This development package comprises architectural and landscape design documents for the Stone Avenue Youth Transitional Housing Project, a joint undertaking by the City of Tucson and its design team including Swaim Associates Ltd. Architects and Wilder Landscape Architects. The project converts an existing 48-unit motel into affordable transitional housing for youth through comprehensive interior and exterior renovations. Interior work includes adding kitchenettes to all units, upgrading electrical service and distribution, replacing HVAC systems with American-made units, replacing all interior plumbing fixtures and distribution, removing exterior conduits and antennas, securing second-floor guardrails with steel columns, and installing painted steel handrails. Exterior improvements feature an 8-foot wrought iron fence with curved tops and gates around the campus perimeter, replacement exterior lighting, full building repainting in a neutral color, and removal of unused doors and windows with infill framing and stucco finish. The 24,978 square-foot site (approximately 0.57 acres) is zoned C-3 and contains three stories with a total building footprint of 16,865 square feet. The project includes two accessible apartment units meeting 2018 IBC and 2009 ICC A117.1 standards. A pre-submittal bidders conference is scheduled for December 5, 2025, at 8:00 a.m., with bids due December 16, 2025, at 2:00 p.m. Arizona time. The successful contractor must complete work within 540 consecutive calendar days from Notice to Proceed, with liquidated damages assessed at $1,683.00 per day for delays.
The project incorporates extensive green stormwater infrastructure (GSI) practices including water harvesting basins, low-to-no irrigation landscapes, decomposed granite patios, native plantings, and seeding throughout landscaped areas to reduce runoff and support pollinator and bird habitat. The site plan shows 12 on-site parking spaces (10 regular, 2 accessible) with the owner pursuing a City Manager waiver for the 49-space parking requirement; 6 short-term bicycle parking spaces exceed the required 5, though long-term spaces require counting interior units toward the 25-space requirement. Site improvements include concrete and asphalt paving, curb cuts for stormwater flow, catch basins, rock check dams, and ornamental iron fencing with various gate configurations. The project budget is estimated between $5,000,000 and $10,000,000 with HUD funding, subject to Davis-Bacon prevailing wage requirements ranging from $10.39 to $33.00 per hour. Bid security of at least 10 percent of the total bid and 100 percent Performance and Payment Bonds are required. Contractors must maintain appropriate Arizona Registrar of Contractors licenses and carry Commercial General Liability insurance of $1,000,000 per occurrence, Commercial Automobile Liability of $1,000,000 combined single limit, and statutory Workers' Compensation coverage. All subcontractors with contracts exceeding $5,000 must be listed with bid submissions.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THIS PROJECT IS AN EXISTING 48 UNIT MOTEL BEING CONVERTED TO 48
APARTMENTS BY ADDING KITCHENETTES. TWO UNITS SHALL BE CONVERTED TO
ACCESSIBLE UNITS.
2. UPGRADE ELECTRICAL SERVICE AND ALL INTERNAL ELECTRICAL DISTRIBUTION
AND PANELS.
3. REPLACE ALL THROUGH WALL HVAC UNITS WITH AMERICAN MADE UNITS.
RELOCATE WHERE SHOWN.
4. REPLACE ALL INTERIOR PLUMBING FIXTURES AND ALL INTERIOR PLUMBING
DISTRIBUTION ABOVE GRADE.
5. REMOVE ALL CONDUITS, WIRES, SATELLITE ANTENNAS AND PLUMBING FROM THE
EXTERIOR FACES OF THE BUILDING. THIS WILL ALL BE MOVED INSIDE.
project summary
6. SECURE SECOND FLOOR GUARDRAILS BY ADDING STEEL COLUMNS.
7. INSTALL PAINTED STEEL HANDRAILS AT ALL STAIRWELLS.
8. INFILL UNUSED DOORS AND WINDOWS WITH WOOD STUD FRAMING AND STUCCO
FINISH TO MATCH EXISTING.
9. SECURE CAMPUS WITH 8' HIGH WROUGHT IRON FENCE WITH CURVED TOP TO
MATCH COT STANDARDS. PROVIDE GATES AS SHOWN.
10. REPLACE EXTERIOR LIGHTING ON THE BUILDING.
11. PAINT ENTIRE BUILDING. NEUTRAL COLOR TO BE DETERMINED.
S T
O N
E A
V E
HELEN ST.
SPEEDWAY BLVD.
E U
C L
ID
A V
E
UNIVERSITY BLVD.
DRACHMAN ST.
O R
A C
L E
R D th
A V
E s t A
V E
THIS
PROJECT
GRANT RD.35 36
2 1
36 31 1 6
2 1 11 1
1 6 12 7
HIGHLAND PARK AMENDED
LOTS 2 & 3 BLK 21
HISTORIC CASE NUMBER:
SD-0125-00006
legal description
N
TACIFI
A D
DENG
S
T E
I
R
C
E T E
O
H
S.
MICHAEL D.
EG
RA
R
NZI O U.A
CULBERT
33109
IS
D
ET
ER ARC
CE
A.
T
IT
job date revisions
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
/8
/2
:4
:4
P
M C
A c ti v e
R e v it P ro je c ts
\2
.0
R
E c o n o
L o d g e
S it e C
F m d c u lb e rt -S w a im .r v t c o v e r s h e e t C it y o f T u c s o n
N
S to n e
A v e n u e
T u c s o n A
Z
S to n e
A v e n u e Y o u th T ra n s it io n a l H o u s in g
2213.04
08.01.2025
CIP-1124-00036
sheet index design team
SWAIM ASSOCIATES LTD. ARCHITECTS AIA
architect
7350 E. Speedway 210
Tucson, AZ 85710
(520) 326-3700 - fax: (520) 326-1148 www.swaimaia.com
Mike Culbert, AIA mculbert@swaimaia.com
WILDER LANDSCAPE ARCHITECTS
landscape architect
2738 E. Adams Street
Tucson AZ 85716
(520) 320-3936 -
Jennifer Patton, PLA jennifer@wilderla.com
Ben Wilder ben@wilderla.com
City of Tucson - EconoLodge Remodel
Stone Avenue Youth Transitional Housing
DEVELOPMENT PACKAGE for
COT APPROVAL STAMP
contacts
TUCSON ELECTRIC POWER COMPANY
4350 E. IRVING ROAD
TUCSON, AZ 85714
PO BOX 711 MAIL STOP DB102
TUCSON, AZ 85702
(520) 917-8726
CITY OF TUCSON WATER DEPT.
310 WEST ALAMEDA STREET
TUCSON, AZ 85701
(520) 837-2216
SOUTHWEST GAS CORPORATION
3401 EAST GAS ROAD
TUCSON, AZ 85714
CONTACT NEW BUSINESS
(877) 860-6020
PIMA COUNTY REGIONAL WASTEWATER
RECLAMATION DEPT.
201 N. STONE AVENUE 8TH FLOOR
TUCSON, AZ 85701
(520) 740-6641
CITY OF TUCSON DEVELOPMENT SERVICES DEPT.
201. N STAONE AVENUE
TUCSON, AZ 85701
(520) 791-4371
1. EXISTING ZONING: C-3
2. GROSS AREA OF THE SITE IS 24,978 SQUARE FEET ~ .5734 ACRES.
3. EXISTING USE: TRAVELERS' ACCOMMODATIONS, LODGING (HOTEL)
PROPOSED USE: RESIDENTIAL (MULTIFAMILY APARTMENTS)
4. TOTAL NUMBER OF UNITS: 48 (47 APARTMENTS AND 1 MANAGERS UNIT = 48, EXISTING UNITS)
5. BUILDING SIZE:
GROUND FLOOR = 7,776 SF
SECOND FLOOR = 7,389 SF
THIRD FLOOR = 1,700 SF
TOTAL BUILDING = 16,865 TOTAL SF
NO BUILDING FOOTPRINT CHANGES ARE PROPOSED.
6. DRAINAGE WILL REMAIN IN ITS NATURAL STATE AND WILL NOT BE ALTERED, DISTURBED, OR
OBSTRUCTED OTHER THAN AS SHOWN ON THIS SITE PLAN.
9. NO NEW STRUCTURE OR VEGETATION SHALL BE LOCATED OR MAINTAINED SO AS TO
INTERFERE WITH THE SIGHT VISIBILITY TRIANGLES IN ACCORDANCE WITH SECTION
10-01.5.0, SIGHT VISIBILITY, OF THE TECHNICAL STANDARDS MANUAL.
10. ANY WASTEWATER DISCHARGED INTO THE PUBLIC SANITARY SEWERAGE SYSTEM SHALL
MEET THE REQUIREMENTS OF PIMA COUNTY ORDINANCE NO. 1991-140, OR AS CURRENTLY
AMENDED.
11. MAINTENANCE AND OPERATION OF THE PRIVATE SANITARY SEWER TO ITS POINT OF
CONNECTION TO THE PUBLIC SANITARY SEWER IS THE RESPONSIBILITY OF THE PROPERTY
OWNER WITHIN THIS DEVELOPMENT.
12. ACCESSIBILITY STANDARDS MUST BE MET PER 2018 IBC, CHAPTER 11, AND 2009 ICC A117.1.
- PROVIDE A PERMANENTLY POSTED METAL SIGN CONFORMING TO TUCSON CODE
SECTION 20-222, THE INTERNATIONAL HANDICAP SYMBOL PAINTED IN THE SPACE, AND
AN ACCESSIBLE ISLE AT 2% MAXIMUM SLOPE LEADING TO ADJACENT SIDEWALK AT EACH
ACCESSIBLE PARKING SPACE. SAID METAL SIGN SHALL INCLUDE THE "INTERNATIONAL
SYMBOL OF ACCESS" AND BOTTOM OF SIGN SHALL BE LOCATED 7' ABOVE THE PARKING
SURFACE. VAN ACCESSIBLE PARKING SPACES SHALL HAVE AN ADDITIONAL SIGN
MOUNTED BELOW THE "INTERNATIONAL SYMBOL OF ACCESS" IDENTIFYING THE SPACE
AS "VAN ACCESSIBLE".
- THE MINIMUM WIDTH OF THE HANDICAP ACCESSIBLE ROUTE SHALL BE 36", THE
MAXIMUM SLOPE SHALL BE 8.33% AT RAMPS (6" MAXIMUM RISE) AND 5% ELSEWHERE
WITHOUT HANDRAILS AND WITH HANDRAILS WHERE GREATER THAN 5%. THE MAXIMUM
CROSS SLOPE SHALL BE 2%. NO LEVEL CHANGES OR STEPS SHALL BE PERMITTED
ALONG THIS ROUTE.
13. GANG MAILBOXES SHALL BE PROVIDED AND ARE SHOWN ON SHEET 3 NEAR THE OFFICE AND
MANAGER APARTMENT. SEE KEYNOTE 11.11. A MAILBOX FOR EACH APARTMENT SHALL BE
PROVIDED ALONG WITH OVERSIZED BOXES.
zoning & land use notes
14. DIMENSIONAL STANDARDS PER U.D.C. SEC 6.3 FOR C-3 ZONE:
ALLOWABLE HEIGHT (TABLE 504.3): 60'
ACTUAL HEIGHT: LESS THAN 40' (EXISTING)
ALLOWABLE STORIES (TABLE 504.4): THREE STORIES.
ACTUAL SORIES: THREE (EXISTING)
BUILDING SETBACKS: (EXISTING)
NORTH 0'
SOUTH 0'
EAST 0'
WEST 0'
15. PARKING REQUIREMENTS - TABLE 7.4.4-1:
MULTIFAMILY DWELLINGS 0-70 UNITS/ ACRE (STUDIO, LESS THAN 400 SQ.FT. -
1 SPACE PER DWELLING UNIT)
REQUIRED: 49 UNITS = 49 SPACES
PROVIDED: 12 ON SITE (10 REGULAR/ 2 ACCESSIBLE)
ACCESSIBLE SPACES REQUIRED: 1
ACCESSIBLE SPACES PROVIDED: 2
THE OWNER (CITY OF TUCSON) IS PURSUING A CITY MANAGERS WAIVER FOR THE
VEHICLE PARKING SPACE REQURIEMENTS.
16. BICYCLE PARKING REQUIREMENTS - TABLE 7.4.8-1:
MULTI-FAMILY DWELLINGS AND GROUP DWELLINGS:
SHORT-TERM BICYCLE PARKING SPACES:
REQUIRED: 0.1 SPACES PER BEDROOM - 49 x 0.1 = 5 SPACES
PROVIDED: 6 SPACES.
LONG-TERM BICYCLE PARKING SPACES:
REQUIRED: 0.5 SPACES PER BEDROOM - 49 x 0.5 = 25 SPACES
PROVIDED: 8 SPACES PLUS ALL OTHER SPACES SHALL BE COUNTED
INSIDE THE APARTMENTS PER UDC 7.4.9.D.2.a
17. UDC ARTICLE 5.4 MAJOR STREETS & ROUTES SETBACK ZONE (MS&R): "THIS
PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE CRITERIA."
THE NOTE ABOVE IS REQUIRED BY THE CITY OF TUCSON BUT IS NOT THE OPINION
OF THE REGISTRANT FOR THIS PROJECT AS THIS BUILDING IS EXISTING AND WAS
BUILT LONG BEFORE THE UDC EXISTED.
18. WASTE STEAM CALCULATION:
16865 x .0057 = 96 ANNUAL TONS GENERATED
96/52 = 1.8 TONS / WK.
1.8 T/WK X 2000 LBS /TON = 3600 LBS /WK.
3600 LBS /WK / 3 LBS /GAL = 1200 GAL/ WK.
CITY OF TUCSON
HOUSING AND COMMUNITY DEVELOPMENT
DEPARTMENT
310 N COMMERCE PARK LOOP
TUCSON, AZ 85745
CONTACT: HCDAdmin@tucsonaz.gov
(520) 791-4171 owner/ developer electric natural gas water sewer storm sewer
Sheet 1 of 20
SITE
1 cover sheet
2 abbreviations and symbols
3 development package site plan
4 site details
5 site details
6 site details
ALTA SURVEY
sheet 1 boundry survey & general notes (for reference) sheet 2 topographic survey & legend (for reference)
LANDSCAPE
l1.0 gsi cover sheet l1.1 gsi schedules l2.0 earthworks plan l2.1 gsi sections l2.2 gsi details l2.3 gsi details l2.4 gsi details l2.5 specifications l3.0 planting plan l4.0 irrigation plan l4.1 irrigation details l4.2 irrigation details
Grand total: 20 n o rt h3" = 1 MILE
LOCATION MAP
.2
.2
C it y C o m m e n ts
W WWW
S SSS
X XXX
G GGG
C CCC
COTE COTECOTECOTE
OHU OHUOHUOHU
FS FSFSFS
a7.1
N-S section 1/8" = 1'-0"
CLASS
A129B
10'-0"
11'-3 3/4"
LANDING 2
a1.0 a9.2 a1.0 a1.0
ELEVATION INDICATOR
KEYNOTE
CEILING HEIGHT
DOOR NUMBER
ROOM NAME / NUMBER
ENLARGED AREA
SECTION / DETAIL TAG
DRAWING TITLE
symbols legend
ACCESSIBLE CIRCULATION PATH
RECORD DISTANCE, PER BOOK 4, PAGE 45 MAPS & PLATS
RECORD DISTANCE, PER SEQUENCE No. 2017-3110359, RECORDS OF SURVEY.
MEASURED BEARING AND/OR DISTANCE
CALCULATED BEARING AND/OR DISTANCE
EXISTING
FIRE HYDRANT
UTILITY POLE
ELECTRIC JUNCTION BOX
LIGHT POLE
STREET SIGN
BOLLARD
HANDICAP PARKING SYMBOL
CONCRETE PARKING BUMPER
TURN/ DIRECTION ARROW
SPOT ELEVATION
PROPERTY LINE
EASEMENT LINE
CHAIN LINK FENCE / ORNAMENTAL IRON FENCE
UNDERGROUND SANITARY SEWER
FIELD VERIFY EXACT LOCATION
UNDERGROUND WATER
FIELD VERIFY EXACT LOCATION
UNDERGROUND NATURAL GAS
FIELD VERIFY EXACT LOCATION
UNDERGROUND FIRE SPRINKLER SERVICE
UNDERGROUND COMMUNICATION
FIELD VERIFY EXACT LOCATION
CITY OF TUCSON ELECTRIC
OVERHEAD UTILITY LINE(s)
ASSESSOR'S PARCEL NUMBER
PER PIMA COUNTY GIS WEBSITE
(R)
(P)
(M)
(C)
(E)
2377.9
115-08-0990
REFER TO ALTA SURVEY FOR ADDITIONAL SYMBOLS,
ABBREVIATIONS AND MORE INFORMATION. ALL DATA SHOWN ON
THE SITE PLAN IN THIS DEVELOPMENT PACKAGE IS BASED ON THE
ALTA SURVEY INFORMATION.
general note N
TACIFI
A D
DENG
S
T E
I
R
C
E T E
O
H
S.
MICHAEL D.
EG
RA
R
NZI O U.A
CULBERT
33109
IS
D
ET
ER ARC
CE
A.
T
IT
job date revisions
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
/7
/2
:1 :2
P
M C
A c ti v e
R e v it P ro je c ts
\2
.0
R
E c o n o
L o d g e
S it e C
F m d c u lb e rt -S w a im .r v t a b b re v ia ti o n s a n d s y m b o ls
C it y o f T u c s o n
N
S to n e
A v e n u e
T u c s o n A
Z
S to n e
A v e n u e Y o u th T ra n s it io n a l H o u s in g
2213.04
08.01.2025 abbreviations
& AND
@ AT
AB ANCHOR BOLT
ABC AGGREGATE BASE
COURSE
ABI ADDITIVE BID ITEM
AC AIR CONDITIONING
ACC ACCESSIBLE
ACOUST ACOUSTICAL
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APC ACOUSTICAL PANEL
CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
ATTN ATTENTION
AUTO AUTOMATIC
AV AUDIOVISUAL
BD BOARD
BET BUILDING ENTRANCE
TERMINAL
BFF BELOW FINISHED FLOOR
BIT BITUMINOUS
BL BASELINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM, BENCHMARK
BO BOTTOM OF
BOS BOTTOM OF STEEL
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMNT BASEMENT
BUR BUILT-UP ROOFING
C CONDUIT
CA COMPRESSED AIR
CAB CABINET
CAT CATEGORY
CB CATCH BASIN
CB CEMENT BOARD
CBU CEMENTITIOUS BACKER
UNIT
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT
TELEVISION
CEM CEMENT
CER CERAMIC
CG CORNER GUARD
CH CHILLER
CI CAST IRON
CIP CAST-lN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLKG CAULKING
CLR CLEAR
CNTR COUNTER
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CTSK COUNTERSUNK
CW COLD WATER
D DEEP, DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIMS DIMENSIONS
DISP DISPENSER
DIV DIVISION
DMPF DAMP PROOFING
DN DOWN
DO DOOR OPENING
DR DOOR
DRN DRAIN
DS DOWNSPOUT
DS DOWN SPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
CMU CONCRETE MASONRY UNIT
E EAST
EA EACH
EB EXPANSION BOLT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENG ENGINEER
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE
DIENE M-CLASS
EQ EQUAL
EQUIP EQUIPMENT
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FD FLOOR DRAIN OR FIRE
DEPARTMENT
FDC FIRE DEPARTMENT
CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF&E FURNITURE, FIXTURES AND
EQUIPMENT
FFB FLUSH FLOOR BOX
FFEL FINISH FLOOR ELEVATION
FH FLAT HEAD
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLASH FLASHING
FLR FLOOR
FLUOR FLUORESCENT
FND FOUNDATION
FO FACE OF
FP FIRE PROTECTION
FPG FIREPROOFING
FR FIRE RESISTANT
FRC FIBER REINFORCED
CONCRETE
FRT FIRE RETARDANT TREATED
FT FEET/FOOT
FTG FOOTING
FURN FURNITURE
FURR FURRING
FWC FABRIC WALL COVERING
FWP FABRIC WRAPPED PANEL
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GEN GENERAL
GFRC GLASS FIBER REINFORCED
CONCRETE
GL GLASS
GLAZ GLAZING
GRAN GRANULAR
GRD GROUND
GRFG GLASS FIBER REINFORCED
GYPSUM
GSM GALVANIZED SHEET METAL
GV GAS VALVE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H HIGH/HEIGHT
HB HOSE BIB
HB HOSE BIBB
HC HANDICAPPED
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HR HOUR
HRC HOSE REEL CABINET
HTG HEATING
HVAC HEATING VENTILATION AND
AIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IN INCH/INCHES
INCAND INCANDESCENT
INCL INCLUDED/INCLUDING
INFO INFORMATION
INSUL INSULATION
INSUL INSULATED OR INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
JAN JANITOR
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
KIT KITCHEN
KO KNOCK OUT
LAM LAMINATE
LAV LAVATORY
LB POUNDS
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MEMBR MEMBRANE
MFR MANUFACTURER
MH MAN HOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
N NORTH
NA NOT APPLICABLE
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NON
COMB
NON COMBUSTIBLE
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OFCI OWNER FURNISHED,
CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED,
OWNER INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PAINT
PAV PAVING
PBD PARTICLE BOARD
PC PRECAST
PDF POWER DRIVEN FASTENER
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PI. PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PNT PAINT OR PAINTED
POL POLISHED
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT
PSF POUNDS PER SQUARE
FOOT
PT POINT
PT PRESSURE TREATED
PTD PAINTED
PTN PARTITION
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
QTY QUANTITY
R RADIUS/RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED
REINFORCING
REINF REINFORCED
REL RELOCATE
REM REMOVABLE
REOOM RECOMMENDED
REQ REQUIRE/REQUIRED
REQD REQUIRED
RESIL RESILIENT
REV REVISION/REVISED
RM ROOM
RO ROUGH OPENING
RTD RATED
RTG RATING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAF SELF ADHERED FLASHING
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FEET/FOOT
SH SPRINKLER HEAD
SHR SHOWER
SHT SHEET
SIM SIMILAR
SM SHEET METAL
SM SURFACE MOUNTED
SP STANDPIPE
SPEC SPECIFICATION
SPEC SPECIFIED OR
SPECIFICATION
SPK SPRINKLER OR SPEAKER
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
STA STATION
STC SOUND TRANSMISSION
COEFFICIENT
STL STEEL
STOR STORAGE
STRG STRINGER
STRUCT STRUCTURAL
STRUCT STRUCTURE OR
STRUCTURAL
SUBCAT SUBCATEGORY
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TOWEL BAR
TEL TELEPHONE/TELECOM
TELE TELEPHONE
TEMP TEMPERATURE
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TKBD TACK BOARD
TLT TOILET
TMPD TEMPERED
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
UON UNLESS OTHERWISE
NOTED
URNL URINAL
VAC VENTILATION AND AIR
CONDITIONING
VAR VARIES
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VISION PANEL
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE/WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WIN WINDOW
WM WIRE MESH
WP WATERPROOF/WATERPRO
OFING
WPM WATERPROOF MEMBRANE
WS WEATHER-STRIPPING
WSCT WAINSCOT
WT WEIGHT
WV WATER VALVE
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
Sheet 2 of 20
FC
S
SS S
W
WW WW
E
EE EE
WW W W WW
W
W
W
W W
W W
E
E
E E
E
F S
F S
F S
F S
F S
C
C
C C
C
E
E
E C
C
C C
C
C C
W
W
W W
W
W W
S
S
S S
S S
S S
C
C
C C C
C C C C
S
S S
S S
S S
S
SS S
OHU
OHU
OHU OHU
OHU
OHU OHU OHU OHUOHU
OHU
OHU
OHU
OHU
G G
G
G G
G
G G
G
G G
G
O H
U
O H
U
O H
U
O H
U
OHU
OHU
OHU
O H
U
OHU
OHU
OHU
OHU OHUOHU
C O
T E
C O
T E
C O
T E
W
W
W W
W
E E
E E
E
W W
W W
W C
O T
E C
O T
E C
O T
E
C O
T E
C O
T E
C O
T E
C O
T E
C O
T E
SLOPE DN.
1 3
P
LA
N T
E R
P
LA
N T
E R
PLANTER PLANTER
PLANTER
PLANTER
FIRE
RISER
9'-0" 10'-0" 9'-0"
27'-0"
C-1
ADJACENT
ZONE
3'-0"
NO PARKING
PLANTER
9'-0"7'-6"27'-0"
SLOPE DN.
S E
E L
A N
D S
C A
P E
P
LA
N S
C-3
ADJACENT ZONE
E Helen St. (Public)
C-3
ADJACENT ZONE
N S to n e A v e
(P u b li c
C-3
ADJACENT ZONE
32.4
32.4
32.18
32.5
32.1
32.1
32.5
32.2
32.15
32.8
32.10
32.10
1.7
32.10
1.5 1.6
1.2
21.2 1.5
32.3
26.2
32.11
32.22
33.2
33.1
32.27
32.23
32.15
32.27
32.13
G -4
G-9
G-5
G -6
G-7
36'-0"
32.35
32.24
32.27
32.15
5'-0" 29'-6" 5'-0"
5 '-0 "
32.1
32.10
32.35
32.15
G -1
32.2
32.27
PLANTER
32.11
5.5
5.5
5.5
5.5
32.32
32.32
32.29
33.3
32.1
6 '-0 "
32.31
TYP.
32.11
CATCH BASIN
SEE LANDSCAPE
3.4 32.33
G-8
7'- 0" +/ -
32.36
21.3
25.1
32.37
32.37
32.37
32.11
32.37
32.34
32.2
32.9
1.9
3.9
3.9
SLOPE TO DRAIN
TO PLANTER
SLOPE TO DRAIN
TO PLANTER
32.38
32.39
32.40
3.6
3.6
3.6
32.34
32.34
32.24
32.3
32.22
33.4
33.4
BOOK 4, PAGE 45, MAPS & PLATS
B O
O K
P
A G
E
M
A P
S
P L
A T
S
3'-0"
8'-6 5/8"7 3/8"29'-11 1/4"
3 5'- 0"
8 '-0 "
3 9'- 0" 1 4'- 7 3 /8 " 5 3/ 4"
1 3'- 3 3 /4 " 5 '-0 "
2 5'- 7 1/ 2" P AA L
SLOPE TO DRAIN
TO PLANTER
32.41
32.42
0.7
32.26
E X
IT
ENTRANCE
N89°07'11"E 185.09' (C), 185.00' (P) N89°07'11"E 26.00' (C & P)
S
°5 0'
"E
5.
C
.0
0'
P
S89°08'14"W 184.82' (M), 185.00' (P)
N
°5 3'
"W
4.
P
M
.6
2'
R
N
°5 3'
0.
C
N89°07'11"E 224.73' (C)
N
°5 7'
5.
M
.0
0'
P
3.4
11.11
G -1
G-2
G-3
5.5
32.15
4'-4 1/2"25'-1"6'-0"
5 '-2"
1.16
39'-10 3/4" +/-
5'- 0"
2 0'- 0"
32.16
32.16
2380.0
2380.25
2380.1
2379.5
2380.1
2379.8
2378.4
2378.6
2378.0
2378.2
2378.0
2377.9
2377.95
2377.8 (E)
2379.3
2379.2
2379.4 (E)
2379.0
2378.7
2379.4
2380.1
2380.1
2381.3
2381.0
2381.4
32.22 2381.0
2380.7
2380.9
2381.4 (E)
2380.7
2380.3
2381.3 (E)
2380.3
2380.1 F.V.
32.16
32.33
1'-0
9'-4
32.28 32.28
32.12
32.12
7.2
7.2
1.19 1.19
1.19
1.18
1.18
1.18
1.19
33.55'-5"5'-5"5'-5"5'-5"5'-5" 2'-6"
32.10
SLO
PE
6 '-6 " 5'- 6"
TYPE A
ACCESSIBLE
APARTMENT
32.7
32.11
32.44
32.44
32.44
32.44
32.35
32.35
A C
C E
S S
IB
LE
C
IR
C U
LA
T
IO
N
P A
T H
A C
C E
S S
IB
LE
C
IR
C U
LA
T
IO
N
P A
T H
1.19
32.22
1.3
1.3
1.3
32.45
32.45
32.45
32.45
3.7
5 '-2 1/ 2" + /- 6 '-2 "
32.1
2379.4 2381.4
2380.74 2381.07
2381.4
2381.4
32.35 32.35
32.35
5.5
32.35
5.5
32.35
32.35
32.2
TYPE A
ACCESSIBLE
APARTMENT
TYPE B
APARTMENT
TYPE B
APARTMENT
N
TACIFI
A D
DENG
S
T E
I
R
C
E T E
O
H
S.
MICHAEL D.
EG
RA
R
NZI O U.A
CULBERT
33109
IS
D
ET
ER ARC
CE
A.
T
IT
job date revisions
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
/2
/2
:2
:2
P
M C
A c ti v e
R e v it P ro je c ts
\2
.0
R
E c o n o
L o d g e
S it e C
F m d c u lb e rt -S w a im .r v t d e v e lo p m e n t p a c k a g e s it e p la n
C it y o f T u c s o n
N
S to n e
A v e n u e
T u c s o n A
Z
S to n e
A v e n u e Y o u th T ra n s it io n a l H o u s in g
2213.04
08.01.2025
CIP-1124-00036
0 10' 20' n o rt h
SCALE: 1" = 10'
COT APPROVAL STAMP
1" = 10'-0"3 site plan - proposed keynotes
0.7 ACCESSIBLE ROUTE TO LAUNDRY ROOM AND EAST GATHERING AREA
1.2 EXISTING MASONRY SITE WALL TO REMAIN.
1.3 EXISTING SIDEWALK TO REMAIN - TYPICAL.
1.5 EXISTING POWER POLE TO REMAIN.
1.6 EXISTING COMMUNICATION BOXES TO REMAIN.
1.7 EXISTING FIRE HYDRANT TO REMAIN.
1.9 EXISTING CHAINLINK FENCE TO REMAIN.
1.16 EXISTING PORTICO COLUMN TO REMAIN.
1.18 EXISTING DOWNSPOUT TO REMAIN.
1.19 EXISITNG DOWNSPOUT TO REMAIN. DOWNSPOUT RUNS UNDERSLAB, CUT BACK BUT
COORDINATE LENGTH WITH LANDSCAPER SO IT DRAINS INTO PLANTER.
3.4 4" CONCRETE SLAB ON 4" COMPACTED BASE COURSE. PROVIDE REBAR DOWELS EPOXY
SET INTO EXISTING SLAB WHERE OCCURS.
3.6 CONCRETE FOOTING, REFER TO STRUCTURAL.
3.7 4" CONCRETE INFILL WHERE PAVERS WERE REMOVED.
3.9 4" CONCRETE INFILL AT NEW WATER LINE. PROVIDED COMPACTED BASE COURSE
BELOW SLAB.
5.5 42" HIGH STEEL GUARDRAIL SYSTEM TO MATCH EXISTNG. PRIME AND PAINT.
7.2 NEW DOWNSPOUT, CONNECT TO EXISTING GUTTER. TERMINATE AT THE CATCHBASIN.
11.11 SLAB MOUNTED MAILBOX UNIT PER PAG DTL 102.
21.2 FIRE DEPARTMENT CONNECTION.
21.3 UNDERGROUND FIRE LINE, REFER TO PLUMBING DRAWINGS.
25.1 CARD READER ACCESS CONTROL EQUIPMENT AT ENTRY GATE.
26.2 ELECTRICAL SERVICE GEAR, SEE ELECTRICAL.
32.1 6" x 14" CONCRETE CURB PER PAG DTL 209, TYPE 2, AROUND PLANTERS.
32.2 8'-0" HIGH ORNAMENTAL IRON FENCE WITH CURVED TOP PICKETS.
32.3 8' HIGH ORNAMENTAL IRON SWINGING GATE WITH PANIC DEVICE FOR EXITING.
32.4 8' HIGH x 20' WIDE ROLLING ORNAMENTAL IRON GATE.
32.5 PARKING BUMPERS, REUSE EXISTING WHERE POSSIBLE.
32.7 BICYCLE RACK.
32.8 3" ASPHALT PAVING OVER 4" COMPACTED BASE COURSE.
32.9 CURB ACCESS RAMP PER PAG DTL 207.
32.10 CONCRETE FILLED PIPE BOLLARD PER PAG DTL 106, TYPE B JUST OUTSIDE OF ROOF
CORNER ABOVE.
32.11 SIDEWALK SCUPPER PER PAG DTL 204. PREPARE, PRIME AND PAINT. SEE DETAIL 1 ON
SHEET 5 FOR DOWNSPOUT CONNECTION.
32.12 EXIT ONLY SIGN MOUNTED TO FENCE.
32.13 CONCRETE LANDING AND STEP, SEE DETAILS.
32.15 4" WHITE PAINTED PARKING LOT STRIPING.
32.16 TRAFFIC GRADE WHITE PAINTED ARROW AND TEXT.
32.18 8' HIGH ORNAMENTAL IRON SWINGING GATE WITH PANIC DEVICE FOR EXITING AND
CARD READER FOR ENTRY.
32.22 6'-0" HIGH ORNAMENTAL STEEL GATE, PRIME AND PAINT. LOCKABLE AT G-1 & G-10.
32.23 SLOPED CONCRETE SIDEWALK OVER COMPACTED BASE COURSE. INSTALL ON BOTH
SIDES OF EXISTING COLUMN. PROVIDE SIDEWALK SCUPPER TO PLANTER FROM
DOWNSPOUT.
32.24 SLOPED CONCRETE SIDEWALK OVER COMPACTED BASE COURSE.
32.26 CONCRETE CURB AND GUTTER PER PAG DTL 209. MATCH EXISTING CURB AND GUTTER.
32.27 4" CONCRETE SIDEWALK OVER COMPACTED BASE COURSE PER PAG DTL 200.
32.28 PROVIDE DROPPED CURB WITH TOP OF CURB FLUSH WITH GUTTER FOR FLOW
THROUGH. REFER TO LANDSCAPE DRAWINGS.
32.29 COMPACTED DG, SEE LANDSCAPE DRAWINGS.
32.31 CHECKDAM, REFER TO LANDSCAPE DRAWINGS.
32.32 ORNAMENTAL IRON FENCE WITH CURVED TOP PICKETS MOUNTED INSIDE OF EXISTING
SITE WALL. TOP TO BE 8'-0" AFF V.I.F.
32.33 CATCH BASIN BELOW EXISTING DOWNSPOUTS WITH PIPE TO BASIN, REFER TO
LANDSCAPE DRAWINGS.
32.34 6" x 14" CONCRETE CURB PER PAG DTL 209, TYPE 2, AROUND PLANTERS. TOP ALIGNED
WITH HEIGHT OF EXISTING SIDEWALK.
32.35 1" Ø PVC CONDENSATE DRAIN EMBEDDED IN CONCRETE SIDEWALK. REFER TO DETAIL 3
ON SHEET 3.
32.36 DOUBLE BIKE LOCKERS, SECURED TO SLAB BELOW.
32.37 IRRIGATION SLEEVE, REFER TO LANDSCAPE DRAWINGS.
32.38 DESIGNATED PET RELIEF AREA SIGNAGE, REFER TO LANDSCAPE DRAWINGS.
32.39 NO DOGS ALLOWED SIGNAGE, REFER TO LANDSCAPE DRAWINGS.
32.40 STEPPING STONES, REFER TO LANDSCAPE DRAWINGS.
32.41 125' FAR SIDE SVT.
32.42 345' NEAR SIDE SVT.
32.44 SLOPED TRANSITION FROM VERTICAL CURB TO GUTTER, REFER TO LANDSCAPE
DRAWINGS.
32.45 12" x 2" CURB SPILLWAY, REFER TO LANDSCAPE DRAWINGS.
33.1 WATER METER, REFER TO PLUMBING.
33.2 GAS METER, REFER TO PLUMBING.
33.3 BACKFLOW PREVENTER, REFER TO PLUMBING.
33.4 EXISTING SEWER LINE, REFER TO PLUMBING.
33.5 TRAFFIC RATED PULL BOX IN GROUND, REFER TO ELECTRICAL DRAWINGS.
Sheet 3 of 20
SEE CONSTRUCTION DOCUMENTS FOR SITE DEMOLITION AND ADDITIONAL INFORMATION
.2
.2
C it y C o m m e n ts
1'- 8" 5'-
0"
9'- 6 1
/2"
7'- 4"
3'- 4"
1'- 4"
'-0
4'-0"
4'-0"
4'-0"
12'-0"
6 3/4"
1'-8"
32.22
4.4
32.20
32.21
32.19
32.20
4.4
32.2
12'-0"
G-2
G -1
G-3
1.10
'-0
CANE BOLT, EA.
GATE, PER DETAIL 6/3
TS 2x2x1/4"
FRAME BRACE
SOLID GROUTED TS 6x6x1/4"
TS 3x3x1/4"
FRAME BRACE
1/8" STEEL
PLATE BANDS
SCHEDULE 40 C.S.
CONCRETE FILLED PIPE
BOLLARD. 4'-0" ABOVE
SLAB. PRIME AND PAINT.
2'- 0"
6'- 0 1
/2"
1"x1" STEEL PICKETS AT
5"O.C. WITH CURVED TOP.
SECURE TO TUBE STEEL AT
BACKSIDE OF GATE
TS 3x3x1/4" FRAME
BRACE FOR PICKET
SUPPORT
CMU WALL, PRIME AND
PAINT
T.S. 3"x3"x1/4" GATE FRAME
STEEL GATE FRAME, PAINT
WELD HEAVY DUTY HINGES 4 MIN.
PER JAMB AT EACH GATE
LEAF. STANLEY BB855
1/8" STEEL PLATE BANDS,
PAINT
TS 6"x6" SOLID GROUTED. SET IN 16" DIA. x 48"
CONCRETE FOOTING, PAINT
GATES
PAVING
CONC. FTG.
2" DIA. OPENING MIN.
1 1/2"X2"X5/16"
1 1/4" X 4" I.D. STL. TUBES
3/4" O.D. STL. ROD - BENT
1" X 2" WELDED STL.
SUPPORT TAB
2"X5"X5/16" WELDED TAB TO
PREVENT CANE BOLT FROM
BEING MOVED WHEN CLOSED
8"
/4
8"
ELEV.
LC
CL
STL. GATE AS SCHED.
3"X5"X5/16" STL. PLT.
3/4" DIA. STL. - TYP.
(2) 2"X 2"X 5/16" PL. W/1" DIA.
(HOLE CHAMFER EXPOSED
CORNERS)
LOCK EXTERIOR GRADE
PLATE "A" 2"X 3"X 5/16" PL. W/
3/4" DIA. HOLE. (2)
(CHAMFER EXPOSED
CORNERS)
4" T.S. COL. WHERE
APPLIES PER GATE
ELEV. & SCHED.
2" 1/2" 2" 2"
"A" PLATE
PLAN
4"
3/4" 1"
1"x1/4" STL. STOP
GATE HT.
STL. GATE AS SCHEDULED
3/4" DIA. STL.
LATCH
2 1/8"
3/8" 1/2"
T H
IC
K
N E
S S
V A
R
IE
S
EXP. JOINT 1/2"x 3/4" URETHANE
SEALANT OVER 1" FOAM BACKER
ROD, BOTH SIDES AND TOP
CONCRETE PAVING SEE PLANS
WALL
4" CONC.
SLAB OVER
4" ABC
3/8" RAD. TOOLED EDGE TYP.
1/4"
T /3
1/2" EXPANSION MATERIAL.
CONT. SEALANT & BACKER ROD
3/8" RAD. TOOLED EDGE TYP.
EXTERIOR CONRETE SLAB CONTROL JOINT
EXTERIOR CONRETE SLAB EXPANSION JOINT
SAW CUT 2" AREA FROM
EXISTING CONC. SIDEWALK
1" Ø PVC IN NON-SHRINK GROUT
1% MINIMUM SLOPE TO DRAIN
EXISTING SIDEWALK
2"
4'- 0"
2'- 2"
8 X 8 X 16 CMU, SEAL
AND PAINT.
CONCRETE
FOOTING, SEE
STRUCTURAL
THICKENED EDGE
CONCRETE
CONCRETE OVER
AGGREGATE BASE
6'- 0"
SCHEDULE 40 C.S.
PIPE BOLLARD
FILLED WITH
CONCRETE, 4'-0"
ABV. SLAB
8 X 2 X 16 SOLID
CAP BLOCK
1'-8"
1'- 0"
1'-8"
N
TACIFI
A D
DENG
S
T E
I
R
C
E T E
O
H
S.
MICHAEL D.
EG
RA
R
NZI O U.A
CULBERT
33109
IS
D
ET
ER ARC
CE
A.
T
IT
job date revisions
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
/7
/2
:1 :2
P
M C
A c ti v e
R e v it P ro je c ts
\2
.0
R
E c o n o
L o d g e
S it e C
F m d c u lb e rt -S w a im .r v t s it e d e ta il s
C it y o f T u c s o n
N
S to n e
A v e n u e
T u c s o n A
Z
S to n e
A v e n u e Y o u th T ra n s it io n a l H o u s in g
2213.04
08.01.2025
CIP-1124-00036
n o rt h1/4" = 1'-0"4 refuse enclosure plan
ID W
ID
T H
H E
IG
H
T
P A
IR
GATE PANEL
E L E
V A
T
IO
N
FRAME DTL.
H A
R D
W A
R E
R E
M A
R K
S
M A
T E
R
IA
L
F
IN
IS
H
M A
T E
R
IA
L
F
IN
IS
H
J A
M B
G-1 10' - 10" 6' - 0" X STL PAINT 2/3 STL PAINT 4/3
G-2 3' - 0" 8' - 0" STL PAINT 3/4 STL PAINT 8/4
G-3 3' - 0" 8' - 0" STL PAINT 3/4 STL PAINT 8/4
G-4 3' - 0" 8' - 0" STL PAINT 3/4 STL PAINT 4/4 PANIC
G-5 3' - 0" 8' - 0" STL PAINT 3/4 STL PAINT 4/4 PANIC CARD READER
G-6 20' - 0" 8' - 0" STL PAINT 5/4 STL PAINT ROLLING GATE
G-7 20' - 0" 8' - 0" STL PAINT 5/4 STL PAINT ROLLING GATE
G-8 3' - 0" 6' - 0" STL PAINT 3/4 SIM STL PAINT 8/4
G-9 3' - 0" 6' - 0" STL PAINT 3/4 SIM STL PAINT 8/4
G-10 3' - 0" 8' - 0" STL PAINT 3/4 STL PAINT 8/4
keynotes
1.10 EXISTING CONCRETE CURB TO REMAIN.
4.4 8X8X16 SMOOTH FACE CMU, PAINTED.
32.2 8'-0" HIGH ORNAMENTAL IRON FENCE WITH CURVED TOP PICKETS.
32.19 6" CONCRETE SLAB, DESIGN STRENGTH 3,000 P.S.I. WITH #4 BARS 12" O.C. BOTH WAYS.
32.20 SCHEDULE 40 C.S. CONCRETE FILLED PIPE BOLLARD. 4'-0" ABOVE SLAB. PRIME AND
PAINT.
32.21 METAL DUMPSTER, COORDINATE WITH REFUSE COLLECTOR.
32.22 6'-0" HIGH ORNAMENTAL STEEL GATE, PRIME AND PAINT. LOCKABLE AT G-1 & G-10.
3/4" = 1'-0"4 41
2 refuse gate elevation 3" = 1'-0"4 41
4 steel gate jamb @ cmu wall
1" = 1'-0"4
6 gate cane bolt 1" = 1'-0"4
7 gate latch detail 3" = 1'-0"4 41
8 exterior concrete slab @ exterior wall
3" = 1'-0"4
9 exterior concrete slab control joint 3" = 1'-0"4
10 condensate drain at sidewalk 3/4" = 1'-0"4 41
11 dumpster enclosure wall
Sheet 4 of 20
COT APPROVAL STAMP
HSS POST, SOLID
GROUTED
1/4" STEEL CLOSURE
PLATE AT STRIKE SIDE.
12" HIGH TO MATCH
STEEL TUBE.
16GA PERFORATED STEEL
PLATE ABOVE AND BELOW
EDGES OF STEEL TUBE, SEE
ELEVATION.
HSS 12x2x1/4 INSTALL
CENTERED AT
CENTERLINE OF EXIT
DEVICE.
EXIT DEVICE.
PERFORATED METAL WHERE
OCCURS
16GA PERFORATED
STEEL PLATE TYPICAL
WITHIN 3' OF GATE
AND EXIT DEVICE
1 1/2" x 2" HORIZ.
RAIL
1" x 1" STEEL PICKETS
WELD PICKETS TO HSS
TOP AND BOTTOM
EXIT DEVICE
(2) L3x2x5/16 WELDED TO HSS12x2x1/4
GATE FRAME BEYOND
3/4"x3/4"x10 GA. WIRE MESH -
WELD TO GATE FRAME AND 1"
PICKETS - SPOT WELD @ 6"
O.C.
PROVIDE 3/4"x3/4"x10 GA.
WIRE MESH AT GATE AND
3'-0" AT ALL SIDES OF GATE
WHERE FENCE CONTINUES.
CONCRETE FOOTING IN
GRADE.
CONCRETE SIDEWALK.
STEEL TUBE W/ LOCKSET
CYLINDER OUTSIDE, EXIT
DEVICE INSIDE. MOUNT AT
3'-4" A.F.F.
8'- 0"
TUBE STEEL FRAME
TO MATCH POST
3'-0" MIN
CARD READER
WHERE OCCURS
HSS 4"x4" 14 GA. POST
SOLID GROUTED.
STEEL GATE.
WELD HEAVY DUTY HINGES
3 MIN. PER JAMB AT EACH
GATE LEAF.
W.I. FENCE
PICKET
HSS RAIL.
3/16"
3/16"
TYP.
1" PICKET
TYP.
TOP VIEW
ELEVATION
EXTERIOR
INTERIOR
4" POST
ALL PICKETS & HORIZONTAL
RAILS TO BE 16 GA. STEEL
WITH SHOP PRIMED FINISH.
TOP OF PICKETS TO HAVE
AN OUTWARD CURVE. LINE
POSTS SHALL BE 14 GA.
STEEL WITH SHOP PRIMED
FINISH. POSTS SHALL HAVE
FLAT METAL CAPS WELDED
IN PLACE. ALL STEEL
FENCING TO BE FIELD
PAINTED.
CONCRETE FOOTING IN
GRADE - CORNER AND
GATE POSTS
CONCRETE FOOTING IN
GRADE - LINE POST
2" x 2"
HORIZONTAL RAIL
4" x 4" x 11 GA STEEL
POST W/ SOLID CAP
1" x 1" WROUGHT
IRON PICKET @ 4" O.C.
CURVED TOP WITH CAPS
ASPHALT OR CONCRETE
WHERE IT OCCURS
RAIL TO POST PICKET TO RAIL
1-1/2"x2"
HORIZ. RAIL
8'- 2"
1'-0" 8"
2'- 0"
3"
3'- 0"
5'- 8"
1'- 8"
6"
2"
8'- 0"
3"
10'-0" MAX.
CURVED PICKETS
ORNAMENTAL IRON
FENCE BEYOND
1"x1" STEEL PICKETS 5" O.C.
WITH CURVED TOP
4"x6" STEEL TUBE TOP & BOTTOM
(4) 6" DIA. STAINLESS STEEL GATE
WHEELS WITH WHEEL GUARDS
STEEL GATE GUIDE
2"x4" STEEL TUBE INTERMEDIATES WITH 4"x4"
STEEL TUBES AT THE ENDS
DRIVE ANGLE FOR GATE OPERATOR -
INSTALL PER MFG INSTRUCTIONS
4"x4" STEEL GUIDE POSTS WITH
GATE GUIDE ASSEMBLY
4"x6" STEEL TUBE WITH STEEL
ANGLE GUIDE
ORNAMENTAL IRON FENCE
DASHED FOR CLARITY
1"x1" STEEL PICKETS
WITH CURVED TOP
4"x4" STEEL TUBE AT ENDS WITH 2"x4" STEEL
TUBES BETWEEN
(4) 6" V-GROOVE WHEELS
STEEL GATE GUIDE
4"x6" STEEL TUBE
TOP & BOTTOM
EXISTING MASONRY WALL
WITH STUCCO FINISH
ORNAMENTAL IRON FENCE
ABOVE EXISTING WALL
8'- 0"
CONTINUOUS STEEL ANGLE:
1-1/4" x 1-1/4". WELD JOINTS. PRIME AND PAINT.
NOTCH ANGLE TO ACCOMMODATE DRAINAGE
ASPHALT
CONTINUOUS STEEL C4 CHANNEL.
WELD JOINTS. PRIME AND PAINT
3000 PSI CONCRETE FOOTING WITH (2) #4'S
TOP & BOTTOM
3/8" DIAMETER x 6" LONG ANCHORS @ 2'-0" O.C.
1'- 0"
8"
2 '-0 "
4'-0"
2'X6' BICYCLE PARKING SPACE,
MIN. TYPICAL
BICYCLE RACK (x3).
EXISTING EDGE OF
BUILDING
6'-0"4 '-1 1/ 2" + /- 4 '-6 "
4 '-6 " 4 '-1 1/ 2" + /-
N
TACIFI
A D
DENG
S
T E
I
R
C
E T E
O
H
S.
MICHAEL D.
EG
RA
R
NZI O U.A
CULBERT
33109
IS
D
ET
ER ARC
CE
A.
T
IT
job date revisions
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
/7
/2
:1 :3
P
M C
A c ti v e
R e v it P ro je c ts
\2
.0
R
E c o n o
L o d g e
S it e C
F m d c u lb e rt -S w a im .r v t s it e d e ta il s
C it y o f T u c s o n
N
S to n e
A v e n u e
T u c s o n A
Z
S to n e
A v e n u e Y o u th T ra n s it io n a l H o u s in g
2213.04
08.01.2025
CIP-1124-00036
3" = 1'-0"5
4 ornamental iron gate jamb @ panic device
3" = 1'-0"5 53
7 ornamental iron gate detail @ panic device
3/8" = 1'-0"5
3 ornamental iron gate w/ panic hardware
3" = 1'-0"5
8 ornamental iron gates @ steel fencing
3/8" = 1'-0"5
1 ornamental iron fence
3/4" = 1'-0"5 55
9 rolling gate detail
3/8" = 1'-0"5
5 rolling gate elevation
1 1/2" = 1'-0"5 55
10 rolling gate track
Sheet 5 of 20
COT APPROVAL STAMP
1/4" = 1'-0"5 32
11 bicycle parking
EXISTING DOWNSPOUT
REPLACE END TO MATCH
3/8" PREFORMED
BITUMINOUS JOINT FILLER.
TOP OF STEEL TUBE TO
BE FLUSH WITH
ADJACENT SIDEWALK.
TOOLED EDGES BOTH
SIDES 1/8" RADIUS.
#4 BAR CONTINUOUS.
6"x6"x3/8" STEEL TUBE (A36) W/
1/2" DIAM. STUDS @ 24" O.C.
PAINT EXPOSED METAL W/ TWO
COATS OF SSPC PAINT NO. 5.
1 1 /2"
6"
EXISTING SIDEWALK
WALL
SEALANT
1/8" CAP WELDED TO
TUBE
COORDINATE
WITH FOOTING
6" 4"
6"
8"
6"
6"
6'-5" FV
EXISTING DOWNSPOUT. REPLACE BOTTOM
SECTION AND EXTEND INTO TUBE STEEL DRAIN
1/2" DIAMETER REBAR STUDS AT 24"
O.C. WELD TO TUBE STEEL DRAIN AND
EPOXY SET INTO EXISTING SLAB
4"x4"x1/8" TUBE STEEL DRAIN WITH 1/2"
DIAMETER STUDS AT 24" O.C. CAP ONE END
AND PROVIDE HOLE IN TOP FOR DOWNSPOUT.
4" CONCRETE SLOPED SIDEWALK OVER
4" MINIMUM COMPACTED BASE COURSE
ASPHALT OVER
COMPACTED BASE COURSE
F.F.E.
100' - 0"4"
8"
8'-3"
1'- 0"
2'-1 1/4"2'-0"4'-1 3/4"
1'- 0"
STEEL TUBE COLUMN AND BASE
PLATE, REFER TO STRUCTURAL.
LINE OF EXISTING
SIDEWALK BEYOND
CONCRETE FOOTING,
REFER TO STRUCTURAL
2'-4 3/8" FV4'-6 1/2" FV
1'-0"1'-0"
3" ASPHALT PAVING OVER 4"
COMPACTED BASE COURSE.
4" CONCRETE LANDING AND
STEP OVER 4" COMPACTED
BASE COURSE.
CONT. SEALANT AND
BACKER ROD OVER
1/2" EXPANSION
MATERIAL
1'-0"
#5 REBAR AT 16"
O.C. AND AT TOES
6"
6"
1'- 0"
3/4"1'-0"
STAIR NOSING TO MATCH
OTHER STAIRWELLS
EXISTING SIDEWALK
'-0
(P
ER
P
LA
N)
2'- 6"
T
YP
9'-0" (PER PLAN)
4" TYP.
ANCHORED CONCRETE
WHEEL STOP
4" PAINTED STRIPING - TYP.
EQ EQ
4" x 4" 11 GA. STEEL
POSTS W/ SOLID CAP
10' -0" O.C. MAX.
ASPHALT OVER ABC
DECOMPOSED GRANITE
- REFER TO LANDSCAPE
EXISTING SITE MASONRY
WALL/ HEIGHT VARIES
1"
HSS2X2X3/16 HORIZ.
RAILS WELDED AT EA.
POST
1" SQ. WROUGHT IRON
PICKETS @ 4" O.C. W/
CURVED TOP WELDED TO
HORIZ. RAILS
1/2" Ø BOLTS WITH
HOLLOW BLOCK
EXPANSION ANCHORS.
MIN. (2) PER POST
EXISTING SITE WALL
FOOTING
EXIST'G. HT. VARIES
8'-0"
N
TACIFI
A D
DENG
S
T E
I
R
C
E T E
O
H
S.
MICHAEL D.
EG
RA
R
NZI O U.A
CULBERT
33109
IS
D
ET
ER ARC
CE
A.
T
IT
job date revisions
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
/7
/2
:1 :3
P
M C
A c ti v e
R e v it P ro je c ts
\2
.0
R
E c o n o
L o d g e
S it e C
F m d c u lb e rt -S w a im .r v t s it e d e ta il s
C it y o f T u c s o n
N
S to n e
A v e n u e
T u c s o n A
Z
S to n e
A v e n u e Y o u th T ra n s it io n a l H o u s in g
2213.04
08.01.2025
CIP-1124-00036
1 1/2" = 1'-0"6
1 downspout at sidewalk 1" = 1'-0"6 32
3 sloped sidewalk at downspout
1" = 1'-0"6 32
7 stepped footing 3/4" = 1'-0"6 32
6 concrete step and landing
Sheet 6 of 20
COT APPROVAL STAMP
1/4" = 1'-0"6
10 typical parking stall 1" = 1'-0"6 32
9 wrought iron fence at masonry wall
Sheet 6 of 16
35'-4 3/4"
Sheet 7 of 16
SHEET INDEX
L1.0 L1.1 L2.0 L2.1 - 2.5 L3.0 L4.0 L4.1 - 4.2
COVER + NOTES
SCHEDULES
EARTHWORKS PLAN
SECTIONS, DETAILS + SPECIFICATIONS
PLANTING PLAN
IRRIGATION PLAN
IRRIGATION SCHEDULE + DETAILS
PROJECT DESCRIPTION
Green stormwater infrastructure (GSI) is being incorporated into the Stone Avenue Youth Transitional Housing Project. The City of Tucson Storm to Shade (S2S) Program is providing water harvesting landscape areas around the building that will reduce runoff, support plant growth, and create a patch of nature that will nourish both the residents and nearby community while supporting pollinator and bird habitat.
Key GSI project elements include:
· Low to no-irrigation landscape. Plants are planted within or adjacent to basins that capture runoff from the buildings, street, hardscape and /or adjacent site area. Once established, this harvested runoff provides the water needed to sustain plant growth.
· Plants have been positioned to provide sightlines throughout the space, and not create any 'hidden' areas or areas that could support 'pass-throughs' through the perimeter fence.
· Low-growing (SVT compliant) seed will be included within all landscape areas. This provides a stabilizing ground cover that reduces erosion while adding plants to the landscape. The seed mix is free of grasses with awns (grass heads that can stick in socks and dog fur). All areas not otherwise rocked / paved will be seeded.
LANDSCAPE NOTES
1. Location of all elements depicted on this plan shall be approved by the Owner’s Representative prior to installation.
2. There are no protected native plants meeting the City inventory requirements on the project site that will be removed / impacted by this project.
3. Dust Control: All disturbed, grubbed, graded, or bladed areas not otherwise improved shall be landscaped, seeded, or covered with an organic or inorganic ground cover to help reduce dust pollution.
4. The Contractor shall obtain all necessary and or required permits and pay all related fees and or taxes required to install the work on the approved Plans.
5. All work shall be per the Project Plans and Specifications. Unless otherwise specified, work shall be in accordance with the current PAG Standard Specifications and Details for Public Improvements, and the requirements of the City of Tucson Municipal Codes.
6. The Contractor shall be appropriately licensed as required by the State of Arizona.
7. The Contractor shall notify the Owner’s Representative immediately of any errors, omissions, or discrepancies in regards to existing conditions and or plans prior to beginning work.
8. The Contractor shall take precautionary measures to protect all utilities on site. Prior to excavating, the Contractor shall verify the location (horizontal and vertical) of underground utilities. A minimum of two days prior to excavating, the Contractor shall request identification of underground utilities by calling Blue Stake at 811.
9. Infiltration testing and soils analysis was conducted by ConformaTech Inc in February 2025. The location of testing is shown on the Project Overview, this Sheet. The rate of infiltration is 6” per hour infiltration, and the soils analysis indicates a 5’ depth of silty sandy soil. The Geotechnical Report has been included with this submittal.
1. The contractor is responsible for verifying utility locations prior to any excavation. There may be existing utilities that are not reflected on the Project Plans.
2. Plants will be located to avoid conflicts with underground and overhead utilities. Horizontal planting setbacks for varying plant sizes are provided in Table 4.1 of the Green Stormwater Infrastructure and Low Impact Development Standard Details and Site Guidance Manual. The setbacks for underground utilities are:
· Sewer: Tree trunks shall be 16’ min from manholes, and 10’ min from sewer lines
· Water: Tree trunks shall be 10’ min from all water lines.
· Electric: Tree trunks shall be 3’ min from all electrical lines.
· Cable / Fiber Optic: Tree trunks shall be 3’ min from all cable / fiber optic lines.
· Gas: Tree trunks (trees under 20' H) shall be 8’ min from gas lines
Shrubs and succulents may be planted within these clearance zones. Plants shown on the plans within 5' of a buried water line have a mature root depth of 18" or less.
3. All plant material located within 10' of the sewer and sewer manholes, and / or within public sewer easements shall be in accordance with the planting guidelines contained within Section 7.7, PCRWRD Engineering Design Standards, 2022 Edition and Detail RWRD 111, SSDC current editions.
4. Overhead Electrical Lines: 10' of clearance in all directions from conductors, and 15' from power poles, must be maintained. Small trees, with maximum height of 15', may be planted underneath overhead power lines.
5. No tree or large shrub planting within 50’ of a stop, yield or speed limit sign.
UTILITY OFFSETS + PLANTING SETBACKS
LANDSCAPE WATERING + MAINTENANCE
IRRIGATION: An irrigation system for plant establishment will be installed for irrigation of nursery plants. Plants started on the project site by seed are not irrigated - their germination and growth success is dependent on rainfall. S2S is responsible for the maintenance of the irrigation system, and will discontinue irrigation after plant establishment.
WEEDS: Hydroseed is a component of all planting areas. No pre- or post- emergent herbicides will be used, and no plants will be weeded out except for those identified by a knowledgeable plant person as invasive. Allowing desired plants to establish by seed is a key part of a resilient and regenerative landscape.
PRUNING: All plants should be allowed to grow in their natural form WITHOUT pruning. Plant symbols are shown at the mature plant size. This is to ensure that planting will not grow into walkways / patios. Unless plant material is growing over a sidewalk / curb, it will not be pruned. Should pruning be necessary, it will be done by (or under the observation of) a certified arborist, and pruned back to adjoining stems / branches. No shearing will occur.
3'
3'
3'
3'
3'
3'
3' 3'
3' 3'
3'
3'
3' 3'
3'
3'
S SS S
S SS S
W
FS
ROW / PROPERTY
BOUNDARY
Pass through to Outdoor Lounge
Pass through to Active Rec
N
ST
ON
E
AV
E
E HELEN ST
AL
LE
Y (P
UB
LIC
ROW /
PROPERTY
BOUNDARY
¡CONTRACTOR ALERTS!
At the award of contract, the Contractor shall carefully review the Plans. The following items are unique to this project.
1. Seeding: All planted areas will be seeded. This project is using a three-step process. Step 1 of the process, amending the site soil with compost, must be done PRIOR to irrigation installation or finish grading, and can be combined with required ripping of the soil. Refer to the Seeding Special Provision, Sheet L2.5, for full requirements.
2. Irrigation System: There is one irrigation system for the project, but the piping for two valves will be PVC, while the piping for the other two valves is poly. PVC is used where the system is intended as more permanent - this is the Stone Avenue frontage, and planting areas between parking lot and units. The remainder of the system (Helen St. Chicane and planting east of the building), is temporary, and will be turned off after plants are established.
The Contractor shall work closely with the City of Tucson Storm to Shade (S2S) Project Manager or their assigned representative. The following project elements will be staked in the field and reviewed by the S2S Project Manager prior to the Contractor continuing with work. The Contractor must receive and retain written approval after each review.
1. Water harvesting basin layout and DG patio layout. After approval of this review, the contractor may begin excavation on site.
2. Finish grading of basins will be approved. The Contractor is responsible for shooting grades during the construction process to ensure that basin depths are per Plan, and that water flows in the direction intended. Approval must be received prior to the start of irrigation trenching.
3. Contractor shall flag tree layout for approval by S2S Project Manager prior to tree installation. Flags shall be labeled in black permanent marker with the first three letters of the plant's genus and species (for example, Prosopis velutina =
PROVEL).
job date revisions
St on e Av en ue
Y ou th T ra ns iti on al H ou si ng
06.25.2025
2213.04
N S to ne
A ve nu e
Tu cs on , A
Z
C ity o f T uc so n swa m
ASSOCIATES LTD
ARCHITECTS AIA
7350 EAST SPEEDWAY 210
TUCSON, ARIZONA 85710
(520) 326-3700 www.swaimaia.com
I
2719 E Adams St Tucson, AZ 85716 520-320-3936 | jennifer@wilderla.com
2 0
6 25-
2 0
- L1.0
1" = 15'-0"
PROJECT OVERVIEW
15 7.5 0 15
INFILTRATION
TEST SITE
ACTIVE RECREATION AREA
PULL UP + DIP BARS
BY OWNER
DESIGNATED PET
RELIEF AREA WITH
DOGI-POT STATION
BIKE PARKING
PER ARCH PLANS
SITE FURNITURE
BY OWNER
G S
I C
O V
E R
S H
E E
T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text d
AutoCAD SHX Text e
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text i
AutoCAD SHX Text S
AutoCAD SHX Text e
AutoCAD SHX Text t
AutoCAD SHX Text a
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text Z
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text 50915
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
JENNIFER
AutoCAD SHX Text
PATTON
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOTANICAL NAME
COMMON NAME
SYMBOL QTY
Justicia californica Chuparosa
Larrea tridentata Creosote
Aloysia gratissima Whitebrush
Ambrosia deltoidea Triangle-leaf Bursage
Calliandra eriophylla Fairy Duster
Lycium fremontii Fremont's Wolfberry
Simmondsia chinensis Jojoba
Sphaeralcea ambigua Globemallow
Ziziphus obtusifolia Graythorn
Ericameria laricifolia Turpentine Bush
Bailyea multiradiata Desert Marigold
Viguiera parishii Goldeneye
SCHEDULE: SHRUBS
BOTANICAL NAME
COMMON NAME
SYMBOL QTY
SCHEDULE: SUCCULENTS
Asclepias subulata Desert Milkweed
CONT.
SIZE
115 Gal 8061627
BID ITEM #
BOTANICAL NAME
COMMON NAME
SYMBOL QTY
SCHEDULE: GRASSES
Aristida purpurea Purple threeawn
CONT.
SIZE
101 Gal 8061295
BID ITEM #
Muhlenbergia dumosa Bamboo Muhly
131 Gal 8061295
BID
ITEM #
8061298
Sporobulus airoides Alkali Sacaton
191 Gal 8061295
Bebbia juncea Sweetbush
Encelia farinosa Brittlebush
Ruellia nudiflora Violet Wild Petunia
Plants have been selected that have the appropriate attributes for the GSI landscape areas planters including:
· Ability to tolerate periodic flooding (succulents are the exception, and these are to be planted on terraces).
· Ability to withstand periods of drought.
· Small stature plants in areas requiring visibility across and above planting.
Plant species shall NOT be substituted without prior written authorization from the Landscape Architect (Wilder Landscape Architects, attn. Jennifer Patton, ph 520-481-2328, jennifer@wilderla.com).
A seedmix (included on this sheet) composed of low-growing (mature height of 30" or less) annuals and perennials will be applied in all GSI planting areas. With adequate rainfall, the seedmix will help to provide an abundance of plants. Adequate rainfall must be received for seed germination. Seed is remarkably resilient, and seeds may germinate over a number of years.
PLANT SPECIES AND PLACEMENT
Senegalia greggii Catclaw Acacia
15 Gal 8061005
PLANT SCHEDULE: TREES
SYMBOL BOTANICAL NAME
COMMON NAME
CONT.
SIZE
QTY
Celtis reticulata Netleaf Hackberry
25 Gal 8061065
BID
ITEM #
Olneya tesota Ironwood
15 Gal 80610052
CONT.
SIZE
5 Gal
1 Gal
1 Gal
5 Gal
5 Gal
5 Gal
5 Gal
5 Gal
5 Gal
5 Gal
5 Gal
5 Gal
5 Gal
1 Gal
1 Gal
8061298
8061298
8061298
8061298
8061298
8061298
8061298
8061298
8061298
8061298
8061296
8061296
8061296
8061296
15 Gal 80610054
Nolina microcarpa Bear Grass
65 Gal 8061627
Opuntia engelmannii Prickly Pear
15 Gal 8061627
Opuntia santa-rita Purple Prickly Pear
25 Gal 8061627
SYMBOL ITEM
GSI PRACTICES
GSI DETAILQTY NOTESKEYNOTE
3.0
NOTE: Quantities are for reference only. Contractor shall calculate amount of material required to construct the project as depicted on the plan.
3.8
Stormwater Harvesting Basin Side Slopes Per Plan
Detail 1, Sheet L2.2300 SF
(200 CU.FT.)
Basin floor to be ripped a minimum of 12" depth.
Sides slopes as noted on Plan Sheet L2.0
Rock Sediment Trap Detail 321, Sheet L2.430 SF Sediment traps to be located per Plan.
Rock Rip Rap: Arizona Trucking, Coronado 8" - 12"
3.5Curb Cut, Type 2 Detail 317, Sheet L2.41 EA Curb opening 24" wide
3.6Spillway in Curb Section A, Sheet L2.14 EA Spillway width 12"
3.7Catch Basin with Decorative Grate and Drainpipe
Detail 3, Sheet L2.43 EA 60 LF piping
3.4New Header Curb Opening (Helen St Chicane)
Detail 2, Sheet L2.42 EA, 21 LF Header Curb per Architectural Plan
3.9Rock Check Dam with Spillway
Detail 4, Sheet L2.2 and Section E-E, Sheet L2.1
8 EA
(8.5 TON)
Height of check dam to be 12" above adjacent upstream basin grade.
Check dam spillway to be recessed 3".
Rock Rip Rap: Arizona Trucking, Coronado 12" - 16"
BID ITEM #
9240110 9240018
9240120
PER ARCH
PLANS
9240121
9240142
PER ARCH
PLANS
9240141
Catch Basin: NDS Low-profile, 9" SQ (930) Grate: Iron Age Designs, Regular Joe 9" Sq. Heel Proof; Cast Ductile Iron;
Finish: Raw Drainpipe shall be Sch 40 PVC. Pipe to have minimum 1% slope to landscape area where shown on plans. Contractor to supply pipe and all incidental connectors as required.
3.1Water Harvesting Basin Vertical Sided - Flush Edge
Details 2 + 3, Sheet L2.2; Sections A-E, Sheet L2.1
3,350 SF
(3,900 CU.FT.)
900 LF (rock edge)
Raised edge 'curb' is used on east side of building, where basins are adjacent to patio and alley. Flush edge will be used in all other areas.
Basin floor to be ripped a minimum of 12" depth.
Rock Rip Rap: Arizona Trucking, Coronado 8" - 24"
9240110 9240018 9240111
3.3Planting Shelf 315 LF Shelf elevation to be at invert (±) of curb opening, downstream spillway invert, or as indicated on Plan. Intent is for plant stem to be above ponding.
Rock Rip Rap: Arizona Trucking, Coronado 8" - 12"
9240111Detail 2, Sheet L2.2 & Section D, Sheet L2.1
3.10
SYMBOL ITEM
GROUNDCOVER + BOULDERS
DESCRIPTIONQTY NOTES / SUPPLIER / DETAILKEYNOTE
NOTE: Quantities are provided for reference only. Contractor is responsible for calculating amount of material required to construct the project as depicted on the plan.
4.3
BID ITEM #
4.0Not Shown
Boulders 16 EA
2 EA
3' x 3' x 3' Avg Size 2' x 2' x 2' Avg Size
Color: Coronado Brown Refer to Details 4+5, Sheet L2.3
8030143 8030142
3'
Seeding (Hydroseed or Hand Scatter followed by a separate application of Straw Mulch)
Per Seed Mix, this Sheet.
Low-growing, sock + pet friendly
To be applied within all landscape areas. This includes all basin bottoms, all planting areas, and all site areas that are not shown to have alternative cover. Seed to be applied after soil preparation (furrows perpendicular to flow of water). This seed mix is appropriate for all areas (maximum plant height is 30"). No pre-emergent herbicide shall be applied in any area to be seeded.
Seed Supplier: Wildlands Restoration, Gary Maskarinec, garyberni@aol.com 520-882-0969
Refer to Seeding Area Keymap, this Sheet, Detail 3, Sheet L2.3 and Seeding Specifications, Sheet L2.5
3,800 SF
(0.1 AC)
4.1
8050007
Decomposed Granite, Stabilized
4.2Washed 14" Cactus Gold
Cactus Gold Stabilized Minus 14"
3" Depth after Compaction Source: Arizona Trucking & Materials or Equal Refer to Detail 3, Sheet L2.2; Section D, Sheet L2.1; and Specifications, Sheet L2.5;
700 SF
Cactus Gold 14" Washed 2" Depth; Source: Arizona Trucking & Materials or Equal Specified for basin areas that serve dual purposes. Washed rock has fewer fines, meaning less clogging of soil pores.
Refer to Detail 1, Sheet L2.3
550 SF
4.4Boulder Curb Edge (opposite bike racks)
4 EA 3 - 5' Long x 18" tall x 12 - 18" deep
Color: Coronado Brown Refer to Detail 4, Sheet L2.3
8030139
4.5Boulder Stepping Stones 2 EA 18" x 30" x height required to be level with top of adjacent curb
Color: Coronado Brown Refer to Detail 4, Sheet L2.3
8030140
Smooth side of rocks shall be placed up.
To be set with flat surface up to serve as stepping stone.
3' boulders are intended to serve as seating. Place smooth side up.
SYMBOL ITEM
DOG ACCOMODATIONS
DESCRIPTIONQTY NOTES / SUPPLIER / DETAILKEYNOTE
5.0Dog Waste Station Dogipot Aluminum Pet Station Item #: 1003-L www.dogipot.com/pet-stations Mount per Manufacturer's Specs
1 EA
5.1Designated Pet Area Sign 12" x 18" Sign, Aluminum, with ProShield Laminate, Post Mount https://www.dogpoopsigns.com Item: K-2241
1 EA
5.2Take your Dog to Designated Pet Area Sign
12" x 18" Sign, Aluminum, with ProShield Laminate, Post Mount https://www.dogpoopsigns.com Item: K-2239
2 EA
3.2Recessed Planting Area 200 SF Basin floor to be ripped a minimum of 12" depth.
Sides slopes 3:1
9240110 9240018
PER ARCH
PLANS
PER ARCH
PLANS
Detail 2, Sheet L2.3
3.11Rock Header (separates DG from adjacent planting area)
N/A18 SF Hand-placed rip rap, 8" width. Minimize spaces between rocks. Top of rip rap 12" above adjacent grade. Top surface to be relatively flat.
Rock Rip Rap: Arizona Trucking, Coronado 8" - 12"
9240142
Rock Run Downs and Flow Dissipaters (at downspout + scupper outlets)
50 SF 2" minimum between top of dissipater and bottom of scupper / downspout outlet. Hand-placed rip rap. Minimize spaces between rocks.
Rock Rip Rap: Arizona Trucking, Coronado 8" - 12"
9240142Detail 5, Sheet L2.2 and Sections A + B, Sheet L2.1
Water Harvesting Basin Vertical Sided - Raised Edge
SYMBOL ITEM
STREET SIGNS
NOTESQTYKEYNOTE
6.0No Parking Sign, R8-3 24" X 24"
Signs (materials, layout, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .