Appendix B1-SBP-6.131 Alternates.pdf
PDF 309 KB Posted
- Solicitation number
- IFB1 GJTA 2027000021 1
- Issued by
- Pueblo County, Colorado
About this file
This document is a State of Colorado Office of the State Architect State Buildings Program Bid Alternates form for the EM2624 Yaeger Structural Stabilization and Repairs project at Colorado Northwestern Community College in the GJTA region. The form provides a structured template for bidders to submit pricing for optional work modifications to the base bid. The document outlines procedures for two mutually exclusive alternate bidding approaches: additive alternates, which increase the contract price, and deductive alternates, which decrease the contract price. Bidders are instructed that only one type of alternate may be used per submission, and they must refer to the contract documents for detailed descriptions of each alternate. The form includes designated spaces for up to ten additive alternates (A.A.1 through A.A.10) and ten deductive alternates (D.A.1 through D.A.10), each requiring specification section references and corresponding pricing entries.
The form requires bidders to enter their company name and provide authorized signature and date upon submission. Pricing for each alternate must be clearly stated in the designated fields, as these amounts will modify the base bid if the alternates are accepted. The document references Item #8 in the Instructions to Bidders (SBP-6.12) for supplementary alternate information and directs bidders to review complete contract documents for thorough descriptions of all proposed alternates. This form serves as the official mechanism for capturing and documenting bid alternate pricing in the State Buildings Program procurement process.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Colorado Northwestern Community College / GJTA |
| TextInput.173: EM2624 / Yaeger Structural Stabilization and Repairs |
| TextInput: |
| AA1: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| AA1S: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .