions;

Detailed Specification Requirements, including all addenda issued prior to the opening of the bids; and, Drawings, including all addenda issued prior to the opening of the bids.

Change Orders (SC-6.31) and Amendments (SC-6.0), if any, when properly executed.

Authorization to Bid (SBP-6.10) Information for Bidders (SBP-6.12);

Bid (SBP-6.13), Bid Alternates, (SBP-6.131) and Unit Pricing (SBP-6.133) if applicable Bid Bond (SBP-6.14);

Labor Burden Calculation (SBP-6.18) Notice of Award (SBP-6.15);

Builder’s risk insurance certificates of insurance (ACORD 25-S);

Liability and Workers’ compensation certificates of insurance;

Notice to Proceed (Design/Bid/Build) (SBP-6.26);

Notice of Approval of Occupancy/Use (SBP-01);

Notice of Partial Substantial Completion (SBP-071);

Notice of Substantial Completion (SBP-07);

Notice of Partial Final Acceptance (SC-6.27);

Notice of Final Acceptance (SBP-6.271);

Notice of Partial Contractor's Settlement (SC-7.3);

Notice of Contractor’s Settlement (SBP-7.31);

Application and Certificate for Contractor’s Payment (SBP-7.2);

Other Procedural and Reporting Documents or Forms

Other procedural and reporting documents or forms referred to in the General Conditions, the Supplementary General Conditions, the Specifications or required by the State Buildings Program or the Principal Representative, including but not necessarily limited to Pre-Acceptance Check List (SBP-05) and the Building Inspection Record (SBP-BIR). A list of the current standard State Buildings Program forms applicable to this Contract may be obtained from the Principal Representative on request.

DEFINITIONS OF WORDS AND TERMS USED

Agreement The term “Agreement” shall mean the written agreement entered into by the State of Colorado acting by and through the Principal Representative and the Contractor for the performance of the Work and payment therefore, on State Form SC-6.21. The term Agreement when used without reference to State Form SC-6.21 may also refer to the entirety of the parties’ agreement to perform the Work described in the Contract Documents or reasonably inferable there from. The term “Contract” shall be interchangeable with this latter meaning of the term Agreement Amendment The term “Amendment” means a written order signed by the Principal Representative or its authorized agent, issued after the execution of this Agreement, authorizing a change in the Work, the method or manner of performance, an adjustment in the Contract Sum, or the Contract Time as required by State Building Program’s policy Contract Modification Guidelines.

Architect/Engineer The term “Architect/Engineer” shall mean either the architect of record or the engineer of record under contract to the State of Colorado for the Project identified in the Contract Documents.

Change Order The term “Change Order” means a written order directing the Contractor to make changes in the Work, in accordance with Article 35L, The Value of Changed Work.

Colorado Labor The term “Colorado labor”, as provided in C.R.S. § 8-17-101(2)(a), as amended, means any person who is a resident of the state of Colorado, at the time of the public Works project, without discrimination as to race, color, creed, sex, sexual orientation, marital status, national origin, ancestry, age, or religion except when sex or age is a bona fide occupational qualification. A resident of the state of Colorado is a person who can provide a valid Colorado driver’s license, a valid Colorado state-issued photo identification, or documentation that he or she has resided in Colorado for the last thirty days.

Contractor The word “Contractor” shall mean the person, company, firm, corporation or other legal entity entering into a contract with the State of Colorado acting by and through the Principal Representative

CORA

The term “CORA” refers to the Colorado Open Records Act, §§24-72-200.1, et seq., C.R.S.

Days The term “days” whether singular or plural shall mean calendar days unless expressly stated otherwise. Where the term “business days” is used it shall mean business days of the State of Colorado.

Drawings The term “Drawings” shall mean all drawings approved by appropriate State officials which have been prepared by the Architect/Engineer showing the Work to be done, except that where a list of drawings is specifically enumerated in the Supplementary General Conditions or division 1 of the Specifications, the term shall mean the drawings so enumerated, including all addenda drawings.

Emergency Field Change Order The term “Emergency Field Change Order” shall mean a written change order for extra Work or a change in the Work necessitated by an emergency as defined in Article 35.4 executed on State form SC 6.31 and identified as an Emergency Field Change Order. The use of such orders is limited to emergencies and to the amounts shown in Article 35.4.

Final Acceptance The terms “final acceptance” or “finally complete” mean the stage in the progress of the Work, after substantial completion, when all remaining items of Work have been completed, all requirements of the Contract Documents are satisfied and the Notice of Acceptance can be issued. Discrete physical portions of the Project may be separately and partially deemed finally complete at the discretion of the Principal Representative when that portion of the Project reaches such stage of completion and a partial Notice of Acceptance can be issued.

Fixed Limit of Construction Cost The term “Fixed Limit of Construction Cost” shall set forth a dollar amount available for the total Construction Cost of all elements of the Work as specified by the Principal Representative.

Incident The term ‘incident’ means any accidental or deliberate event that results in or constitutes an imminent threat of the unauthorized access, loss, disclosure, modification, disruption, or destruction of any communications or information resources of the State, which are included as part of the Work, as described in §§24-37.5-401, et seq., C.R.S. Incidents include, without limitation, (i) successful attempts to gain unauthorized access to a State system or State Records regardless of where such information is located; (ii) unwanted disruption or denial of service; (iii) the unauthorized use of a State system for the processing or storage of data; or (iv) changes to State system hardware, firmware, or software characteristics without the State’s knowledge, instruction, or consent.

Notice The term “Notice” shall mean any communication in writing from either contracting party to the other by such means of delivery that receipt cannot properly be denied. Notice shall be provided to the person identified to receive it in Article 8 of the Agreement. Notice Identification, or to such other person as either party identifies in writing to receive Notice Notwithstanding an email delivery or return receipt, email Notice shall not be adequate. Acknowledgment of receipt of a voice message shall not be deemed to waive the requirement that Notice, where required, shall be in writing.

Occupancy The term “Occupancy” means occupancy taken by the State as Owner after the Date of Substantial Completion at a time when a building or other discrete physical portion of the Project is used for the purpose intended. The Date of Occupancy shall be the date of such first use, but shall not be prior to the date of execution of the Notice of Approval of Occupancy/Use. Prior to the date of execution of a Notice of Approval of Occupancy/Use, the state shall have no right to occupy and the project may not be considered safe for occupancy for the intended use.

Owner The term “Owner” shall mean the Principal Representative.

PII

The term “PII” shall be defined as personally identifiable information including, without limitation, any information maintained by the State about an individual that can be used to distinguish or trace an individual’s identity, such as name, social security number, date and place of birth, mother’s maiden name, or biometric records; and any other information that is linked or linkable to an individual, such as medical, educational, financial, and employment information. PII includes, but is not limited to, all information defined as personally identifiable information in §§24-72-501 and 24-73-101, C.R.S. “PII” shall also mean “personal identifying information” as set forth at § 24-74-102, et. seq., C.R.S.

Principal Representative The term “Principal Representative” shall be defined, as provided in C.R.S. § 24-30-1301(14), as the governing board of a state department, institution, or agency; or if there is no governing board, then the executive head of a state department, institution, or agency, as designated by the governor or the general assembly and as specifically identified in the Contract Documents, or shall have such other meaning as the term may otherwise be given in C.R.S. § 24-30-1301(14), as amended. The Principal Representative may delegate authority. The Contractor shall have the right to inquire regarding the delegated authority of any of the Principal Representative’s representatives on the project and shall be provided with a response in writing when requested.

Product Data The term “Product Data” shall mean all submittals in the form of printed manufacturer’s literature, manufacturer’s specifications, and catalog cuts.

Project The "Project" is the total construction of which the Work performed under the Contract Documents is a part, and may include construction by the Principal Representative or by separate contractors.

Reasonably Inferable The phrase “reasonably inferable” means that if an item or system is either shown or specified, all material and equipment normally furnished with such items or systems and needed to make a complete installation shall be provided whether mentioned or not, omitting only such parts as are specifically excepted, and shall include only components which the Contractor could reasonably anticipate based on his or her skill and knowledge using an objective, industry standard, not a subjective standard. This term takes into consideration the normal understanding that not every detail is to be given on the Drawings and Specifications If there is a difference of opinion, the Principal Representative shall make the determination as to the standards of what reasonably inferable.

Samples The term “Samples” shall mean examples of materials or Work provided to establish the standard by which the Work will be judged.

SBP

The term "SBP" means "State Buildings", which is used in connection with labeling applicable State form documents (e.g., "SBP-01" is the form number for Notice of Approval of Occupancy/Use).

SC

The term "SC" means "State Contract" which is used in connection with labeling applicable State form documents (e.g. "SC 6.23" is the State form number for these General Conditions of the Contractor’s Design/Bid/Build Agreement).

Schedule of Values The term “Schedule of Values” is defined as the itemized listing of description of the Work by Division and Section of the Specifications. The format shall be the same as Form SC-7.2. Included shall be the material costs, and the labor and other costs plus the sum of both.

Shop Drawings The term “Shop Drawings” shall mean any and all detailed drawings prepared and submitted by Contractor, Subcontractor at any tier, vendors or manufacturers providing the products and equipment specified on the Drawings or called for in the Specifications.

Specifications The term “Specifications” shall mean the requirements of the CSI divisions of the project manual prepared by the Architect/Engineer describing the Work to be accomplished.

State Buildings Program Shall refer to the Office of the State Architect within the Department of Personnel & Administration of Colorado State government responsible for project administration, review, approval and coordination of plans, construction procurement policy, contractual procedures, and code compliance and inspection of all buildings, public Works and improvements erected for state purposes; except public roads and highways and projects under the supervision of the division of wildlife and the division of parks and outdoor recreation as provided in C.R.S. § 24-30-1301, et seq. The term State Buildings Program shall also mean that individual within a State Department agency or institution, including institutions of higher education, who has signed an agreement accepting delegation to perform all or part of the responsibilities and functions of State Buildings Program.

State Confidential Information The term “State Confidential Information” shall mean any and all State Records not subject to disclosure under CORA. State Confidential Information shall include, but is not limited to, PII, and State personnel records not subject to disclosure under CORA. State Confidential Information shall not include information or data concerning individuals that is not deemed confidential but nevertheless belongs to the State, which has been communicated, furnished, or disclosed by the State to Contractor which (i) is subject to disclosure pursuant to CORA; (ii) is already known to Contractor without restrictions at the time of its disclosure to Contractor; (iii) is or subsequently becomes publicly available without breach of any obligation owed by Contractor to the State; (iv) is disclosed to Contractor, without confidentiality obligations, by a third party who has the right to disclose such information; or (v) was independently developed without reliance on any State Confidential Information.

State Fiscal Rules State Fiscal Rules means the fiscal rules promulgated by the Colorado State Controller pursuant to §24-30-202(13)(a), C.R.S.

State Records The term “State Records” shall mean any and all State data, information, and records, regardless of physical form, including, but not limited to, information subject to disclosure under CORA.

Subcontractor The term “Subcontractor” shall mean a person, firm or corporation supplying labor, materials, equipment and/or Services for Work at the site of the Project for, and under separate contract or agreement with the Contractor.

Submittals The term “submittals” means drawings, lists, tables, documents and samples prepared by the Contractor to facilitate the progress of the Work as required by these General Conditions or the Drawings and Specifications. They consist of Shop Drawings, Product Data, Samples, and various administrative support documents including but not limited to lists of subcontractors, construction progress schedules, schedules of values, applications for payment, inspection and test results, requests for information, various document logs, and as-built drawings. Submittals are required by the Contract Documents, but except to the extent expressly specified otherwise are not themselves a part of the Contract Documents.

Substantial Completion The terms “substantial completion” or “substantially complete” mean the stage in the progress of the Work when the construction is sufficiently complete, in accordance with the Contract Documents as modified by any Change Orders, so that the Work, or at the discretion of the Principal Representative, any designated portion thereof, is available for its intended use by the Principal Representative and a Notice of Substantial Completion can be issued. Portions of the Project may, at the discretion of the Principal Representative, be designated as substantially complete.

Supplier The term "Supplier" shall mean any manufacturer, fabricator, distributor, material man or vendor.

Surety The term “Surety” shall mean the company providing the labor and material payment and performance bonds for the Contractor as obligor.

Value Engineering “Value Engineering” or “VE” is defined as an analysis and comparison of cost versus value of building materials, equipment, and systems. VE considers the initial cost of construction, coupled with the estimated cost of maintenance, energy use, life expectancy and replacement cost. VE related to this Project shall include the analysis and comparison of building elements in an effort to reduce overall Project costs, while maintaining or enhancing the quality of the design intent, whenever possible.

Work The term “Work” shall mean all or part of the labor, materials, equipment, and other services required by the Contract Documents or otherwise required to be provided by the Contractor to meet the Contractor’s obligations under the Contract.

Work Product The phrase “Work Product” means the tangible and intangible results of the Work, whether finished or unfinished, including drafts. Work Product includes, but is not limited to, documents, text, software (including source code), research, reports, proposals, specifications, plans, notes, studies, data, images, photographs, negatives, pictures, drawings, designs, models, surveys, maps, materials, ideas, concepts, know-how, and any other results of the Work. “Work Product” does not include any material that was developed prior to the Effective Date that is used, without modification, in the performance of the Work.

ARTICLE 2 EXECUTION, CORRELATION, INTENT OF DOCUMENTS, COMMUNICATION AND COOPERATION

EXECUTION

The Contractor, within ten (10) days from the date of Notice of Award, will be required to:

1. Execute the Agreement, State Form SC-6.21;

1. Furnish fully executed Performance and Labor and Material Payment Bonds on State Forms SC-6.22 and SC-6.221; and

1. Furnish certificates of insurance evidencing all required insurance on standard Acord forms designed for such purpose.

1. Furnish certified copies of any insurance policies requested by the Principal Representative.

1. If Article 7.1 of the Contractor’s Design/Bid/Build Agreement (SC-6.21) applies, furnish documentation that identifies the subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certify that that all firms identified participate in apprenticeship programs registered with the United States Department of Labor’s Employment and Training Administration or state apprenticeship councils recognized by the United States Department of Labor and have a proven record of graduating a minimum of fifteen percent of its apprentices for at least three of the past five years;

CORRELATION

By execution of the Agreement the Contractor represents that the Contractor has visited the site, has become familiar with local conditions and local requirements under which the Work is to be performed, including the building code programs of the State Buildings Program as implemented by the Principal Representative, and has correlated personal observations with the requirements of the Contract Documents.

INTENT OF DOCUMENTS

The Contract Documents are complementary, and what is called for by any one document shall be as binding as if called for by all. The intention of the documents is to include all labor, materials, equipment and transportation necessary for the proper execution of the Work. Words describing materials or Work which have a well-known technical or trade meaning shall be held to refer to such recognized standards.

In any event, if any error exists, or appears to exist, in the requirements of the Drawings or Specifications, or if any disagreement exists as to such requirements, the Contractor shall have the same explained or adjusted by the Architect/Engineer before proceeding with the Work in question. In the event of the Contractor’s failure to give prior written Notice of any such errors or disagreements of which the Contractor or the Subcontractors at any tier are aware, the Contractor shall, at no additional cost to the Principal Representative, make good any damage to, or defect in, Work which is caused by such omission.

Where a conflict occurs between or within standards, Specifications or Drawings, which is not resolved by reference to the precedence between the Contract Documents, the more stringent or higher quality requirements shall apply so long as such more stringent or higher quality requirements are reasonably inferable. The Architect/Engineer shall decide which requirements will provide the best installation.

With the exception noted in the following paragraph, the precedence of the Contract Documents is in the following sequence:

1. The Supplementary General Conditions, if any;

1. The Colorado Special Provisions, Article 52 of General Conditions of the Contractor’s Design/Bid/Build (State Form SC-6.23);

1. The Agreement (SC-6.21);

1. The General Conditions (SC-6.23);

1. Drawings and Specifications, all as modified by any addenda; and

1. Any additional Exhibit to this agreement Change Orders and Amendments, if any, to the Contract Documents take precedence over the original Contract Documents.

Notwithstanding the foregoing order of precedence, the Special Provisions of Article 52 of the General Conditions, Special Provisions, shall take precedence, rule and control over all other provisions of the Contract Documents.

Unless the context otherwise requires, form numbers in this document are for convenience only. In the event of any conflict between the form required by name or context and the form required by number, the form required by name or context shall control. The Contractor may obtain State forms from the Principal Representative upon request.

PARTNERING, COMMUNICATIONS AND COOPERATION

In recognition of the fact that conflicts, disagreements and disputes often arise during the performance of construction contracts, the Contractor and the Principal Representative aspire to encourage a relationship of open communication and cooperation between the employees and personnel of both, in which the objectives of the Contract may be better achieved and issues resolved in a more fully informed atmosphere.

The Contractor and the Principal Representative each agree to assign an individual who shall be fully authorized to negotiate and implement a voluntary partnering plan for the purpose of facilitating open communications between them. Within thirty days (30) of the Notice to Proceed, the assigned individuals shall meet to discuss development of an informal agreement to accomplish these goals.

The assigned individuals shall endeavor to reach an informal agreement, but shall have no such obligation. Any plans these parties voluntarily agree to implement shall result in no change to the contract amount, and no costs associated with such plan or its development shall be recoverable under any contract clause. In addition, no plan developed to facilitate open communication and cooperation shall alter, amend or waive any of the rights or duties of either party under the Contract unless and except by written Amendment to the Contract, nor shall anything in this clause or any subsequently developed partnering plan be deemed to create fiduciary duties between the parties unless expressly agreed in a written Amendment to the Contract. It is also recognized that projects with relatively low contract values may not justify the expense or special efforts required. In the case of small projects with an initial Contract value under $500,000, the requirements of the preceding paragraph shall not apply.

ARTICLE 3 COPIES FURNISHED

The Contractor will be furnished, free of charge, the number of copies of Drawings and Specifications as specified in the Contract Documents, or if no number is specified, all copies reasonably necessary for the execution of the Work.

ARTICLE 4 OWNERSHIP OF DRAWINGS

Drawings or Specifications, or copies of either, furnished by the Architect/Engineer, are not to be used on any other Work. At the completion of the Work, at the written request of the Architect/Engineer, the Contractor shall endeavor to return all Drawings and Specifications.

The Contractor may retain the Contractor’s Contract Document set, copies of Drawings and Specifications used to contract with others for any portion of the Work and a marked up set of as-built drawings.

ARTICLE 5 ARCHITECT/ENGINEER’S STATUS

The Architect/Engineer is the representative of the Principal Representative for purposes of administration of the Contract, as provided in the Contract Documents and the Agreement. In case of termination of employment or the death of the Architect/Engineer, the Principal Representative will appoint a capable Architect/Engineer against whom the Contractor makes no reasonable objection, whose status under the Contract shall be the same as that of the former Architect/Engineer.

ARTICLE 6 ARCHITECT/ENGINEER DECISIONS AND JUDGMENTS, ACCESS TO WORK AND INSPECTION

DECISIONS

The Architect/Engineer shall, within a reasonable time, make decisions on all matters relating to the execution and progress of the Work or the interpretation of the Contract Documents, and in the exercise of due diligence shall be reasonably available to the Contractor to timely interpret and make decisions with respect to questions relating to the design or concerning the Contract Documents.

JUDGMENTS

The Architect/Engineer is, in the first instance, the judge of the performance required by the Contract Documents as it relates to compliance with the Drawings and Specifications and quality of Workmanship and materials.

The Architect/Engineer shall make judgments regarding whether directed Work is extra or outside the scope of Work required by the Contract Documents at the time such direction is first given. If, in the Contractor’s judgment, any performance directed by the Architect/Engineer is not required by the Contract Documents or if the Architect/Engineer does not make the judgment required, it shall be a condition precedent to the filing of any claim for additional cost related to such directed Work that the Contractor, before performing such Work, shall first obtain in writing, the Architect/Engineer’s written decision that such directed Work is included in the performance required by the Contract Documents. If the Architect/Engineer’s direction to perform the Work does not state that the Work is within the performance required by the Contract Documents, the Contractor shall, in writing, request the Architect/Engineer to advise in writing whether the directed Work will be considered extra Work or Work included in the performance required by the Contract Documents.

The Architect/Engineer shall respond to any such written request for such a decision within three (3) business days and if no response is provided, or if the Architect/Engineer’s written decision is to the effect that the Work is included in the performance required by the Contract Documents, the Contractor may file with the Principal Representative and the Architect/Engineer a Notice of claim in accordance with Article 36, Claims. Whether or not a Notice of claim is filed, the Contractor shall proceed with the ordered Work. Disagreement with the decision of the Architect/Engineer shall not be grounds for the Contractor to refuse to perform the Work directed or to suspend or terminate performance.

ACCESS TO WORK

The Architect/Engineer, the Principal Representative and representatives of State Buildings Program shall at all times have access to the Work. The Contractor shall provide proper facilities for such access and for their observations or inspection of the Work.

INSPECTION

The Architect/Engineer has agreed to make, or that structural, mechanical, electrical engineers or other consultants will make, periodic visits to the site to generally observe the progress and quality of the Work to determine in general if the Work is proceeding in accordance with the Contract Documents. Observation may extend to all or any part of the Work and to the preparation, fabrication or manufacture of materials.

Without in any way meaning to be exclusive or to limit the responsibilities of the Architect/Engineer or the Contractor, the Architect/Engineer has agreed to observe, among other aspects of the Work, the following for compliance with the Contract Documents:

1. Compaction testing reports based upon the findings and recommendations of the Principal Representative’s testing consultant;

1. Bearing surfaces of excavations before concrete is placed based upon the findings and recommendations of the Principal Representative’s soils engineering consultant;

1. Reinforcing steel after installation and before concrete is poured;

1. Structural concrete;

1. Laboratory reports on all concrete testing based upon the findings and recommendations of the Principal Representative’s testing consultant;

1. Structural steel during and after erection and prior to its being covered or enclosed;

1. Steel welding; Principal Representative will furnish steel welding inspection consultant/agency if required or necessary for the project;

1. Mechanical and plumbing Work following its installation and prior to its being covered or enclosed;

1. Electrical Work following its installation and prior to its being covered or enclosed; and

1. Any special or quality control testing required in the Contract Documents provided by the Principal Representative’s testing consultant.

If the Specifications, the Architect/Engineer’s instructions, laws, ordinances of any public authority require any Work to be specifically tested or approved, the Contractor shall give the Principal Representative, Architect/Engineer and appropriate testing agency (if necessary) timely notice of its readiness for observation by the Architect/Engineer or inspection by another authority, and if the inspection is by another authority, of the date fixed for such inspection, required certificates of inspection being secured by the Contractor. The Contractor shall give all required Notices to the Principal Representative or his or her designee for inspections required for the building inspection program. It shall be the responsibility of the Contractor to determine the Notice required by the State pursuant to Building Inspection Record for the Project, according to State form SBP-B.I.R., or the equivalent form required by the Principal Representative as approved by the State Buildings Program. If any portion of the Work should be covered contrary to the reasonable request of the Architect/Engineer, or to requirements specifically expressed in the Contract Documents, it must, if required in writing by the Architect/Engineer, be uncovered for its observation and shall be replaced at the Contractor’s expense.

If any other portion of the Work has been covered which the Architect/Engineer has not specifically requested to observe prior to it’s being covered, it may request to see such work and it shall be uncovered by the Contractor. If such work is found in accordance with the Contract Documents, the cost of uncovering and replacement shall, by appropriate Amendment or Change Order, be charged to the Principal Representative. If such work is found not in accordance with the Contract Documents, the Contractor shall pay such costs unless it is found that this condition was caused by the Principal Representative or a separate Contractor as provided in Article 18, in which event, the Principal Representative shall be responsible for the payment of such costs.

ARTICLE 7 CONTRACTOR’S SUPERINTENDENCE AND SUPERVISION

The Contractor shall employ, and keep present (as applicable) on the Project during its progress, a competent project manager as satisfactory to the Principal Representative. The project manager shall not be changed except with the consent of the Principal Representative, unless the project manager proves to be unsatisfactory to the Contractor and ceases to be in his or her employ. The project manager shall represent the Contractor for the Project, and in the absence of the Contractor, all directions given to the project manager shall be as binding as if given to the Contractor. Directions received by the project manager shall be documented by the project manager and communicated in writing with the Contractor.

The Contractor shall employ, and keep present on the Project during its progress, a competent superintendent and any necessary assistants, all satisfactory to the Architect/Engineer and the Principal Representative. The superintendent shall not be changed except with the consent of the Architect/Engineer and the Principal Representative, unless the superintendent proves to be unsatisfactory to the Project Manager/Contractor and ceases to be in his or her employ. The superintendent shall represent the Project Manager/Contractor in his or her absence and all directions given to the superintendent shall be as binding as if given to the Project Manager/Contractor. Directions received by the superintendent shall be documented by the superintendent and confirmed in writing with the Project Manager/Contractor.

The Contractor shall give efficient supervision to the Work, using his or her best skill and attention. He or she shall carefully study and compare all Drawings, Specifications and other written instructions and shall without delay report any error, inconsistency or omission which he or she may discover in writing to the Architect/Engineer. The Contractor shall not be liable to the Principal Representative for damage to the extent it results from errors or deficiencies in the Contract Documents or other instructions by the Architect/Engineer, unless the Contractor knew or had reason to know, that damage would result by proceeding and the Contractor fails to so advise the Architect/Engineer.

The superintendent shall see that the Work is carried out in accordance with the Contract Documents and in a uniform, thorough and first-class manner in every respect. The Contractor’s superintendent shall establish all lines, levels, and marks necessary to facilitate the operations of all concerned in the Contractor’s Work. The Contractor shall lay out all Work in a manner satisfactory to the Architect/Engineer, making permanent records of all lines and levels required for excavation, grading, foundations, and for all other parts of the Work.

ARTICLE 8 MATERIALS AND EMPLOYEES

Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities necessary for the execution and completion of the Work.

Unless otherwise specified, all materials shall be new and both workmanship and materials shall be first class and of uniform quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials.

The Contractor is fully responsible for all acts and omissions of the Contractor’s employees and shall at all times enforce strict discipline and good order among employees on the site. The Contractor shall not employ on the Work any person reasonably deemed unfit by the Principal Representative or anyone not skilled in the Work assigned to them.

ARTICLE 9 SURVEYS, PERMITS, LAWS, TAXES AND REGULATIONS

SURVEYS

The Principal Representative shall furnish all surveys, property lines and bench marks deemed necessary by the Architect/Engineer, unless otherwise specified.

PERMITS AND LICENSES

Permits and licenses necessary for the prosecution of the Work shall be secured and paid for by the Contractor. Unless otherwise specified in the Specifications, no local municipal or county building permit shall be required. However, State Buildings Program requires each Principal Representative to administer a building code inspection program, the implementation of which may vary at each agency or institution of the State. The Contractors’ employees shall become personally familiar with these local conditions and requirements and shall fully comply with such requirements. State electrical and plumbing permits are required, unless the requirement to obtain such permits is altered by State Building’s Programs. The Contractor shall obtain and pay for such permits.

Easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the Principal Representative, unless otherwise specified.

TAXES

Refund of Sales and Use Taxes The Contractor shall pay all local taxes required to be paid, including but not necessarily limited to all sales and use taxes. If requested by the Principal Representative prior to issuance of the Notice to Proceed or directed in the Supplementary General Conditions or the Specifications, the Contractor shall maintain records of such payments in respect to the Work, which shall be separate and distinct from all other records maintained by the Contractor, and the Contractor shall furnish such data as may be necessary to enable the State of Colorado, acting by and through the Principal Representative, to obtain any refunds of such taxes which may be available under the laws, ordinances, rules or regulations applicable to such taxes. When so requested or directed, the Contractor shall require Subcontractors at all tiers to pay all local sales and use taxes required to be paid and to maintain records and furnish the Contractor with such data as may be necessary to obtain refunds of the taxes paid by such Subcontractors. No State sales and use taxes are to be paid on material to be used in this Project. On application by the purchaser or seller, the Department of Revenue shall issue to a Contractor or to a Subcontractor at any tier, a certificate or certificates of exemption per C.R.S. § 39-26-703(2)(b), and C.R.S. § 39-26-708.

Federal Taxes The Contractor shall exclude the amount of any applicable federal excise or manufacturers’ taxes from the proposal. The Principal Representative will furnish the Contractor, on request exemption certificates.

LAWS AND REGULATIONS

The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as drawn or specified. If the Contractor observes that the Drawings or Specifications require Work, which is at variance therewith, the Contractor shall, without delay, notify the Architect/Engineer in writing and any necessary changes shall be adjusted as provided in Article 35, Changes In The Work.

The Contractor shall bear all costs arising from the performance of Work required by the Drawings or Specifications that the Contractor knows to be contrary to such laws, ordinances, rules or regulations, if such Work is performed without giving Notice to the Architect/Engineer.

ARTICLE 10 PROTECTION OF WORK AND PROPERTY

GENERAL PROVISIONS

The Contractor shall continuously maintain adequate protection of all Work and materials, protect the property from injury or loss arising in connection with this Contract and adequately protect adjacent property as provided by law and the Contract Documents. The Contractor shall make good any damage, injury or loss, except to the extent:

1. Directly due to errors in the Contract Documents;

1. Caused by agents or employees of the Principal Representative; and,

1. Due to causes beyond the Contractor’s control and not to fault or negligence; provided such damage, injury or loss would not be covered by the insurance required to be carried by the Contractor;

SAFETY PRECAUTIONS

The Contractor shall take all necessary precautions for the safety of employees on the Project, and shall comply with all applicable provisions of federal, State and municipal safety laws and building codes to prevent accidents or injury to persons on, about or adjacent to the premises where the Work is being performed. He or she shall erect and properly maintain at all times, as required by the conditions and progress of the Work, all necessary safeguards for the protection of Workers and the public and shall post danger signs warning against the hazards created by such features of construction as protruding nails, hoists, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and he or she shall designate a responsible member of his or her organization on the Project, whose duty shall be the prevention of accidents. The name and position of any person so designated shall be reported to the Architect/Engineer by the Contractor.

The Contractor shall provide all necessary bracing, shoring and tying of all structures, decks and framing to prevent any structural failure of any material which could result in damage to property or the injury or death of persons; take all precautions to insure that no part of any structure of any description is loaded beyond its carrying capacity with anything that will endanger its safety at any time during the execution of this Contract; and provide for the adequacy and safety of all scaffolding and hoisting equipment. The Contractor shall not permit open fires within the building enclosure. The Contractor shall construct and maintain all necessary temporary drainage and do all pumping necessary to keep excavations and floors, pits and trenches free of water. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work, except as otherwise noted.

The Contractor shall take due precautions when obstructing sidewalks, streets or other public ways in any manner, and shall provide, erect and maintain barricades, temporary walkways, roadways, trench covers, colored lights or danger signals and any other devices necessary or required to assure the safe passage of pedestrians and automobiles.

EMERGENCIES

In an emergency affecting the safety of life or of the Work or of adjoining property, the Contractor without special instruction or authorization from the Architect/Engineer or Principal Representative, is hereby permitted to act, at his or her discretion, to prevent such threatened loss or injury; and he or she shall so act, without appeal, if so authorized or instructed. Provided the Contractor has no responsibilities for the emergency, if the Contractor incurs additional cost not otherwise recoverable from insurance or others on account of any such emergency Work, the Contract sum shall be equitably adjusted in accordance with Article 35, Changes In The Work.

ARTICLE 11 DRAWINGS AND SPECIFICATIONS ON THE WORK

The Contractor shall keep on the job site one copy of the Contract Documents in good order, including current copies of all Drawings and Specifications for the Work, and any approved Shop Drawings, Product Data or Samples, and as-built drawings. As-built drawings shall be updated weekly by the Contractor and Subcontractors to reflect actual constructed conditions including dimensioned locations of underground Work and the Contractor's failure to maintain such updates may be grounds to withhold portions of payments otherwise due in accordance with Article 33, Payments Withheld.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .