This document includes a schedule of material submittals and details of a federal contract opportunity to renovate Building 1334 at Moron Air Base in Spain. The project value is between $500,000 and $1,000,000. A pre-proposal conference will be held on August 13, 2020, with questions due by August 19, 2020 and proposals due by August 31, 2020. The schedule of material submittals lists 14 required submittals including a warranty letter, construction schedule, progress schedule, work plan, mobility plan, project sign, quality control plan, environmental protection plan, waste management plan, as-built drawings, health and safety plan, key staff, and design-build schedules. Spanish material, labor, and equipment must be utilized where feasible and consistent with requirements. Funding is not presently available and no award will be made until funds are received.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement of Work R1_ English SC ALT BDOC v.3 27 Aug 2020.pdf | ||
| Solicitation Amendment FA557520R00030002 SF_30.pdf | ||
| Cost Estimate ALT BDOC -KTR v.3 27 Aug 2020.xlsx | XLSX spreadsheet | |
| Content of Revision Redacted.pdf | ||
| Solicitation Amendment FA557520R00030001 SF 30.pdf | ||
| Solicitation FA557520R0003.pdf | ||
| Drawings Cons Space Operations Center 2 of 2.pdf | ||
| Attch A - Integrated Natural Resources Management Plan for Moron Air Base.pdf | ||
| Attch B - Final Governing Standards for Spain_ May 2014.pdf | ||
| Cost Estimate ALT BDOC.xlsx | XLSX spreadsheet | |
| Statement of Work English_ALT BDOC_23 Jun 20.pdf | ||
| Attch C Architectural Compatibility Plan-Dec19.pdf | ||
| Concept Drawings 1 of 2.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 10-1017 | PROJECT TITLE |
RENOVATE BDOC B1334
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| PART 11 -GENERAL CONDITIONS | |||
| 01 | Warranty letter | 4 | Acceptance+15 |
| 02 | Construction Schedule | CNTP+7 | |
| 03 | Progress Schedule | 4 | CNTP+10 |
| 04 | Work Plan | CNTP+7 | |
| 05 | Mobility Plan | 4 | CNTP+15 |
| 06 | Project Sign | CNTP+15 | |
| 07 | Quality Control Plan | 4 | CNTP+15 |
| 08 | Environmental Protection Plan | 4 | CNTP+15 |
| 09 | DD Form 1354 | 4 | FI+15 |
| 10 | Waste & construction debris management | 4 | Final Inspection |
| 11 | As-Built drawings | 4 | FI+15 |
| 12 | Spatial Data | 4 | As Built+10 |
| 13 | Key Staff | 4 | DNTP+15 |
| 14 | Health and safety Plan | 4 | CNTP +15 |
| PART 12 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES | |||
| 15 | Design-Build Schedule | 1 | DNTP+10 |
| 16 | Monthly Updates | 1 | Every 1st of month |
| DB Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N