This Request for Proposal from the Transportation Security Administration solicits offers for checked baggage screening equipment deployment services for a five-year period. Services include shipping, rigging, installing, and maintaining large and small screening equipment such as EDS and ETD machines at airports nationwide. Offerors must provide fully burdened labor rates and pricing for equipment shipping and repairs at different distances, as well as for peripherals, installation, storage, and project management. The attached spreadsheet templates define pricing categories and units of measure. Questions regarding this RFP must be submitted using the provided template by the specified due date.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CB Pricing Template - Year 1
| Equipment Type | Shipping (if given greater than 15 business days notice) | Shipping (if given between 3 business days and 15 business days notice) | Urgent Shipping (if given less than 3 business days notice) | Rigging (includes equipment and labor) at CAT X and I airports | Rigging (includes equipment and labor) at CAT II, III, and IV airports | Installation | De-installation (Condition Code X) | De-installation (for all except for Condition Code X) | Packaging/Crating (includes materials and labor) | Temporary Storage at CAT X and I airports | Temporary Storage at CAT II, III, and IV airports | |||||||||||
| Large Screening Equipment | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | For 1-2 Units | Price | For 1-2 Units | Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Reduced Size EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2+ units | 2+ units | 2+ units | 2+ units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Medium and High Speed EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2 units | 2 units | 2 units | 2 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Small Screening Equipment | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| ETD | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||||
| 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||||
| 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | ||||||||||||||||
| FF&E (see definitions on next tab) | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Lightweight Parts | 1 unit | 1 unit | 1 unit | |||||||||||||||||||
| 2 - 20 units | 2 - 20 units | 2 - 20 units | ||||||||||||||||||||
| 21 - 50 units | 21 - 50 units | 21 - 50 units | ||||||||||||||||||||
| 51+ units | 51+ units | 51+ units | ||||||||||||||||||||
| Heavy Parts | 1 unit | 1 unit | 1 unit | all parts for project, daily price | all parts for project, daily price | 1 unit | 1 unit | 1 unit | 1 unit | |||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | ||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | ||||||||||||||||
| Furniture | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | |||||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | |||||||||||||||||||
| UPS associated with Medium and High Speed EDS | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 units | 2 units | 2 units | 2 - 4 units |
| Additional Fixed Rates | ||
| Description of Services | Unit | Unit Price/Rate |
| Reimbursement agreement Invoice review | Hourly | |
| Site Design - CAD | Hourly | |
| Site Lead - Inline | Hourly | |
| Site Lead - Stand-Alone | Hourly |
Page &P
CB Pricing Template - Year 2
| Equipment Type | Shipping (if given greater than 15 business days notice) | Shipping (if given between 3 business days and 15 business days notice) | Urgent Shipping (if given less than 3 business days notice) | Rigging (includes equipment and labor) at CAT X and I airports | Rigging (includes equipment and labor) at CAT II, III, and IV airports | Installation | De-installation (Condition Code X) | De-installation (for all except for Condition Code X) | Packaging/Crating (includes materials and labor) | Temporary Storage at CAT X and I airports | Temporary Storage at CAT II, III, and IV airports | |||||||||||
| Large Screening Equipment | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | For 1-2 Units | Price | For 1-2 Units | Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Reduced Size EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2+ units | 2+ units | 2+ units | 2+ units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Medium and High Speed EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2 units | 2 units | 2 units | 2 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Small Screening Equipment | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| ETD | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||||
| 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||||
| 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | ||||||||||||||||
| FF&E (see definitions on next tab) | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Lightweight Parts | 1 unit | 1 unit | 1 unit | |||||||||||||||||||
| 2 - 20 units | 2 - 20 units | 2 - 20 units | ||||||||||||||||||||
| 21 - 50 units | 21 - 50 units | 21 - 50 units | ||||||||||||||||||||
| 51+ units | 51+ units | 51+ units | ||||||||||||||||||||
| Heavy Parts | 1 unit | 1 unit | 1 unit | all parts for project, daily price | all parts for project, daily price | 1 unit | 1 unit | 1 unit | 1 unit | |||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | ||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | ||||||||||||||||
| Furniture | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | |||||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | |||||||||||||||||||
| UPS associated with Medium and High Speed EDS | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 units | 2 units | 2 units | 2 - 4 units |
| Additional Fixed Rates | ||
| Description of Services | Unit | Unit Price/Rate |
| Reimbursement agreement Invoice review | Hourly | |
| Site Design - CAD | Hourly | |
| Site Lead - Inline | Hourly | |
| Site Lead - Stand-Alone | Hourly |
CB Pricing Template - Year 3
| Equipment Type | Shipping (if given greater than 15 business days notice) | Shipping (if given between 3 business days and 15 business days notice) | Urgent Shipping (if given less than 3 business days notice) | Rigging (includes equipment and labor) at CAT X and I airports | Rigging (includes equipment and labor) at CAT II, III, and IV airports | Installation | De-installation (Condition Code X) | De-installation (for all except for Condition Code X) | Packaging/Crating (includes materials and labor) | Temporary Storage at CAT X and I airports | Temporary Storage at CAT II, III, and IV airports | |||||||||||
| Large Screening Equipment | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | For 1-2 Units | Price | For 1-2 Units | Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Reduced Size EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2+ units | 2+ units | 2+ units | 2+ units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Medium and High Speed EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2 units | 2 units | 2 units | 2 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Small Screening Equipment | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| ETD | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||||
| 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||||
| 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | ||||||||||||||||
| FF&E (see definitions on next tab) | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Lightweight Parts | 1 unit | 1 unit | 1 unit | |||||||||||||||||||
| 2 - 20 units | 2 - 20 units | 2 - 20 units | ||||||||||||||||||||
| 21 - 50 units | 21 - 50 units | 21 - 50 units | ||||||||||||||||||||
| 51+ units | 51+ units | 51+ units | ||||||||||||||||||||
| Heavy Parts | 1 unit | 1 unit | 1 unit | all parts for project, daily price | all parts for project, daily price | 1 unit | 1 unit | 1 unit | 1 unit | |||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | ||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | ||||||||||||||||
| Furniture | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | |||||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | |||||||||||||||||||
| UPS associated with Medium and High Speed EDS | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 units | 2 units | 2 units | 2 - 4 units |
| Additional Fixed Rates | ||
| Description of Services | Unit | Unit Price/Rate |
| Reimbursement agreement Invoice review | Hourly | |
| Site Design - CAD | Hourly | |
| Site Lead - Inline | Hourly | |
| Site Lead - Stand-Alone | Hourly |
CB Pricing Template - Year 4
| Equipment Type | Shipping (if given greater than 15 business days notice) | Shipping (if given between 3 business days and 15 business days notice) | Urgent Shipping (if given less than 3 business days notice) | Rigging (includes equipment and labor) at CAT X and I airports | Rigging (includes equipment and labor) at CAT II, III, and IV airports | Installation | De-installation (Condition Code X) | De-installation (for all except for Condition Code X) | Packaging/Crating (includes materials and labor) | Temporary Storage at CAT X and I airports | Temporary Storage at CAT II, III, and IV airports | |||||||||||
| Large Screening Equipment | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | For 1-2 Units | Price | For 1-2 Units | Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Reduced Size EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2+ units | 2+ units | 2+ units | 2+ units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Medium and High Speed EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2 units | 2 units | 2 units | 2 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Small Screening Equipment | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| ETD | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||||
| 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||||
| 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | ||||||||||||||||
| FF&E (see definitions on next tab) | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Lightweight Parts | 1 unit | 1 unit | 1 unit | |||||||||||||||||||
| 2 - 20 units | 2 - 20 units | 2 - 20 units | ||||||||||||||||||||
| 21 - 50 units | 21 - 50 units | 21 - 50 units | ||||||||||||||||||||
| 51+ units | 51+ units | 51+ units | ||||||||||||||||||||
| Heavy Parts | 1 unit | 1 unit | 1 unit | all parts for project, daily price | all parts for project, daily price | 1 unit | 1 unit | 1 unit | 1 unit | |||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | ||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | ||||||||||||||||
| Furniture | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | |||||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | |||||||||||||||||||
| UPS associated with Medium and High Speed EDS | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 units | 2 units | 2 units | 2 - 4 units |
| Additional Fixed Rates | ||
| Description of Services | Unit | Unit Price/Rate |
| Reimbursement agreement Invoice review | Hourly | |
| Site Design - CAD | Hourly | |
| Site Lead - Inline | Hourly | |
| Site Lead - Stand-Alone | Hourly |
CB Pricing Template - Year 5
| Equipment Type | Shipping (if given greater than 15 business days notice) | Shipping (if given between 3 business days and 15 business days notice) | Urgent Shipping (if given less than 3 business days notice) | Rigging (includes equipment and labor) at CAT X and I airports | Rigging (includes equipment and labor) at CAT II, III, and IV airports | Installation | De-installation (Condition Code X) | De-installation (for all except for Condition Code X) | Packaging/Crating (includes materials and labor) | Temporary Storage at CAT X and I airports | Temporary Storage at CAT II, III, and IV airports | |||||||||||
| Large Screening Equipment | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | per unit, shipping range | Unit Price | For 1-2 Units | Price | For 1-2 Units | Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Reduced Size EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2+ units | 2+ units | 2+ units | 2+ units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Medium and High Speed EDS | 0 - 200 miles | 0 - 200 miles | 0 - 200 miles | Daily | Daily | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||
| 201 - 499 miles | 201 - 499 miles | 201 - 499 miles | ||||||||||||||||||||
| 500 - 1000 miles | 500 - 1000 miles | 500 - 1000 miles | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | Daily (special equpment required, such as Cranes, variable reach forklift, supplemental lift devices) | 2 units | 2 units | 2 units | 2 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||
| 1000 - 2000 miles | 1000 - 2000 miles | 1000 - 2000 miles | ||||||||||||||||||||
| 2000+ miles | 2000+ miles | 2000+ miles | ||||||||||||||||||||
| Small Screening Equipment | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| ETD | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit | 1 unit per week (week 1) | 1 unit per week (week 1) | |||||||||||||
| 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 2 - 4 units | 1 unit per week (week 2 +) | 1 unit per week (week 2 +) | ||||||||||||||
| 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | 5+ units | ||||||||||||||||
| FF&E (see definitions on next tab) | Unit shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Units shipping to the same location | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price | Unit | Unit Price |
| Lightweight Parts | 1 unit | 1 unit | 1 unit | |||||||||||||||||||
| 2 - 20 units | 2 - 20 units | 2 - 20 units | ||||||||||||||||||||
| 21 - 50 units | 21 - 50 units | 21 - 50 units | ||||||||||||||||||||
| 51+ units | 51+ units | 51+ units | ||||||||||||||||||||
| Heavy Parts | 1 unit | 1 unit | 1 unit | all parts for project, daily price | all parts for project, daily price | 1 unit | 1 unit | 1 unit | 1 unit | |||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | ||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | 11+ units | ||||||||||||||||
| Furniture | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 - 10 units | 2 - 10 units | 2 - 10 units | 2 - 10 units | |||||||||||||||||||
| 11+ units | 11+ units | 11+ units | 11+ units | |||||||||||||||||||
| UPS associated with Medium and High Speed EDS | 1 unit | 1 unit | 1 unit | 1 unit | ||||||||||||||||||
| 2 units | 2 units | 2 units | 2 - 4 units |
| Additional Fixed Rates | ||
| Description of Services | Unit | Unit Price/Rate |
| Reimbursement agreement Invoice review | Hourly | |
| Site Design - CAD | Hourly | |
| Site Lead - Inline | Hourly | |
| Site Lead - Stand-Alone | Hourly |
Fully Burdened Labor Rates
| Labor Category - Title | Corresponding Deployment Roles | Minimum Education/Years of Relevant Experience | Description of Responsibilities | Propsoed Fully Burdened Labor Rate |
| Engineer – Level 1 | Project Engineer I | BA/BS + 2 years or MA/MS + 0 years |
Eight years of additional related experience may be substituted for a BA/BS degree.
Degree should be in Engineering, Science, Mathematics
| Under the supervision of engineering personnel, perform technical assignments through to completion. Work with other technical and administrative personnel to assure coordination between groups. Report progress and problems to senior engineering personnel. Other duties as assigned. | |
| Engineer – Level 2 | Project Engineer II |
Scheduler BA/BS + 4 years or MA/MS + 2 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Degree should be in Engineering, Science, Mathematics | Serves as a mid-level engineering resource on a task or tasks. Work with minimal supervision, perform technical assignments as required. Provide assistance and guidance to associate and support staff as required. Report progress and problems to senior engineering personnel. Other duties as assigned. | |
| Engineer – Level 3 | Project Engineer III |
Control Account Manager Electrical Engineer BA/BS + 6 years or MA/MS + 4 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Degree should be in Engineering, Science, Mathematics | Serves as a high level engineering resource on a task or tasks. Supervises a small team of engineers (2-3) depending on the task order scope. Perform technical assignments within the approved schedules and budgets. Coordinate technical and administrative activities with those of other disciplines and other departments. Provide assistance and guidance to lower-classified engineers and design personnel. Report progress and problems to senior engineering personnel. Other duties as assigned. | |
| Engineer – Level 4 | Chief Engineer |
Program Engineer BA/BS + 8 years or MA/MS + 6 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Degree should be in Engineering, Science, Mathematics | Serves as a senior engineering resource on a task or tasks. Supervises a larger team of engineers (5-10) depending on the task order scope. May provide analysis, guidance, and insight into the engineering discipline required to complete the requirements identified in the statement of work. | |
| Manager I | Finance Manager I |
Quality Manager I Enviromental Health and Safety Manager II Material Program Manager Contracts Manager I Airport Lead BA/BS + 8 years or MA/MS + 6 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Serves as a high level functional resource on a task or tasks. Supervises other resources on a task or tasks in a technical and/or managerial role. May provide analysis, guidance, and insight into the discipline required to complete the requirements identified in the statement of work. Provides specific analytical or project support. |
| Manager II |
Quality Manager II Enviromental Health and Safety Manager II Field Engineering Manager Subcontracts Manager Contracts Manager II Finance Manager II
BA/BS + 10 years or MA/MS + 8 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Manages one or more tasks for moderate complexity and staff performing functional, or management activities. May also serve as a functional resource on a task. Apply and supervise others in theory, technology, and technique to solve and execute discipline and functional tasks. Interact with personnel from other disciplines. Review progress, analyze problems and initiate corrective action. Responsible for functional quality assurance. Prepare, analyze, and identify implement recommendations and actions to be taken to achieve task order goals and objectives. Assist program management and provide task-oriented supervision to staff. May provide analysis, guidance, and insight into the discipline required to complete the requirements identified in the statement of work. Provides specific analytical or project support. | ||
| Program Manager I | Program Manager I | |
| Deputy Program Manager | BA/BS + 8 years or MA/MS + 6 years |
Eight years of additional related experience may be substituted for a BA/BS degree.
| Full accountability and authority for leading and managing assigned to Task Orders. Manages one or more tasks for basic to moderately complex task orders. May also serve as a technical resource on a task. Sets Task Order strategy, vision and tactical direction for program execution by multifunctional team(s) and sub-contractors. Acts as primary contact and is responsible for meeting task order commitments including the financial, quality, technology, and schedule performance of assigned program(s) within contractual boundaries, company expectations, and established standards, using the approved business model and management tools. Establishes an executable baseline and manages the task order risk and opportunity. Sets milestones and monitors adherence to task order master plans and schedules. Uses approved control systems and reports that accurately measure progress, identifies potential problems in sufficient time for corrective action to be taken and ensures the meeting of company’s contract commitments. Supervises and integrates the performance of the program Integrated Product Teams. Leads partnerships with internal functional organizations; such as contracts, finance, procurement, manufacturing, quality control, logistics, and administrative functions. Acts as primary customer contact on task order status and performance. | |
| Program Manager II | |
| Program Manager II | BA/BS + 10 years or MA/MS + 8 years |
Eight years of additional related experience may be substituted for a BA/BS degree.
| Full accountability and authority for leading and managing assigned to Task Orders. Manages one or more tasks for complex task orders. May also serve as a technical resource on a task. Sets Task Order strategy, vision and tactical direction for program execution by multifunctional team(s) and sub-contractors. Acts as primary contact and is responsible for meeting task order commitments including the financial, quality, technology, and schedule performance of assigned program(s) within contractual boundaries, company expectations, and established standards, using the approved business model and management tools. Establishes an executable baseline and manages the task order risk and opportunity. Sets milestones and monitors adherence to task order master plans and schedules. Uses approved control systems and reports that accurately measure progress, identifies potential problems in sufficient time for corrective action to be taken and ensures the meeting of company’s contract commitments. Supervises and integrates the performance of the program Integrated Product Teams. Leads partnerships with internal functional organizations; such as contracts, finance, procurement, manufacturing, quality control, logistics, and administrative functions. Acts as primary customer contact on task order status and performance. | |
| Administration | Administrative Assistant I |
| High school, secondary school or equivalent with 6 years of experience. |
| Performs variety of activities in support of functional areas such as finance, purchasing, or human resources or for a specific project/business/technical unit. Gathers, collects, records, tracks and verifies data and information from multiple sources. Compiles, reviews and analyzes data. Uses software for functional area, to compile and generate reports, statistics, timelines, tables, graphs, correspondence and presentations. May design processes to enhance work flow. Provides data and information to others on functional unit processes and procedures. | |
| Project Specialist – Level 1 | Government Property Specialist |
Administrative Assistant II Data Coordinator Subcontracts Requisition Support Subcontracts Quality Assuarance BA/BS + 2 years or MA/MS + 0 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Serves as a functional resource on a task or tasks. Works under direct supervision assists team by contributing analysis, guidance, and insight into a project discipline as part of the project team. Provides specific analytical or project support. | |
| Project Specialist – Level 2 | Subcontracts Administrator |
Financial Analyst I Technical Planner I BA/BS + 4 years or MA/MS + 2 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Serves as an experienced functional resource on a task or tasks. Provides insight into a project discipline either as part of a team or independently. Provides specific analytical or project support. | |
| Project Specialist – Level 3 | Subcontracts Administrator, Senior |
Financial Analyst II Technical Planner II BA/BS + 6 years or MA/MS + 4 years Eight years of additional related experience may be substituted for a BA/BS degree.
| Serves as a mid-level functional resource on a task or tasks. Provides insight into a project discipline either as part of a team or independently. Provides specific analytical or project support. | ||
| Project Specialist – Level 4 | Financial Analyst III | |
| Technical Planner III | BA/BS + 8 years, MA/MS + 6 years |
Eight years of additional related experience may be substituted for a BA/BS degree
| Works to achieve operations targets with major impact on department results. May manage large projects or processes that span outside of immediate job area and work is performed with limited oversight. Responsible for making moderate to significant improvements of processes, systems or products to enhance performance of job area. Problems and issues required detailed information gathering, analysis and investigation to understand the problem and resolution is typically solved through drawing from prior experience and analysis of the issues. Communicates with parties/stakeholders within and outside of job function (i.e. customers and vendors). Requires deep knowledge of job area – typically viewed as having a specialty within discipline. | ||
| Senior Program Manager | IDIQ Program Manager | |
| Construction Engineering Management | BA/BS + 12 years or MA/MS + 10 years |
Eight years of additional related experience may be substituted for a BA/BS degree.
Full accountability and authority for leading and managing the program. Sets program strategy, vision and tactical direction for program execution by multifunctional team(s) and sub-contractors. Acts as primary contact and is responsible for meeting contractual commitments including the financial, quality, technology, and schedule performance of assigned program(s) within contractual boundaries, company expectations, and established standards, using the approved business model and management tools. Establishes an executable baseline and manages the program risk and opportunity, in accordance with specific financial goals and obligations. Sets milestones and monitors adherence to program master plans and schedules. Uses approved control systems and reports that accurately measure progress, identifies potential problems in sufficient time for corrective action to be taken and ensures the meeting of company’s contract commitments. Supervises and integrates the performance of the program Integrated Product Teams. Develops customer and program enhancing partnerships with internal functional organizations; such as contracts, finance, procurement, manufacturing, quality control, logistics, and administrative functions. Acts as primary customer contact on status and performance and anticipates and fulfills customer needs to ensure their satisfaction and continued business.
FF&E definitions
| Pricing group (heavy parts,lightweight parts, and furniture)? | Title (from current Checked Baggage FF&E Guide) | Description (from current Checked Baggage FF&E Guide) |
| lightweight part | 3 1/2" High Channel Guard Rail - 10ft Long (3 1/2"-CH-10ft) | A 3 1/2" high removable fixed guide in 10ft straight increment. |
| lightweight part | 3 1/2" High Channel Guard Rail - 3ft Long (3 1/2"-CH-3ft) | A 3 1/2" high removable fixed guide in 10ft straight increment. |
| lightweight part | 3 1/2" High Channel Guard Rail - 45 Deg-Outside (3 1/2"-CH-45Deg) | A 3 1/2" high removable fixed guide with curved rail to match length of 45 Degree curved roller. |
| lightweight part | 3 1/2" High Channel Guard Rail - 5ft Long (3 1/2"-CH-5ft) | A 3 1/2" high removable fixed guide in 5ft straight increment. |
| lightweight part | 3 1/2" High Channel Guard Rail - 90 Deg-Outside (3 1/2"-CH90Deg) | A 3 1/2" high removable fixed guide with curved rail to match length of 90 Degree curved roller. |
| lightweight part | 6" Turning Wheel (10100-ACC) | A 6” Dia 12” to 42” HYTROL Rubber Turning Wheel with mount hardware. |
heavy part Ball Transfer Table with Cover Plate - 30" x 30", Width -30" (BTT35-30-30) The Ball Transfer Tables with Cover Plate is designed to facilitate quick and easy handling of heavy loads on operations such as the manual rotation and/or correct positioning of products on work stations, and on the convergence of more than two conveyor lines, where bags must be transferred from one line to another. Specifications: 1 in. ball casters; Steel channel frame 3-1/2”x1-1/2”x10ga., 2-1/2”x1”x12ga; Steel cover plate limiting ball exposure to 1/4” above the plate. Dimensions: 30”x30”.
heavy part Ball Transfer Table with Cover Plate - 36" x 36", Width -36" (BTT35-36-36) The Ball Transfer Tables with Cover Plate is designed to facilitate quick and easy handling of heavy loads on operations such as the manual rotation and/or correct positioning of products on work stations, and on the convergence of more than two conveyor lines, where bags must be transferred from one line to another. Specifications: 1 in. ball casters; Steel channel frame 3-1/2”x1-1/2”x10ga., 2-1/2”x1”x12ga; Steel cover plate limiting ball exposure to 1/4” above the plate. Dimensions: 36”x36”.
| lightweight part | Carolina - Anti-fatigue mat 2’x3’ | These mats are made of 100% single piece molded Polyurethane sponge with a non-slip top surface and beveled edges on all four sides for trip prevention. All surfaces are sealed to prevent absorption of cleaning fluids and other liquids. Thickness: 9/16” – 5/8” overall (combined sponge and tread surface thickness). Color: Black with yellow borders around the 4 sides. Size: 2’x3'. |
| lightweight part | Carolina - Anti-fatigue mat 3’x12’ | These mats are made of 100% single piece molded Polyurethane sponge with a non-slip top surface and beveled edges on all four sides for trip prevention. All surfaces are sealed to prevent absorption of cleaning fluids and other liquids. Thickness: 9/16” – 5/8” overall (combined sponge and tread surface thickness). Color: Black with yellow borders around the 4 sides. Size: 3’x12'. |
| lightweight part | Carolina - Anti-fatigue mat 3’x5’ | These mats are made of 100% single piece molded Polyurethane sponge with a non-slip top surface and beveled edges on all four sides for trip prevention. All surfaces are sealed to prevent absorption of cleaning fluids and other liquids. Thickness: 9/16” – 5/8” overall (combined sponge and tread surface thickness). Color: Black with yellow borders around the 4 sides. Size: 3’x5'. |
| lightweight part | Carolina - Anti-fatigue mat 3’x8’ | These mats are made of 100% single piece molded Polyurethane sponge with a non-slip top surface and beveled edges on all four sides for trip prevention. All surfaces are sealed to prevent absorption of cleaning fluids and other liquids. Thickness: 9/16” – 5/8” overall (combined sponge and tread surface thickness). Color: Black with yellow borders around the 4 sides. Size: 3’x8'. |
| furniture | Cramer - EDS Chair Standard (**max 350 lbs**) (black) | The EDS chairs offer a wide variety of ergonomic functions and adjustments. They contain urethane fabric with adjustable arms, seat, back and height. The chairs are on casters. Standard EDS Chair: 350lb max (Black), Seat (20”W x 19.5D), Back (15”W x 15”D). |
| furniture | Cramer - EDS Chair XL (**max 500 lbs**) (black) | The EDS chairs offer a wide variety of ergonomic functions and adjustments. They contain urethane fabric with adjustable arms, seat, back and height. The chairs are on casters. X-Large EDS Chair, 500lb max (Black), Seat (23”W x 20”D), Back (18”W x 18”D). |
| lightweight part | Edge Bump Guard - 3 FT (Bump Guard) | Frame neoprene or equiv. edge bumper with cushioned frame insert |
to fit conveyor frame. Length: 3ft.
lightweight part Edge Bump Guard - 5 FT (Bump Guard) Frame neoprene or equiv. edge bumper with cushioned frame insert to fit conveyor frame. Length: 5ft.
| lightweight part | Edge Guard (Black) (MM-8451A45-10) | A black 10ft roll. |
| furniture | ETD Cabinet | The Explosive Trace Detector cabinet is 57 ¾ ” H x 33 ½ ”W x 30 9/16“D. The top portion of the cabinet contains (1) sliding shelves. The cabinet doors can be locked and the cabinet sits on (4) casters. |
| furniture | ETD Table (TSACPSTABLE28) | The Explosive Trace Detector search table is a reinforced steel table with casters for portability. The table has adjustable legs, a power strip and an under table drawer. The table is fully assembled when shipped. Dimensions: 48”W x 30”D x 28”H. |
| heavy part | Flexible Roller Conveyor – Length - 14' , Width -24" (RLS24012S-14') | The 14ft Flexible Roller Conveyor is eight feet (8') compressed and fourteen feet (14') fully extended. Overall width: 24”. |
| heavy part | Flexible Roller Conveyor - Length - 14' , Width -30" (RLS30012S-14') | The 14ft Flexible Roller Conveyor is eight feet (8') compressed and fourteen feet (14') fully extended. Overall width: 30”. |
| heavy part | Flexible Roller Conveyor – Length - 8' , Width -24" (RLS24012S-8') | The 8ft Flexible Roller Conveyor is four feet (4') compressed and eight feet (8') fully extended. Overall width: 24”. |
| heavy part | Flexible Roller Conveyor – Length - 8' , Width -30" (RLS30012S-8') | The 8ft Flexible Roller Conveyor is four feet (4') compressed and eight feet (8') fully extended. Overall width: 24”. |
| heavy part | Gate Support Legs RS-2 13-3/4"-16-3/4" TOR (RS-2), Width 24" | Gate Support Legs (13-3/4"-16-3/4") - width 24" (in increments to match roller conveyors, lift gates and ball transfer tables). |
heavy part Gate Support Legs RS-2 13-3/4"-16-3/4" TOR (RS-2), Width 26" Gate Support Legs (13-3/4"-16-3/4") - width 26" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-2 13-3/4"-16-3/4" TOR (RS-2), Width 28" Gate Support Legs (13-3/4"-16-3/4") - width 28" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-2 13-3/4"-16-3/4" TOR (RS-2), Width 30" Gate Support Legs (13-3/4"-16-3/4") - width 30" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-2 13-3/4"-16-3/4" TOR (RS-2), Width 34" Gate Support Legs (13-3/4"-16-3/4") - width 34" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-2 13-3/4"-16-3/4" TOR (RS-2), Width 36" Gate Support Legs (13-3/4"-16-3/4") - width 36" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-3 16-3/8"-19-3/8" TOR (RS-3), Width 24" Gate Support Legs (16-3/8"-19-3/8") - width 24" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-3 16-3/8"-19-3/8" TOR (RS-3), Width 26" Gate Support Legs (16-3/8"-19-3/8") - width 26" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-3 16-3/8"-19-3/8" TOR (RS-3), Width 28" Gate Support Legs (16-3/8"-19-3/8") - width 28" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-3 16-3/8"-19-3/8" TOR (RS-3), Width 30" Gate Support Legs (16-3/8"-19-3/8") - width 30" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-3 16-3/8"-19-3/8" TOR (RS-3), Width 34" Gate Support Legs (16-3/8"-19-3/8") - width 34" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-3 16-3/8"-19-3/8" TOR (RS-3), Width 36" Gate Support Legs (16-3/8"-19-3/8") - width 36" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-4 19-3/8"-25-3/8" TOR (RS-4), Width 24" Gate Support Legs (19-3/8"-25-3/8") - width 24" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-4 19-3/8"-25-3/8" TOR (RS-4), Width 26" Gate Support Legs (19-3/8"-25-3/8") - width 26" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-4 19-3/8"-25-3/8" TOR (RS-4), Width 28" Gate Support Legs (19-3/8"-25-3/8") - width 28" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-4 19-3/8"-25-3/8" TOR (RS-4), Width 30" Gate Support Legs (19-3/8"-25-3/8") - width 30" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-4 19-3/8"-25-3/8" TOR (RS-4), Width 34" Gate Support Legs (19-3/8"-25-3/8") - width 34" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-4 19-3/8"-25-3/8" TOR (RS-4), Width 36" Gate Support Legs (19-3/8"-25-3/8") - width 36" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-5 23-3/8"-29-3/8" TOR (RS-5), Width 24" Gate Support Legs (23-3/8"-29-3/8") - width 24" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-5 23-3/8"-29-3/8" TOR (RS-5), Width 26" Gate Support Legs (23-3/8"-29-3/8") - width 26" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-5 23-3/8"-29-3/8" TOR (RS-5), Width 28" Gate Support Legs (23-3/8"-29-3/8") - width 28" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-5 23-3/8"-29-3/8" TOR (RS-5), Width 30" Gate Support Legs (23-3/8"-29-3/8") - width 30" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-5 23-3/8"-29-3/8" TOR (RS-5), Width 34" Gate Support Legs (23-3/8"-29-3/8") - width 34" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-5 23-3/8"-29-3/8" TOR (RS-5), Width 36" Gate Support Legs (23-3/8"-29-3/8") - width 36" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-6 27-3/8"-39-3/8" TOR (RS-6), Width 24" Gate Support Legs (27-3/8"-39-3/8") - width 24" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-6 27-3/8"-39-3/8" TOR (RS-6), Width 26" Gate Support Legs (27-3/8"-39-3/8") - width 26" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-6 27-3/8"-39-3/8" TOR (RS-6), Width 28" Gate Support Legs (27-3/8"-39-3/8") - width 28" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-6 27-3/8"-39-3/8" TOR (RS-6), Width 30" Gate Support Legs (27-3/8"-39-3/8") - width 30" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-6 27-3/8"-39-3/8" TOR (RS-6), Width 34" Gate Support Legs (27-3/8"-39-3/8") - width 34" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-6 27-3/8"-39-3/8" TOR (RS-6), Width 36" Gate Support Legs (27-3/8"-39-3/8") - width 36" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-7 37-3/8"-49-3/8" TOR (RS-7), Width 24" Gate Support Legs (37-3/8"- 49-3/8") - width 24" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-7 37-3/8"-49-3/8" TOR (RS-7), Width 26" Gate Support Legs (37-3/8"- 49-3/8") - width 26" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-7 37-3/8"-49-3/8" TOR (RS-7), Width 28" Gate Support Legs (37-3/8"- 49-3/8") - width 28" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-7 37-3/8"-49-3/8" TOR (RS-7), Width 30" Gate Support Legs (37-3/8"- 49-3/8") - width 30" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-7 37-3/8"-49-3/8" TOR (RS-7), Width 34" Gate Support Legs (37-3/8"- 49-3/8") - width 34" (in increments to match roller conveyors, lift gates and ball transfer tables).
heavy part Gate Support Legs RS-7 37-3/8"-49-3/8" TOR (RS-7), Width 36" Gate Support Legs (37-3/8"- 49-3/8") - width 36" (in increments to match roller conveyors, lift gates and ball transfer tables).
| heavy part | Power Mobile Lift Table/Electronic Baggage Cart | These electro-hydraulic scissor lift tables are portable and are used to transport passenger baggage within TSA’s screening areas. They minimize the need to lift and carry heavy baggage. |
| heavy part | Rigid Gravity Roller Conveyor - Length - 10ft, Width -24" (19GSR-24-10ft) | The Rigid Gravity Roller Conveyors have side frames three and one half inches (3 1/2"), 10 gauge formed steel, dark grey baked powder coated finish, 1.9" dia. 16 gauge Zinc roller 3" axle centers with 7/16" spring loaded hex shaft, sealed bearings oiled or grease, rollers set high. |
Minimum conveyor live load capacity of three hundred pounds (300lb) per linear foot. Specifications: Frame: 3-1/2” or 4-1/2” deep x 1-1/2” flange x 10 ga. powder painted formed steel channel with bolt-in cross members; Butt couplings: Bolt-on type for bolting sections together; Rollers: 19-SR 1.9 in. dia. x 16 ga. unplated o galvanized steel tubing; 199-SR 1.9 in. dia. X 9 ga. unplated steel tubing. Bearings are labyrinth sealed and grease packed; Axles: 7/16 in. hex shaft, spring loaded. Dimensions: Length - 10ft straight section, Overall width: 24".
heavy part Rigid Gravity Roller Conveyor - Length - 10ft, Width -26" (19GSR-26-10ft) The Rigid Gravity Roller Conveyors have side frames three and one half inches (3 1/2"), 10 gauge formed steel, dark grey baked powder coated finish, 1.9" dia. 16 gauge Zinc roller 3" axle centers with 7/16" spring loaded hex shaft, sealed bearings oiled or grease, rollers set high.
Minimum conveyor live load capacity of three hundred pounds (300lb) per linear foot. Specifications: Frame: 3-1/2” or 4-1/2” deep x 1-1/2” flange x 10 ga. powder painted formed steel channel with bolt-in cross members; Butt couplings: Bolt-on type for bolting sections together; Rollers: 19-SR 1.9 in. dia. x 16 ga. unplated o galvanized steel tubing; 199-SR 1.9 in. dia. X 9 ga. unplated steel tubing. Bearings are labyrinth sealed and grease packed; Axles: 7/16 in. hex shaft, spring loaded. Dimensions: Length - 10ft straight section, Overall width: 26".
heavy part Rigid Gravity Roller Conveyor - Length - 10ft, Width -28" (19GSR-28-10ft) The Rigid Gravity Roller Conveyors have side frames three and one half inches (3 1/2"), 10 gauge formed steel, dark grey baked powder coated finish, 1.9" dia. 16 gauge Zinc roller 3" axle centers with 7/16" spring loaded hex shaft, sealed bearings oiled or grease, rollers set high.
Minimum conveyor live load capacity of three hundred pounds (300lb) per linear foot. Specifications: Frame: 3-1/2” or 4-1/2” deep x 1-1/2” flange x 10 ga. powder painted formed steel channel with bolt-in cross members; Butt couplings: Bolt-on type for bolting sections together; Rollers: 19-SR 1.9 in. dia. x 16 ga. unplated o galvanized steel tubing; 199-SR 1.9 in. dia. X 9 ga. unplated steel tubing. Bearings are labyrinth sealed and grease packed; Axles: 7/16 in. hex shaft, spring loaded. Dimensions: Length - 10ft straight section, Overall width: 28".
heavy part Rigid Gravity Roller Conveyor - Length - 10ft, Width -30" (19GSR-30-10ft) The Rigid Gravity Roller…