This document provides details for a federal contract solicitation to renovate Building 1334 at Moron Air Base in Spain. The project scope includes design services, basic renovation work, and three additive options. The estimated value is between $500,000 and $1,000,000. A pre-proposal conference will be held on August 13, with questions due by August 19 and proposals due by August 31. In accordance with the defense cooperation agreement between the US and Spain, Spanish labor, materials, and equipment must be utilized where feasible. The solicitation is subject to fund availability, and the government reserves the right to cancel with no obligation. The contracting agency is the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA557520R00030002 SF_30.pdf | ||
| Statement of Work R1_ English SC ALT BDOC v.3 27 Aug 2020.pdf | ||
| Cost Estimate ALT BDOC -KTR v.3 27 Aug 2020.xlsx | XLSX spreadsheet | |
| Content of Revision Redacted.pdf | ||
| Solicitation Amendment FA557520R00030001 SF 30.pdf | ||
| Solicitation FA557520R0003.pdf | ||
| Concept Drawings 1 of 2.pdf | ||
| Attch B - Final Governing Standards for Spain_ May 2014.pdf | ||
| Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| Drawings Cons Space Operations Center 2 of 2.pdf | ||
| Attch A - Integrated Natural Resources Management Plan for Moron Air Base.pdf | ||
| Statement of Work English_ALT BDOC_23 Jun 20.pdf | ||
| Attch C Architectural Compatibility Plan-Dec19.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DSN
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| MORÓN AIR BASE, SPAIN | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| RENOVATE BDOC B1334 (DESIGN) | DSN | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| QUUG 10-1017 | MORÓN AIR BASE, SPAIN | ||||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | ||||||||
| LIN | ITEM | OF | DIRECT | LINE | |||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| DESIGN SERVICES | |||||||||||
| SERVICIOS DE REDACCIÓN DE PROYECTO | |||||||||||
| 1 | 35% Design Submission | ||||||||||
| Presentación del Diseño al 35% | Ea | ||||||||||
| 2 | 65% Design Submission | 0.00 | |||||||||
| Presentación del Diseño al 65% | Ea | ||||||||||
| 3 | 95% Design Submission | ||||||||||
| Presentación del Diseño al 95% | Ea | ||||||||||
| 4 | 100% Design Submission | ||||||||||
| Presentación del Diseño al 100% | Ea | ||||||||||
| DESIGN SERVICES TOTAL | |||||||||||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONSTRUCTION COST BREAKDOWN &"Times New Roman,Regular"Page &P of &N
BASIC PACKAGE
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE BDOC B1334 (BASIC PACKAGE) | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1017 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BLDG #1334 | ||||||||||
| EDIF #1334 | ||||||||||
| Miscellaneous | ||||||||||
| Varios | ||||||||||
| 1 | Transportation and Installation of Portable Armory (ARMAG) | |||||||||
| Transporte e instalación de armería portátil | JOB | LS | ||||||||
| 2 | Installation of Overhang and Clearing Barrel | |||||||||
| Instalación de marquesina y barril de descarga de armas | JOB | LS | ||||||||
| 3 | Sidewalk for ARMAG | |||||||||
| Acerado para ARMAG | JOB | LS | ||||||||
| Total Miscellaneous | ||||||||||
| Total Varios | ||||||||||
| Architectural Repair Works | ||||||||||
| Trabajos de Reparación de Arquitectura | ||||||||||
| 4 | Demolitiopn and Disposal of Architectural Works | |||||||||
| Demolición y gestión de Trabajos de Arquitectura | JOB | LS | ||||||||
| 5 | Improve interior finishes for new funtioning spaces | |||||||||
| Mejora de acabados para nuevos espacios funcionales | JOB | LS | ||||||||
| 6 | Repair exterior metal doors and provide new hardware | |||||||||
| Reparar puertas exteriores metálicas y proveer cerrajería | JOB | LS | ||||||||
| 7 | Provide and install partitions | |||||||||
| Proveer e instalar particiones | JOB | LS | ||||||||
| 8 | Provide and intall Standard Interior Doors & Fire Rated doors | |||||||||
| Proveer/instalar puertas interiores estandards y puertas RF | JOB | LS | ||||||||
| 9 | Provide and iinstall ATC ceiling | |||||||||
| Proveer e instalar techo acústico | JOB | LS | ||||||||
| 10 | Repair by replacing access floor | |||||||||
| Reparar reemplazando suelo técnico | JOB | LS | ||||||||
| 11 | Repair and patching roof slab exposed surfaces | |||||||||
| Reparar emparchar superficies expuestas de forjado de cubierta | JOB | LS | ||||||||
| 12 | Repair roof tiles, gutters and dowspout | |||||||||
| Reparar tejas de cubiertas, canalones y bajantes | JOB | LS | ||||||||
| 13 | Provide and install a certified fall arresting system | |||||||||
| Proveer e instalar un sistema anticaidas certificado | JOB | LS | ||||||||
| 14 | Repair and reseal sidewalk | |||||||||
| Reparar y resellar aceras de hormigón | JOB | LS | ||||||||
| Total Architectural Repair Works | ||||||||||
| Total Trabajos de Reparación de Arquitectura |
| Mechanical Repair Works | |||
| Trabajos de Reparación Mecánicos | |||
| 15 | Demolition and Disposal of Mechanical Installations | ||
| Demolición y gestión instalaciones mecánicas | JOB | LS | |
| 16 | Renovate HVAC systems | ||
| Renovar sistemas de ventilación, calefacción y aire acondicionado | JOB | LS | |
| 17 | Fire Suppression System | ||
| Sistema de extinción de incendios | JOB | 1.00 | |
| 18 | Water Supply for Fire Suppression System | ||
| Suministro de agua para sistema de extinción de incendios | JOB | 1.00 | |
| Total Mechanical Repair Works | |||
| Total Trabajos de Reparación Mecánicos |
| Electrical Repair Works | ||
| Trabajos de Reparación Electricos | ||
| 19 | Demolition and disposal elec installation | |
| Demolición y Tto de instal. eléctrica | JOB | |
| 20 | Replace interior and ext. lighting | |
| Reemplazar sistema de iluminación int. y ext. | JOB | |
| 21 | Replace electrical distribution system | |
| Reemplazar sistema de distribución eléctrica | JOB | |
| 22 | Replace/Upgrade Lightning Protection System | |
| Reemplazar/Mejorar Sist. Protección frente al Rayo | JOB | |
| 23 | Install new FACP System and new MNS | |
| Instalar nuevos sist. alarma contraincendios y de notificación masiva | JOB | |
| 24 | Replace service lines | |
| Sustituir acometidas | JOB | |
| 25 | Renovate Comm installation | |
| Renovar instalación de comunicaciones | JOB | |
| Total Electrical Repair Works | ||
| Total Trabajos de Reparación Eléctricos |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Miscellaneous |
| Varios |
| Total Architectural Repair Works |
| Total Trabajos de Reparación de Arquitectura |
| Total Mechanical Repair Works |
| Total Trabajos de Reparación Mecánicos |
| Total Electrical Repair Works |
| Total Trabajos de Reparación Eléctricos |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONSTRUCTION COST BREAKDOWN &"Times New Roman,Regular"Page &P of &N
ADD ITEM 1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE BDOC B1334 (ADDITIVE ITEM 1) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1017 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BLDG #1334 | ||||||||||
| EDIF #1334 | ||||||||||
| Architectural Repair Works | ||||||||||
| Trabajos de Reparación de Arquitectura | ||||||||||
| 1 | Reorganize kitchen countrtop and cabinet | |||||||||
| Reorganizar encimera de cocina y mobiliario | JOB | |||||||||
| 2 | Repair and reseal sidewalk | |||||||||
| Reparar y resellar aceras de hormigón | JOB | |||||||||
| Total Architectural Repair Works | ||||||||||
| Total Trabajos de Reparación de Arquitectura |
| Mechanical Repair Works | ||
| Trabajos de Reparación Mecánicos | ||
| 3 | Replace Toilet/Kitchen Fixtures | |
| Reemplazar accesorios de aseo y cocina | JOB | |
| Total Mechanical Repair Works | ||
| Total Trabajos de Reparación Mecánicos |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Total Architectural Repair Works |
| Total Trabajos de Reparación de Arquitectura |
| Total Mechanical Repair Works |
| Total Trabajos de Reparación Mecánicos |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONSTRUCTION COST BREAKDOWN &"Times New Roman,Regular"Page &P of &N
ADD ITEM 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE BDOC B1334 (ADDITIVE ITEM 2) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1017 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BLDG #1334 | ||||||||||
| EDIF #1334 | ||||||||||
| Electrical Repair Works | ||||||||||
| Trabajos de Reparación Electricos | ||||||||||
| 1 | New Emergency Generator w/ATS | |||||||||
| Nuevo Grupo Electrógeno y Conmutaor Automático | ||||||||||
| Total Electrical Repair Works | ||||||||||
| Total Trabajos de Reparación Eléctricos |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Total Electrical Repair Works |
| Total Trabajos de Reparación Eléctricos |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONSTRUCTION COST BREAKDOWN &"Times New Roman,Regular"Page &P of &N
ADD ITEM 3
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE BDOC B1334 ADD ITEM 3 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1017 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BLDG #1334 | ||||||||||
| EDIF #1334 | ||||||||||
| Architectural Repair Works | ||||||||||
| Trabajos de Reparación de Arquitectura | ||||||||||
| 1 | Demolish sidewalk, manhole and exterior light fixtures | |||||||||
| Demoler acerdo, arqueta y luminarias exteriores | JOB | |||||||||
| 2 | Earth movement and soil improvement for slab on grade | |||||||||
| Movimientos de tierra y mejora de suelo para losa armada | sm | |||||||||
| 3 | Construct 25 cm thick concrete slab with doweled connection | |||||||||
| Construir losa de 25 cm espesor conectada con dovelas | sm | |||||||||
| 4 | Load, haul and install portable ARMAG to new Base location | |||||||||
| Cargar, transportar e installar ARMAG portátil a nuevo sitio | JOB | |||||||||
| 5 | Install concrete curb around the ARMAG and seal joint | |||||||||
| Instalar bordillo de hormigón alrededor del ARMAG y sellar | lm | |||||||||
| 6 | Construct insulated metal panel canopy | |||||||||
| Construir marquesina de panel sandwinch | sm | |||||||||
| 7 | Demolish interior insulation, timber paneling and ligth fixtures | |||||||||
| Demoler aislamiento, tablazón paneles y luminarias | sm | |||||||||
| 8 | Scrape paint from metal surfaces | |||||||||
| Decapar pintura de superficies metalicas | sm | |||||||||
| 9 | Metal surface treatment and painting | |||||||||
| Tratamiento de superficies metálicas y pintura | sm | |||||||||
| 10 | Interior wall covering plywood, insulation, timber & plywood | |||||||||
| Revestimiento interior contrachapado aislam tablazón y contr | sm | |||||||||
| 11 | Interior floor 2 planks, plywood and vinyl finishes | |||||||||
| Suelo interior con 2 tablazones, plywood y suelo vinílico | sm | |||||||||
| 12 | Separate, treat and transport waste to authorized damp | |||||||||
| Separar, tratar y enviar residuos a vertedero autorizado | cm | |||||||||
| Total Architectural Repair Works | ||||||||||
| Total Trabajos de Reparación de Arquitectura |
| Electrical Repair Works | |
| Trabajos de Reparación Electricos | |
| 1 | New electrical service line for ARMAG |
| Nueva acometida eléctrica para ARMAG | |
| 2 | Provide grounding, bonding and LPS for ARMAG |
| Proveer puesta a tierra y sistem pararrayos para ARMAG | |
| 3 | Replace armory container lighting fixtures and acc. |
| Reemplazar luminarias y acc. De contenedor de armas. | |
| Total Electrical Repair Works | |
| Total Trabajos de Reparación Eléctricos |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Total Architectural Repair Works |
| Total Trabajos de Reparación de Arquitectura |
| Total Electrical Repair Works |
| Total Trabajos de Reparación Eléctricos |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONSTRUCTION COST BREAKDOWN &"Times New Roman,Regular"Page &P of &N
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE BDOC B1334 (DESIGN) | SUMMARY | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1017 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SUMMARY | ||||||||||
| RESUMEN | ||||||||||
| 1 | DESIGN SERVICES TOTAL | |||||||||
| TOTAL SERVICIOS DE REDACCIÓN DE PROYECTO | ||||||||||
| 2 | BASIC PACKAGE TOTAL | |||||||||
| TOTAL PAQUETE BASICO | ||||||||||
| 3 | ADDITIVE ITEM #01 KITCHEN TOTAL | |||||||||
| TOTAL PARTIDA ADICIONAL No 01 COCINA | ||||||||||
| 4 | ADDITIVE ITEM #02 GENERATOR TOTAL | |||||||||
| TOTAL PARTIDA ADICIONAL No 02 GENERADOR | ||||||||||
| 5 | ADDITIVE ITEM #03 ARMAG TOTAL | |||||||||
| TOTAL PARTIDA ADICIONAL No 03 ARMAG | ||||||||||
| SUMMARY TOTAL | ||||||||||
| TOTAL RESUMEN |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
CONSTRUCTION COST BREAKDOWN &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .