Schedule of Material Submittals.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Renovate BDOC 1334 Federal contract opportunity
Solicitation number
FA557520R0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document includes a schedule of material submittals and details of a federal contract opportunity to renovate Building 1334 at Moron Air Base in Spain. The project value is between $500,000 and $1,000,000. A pre-proposal conference will be held on August 13, 2020, with questions due by August 19, 2020 and proposals due by August 31, 2020. The schedule of material submittals lists 14 required submittals including a warranty letter, construction schedule, progress schedule, work plan, mobility plan, project sign, quality control plan, environmental protection plan, waste management plan, as-built drawings, health and safety plan, key staff, and design-build schedules. Spanish material, labor, and equipment must be utilized where feasible and consistent with requirements. Funding is not presently available and no award will be made until funds are received.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 10-1017PROJECT TITLE

RENOVATE BDOC B1334

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

PART 11 -GENERAL CONDITIONS
01Warranty letter4Acceptance+15
02Construction ScheduleCNTP+7
03Progress Schedule4CNTP+10
04Work PlanCNTP+7
05Mobility Plan4CNTP+15
06Project SignCNTP+15
07Quality Control Plan4CNTP+15
08Environmental Protection Plan4CNTP+15
09DD Form 13544FI+15
10Waste & construction debris management4Final Inspection
11As-Built drawings4FI+15
12Spatial Data4As Built+10
13Key Staff4DNTP+15
14Health and safety Plan4CNTP +15
PART 12 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES
15Design-Build Schedule1DNTP+10
16Monthly Updates1Every 1st of month
DB Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

File details come from the government source that posted it. Updated .