This Request for Proposal from the Transportation Security Administration seeks screening equipment deployment services for checked baggage systems. Vendors are invited to submit proposals to provide explosive detection systems, as well as installation, integration, networking, upgrades, testing, relocation, deinstallation, decommissioning, and reinstallation services for multiple CTX-9800 units across various airport locations. Proposals are due by an unspecified date. The contract period and pricing terms were not disclosed in the provided documentation.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLIS
Transportation Security Administration Explosive Detection System (EDS) TSA Site Lead Input Sheet (SLIS) EBSP Checked Baggage Systems
| Form Version: 3/10/16 | ||||
| For Multiple Vendors or Terminal Locations Complete a Separate SLIS for each Vendor or each Location. | ||||
| Use the comments section at the end of this document for any additional entries. | ||||
| Do not insert additional rows or columns | ||||
| Project Description (e.g. Install, Integrate, and Network (3) CTX-9800s at LAX T4): | ||||
| Initial Submission Date: | ReMag #s: | |||
| Revision Date: | Revision Number: | |||
| General Information | Lodging | IE | ||
| Selecting Airport Code will auto populate the Airport Name, City, and State | ||||
| EDS Manufacturer (Dropdown): | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | |
| Airport Code (Dropdown): | ||||
| CBIS Type (Dropdown): | Project City: | ERROR:#N/A | ||
| Integration Type (Dropdown): | State: | ERROR:#N/A | ||
| Project Name / Terminal / Location / Zone: | ||||
| Scope of Services | ||||
| List Project Details under "Primary Work to be Performed" Use the "Secondary Work to be Performed" fields when additional work is required (e.g. A project requires an EDS install and decom: EDS install info. is entered as the Primary Scope, and the decom is the Secondary Scope) | ||||
| Primary Work to be Performed | Secondary Work to be Performed | |||
| Model (Dropdown): | Model (Dropdown): | |||
| Number of EDS Units: | Number of EDS Units: | |||
| Installation: | Installation: | |||
| Integration: | Integration: | |||
| Multiplex Networking: | Multiplex Networking: | |||
| Upgrade: | Upgrade: | |||
| Testing: | Testing: | |||
| Relocation: | Relocation: | |||
| Deinstallation (Code X): | Deinstallation (Code X): | |||
| Decommission (Code4): | Decommission (Code 4): | |||
| Reinstallations: | Reinstallations: | |||
| List any additional work or upgrades: | ||||
| Facility Modification Information | ||||
| OTA Number: | TBD | |||
| Current Design Level (Dropdown): | 100% | |||
| EDS Equipment Delivery / Install / Testing Schedule / Milestone Schedule | ||||
| Requested Pre-Planning Meeting (Site walk-through) Date: | ||||
| Construction Start Date: | ||||
| Power Available Date: | ||||
| Network Install Date: | ||||
| Use "Unit 1" section when all EDS have the same dates. When EDS dates vary by unit or phase, enter dates from "Unit 1" through "Unit 10" respectively | ||||
| Are any EDS units Installed/Operational at the site?: | Yes | |||
| Unit 1 (Use if all EDS have the same dates) | Unit 2 | |||
| Serial Number(s): |
Biggs, Andrew <CTR>: Enter all serial numbers in this cell if all dates are the same. (Separate with a comma)
| Serial Number: | |||||||||||||||||||||||||||||||||||||||||||||||||
| EDS Delivery Date: | EDS Delivery Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Installation Date: | Installation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| SAT Date: | SAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| TRR Date: | TRR Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| iSAT Date: | iSAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Live Bag Screening: | Live Bag Screening: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Relocation or Reinstallation Date: | Requested Relocation or Reinstallation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Deinstallation (Code X) Date: | Requested Deinstallation (Code X) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Decom (Code 4) Date: | Requested Decom (Code 4) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Unit 3 | Unit 4 | ||||||||||||||||||||||||||||||||||||||||||||||||
| Serial Number(s): | Serial Number: | ||||||||||||||||||||||||||||||||||||||||||||||||
| EDS Delivery Date: | EDS Delivery Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Installation Date: | Installation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| SAT Date: | SAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| TRR Date: | TRR Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| iSAT Date: | iSAT Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Live Bag Screening: | Live Bag Screening: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Relocation or Reinstallation Date: | Requested Relocation or Reinstallation Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Deinstallation (Code X) Date: | Requested Deinstallation (Code X) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Requested Decom (Code 4) Date: | Requested Decom (Code 4) Date: | ||||||||||||||||||||||||||||||||||||||||||||||||
| Unit 5 | Unit 6 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | Unit 3 | Unit 4 | ||||||||||||||||||||||||
| Serial Number(s): | Serial Number: | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 | Serial Number(s): | TBD | Serial Number: | G485 |