J-2-5,_Submittal_Register.pdf

PDF 148 KB Posted

Attached to
Turbo - Administrative/lodging building
Solicitation number
SAQMMA17R0034
Issued by

About this file

Attachment J-2-5 (Submittal Register)

View the file

Other files

File Type Posted
J-3-4,_Drawing_HS-03_(A003).pdf PDF
SAQMMA17R0034_A003.pdf PDF
J-3-1,_Specifications_(A003).pdf PDF
SAQMMA17R0034_A002.pdf PDF
SAQMMA17R0034_A001.pdf PDF
SAQMMA17R0034_Section_B-M_(A001).pdf PDF
Architectural.dwg DWG drawing
Hydro-Sanitary.dwg DWG drawing
Xref_Plan_Turbo.dwg DWG drawing
Location.dwg DWG drawing
Electrical-Mechanical.dwg DWG drawing
General_Layout.dwg DWG drawing
Structural.dwg DWG drawing
SAQMMA17R0034_Questions_and_Answers.pdf PDF
J-2-1,_Material_or_Product_Substitution_Form.docx DOCX document
SAQMMA17R0034_Schedule_B-M.pdf PDF
J-2-6,_Bidding_Chart.xlsx XLSX spreadsheet
J-2-3,_IncidentReports.docx DOCX document
J-1-2,_Past_Performance_and_References.xlsx XLSX spreadsheet
J-1-3,_SAM_Registration.pdf PDF
J-3-2,_Drawings.pdf PDF
SAQMMA17R0034_SF1442.pdf PDF
J-3-3,_Form_4025-R.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-1,_Specifications.pdf PDF
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 32 PAGES

SEIT-12

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Insurance Policy (poliza de cumplimeinto):

Payment Insurance Policy(Poliza de Pagos de Salarios y Prestaciones Sociales):

Liability Insurance Policy(Poliza de Responsabilidad Civil Contractual):

Stability Insurance Policy(Poliza de Estabilidad):

Elements Quality Insurance Policy(Poliza de Calidad de Elementos):

Correct Equipment Functioning Insurance Policy(Poliza de Correcto funcionamiento de los Equipos):

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 32 PAGES

01 11 00 List of Proposed Products Enviromental plan implementation

01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule

Submittal Register 01 33 00 SD-01 Preconstruction Submittals

1.5 GSubmittal Register

01 50 00 SD-01 Preconstruction Submittals

1.3Construction site plan 01 74 19 SD-01 Preconstruction Submittals

1.6Waste Management Plan SD-11 Closeout Submittals

1.7Records 01 78 00 SD-03 Product Data

As-Built Record of Equipment and Materials

1.4.1Warranty Management Plan 1.4.4Warranty Tags

Spare Parts Data SD-08 Manufacturer’s Instructions

1.3Preventative Maintenance 1.3Condition Monitoring (Predictive

Testing) 1.3Inspection 1.4.1Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 32 PAGES

01 78 00 SD-10 Operation and Maintenance Data

1.5Operation and Maintenance Manuals

SD-11 Closeout Submittals Record Drawings Final report

03 11 13.00 10 SD-03 Product Data 1.2Design 2.1Form Materials 2.1.5Form Releasing Agents

SD-04 Samples Sample Panels

SD-06 Test Reports 3.5Inspection

SD-07 Certificates Fiber Voids

03 15 00.00 10 SD-03 Product Data 2.1Preformed Expansion Joint Filler 2.2Sealant 2.3Waterstops

SD-07 Certificates 2.1Preformed Expansion Joint Filler 2.2Sealant 2.3Waterstops

03 20 00.00 10 SD-03 Product Data Welding

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 32 PAGES

03 20 00.00 10 3.1.4.1Butt-Splices Material

SD-06 Test Reports Material Tests, Inspections, and Verifications

SD-07 Certificates 2.3Reinforcing Steel

Qualification of Steel Bar Butt-Splicers

03 31 01.00 10 SD-03 Product Data Concrete Mixture Proportions Batch Plant:

Concrete Mixers Conveying Equipment Placing Equipment

3.1.3Construction Joint Treatment SD-06 Test Reports

3.3.2.2Quality of Aggregates 3.3Tests and Inspections

SD-07 Certificates 1.3Testing Technicians 2.1.1Cementitious Materials

Admixture 04 20 00 SD-02 Shop Drawings

1.4.4Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 32 PAGES

04 20 00 SD-03 Product Data Local/Regional Materials Environmental Data

2.4.2Cement SD-04 Samples

2.2Concrete Masonry Units (CMU) 2.6Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials 2.7Joint Reinforcement 1.4.3Portable Panel

SD-06 Test Reports 3.21.1Field Testing of Mortar 3.21.2Field Testing of Grout 3.21.3Prism tests 2.4.2Masonry Cement

SD-07 Certificates 2.2Concrete Masonry Units (CMU) 2.6Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials 2.7Joint Reinforcement 2.4.2Masonry Cement 2.4.1Admixtures for Masonry Mortar

Admixtures for Grout 1.4.2Contamination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 32 PAGES

04 20 00 SD-08 Manufacturer’s Instructions 2.4.2Masonry Cement

SD-10 Operation and Maintenance Data Plastic Identification Take-Back Program

05 05 23 SD-03 Product Data 1.5Welding Procedure Qualifications 1.5.5Welder, Welding Operator, and

Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination 1.5.1Certified Welding Procedure

Specifications (WPS) 1.5.1Certified Procedure Qualification

Records (PQR) 1.5.1Certified Welder Performance

Qualifications (WPQ) 05 12 00 SD-02 Shop Drawings

1.3.1Fabrication drawings SD-03 Product Data

2.4Shop primer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 32 PAGES

05 12 00 2.3.1Welding electrodes and rods SD-07 Certificates

2.1Steel 2.2Bolts, nuts, and washers

Welding procedures and qualifications

07 41 63 SD-01 Preconstruction Submittals 1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer

SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly

SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories

SD-04 Samples 1.5.1Roofing Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 32 PAGES

07 41 63 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Insulation 1.5.1Manufacturer s color charts and chips SD-05 Design Data

1.5.1Wind design analysis SD-07 Certificates

2.2.2Fasteners 1.5.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals

1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets

07 60 00 SD-02 Shop Drawings 3.1.7Gutters 3.1.8Downspouts 3.1.11Flashing at roof penetrations 3.1.9Eave flashing

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 32 PAGES

07 92 00 2.4Backstops SD-07 Certificates

3.3.6Sealant 08 11 16 SD-04 Samples

1.5.1.1Finish sample SD-08 Manufacturer’s Instructions

2.1Doors and frames 08 51 13 SD-02 Shop Drawings

2.1Windows 1.9Fabrication Drawings

SD-03 Product Data 2.1Windows 2.2.2.1Hardware 2.2.4Screens 2.2.2Accessories 1.10.4Thermal performance

SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample

SD-10 Operation and Maintenance Data

2.1Windows 08 81 00 SD-03 Product Data

1.3Glazing Accessories SD-04 Samples

2.3.1Glazing Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 32 PAGES

08 81 00 2.3.2.1Sealant 09 06 90 SD-04 Samples

2.2Color Schedule 09 24 23 SD-03 Product Data

3.3Proportions and Mixing SD-04 Samples Colored Stucco Finish Coat

1.3Sample Panel 09 26 00 SD-03 Product Data

2.1.4Gypsum base 2.1.5Gypsum veneer plaster

09 30 13 SD-03 Product Data 2.1Tile

CERAMIC

: Commercial Traffic

2.2Setting-Bed 2.4Mortar, Grout, and Adhesive

SD-04 Samples 2.1Tile

CERAMIC

2.4Grout SD-07 Certificates

2.1Tile 2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 32 PAGES

09 30 13 3.5Maintenance Instructions SD-10 Operation and Maintenance Data

3.2 GInstallation

SD-11 Closeout Submittals Adhesives

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data Acoustical Ceiling Systems Certification

SD-04 Samples Ceiling Tiles

09 90 00 SD-03 Product Data 2.1Coating 2.1Manufacturer's Technical Data

Sheets 3.3.5Sealant

SD-04 Samples Color Textured Wall Coating System Sample Textured Wall Coating System Mock-Up

SD-08 Manufacturer’s Instructions Application instructions

3.7.2Mixing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 32 PAGES

09 90 00 1.6.2Manufacturer's Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1Coatings:

09 96 00 SD-01 Preconstruction Submittals

1.3Material, Equipment and Fixture List

SD-03 Product Data 2.1Heat-Resistant Coatings 2.2Epoxy Coatings 2.3Polyurethane Coatings 2.4Chlorinated-Rubber Coatings

SD-04 Samples 1.3Color Chips

SD-07 Certificates 2.1Heat-Resistant Coatings 2.2Epoxy Coatings 2.3Polyurethane Coatings 2.4Chlorinated-Rubber Coatings

10 14 00.20 SD-02 Shop Drawings Detail Drawings

SD-03 Product Data 3.1Installation

SD-04 Samples Interior Signage

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 32 PAGES

10 14 00.20 SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-03 Product Data

2.1Cleaning and Maintenance Instructions

2.8Colors And Finishes 2.2.2Anchoring Devices and

Fasteners 2.2.4Hardware and Fittings 2.2.3Brackets 2.2.5Door Hardware 2.3.1Toilet Enclosures 2.3.2Urinal Screens 2.6Pilaster Shoes

SD-04 Samples 2.8Colors and Finishes 2.2.4Hardware and Fittings 2.2.2Anchoring Devices and

Fasteners SD-07 Certificates

1.5Warranty 10 28 13 SD-03 Product Data

2.1.2Finishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 32 PAGES

10 28 13 2.2Accessory Items SD-04 Samples

2.1.2Finishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-02 Shop Drawings 2.1Fire Extinguishers

Accessories 2.4Cabinets 2.5Wall Brackets

SD-03 Product Data 2.1Fire Extinguishers

Accessories 2.5Wall Brackets

SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets

Accessories SD-07 Certificates

2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 12 36 00 SD-02 Shop Drawings

2.3Fabrication 3.1Installation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 32 PAGES

12 36 00 SD-03 Product Data In situ polishedGranite material components

Tile SD-04 Samples

2.3Countertop 2.3Backsplash, Bronce Counter top joints Manufacturer's Standard Color Charts

2.2Filler Material SD-08 Manufacturer’s Instructions Manufacturer's Instructions

22 00 00 SD-02 Shop Drawings 3.7.1Plumbing System

SD-03 Product Data 2.4Fixtures 3.7.1Plumbing System

SD-06 Test Reports 3.7Tests, Flushing and Disinfection

SD-07 Certificates 1.3Materials and Equipment

SD-10 Operation and Maintenance Data

3.7.1Plumbing System 23 00 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 32 PAGES

23 00 00 1.4.5Detail Drawings SD-03 Product Data Air Vents, Penthouses, and Goosenecks

Ceiling Exhaust Fans Air Handling Units

2.9.1Room Fan-Coil Units Test Procedures Diagrams

SD-06 Test Reports 3.8Performance Tests

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.9.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.9.1Operation and Maintenance Manuals

23 07 00 SD-03 Product Data Pipe Insulation Systems

SD-08 Manufacturer’s Instructions Pipe Insulation Systems

23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 32 PAGES

23 23 00 SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 23 81 00.00 20 SD-02 Shop Drawings

2.5.2Field-assembled refrigerant piping

1.4.2Control system wiring diagrams SD-03 Product Data

2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils

SD-06 Test Reports 3.8.3Start-up and initial operational tests SD-08 Manufacturer’s Instructions

2.1Room air conditioners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 32 PAGES

23 81 00.00 20 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data

2.1Room air conditioners 2.2Air conditioners

SD-11 Closeout Submittals 1.4.4Posted operating instructions

26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull

Boxes 2.1.8Circuit Breakers 2.1.7Panelboards 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution

Transformers SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 32 PAGES

26 05 00.00 40 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates 1.4Certification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions

SD-06 Test Reports 3.2Tests, Inspections, and

Verifications 26 05 71.00 40 SD-02 Shop Drawings

3.1Protective Devices SD-03 Product Data

2.2Enclosures 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments

SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports

SD-08 Manufacturer’s Instructions 3.1Protective Devices

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 32 PAGES

26 05 71.00 40 2.3Circuit Breakers 26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data

2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices

Lighting Contactor 2.2.2Photocell Switch 2.2.3Occupancy Sensors 1.3Motion Sensors

SD-06 Test Reports 3.2System Operation Tests

26 11 16 SD-02 Shop Drawings 1.5.1.1Unit Substation Drawings 1.5.1.2Transformer drawings

SD-03 Product Data 1.5.1.1Fuse curves 2.2Secondary unit substation 2.2.3transformer (dry-type)

SD-06 Test Reports 3.6.1Acceptance checks and tests

SD-07 Certificates 1.5.2Paint coating system

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 32 PAGES

26 11 16 1.5.3Transformer Losses SD-09 Manufacturer’s Field Reports

2.6.2Load Interrupter Switch production tests

2.6.4transformer routine and other tests (liquid-filled)

SD-10 Operation and Maintenance Data

2.2Unit substations SD-11 Closeout Submittals

1.6.1Assembled Operation and Maintenance Manuals

2.6.1Equipment test schedule 26 20 00 SD-02 Shop Drawings

2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips

SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 32 PAGES

26 20 00 2.15Enclosed circuit breakers CATV outlets

2.20.3Grounding Busbar 2.25Surge protective devices

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test

SD-09 Manufacturer’s Field Reports

2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings 2.1.1Outline Drawings

SD-03 Product Data 1.3Panelboards 2.1.1Panelboards

SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests

SD-07 Certificates 1.4Statements

SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 32 PAGES

26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination

Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation

SD-06 Test Reports 3.3Field Testing

SD-07 Certificates 1.6Devices and Equipment

26 28 21.00 40 SD-02 Shop Drawings 2.1Connection Diagrams 2.1Fabrication Drawings 2.1Installation Drawings

SD-03 Product Data 2.1Equipment and Performance

Data 2.3.1Contacts 2.3.2Indicating Lights 2.3.3Terminal Board 2.2.2Enclosures 2.5Accessories

SD-06 Test Reports 1.3Qualification Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 32 PAGES

26 28 21.00 40 1.3Operation Tests SD-08 Manufacturer’s Instructions

2.3.2Automatic Transfer Switch 26 32 14.00 10 SD-02 Shop Drawings

1.4.3Detailed Drawings 3.10Acceptance

SD-03 Product Data 2.4Manufacturer's Catalog 3.9Instructions 1.4.2Experience 3.2General Installation 3.1Site Visit

SD-05 Design Data 2.8Sound Limitations 2.14Generator 2.5.4Integral Main Fuel Storage Tank

Power Factor 2.7.2Heat Exchanger 2.18.5Time-Delay on Alarms 2.7Cooling System 1.2.5Vibration Isolation

SD-06 Test Reports 3.5.6Performance Tests 3.5Onsite Inspection and Tests

SD-07 Certificates 1.2.5Vibration Isolation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 32 PAGES

26 32 14.00 10 3.4Prototype Tests 1.2.6Reliability and Durability 2.11Emissions 2.8Sound limitations 2.14.1Current Balance 2.3Materials and Equipment 2.27Factory Inspection and Tests 3.5.4Inspections 2.7Cooling System

SD-10 Operation and Maintenance Data

1.6.1Operation Manual 1.6.2Maintenance Manual 1.6.3Extra Materials

26 32 33.00 10 SD-02 Shop Drawings 1.2UPS System 3.2Installation

SD-03 Product Data 1.2.4Performance Requirements 1.7Spare Parts

3.5 GField Training

SD-06 Test Reports 2.12Factory Testing 3.3Field Supervision, Startup and

Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 32 PAGES

26 32 33.00 10 SD-10 Operation and Maintenance Data

3.5Operating and Maintenance Manuals

26 41 00.00 40 SD-02 Shop Drawings 1.4.1Overall lightning protection system 1.4.1Each major component

SD-03 Product Data 2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors 2.5Lightning Protection Components 2.1Hardware 2.1Accessories

SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent

3.6.3Certificates 26 51 00 SD-03 Product Data

LED lighting fixtures LED lamps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 32 PAGES

26 51 00 2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs

LED Emergency lighting equipment

2.12Occupancy sensors SD-06 Test Reports

3.2Operating test 27 05 26.00 40 SD-03 Product Data

Product Data 27 10 00 SD-02 Shop Drawings

1.6.1.1Telecommunications drawings 1.6.1.2Telecommunications Space

Drawings SD-03 Product Data

2.4Telecommunications cabling 2.5.6Patch panels 2.6Telecommunications outlet/connector assemblies 2.5.3Equipment support frame

SD-06 Test Reports 3.5.1Telecommunications cabling testing SD-07 Certificates

1.6.2.1Telecommunications Contractor 1.6.2.3Manufacturer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 32 PAGES

27 10 00 1.6.3Test plan SD-10 Operation and Maintenance Data

1.10.1Telecommunications cabling and pathway system

SD-11 Closeout Submittals 1.10.2Record Documentation

28 23 23.00 10 SD-02 Shop Drawings 1.4.2.4Graphics 1.3.3As-built Drawings

SD-03 Product Data 1.4CCTV Technical Data Packages 3.6.9Software Updates

SD-06 Test Reports 1.4.2Performance Verification Test 1.3.2Test Procedures and Reports

SD-08 Manufacturer’s Instructions 1.4.3Group V Technical Data Package

SD-10 Operation and Maintenance Data

1.4.2.1Operation and Maintenance Manuals

3.4.2Operator's Training Report SD-11 Closeout Submittals

1.4.2.3Data Entry 31 00 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 32 PAGES

31 00 00 3.5Shoring 1.3.2Dewatering Work Plan

SD-03 Product Data 3.9Utilization of Excavated Materials 1.3.1.2Rock Excavation

Opening of any Excavation or Borrow Pit

Shoulder Construction SD-06 Test Reports

3.17Testing Borrow Site Testing

SD-07 Certificates 3.17Testing

31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials

31 23 00.00 20 SD-01 Preconstruction Submittals 1.5.1Shoring and Sheeting Plan 1.5.2Dewatering work plan

SD-06 Test Reports Borrow Site Testing

3.12.2.1Fill and backfill 3.12.2.2Select material 3.12.2.3Density tests

31 60 00 SD-03 Product Data 3.2.1.1Tools

32 16 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 32 PAGES

32 16 13 2.1Concrete SD-06 Test Reports

3.8Field Quality Control 32 92 23 SD-03 Product Data

2.3Fertilizer SD-06 Test Reports Topsoil composition tests

SD-07 Certificates 2.1sods

33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line

Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes

SD-06 Test Reports 2.2.2.4Disinfection

SD-07 Certificates 2.1Water distribution main 2.2Water service line

Displacement Type Meters Compound Type Meters

SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling

Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 32 PAGES

33 30 00 SD-01 Preconstruction Submittals Existing Conditions

SD-02 Shop Drawings 1.4.1Drawings 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings

SD-03 Product Data 2.1Pipeline materials

SD-06 Test Reports 2.4Reports

SD-07 Certificates Gaskets

33 71 01.00 40 SD-03 Product Data

2.6 GConductors

2.5 GInsulators

2.2.1 GConcrete poles

2.17 GNameplates

GPole top switch GRecloser GSectionalizer

2.12 GCutouts

2.14 GTransformer

GMetering equipment GMeters

2.11 GSurge arresters

2.7Guy strand

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 32 PAGES

33 71 01.00 40 2.9Anchors SD-05 Design Data

2.2.1 GConcrete poles

SD-06 Test Reports

GField Test Plan

3.6 GField Quality Control

1.5.3 GGround resistance test reports

SD-07 Certificates

2.2.1 GConcrete poles

2.14.1 GTransformer Losses

SD-09 Manufacturer’s Field Reports

2.18.2 Groutine and other tests

SD-10 Operation and Maintenance Data

1.6.1 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.18.1 GTransformer test schedule

33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material

2.11.2Manhole frames and covers 2.11.3Handhole frames and covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .