SATPC0039973 Tab 04 4 SOW..pdf

PDF 168 KB Posted

Attached to
Strongback Fabrication
Solicitation number
80NSSC25918799Q
Issued by

About this file

This Statement of Work (SOW) from NASA Armstrong Flight Research Center (AFRC) details the requirements for fabricating Strongback components for an upcoming ground test effort. The SOW specifies the fabrication of multiple component types including floor beams, vertical beams, cap channels, plates, diagonals, track plates, and gusset plates across several detailed drawing sets, with specific part numbers and quantities for each component. NASA requires the contractor to complete and deliver all Strongback components within 12 weeks after contract award, provide a manufacturing process plan and quality tolerance plan, and submit three references demonstrating past performance.

The best value evaluation will consider lowest price, past performance information, delivery timeline, and technical acceptability. The contractor must provide fabrication status updates via email every three weeks and is responsible for documenting and reporting any requested drawing modifications during the fabrication process. Components will be shipped to NASA Armstrong Flight Research Center in Edwards, California, with contractors required to coordinate delivery logistics one week in advance. No government-furnished property will be provided, with all technical specifications outlined in the supplied drawing sets.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work –Strongback Fabrication

1.0 Introduction/Background: NASA Armstrong Flight Research Center (AFRC) has designed a Strongback for an upcoming ground test effort and is looking for a vendor to fabricate and deliver the Strongback components per the design drawings provided by NASA AFRC.

2.0 Scope of Work: This statement of work (SOW) pertains to the fabrication of test hardware components for the Strongback per the provided design drawings.

3.0 Objectives: The fabrication of the Strongback components will be one structure in the overall test setup design being formulated by NASA AFRC.

4.0 Description of the Work/Contractor Tasks: Contractor is to fabricate and deliver the components for the Strongback per the drawings identified in the section noted “Government furnished information.”

To preserve the NASA AFRC project schedule, the contractor is requested to complete the Strongback component fabrication and delivery within 12 weeks after contract award. The technical point-of-contacts are as follows and are available to answer questions regarding the Strongback component fabrication.

NASA Armstrong Flight Research Center Edwards, California 93523

5.0 Deliverables: Upon completion of the Strongback fabrication, the components are to be shipped to the following address. Contractors are to inform NASA one week in advance of the Strongback hardware delivery to coordinate the delivery logistics.

NASA Armstrong Flight Research Center Edwards, CA 93524

Other Considerations:

As part of the proposal submission, contractors as asked to provide information on the following:

• A manufacturing process plan for how the Strongback components will be fabricated.

• A quality plan for ensuring dimensional tolerances.

Best Value Evaluation:

Note that NASA AFRC intends to perform a “best value” evaluation of all market research collected by the NASA Shared Services Center (NSSC) in association with procurement of the Strongback components. The best value will be determined by a collective evaluation of the following criteria:

mailto:Larry.d.hudson@nasa.gov mailto:andrew.c.holguin@nasa.gov

• Lowest price

• Past performance information:

• Three (3) references for work performed within the past three (3) years

• Current contact name, e-mail address, and telephone number for each

• Description of the work performed for each

• Twelve (12) week delivery of Strongback components (to preserve project schedule) desired

• Technical acceptability

Milestones: The contractor is requested to provide status of fabrication process by email to the Technical POC at the end of every 3 weeks.

Government-furnished property: No Government furnished property will be provided.

Government-furnished information – NASA AFRC is supplying the following drawings that pertain to the Strongback components that are to be fabricated.

• FLL-HPROJ-0004_ Title: Strongback Floor Beams

Part Number Qty Nomenclature

FLL-HPROJ-0004-101 1 STRONGBACK FLOOR BEAM 1

FLL-HPROJ-0004-102 1 STRONGBACK FLOOR BEAM 2

FLL-HPROJ-0004-103 5 STRONGBACK FLOOR BEAM 3

FLL-HPROJ-0004-104 5 STRONGBACK FLOOR BEAM 5

• FLL-HPROJ-0005_ Title: Strongback Cap Channel

Part Number Qty Nomenclature

FLL-HPROJ-0005-101 1 STRONGBACK CAP CHANNEL

• FLL-HPROJ-0006_ Title: Strongback Cap Plate

Part Number Qty Nomenclature

FLL-HPROJ-0006-101 1 STRONGBACK BACK CAP PLATE

FLL-HPROJ-0006-103 1 STRONGBACK FRONT CAP PLATE

• FLL-HPROJ-0007_ Title: Strongback Vertical Beams

Part Number Qty Nomenclature

FLL-HPROJ-0007-101 3 STRONGBACK VERTICAL BEAM 1

FLL-HPROJ-0007-102 2 STRONGBACK VERTICAL BEAM 2

FLL-HPROJ-0007-103 1 STRONGBACK VERTICAL BEAM 3

FLL-HPROJ-0007-105 2 STRONGBACK VERTICAL BEAM 5

FLL-HPROJ-0007-106 2 STRONGBACK VERTICAL BEAM 6

FLL-HPROJ-0007-107 1 STRONGBACK VERTICAL BEAM 7

FLL-HPROJ-0007-109 1 STRONGBACK VERTICAL BEAM 9

• FLL-HPROJ-0011_ Title: Strongback Plates

Part Number Qty Nomenclature

FLL-HPROJ-0011-101 1 STRONGBACK PLATE A

FLL-HPROJ-0011-103 1 STRONGBACK PLATE B

FLL-HPROJ-0011-105 1 STRONGBACK PLATE C

FLL-HPROJ-0011-107 1 STRONGBACK PLATE D

FLL-HPROJ-0011-109 1 STRONGBACK PLATE E

FLL-HPROJ-0011-111 1 STRONGBACK PLATE F

FLL-HPROJ-0011-113 1 STRONGBACK PLATE G

FLL-HPROJ-0011-115 2 STRONGBACK PLATE H

FLL-HPROJ-0011-117 1 STRONGBACK PLATE J

FLL-HPROJ-0011-119 1 STRONGBACK PLATE K

FLL-HPROJ-0011-121 1 STRONGBACK PLATE L

• FLL-HPROJ-0012_ Title: Floor Plate Doubler

Part Number Qty Nomenclature

FLL-HPROJ-0012-101 1 FLOOR PLATE DOUBLER

• FLL-HPROJ-0013_ Title: Pedestal Adapter Plate

Part Number Qty Nomenclature

FLL-HPROJ-0013-101 4 PEDESTAL ADAPTE PLATE

• FLL-HPROJ-0015_ Title: Strongback Floor Track Plate 1

Part Number Qty Nomenclature

FLL-HPROJ-0015-101 1 STRONGBACK FLOOR TRACK PLATE 1

• FLL-HPROJ-0016_- Title: Strongback Gusset Plate

Part Number Qty Nomenclature

FLL-HPROJ-0016-101 12 STRONGBACK GUSSET PLATE

• FLL-HPROJ-0017_ Title: Strongback Floor Track Plate 2

Part Number Qty Nomenclature

FLL-HPROJ-0017-101 2 STRONGBACK FLOOR TRACK PLATE 2

• FLL-HPROJ-0018_ Title: Floor Beam Diagonal

Part Number Qty Nomenclature

FLL-HPROJ-0018-101 8 FLOOR BEAM DIAGONAL

• FLL-HPROJ-0019_ Title: Strongback Long Diagonal

Part Number Qty Nomenclature

FLL-HPROJ-0019-101 6 STRONGBACK LONG DIAGONAL

• FLL-HPROJ-0027_ Title: Strongback Cap Web Plate

Part Number Qty Nomenclature

FLL-HPROJ-0027-101 12 STRONGBACK CAP WEB PLATE

• FLL-HPROJ-0028_ Title: Strongback Floor Track Plate 3

Part Number Qty Nomenclature

FLL-HPROJ-0028-101 1 STRONGBACK FLOOR TRACK PLATE 3

The contractor is to document and provide NASA information regarding any requested changes / modifications to drawings identified during the fabrication process.

File details come from the government source that posted it. Updated .