J-1-2,_Past_Performance_and_References.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Turbo - Administrative/lodging building
Solicitation number
SAQMMA17R0034
Issued by

About this file

Attachment J-1-2 (Past Performance and References)

View the file

Other files

File Type Posted
J-3-1,_Specifications_(A003).pdf PDF
J-3-4,_Drawing_HS-03_(A003).pdf PDF
SAQMMA17R0034_A003.pdf PDF
SAQMMA17R0034_A002.pdf PDF
SAQMMA17R0034_Section_B-M_(A001).pdf PDF
SAQMMA17R0034_A001.pdf PDF
Location.dwg DWG drawing
Electrical-Mechanical.dwg DWG drawing
General_Layout.dwg DWG drawing
Structural.dwg DWG drawing
Architectural.dwg DWG drawing
Hydro-Sanitary.dwg DWG drawing
Xref_Plan_Turbo.dwg DWG drawing
SAQMMA17R0034_Questions_and_Answers.pdf PDF
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-2-5,_Submittal_Register.pdf PDF
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-2-1,_Material_or_Product_Substitution_Form.docx DOCX document
SAQMMA17R0034_Schedule_B-M.pdf PDF
J-2-6,_Bidding_Chart.xlsx XLSX spreadsheet
J-2-3,_IncidentReports.docx DOCX document
J-1-3,_SAM_Registration.pdf PDF
J-3-2,_Drawings.pdf PDF
SAQMMA17R0034_SF1442.pdf PDF
J-3-3,_Form_4025-R.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-1,_Specifications.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Past Performance References

PAST PERFORMANCE & REFERENCES
Indicate the past performance information of the firm in similar projects performed in the last five (5) years. Include maximum 10 projects. Do not include certifications or contract copies. In the case we needed we will require it afterwards.
OneTwoThreeFourFive
NAME OF THE CLIENT (CONTRACTING PARTY)
CLIENT ADDRESS
CLIENT TELEPHONE NUMBER
CLIENT POINT OF CONTACT (Name & Title)
POINT OF CONTACT EMAIL ADDRESS
CONTRACT NUMBER
TYPE OF CONTRACT( * 1)
NAME OF THE CONTRACT OR PROJECT
PROJECT LOCATION
PROJECT STARTING DATE
PROJECT FINISH DATE
WAS THE PROJECT FINISHED ON TIME ( Explain if needed)
SQUARE METERS OR UNITS (Indicate unit measurements)
CONTRACT COST IN PESOS
CONTRACT COST IN MONTHLY MINIMUM SALARIES
INDICATE IF IN THIS PROJECT YOU WERE THE PRIME CONTRACTOR , SUBCONTRACTOR OR ASSOCIATE
INDICATE THE PERCENTAGE OF PARTICIPATION OF YOUR FIRM IN THIS PROJECT
BRIEF DESCRIPTION OF ACTIVITIES BEING PERFORMED
COMPARISON OF THE WORK PERFORMED WITH THIS SOLICITATION ( *2 )
BRIEF DESCRIPTION OF TECHNICAL PROBLEMS ENCOUNTERED AND THE WAY THEY WERE SOLVED
METHOD OF ACQUISITION (Public solicitation, private or non competed) award criteria
COST/PRICE MANAGEMENT HISTORY (any cost overruns and under runs, and cost growth and changes)
HAVE YOU HAD ANY CONTRACT TERMINATIONS IN THE LAST TEN (10) YEARS?
REASONS FOR TERMINATIONS (for contractor convenience ó for default or other)
(*1)Consulting, construction, design, work oversight, delegated administration If you are not a company explain if you were the

superintendent, director or other.

(*2) Here you should indicate which activities performed are similar to the work being contracted.
I certify that the information is accurate and verifiable

Signature of the Legal Representative and Date Date

Name (Print) ID Number

Past Performance Questionnaire Attachment J-1-1

Artículo 289 del Código Penal Colombiano: “El que falsifique documento privado que pueda servir de prueba, incurrirá, si lo usa, en prisión de uno (1) a seis (6) años .”

File details come from the government source that posted it. Updated .