IFB_250133_Bid_Schedule.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Stone Avenue Youth Transitional Housing Project
Solicitation number
250133
Issued by
Pima County, Tucson City, Arizona

About this file

This is a bid schedule for IFB 250133 related to the Stone Avenue Youth Transitional Housing Project in Arizona. The project involves comprehensive exterior and interior improvements to an Econolodge facility containing 50 rooms that will be converted from single rooms into studio kitchenettes. The scope of work includes replacement or modification of major building systems including electrical, HVAC, plumbing, and structural elements to meet current code requirements and safety standards. Exterior improvements encompass landscaping with green stormwater infrastructure practices designed for water harvesting and community gathering and gardening spaces. The completed facility will serve as low-income transitional housing for youth. The bid schedule itemizes numerous work categories organized into site work, building demolition and construction, and general conditions, with separate line items for materials costs, labor costs, and total costs for each scope element.

The bid schedule provides a blank template for contractors to enter pricing for all identified work categories, with columns for materials costs and labor costs that sum to a total cost per line item. All line items are currently shown at $0.00, requiring bidders to complete the schedule with their actual pricing. The schedule includes standard construction cost categories such as site demolition, grading, paving, utilities, concrete work, framing, doors, drywall, mechanical systems, fire protection, security systems, and general conditions including mobilization, profit and overhead, insurance, and sales tax. Contractors are responsible for all costs associated with the project as specified in the plans and are instructed to add any additional costs not listed on the schedule. The total bid amount is to be entered on the final line of the schedule.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB 250133 Stone Avenue Youth Transitional Housing Project11/20/25
LocationDescriptionMaterials CostsLabor CostsTotal
SiteDemolition$0.00
Finish Grading$0.00
Base course & Paving$0.00
Water line - FDC$0.00
Electrical - Lighting$0.00
Elect. - Gates and access control$0.00
Concrete stairs & Framing$0.00
Concrete ramps and sidewalks$0.00
Rolling gates & Equip.$0.00
Wrought iron fencing & Guardrails$0.00
Hardscape$0.00
Landscape$0.00
$0.00
BuildingDemolition$0.00
Sawcut slabs$0.00
Concrete slabs$0.00
Framing - Floors$0.00
Framing - Walls$0.00
HM Doors & Frames$0.00
SCWD Doors & Frames$0.00
Door hardware$0.00
Drywall$0.00
Millwork/Cabinetry$0.00
Wood baseboards$0.00
Bathroom Accessories$0.00
Appliances$0.00
Plumbing$0.00
HVAC$0.00
Electrical$0.00
Fire sprinkler system$0.00
Fire alarm systems$0.00
Security system$0.00
$0.00
GeneralGeneral Conditions$0.00
Mobilization$0.00
Profit & Overhead$0.00
Insurance$0.00
Sales Tax$0.00

Totals: $0.00 $0.00 $0.00

Please add any additional Costs not listed here. Contractor responsible for all costs per the plans.

Total Bid Amount: ________________