J-2-6,_Bidding_Chart.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
Turbo - Administrative/lodging building
Solicitation number
SAQMMA17R0034
Issued by

About this file

Attachment J-2-6 (Bidding Chart)

View the file

Other files

File Type Posted
J-3-1,_Specifications_(A003).pdf PDF
SAQMMA17R0034_A003.pdf PDF
J-3-4,_Drawing_HS-03_(A003).pdf PDF
SAQMMA17R0034_A002.pdf PDF
SAQMMA17R0034_Section_B-M_(A001).pdf PDF
SAQMMA17R0034_A001.pdf PDF
Location.dwg DWG drawing
Electrical-Mechanical.dwg DWG drawing
General_Layout.dwg DWG drawing
Structural.dwg DWG drawing
Hydro-Sanitary.dwg DWG drawing
Xref_Plan_Turbo.dwg DWG drawing
Architectural.dwg DWG drawing
SAQMMA17R0034_Questions_and_Answers.pdf PDF
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-2-5,_Submittal_Register.pdf PDF
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-3-2,_Drawings.pdf PDF
SAQMMA17R0034_SF1442.pdf PDF
J-3-3,_Form_4025-R.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-1,_Specifications.pdf PDF
J-2-1,_Material_or_Product_Substitution_Form.docx DOCX document
SAQMMA17R0034_Schedule_B-M.pdf PDF
J-2-3,_IncidentReports.docx DOCX document
J-1-2,_Past_Performance_and_References.xlsx XLSX spreadsheet
J-1-3,_SAM_Registration.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBS

-8XXXxOFFICIAL BIDDING CHART
-7XXXxPROJECT:SEIT No. 12 Turbo
-6XXXxPlace:The Marine battalion No. 16 at Turbo (Antioquia), Colombia
-5XXXx
-4XXXx
-3XXXx
-2XXXxBASE BID (CLIN 001)
-1XXXx
StatusLinePHASEDIVSUBDIVSUBDIV ITEMITEMDESCRIPTIONMATERIAL UNITMATERIAL QUANTITYMATERIAL UNIT COSTLABOR UNITLABOR QUANTITYLABOR UNIT COSTEQUIPMENT UNITEQUIPMENT QUANTITYEQUIPMENT UNIT COSTTOTAL COSTTOTAL COST BY CHAPTER
x1AA. GENERAL REQUIREMENTS$ 0.00
x33A11GENERAL REQUIREMENTS$ 0.00
P43A101 30 0001 32 16 00 20Construction Progress Documentation$ 0.00
x44A101 30 00l$ 0.00
x45A101 30 00l
P43A101 30 0001 33 00Submittal Procedures$ 0.00
x44A101 30 00l$ 0.00
x45A101 30 00l
P49A101 50 0001 50 00Temporary Construction Facilities and Controls$ 0.00
x50A101 50 00l$ 0.00
x51A101 50 00l
P61A101 70 0001 78 00Execution and Closeout Submittals$ 0.00
x62A101 70 00l$ 0.00
x63A101 70 00l
x70BB. SEIT BUILDING$ 0.00
x71B22EXISTING CONDITIONS$ 0.00
D72B202 41 0002 41 00Demolition$ 0.00
x73B202 41 00l$ 0.00
x74B202 41 00l
x75B33CONCRETE$ 0.00
D76B303 11 13.00 1003 15 00.00 10Concrete accessories$ 0.00
x77B303 11 13.00 10l$ 0.00
x78B303 11 13.00 10l
D79B303 20 00.00 1003 20 00.00 10Concrete Reinforcing$ 0.00
x80B303 20 00.00 10l$ 0.00
x81B303 20 00.00 10l
D82B303 30 0003 31 01.00 10Cast-in-Place Structural Concrete for Civil Works$ 0.00
x83B303 30 00l$ 0.00
x84B303 30 00l
x85B44MASONRY$ 0.00
D86B404 20 0004 20 00Masonry$ 0.00
x87B404 20 00l$ 0.00
x88B404 20 00l
x89B55METALS$ 0.00
D90B505 05 2305 05 23.16Welding, Structural$ 0.00
x91B505 05 23l$ 0.00
x92B505 05 23l
D93B505 12 0005 12 00Structural Steel$ 0.00
x94B505 12 00l$ 0.00
x95B505 12 00l
x109B77THERMAL AND MOISTURE PROTECTION$ 0.00
D110B707 21 1607 41 63Fabricated roof panels assemblies$ 0.00
x111B707 21 16l$ 0.00
x112B707 21 16l
D113B707 41 6307 60 00Flashing and Sheet Metal$ 0.00
x114B707 41 63l$ 0.00
x115B707 41 63l
D113B707 41 6307 92 00Joint Sealants$ 0.00
x114B707 41 63l$ 0.00
x115B707 41 63l
x125B88OPENINGS$ 0.00
D126B808 11 1308 11 16Aluminium Doors and Frames$ 0.00
x127B808 11 13l$ 0.00
x128B808 11 13l
D135B808 71 0008 51 13Aluminum Windows$ 0.00
x136B808 71 00l$ 0.00
x137B808 71 00l
D138B808 81 0008 71 00Door Hardware$ 0.00
x139B808 81 00l$ 0.00
x140B808 81 00l
D141B808 91 0008 81 00Glazing$ 0.00
x142B808 91 00l$ 0.00
x143B808 91 00l
x144B99FINISHES$ 0.00
D145B909 06 9009 06 90Color Schedule$ 0.00
x146B909 06 90l$ 0.00
x147B909 06 90l
D145B909 06 9009 06 90Stucco$ 0.00
x146B909 06 90l$ 0.00
x147B909 06 90l
D145B909 06 9009 06 90Veneer plaster$ 0.00
x146B909 06 90l$ 0.00
x147B909 06 90l
PU154B909 30 0009 30 13Ceramic Tiling$ 0.00
x155B909 30 00l$ 0.00
x156B909 30 00l
D157B909 51 0009 51 00Acoustical Ceilings$ 0.00
x158B909 51 00l$ 0.00
x159B909 51 00l
D160B909 90 0009 90 00Paints and Coatings$ 0.00
x161B909 90 00l$ 0.00
x162B909 90 00l
D160B909 90 0009 96 00High-Performance Coatings$ 0.00
x161B909 90 00l$ 0.00
x162B909 90 00l
x163B1010SPECIALTIES$ 0.00
D167B1010 28 1310 14 00.20Interior Signage$ 0.00
x168B1010 28 13l$ 0.00
x169B1010 28 13l
D167B1010 28 1310 21 13Toilet Compartments$ 0.00
x168B1010 28 13l.$ 0.00
x169B1010 28 13l
D167B1010 28 1310 28 13Toilet Accessories$ 0.00
x168B1010 28 13l$ 0.00
x169B1010 28 13l
D170B1010 44 1610 44 16Fire Extinguishers$ 0.00
x194B1313 48 00l$ 0.00
x195B1313 48 00l
x163B1012FURNISHINGS$ 0.00
D167B1010 28 1312 36 00Countertops$ 0.00
x168B1010 28 13l$ 0.00
x169B1010 28 13l
x196B2222PLUMBING$ 0.00
D197B2222 00 0022 00 00Plumbing, General Purpose$ 0.00
x198B2222 00 00l$ 0.00
x199B2222 00 00l
x200B2323HEATING, VENTILATING, AND AIR CONDITIONING$ 0.00
D201B2323 00 0023 00 00Air Supply, Distribution, Ventilation and Exhaust Systems$ 0.00
x202B2323 00 00l$ 0.00
x203B2323 00 00l
D216B2323 34 23.00 4023 03 00.00 20Basic Mechanical Materials and Methods$ 0.00
x217B2323 34 23.00 40l$ 0.00
x218B2323 34 23.00 40l
D216B2323 34 23.00 4023 07 00Basic Mechanical Materials and Methods$ 0.00
x217B2323 34 23.00 40l$ 0.00
x218B2323 34 23.00 40l
D216B2323 34 23.00 4023 23 00Refrigerant Piping$ 0.00
x217B2323 34 23.00 40l$ 0.00
x218B2323 34 23.00 40l
D216B2323 34 23.00 4023 81 00.00 20Unitary Air Conditioning Equipment$ 0.00
x217B2323 34 23.00 40l$ 0.00
x218B2323 34 23.00 40l
x225B2626ELECTRICAL$ 0.00
D226B2626 20 0026 00 00.00 20Basic Electrical Materials and Methods$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 05 00.00 40Common Work Results for Electrical$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 05 19.00 10Insulated Wire and Cable$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 05 71.00 40Low Voltage Overcurrent Protective Devices$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 08 00Apparatus Inspection and Testing$ 0.00
x227B2626 20 00l$ 0.00
D226B2626 20 0026 09 13Power Monitoring System$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 09 23.00 40Lighting Control Devices$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 11 16Secondary Unit Substations$ 0.00
x227B2626 20 00l$ 0.00
D226B2626 20 0026 20 00Interior Distribution System$ 0.00
x227B2626 20 00l$ 0.00
D226B2626 20 0026 24 16.00 40Pannelboards$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 28 01.00 10Coordinated Power System Protection$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 28 21.00 40Automatic Transfer Switches$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D226B2626 20 0026 32 14.00 10Disel-Generator Set, Stationary 15-300KW, Standby Applications$ 0.00
x227B2626 20 00l$ 0.00
x228B2626 20 00l
D235B2626 32 33.00 1026 32 33.00 10Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity$ 0.00
x236B2626 32 33.00 10l$ 0.00
x237B2626 32 33.00 10l
D235B2626 32 33.00 1026 41 01.00 40Lightning Protection System$ 0.00
x236B2626 32 33.00 10l$ 0.00
x237B2626 32 33.00 10l
D238B2626 51 00.00 4026 51 00Lighting$ 0.00
x239B2626 51 00.00 40l$ 0.00
x240B2626 51 00.00 40l
x244B2727COMMUNICATIONS$ 0.00
P245B2727 10 0027 05 26.00 40High Frecuency Grounding and Signal Reference Grid (SRG)$ 0.00
x246B2727 10 00l$ 0.00
x247B2727 10 00l
P245B2727 10 0027 10 00Building Telecommunications Cabling System$ 0.00
x246B2727 10 00l$ 0.00
x247B2727 10 00l
x248B2828ELECTRONIC SAFETY AND SECURITY$ 0.00
D249B2828 31 00.00 1028 20 01.00 10Electronic Security System$ 0.00
x250B2828 31 00.00 10l$ 0.00
x251B2828 31 00.00 10l
D249B2828 31 00.00 1028 23 23.00 10Closed Circuit Television System$ 0.00
x250B2828 31 00.00 10l$ 0.00
x251B2828 31 00.00 10l
x252CC. EXTERIOR WORKS$ 0.00
x253C3131EARTHWORK$ 0.00
D254C3131 00 0031 00 00Earthwork$ 0.00
x255C3131 00 00l$ 0.00
x256C3131 00 00l
D257C3131 11 0031 11 00Clearing and Grubbing$ 0.00
x258C3131 11 00l$ 0.00
x259C3131 11 00l
D260C3131 23 00.00 2031 23 00.00 20Excavation and Fill$ 0.00
x261C3131 23 00.00 20l$ 0.00
x262C3131 23 00.00 20l
D257C3131 11 0031 60 00Foundation Preparation$ 0.00
x258C3131 11 00l$ 0.00
x259C3131 11 00l
x270C3232EXTERIOR IMPROVEMENTS$ 0.00
D257C3131 11 0032 16 13Concrete Sidewalks and Curbs and Gutters$ 0.00
x258C3131 11 00l$ 0.00
x259C3131 11 00l
D271C3232 92 2332 92 23Sodding$ 0.00
x272C3232 92 23l$ 0.00
x273C3232 92 23l
x274C3333UTILITIES$ 0.00
P275C3333 11 0033 11 00Water Distribution$ 0.00
x276C3333 11 00l$ 0.00
x277C3333 11 00l
P278C3333 30 0033 30 00Sanitary Sewer$ 0.00
x279C3333 30 00l$ 0.00
x280C3333 30 00l
D287C3333 71 01.00 4033 71 01.00 40Overhead Transmission and Distribution$ 0.00
x288C3333 71 01.00 40l$ 0.00
x289C3333 71 01.00 40l
D287C3333 71 01.00 4033 71 02Underground Electrical and Telecomunications Distribution$ 0.00
x288C3333 71 01.00 40l$ 0.00
x289C3333 71 01.00 40l
x290DD. MARKUPS$ 0.00
x291DDDTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID)$ 0.00
x292DDDAdministration%$ 0.00
x293DDDUnforenseens%$ 0.00
x294DDDProfit%$ 0.00
x295DDDTAX(Over the profit value)%$ 0.00
x296DTTOTAL COSTS (BASE BID) $$ 0.00

AC System (CLIN 1001): POST CONSTRUCTION SERVICES

ITEMDESCRIPTIONMATERIAL UNITMATERIAL QUANTITYMATERIAL UNIT COSTLABOR UNITLABOR QUANTITYLABOR UNIT COSTEQUIPMENT UNITEQUIPMENT QUANTITYEQUIPMENT UNIT COSTTOTAL COSTTOTAL COST BY CHAPTER
B. SEIT BUILDING
23HEATING, VENTILATING, AND AIR CONDITIONING$ 0.00
23 81 00.00 20Unitary Air Conditioning Equipment$ 0.00
1 year Preventive Maintenace$ 0.00
D. MARKUPS$ 0.00
DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (OPTION 1)$ 0.00
DAdministration%$ 0.00
DUnforenseens%$ 0.00
DProfit%$ 0.00
DTAX(Over the profit value)%$ 0.00
TTOTAL COSTS (CLIN 1001) $$ 0.00

Electronic Security System (CLIN 1002): POST CONSTRUCTION SERVICES

ITEMDESCRIPTIONMATERIAL UNITMATERIAL QUANTITYMATERIAL UNIT COSTLABOR UNITLABOR QUANTITYLABOR UNIT COSTEQUIPMENT UNITEQUIPMENT QUANTITYEQUIPMENT UNIT COSTTOTAL COSTTOTAL COST BY CHAPTER
B. SEIT BUILDING
28ELECTRONIC SAFETY AND SECURITY$ 0.00
28 20 01.00 10Electronic Security System$ 0.00
1 year Maintenance Service$ 0.00
D. MARKUPS$ 0.00
DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (OPTION 1)$ 0.00
DAdministration%$ 0.00
DUnforenseens%$ 0.00
DProfit%$ 0.00
DTAX(Over the profit value)%$ 0.00
TTOTAL COSTS (1002) $$ 0.00

CCTV (CLIN 1003): POST CONSTRUCTION SERVICES

ITEMDESCRIPTIONMATERIAL UNITMATERIAL QUANTITYMATERIAL UNIT COSTLABOR UNITLABOR QUANTITYLABOR UNIT COSTEQUIPMENT UNITEQUIPMENT QUANTITYEQUIPMENT UNIT COSTTOTAL COSTTOTAL COST BY CHAPTER
B. SEIT BUILDING
28ELECTRONIC SAFETY AND SECURITY$ 0.00
28 20 01.00 10Electronic Security System$ 0.00
1 year Maintenance Service$ 0.00
28 23 23.00 10Closed Circuit Television System$ 0.00
1 year Maintenance Service$ 0.00
D. MARKUPS$ 0.00
DTOTAL DIRECT COST PHYSICAL ADECUATION WORKS (OPTION 1)$ 0.00
DAdministration%$ 0.00
DUnforenseens%$ 0.00
DProfit%$ 0.00
DTAX(Over the profit value)%$ 0.00
TTOTAL COSTS (1003) $$ 0.00

SEIT No. 12 Page &P of &N TURBO, COLOMBIA

Sheet2

Sheet3 image1.emf

File details come from the government source that posted it. Updated .