Appendix B2-SBP-6.133 Unit Pricing.docx
DOCX document 42 KB Posted
- Solicitation number
- IFB1 GJTA 2027000021 1
- Issued by
- Pueblo County, Colorado
About this file
This is a Unit Pricing Form from the State of Colorado Office of the State Architect State Buildings Program for the EM2624 Yaeger Structural Stabilization and Repairs project at Colorado Northwestern Community College. The form establishes the framework for unit prices that will be applied to determine adjustments to the contract sum should changes in the work become necessary. The unit pricing structure includes nine line items (U1 through U9) for which bidders must provide pricing, though specific descriptions of these items are to be completed by the Architect/Engineer based on Division 01 specifications and inserted into the solicitation prior to release.
All unit prices supplied by bidders shall remain in effect until the date of contract completion established on the Notice to Proceed and must include the pro-rata share of all costs associated with materials, equipment, and disposal required to complete each work item. Overhead, profit, and bond calculations related to unit price changes will be determined separately through a Change Order Proposal using form SC-6.312. Bidders must execute the form by providing their company name, signature, and date to acknowledge acceptance of the unit pricing requirements. The form references revision 7/2025, indicating current applicability to the solicitation process.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
UNIT PRICING FORM
Institution or Agency: Colorado Northwestern Community College / GJTA Project No./Project Name: EM2624 / Yaeger Structural Stabilization and Repairs
INSTRUCTIONS:
The unit prices below shall be used to determine adjustment to the contract sum when changes in the work involving said items are deemed necessary.
Unit Prices shall apply until the date of contract completion established on the Notice to Proceed.
All unit prices shall include the pro-rata share of all costs of materials, equipment and disposal required to complete the work item. Overhead, profit and bond will be calculated on a Change Order Proposal (SC-6.312).
(Architect/Engineer should complete a brief description below based on their complete description provided in Division 01 of their specification before inserting into the solicitation)
UNIT PRICING
| Number |
| Description |
Unit of Measure
Unit Price
U1
U2
U3
U4
U5
U6
U7
U8
U9
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
SBP-6.131
Rev 7/2025 image1.jpeg
File details come from the government source that posted it. Updated .