J-2-1,_Material_or_Product_Substitution_Form.docx

DOCX document 19 KB Posted

Attached to
Turbo - Administrative/lodging building
Solicitation number
SAQMMA17R0034
Issued by

About this file

Attachment J-2-1 (Material or Product Sub)

View the file

Other files

File Type Posted
J-3-1,_Specifications_(A003).pdf PDF
SAQMMA17R0034_A003.pdf PDF
J-3-4,_Drawing_HS-03_(A003).pdf PDF
SAQMMA17R0034_A002.pdf PDF
SAQMMA17R0034_A001.pdf PDF
SAQMMA17R0034_Section_B-M_(A001).pdf PDF
Structural.dwg DWG drawing
General_Layout.dwg DWG drawing
Hydro-Sanitary.dwg DWG drawing
Xref_Plan_Turbo.dwg DWG drawing
Location.dwg DWG drawing
Electrical-Mechanical.dwg DWG drawing
Architectural.dwg DWG drawing
SAQMMA17R0034_Questions_and_Answers.pdf PDF
J-2-3,_IncidentReports.docx DOCX document
J-2-4_Tax_Exemption_(Exencion_de_Impuesto).doc DOC document
J-1-2,_Past_Performance_and_References.xlsx XLSX spreadsheet
J-1-3,_SAM_Registration.pdf PDF
J-3-2,_Drawings.pdf PDF
J-2-5,_Submittal_Register.pdf PDF
SAQMMA17R0034_SF1442.pdf PDF
J-3-3,_Form_4025-R.pdf PDF
J-1-1,_Past_Performance_Questionnaire_(PPQ).docx DOCX document
J-3-1,_Specifications.pdf PDF
J-2-2,_Firm_and_Project_Information.docx DOCX document
J-2-6,_Bidding_Chart.xlsx XLSX spreadsheet
SAQMMA17R0034_Schedule_B-M.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material/Product Substitution Request Attachment J-2-1

MATERIAL/PRODUCT SUBSTITUTION REQUEST

Date:

Contractor:

Project:

D/B – A/E:

After the construction NTP, this form shall be used to request consideration of materials for substitution of products specified as a minimum standard.

Specified Material/Product:

Specification Division – Section:

Specified Manufacturer/Origin:

Proposed Substitution:

Proposed Manufacturer/Origin:

Proposed Supplier/Source:

Attached hereto are the specification, data, performance documents and standard laboratory test results supporting the product substitution.

The following criteria has been taken into consideration:

· The use of this material/product is applicable to this product in the prescribed location and will be warranted in the same manner as the specified product for a period of years, when applied and used as per the manufacturers’ guidelines.

· The substitution of this product will not affect the dimensions shown on the drawing in any way.

· This product substitution will not affect the work of other trades working on this product

The advantages of incorporating the proposed substitution into this Project are as follows:

Submitted By:

Submitted by:

of

Name and Title

Company Name

This completed form is to be sent to INL COR with the required submittal. See Section H.31.1.6 for additional details.

File details come from the government source that posted it. Updated .