Site_Survey_Questions_(May_2).docx

DOCX document 42 KB Posted

Attached to
Request for Proposals Federal contract opportunity
Solicitation number
SAQMMA14R0042
Issued by
Department of State Office of Acquisition Management

About this file

Responses to Site Survey Questions The Government will post responses to questions 1-13 at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Request for Proposals, newest first.
File Type Posted
EXH 5 TO-005 RSO Support Services RFP and PWS —
SAQMMA14R0042 —
SAQMMA14R0042 —
ATCH 7 Price Proposal_Table —
Exh_5a_Talon_Technical_Manual.pdf PDF
Ex5b_Talon_Range_Push_Package.docx DOCX document
ALiSS _Question_and_Responses_(Round_3).pdf PDF
SAQMMA14R0042 _Questions_and_Answers__(Round_2).pdf PDF
Mechanical_and_Plumbing_Drawings_(Attachment_to_Round_2_Questions).pdf PDF
EXH 3 TO-003 Fire Protection RFP and PWS —
EXH 4 TO-004 MED RFP and PWS —
EXH 5 TO-005 RSO Support Services RFP and PWS —
EXH 2 TO-002 FOOD RFP and SOO —
ATCH 10 Sample PWS —
Bidders 254 ALiSS SAQMMA14R0042.pdf PDF
EXH 4a TO-004 MED RFP Equipment —
SAQMMA14R0042 _Questions_and_Answers_(Round_1).pdf PDF
SAQMMA14R0042 —
EXH 5 TO-005 RSO Support Services RFP and PWS —
ATCH 4 SB Subcontracting Plan —
EXH 3a FIRE Equipment —
ATCH 1 ALiSS PDs and Qualifications —
EXH 4a TO-004 MED RFP Equipment —
EXH 1 TO-001 PEO RFP and SOO —
EXH 3 TO-003 Fire Protection RFP and PWS —
EXH 4 TO-004 MED RFP and PWS —
ATCH_12 Vetting Package Status Update —
ALiSS _Letter_from_the_CO_(June_2_2014).pdf PDF
EXH_4b _MEDEVAC.pdf PDF
EXH_1a_Designated_Safe_Zone_Kabul.pdf PDF
ATCH_7 _Price_Proposal_Table_(INCLUDES_TO3).xlsx XLSX spreadsheet
EXH_4a_TO-004_MED_RFP_Equipment_04.27.pdf PDF
ATCH_9 _Mortuary_Affairs_Contact_Matrix.xlsx XLSX spreadsheet
ATCH_2 _ALiSS_Acronyms.pdf PDF
EXH_4 _TO-004 _MED_RFP_and_PWS.pdf PDF
ATCH_8 _Labor_Table_(INCLUDES_TO3).xlsx XLSX spreadsheet
EXH_2a _Equipment.pdf PDF
EXH_1 _TO-001 _PEO_RFP_and_SOO_(05-23_Security_Plan_highlight).pdf PDF
ATCH_6 _Offeror_Information.docx DOCX document
EXH_6 _TO-006 _MED_RFP_draft.pdf PDF
EXH_4 _TO-004 _draft_FOOD_RFP_and_SOO.pdf PDF
SAQMMA14R0042_RFI_(03-21).docx DOCX document
ALISS_SITE_SURVEY_INSTRUCTIONS_(update_03.20.14).docx DOCX document
SAQMMA14R0042_draft_RFP_(03-17).pdf PDF
ALISS_SITE_SURVEY_INSTRUCTIONS.docx DOCX document
INDUSTRY_DAY_QUESTIONS_-_SAQMMA14R0042.pdf PDF
ALiSS_-_Industry_Day_Opening.pdf PDF
ALiSS_Industry_DaySlides-_One.pdf PDF
ALiSS_Attendee_List.pdf PDF
ALiSS_-_Industry_Day_Announcement.pdf PDF
Show all 50

Request for Proposals has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALiSSSite Survey Questions and ResponseSAQMMA14R0042
ALiSSSite Survey Questions and ResponsesSAQMMA14R0042
Questions/Comments and Responses
#
Reference
Comments
DOS Response
14
TO 3
Is it possible to propose rates for a medical professional not licensed in the U.S. or Canada since others have to be approved on a case-by-case basis?
No, for the proposal we will only consider U.S. or Canada licensed staff for position with that requirement.
15
Site Survey
Will the villas be feasible for contractor housing?
All the villas in the yellow triangle(NW) are feasible. Right now, we are only legally able to house contractors in VA, MD, PA, and CT. We suggest working with a good realtor.
16
Site Survey
Is the SE area near Camp Grizzly?
It is close. In addition, there are vacant lots nearby that you may consider.
17
Site Survey
Will there be contactors other than guards on Camp Eggers?
Yes, but only ALiSS personnel that are supporting that site.
18
Site Survey
Is armored transport required for the south (SE) area?
Given the security history of the south area, we will not allow contractors to walk. Our preference is for you to use the NW area were you can easily walk to the Embassy compound through a Personnel CAC. Armored vehicles (Light) will be provided by the U.S. government. Currently, contractors cannot import armored vehicles into Afghanistan. This would be cost prohibitive and there are a small number of Afghan companies that provide armored vehicles. The U.S. military vehicles that are in Afghanistan are not properly registered.
19
Site Survey
What other housing is available?
The Marriott hotel is a possibility but OBO has declared that the hotel is unsafe due to seismic standards. In addition, RSO has determined that it has security issues. At present, construction is halted due to funding issues. The inside is not finished. A contractor could make arrangements with building owners to use part of the hotel (e.g. servants quarters area to the rear of the building, away from main streets, closest to Embassy). However, you must meet the security requirements in the proposal.
20
Site Survey
Who would be serviced in the Medical units?
Contractors at the Primary Care Clinics (MACCs) (although DOS employees may be seen at MACCs in rare instances) Camp Seitz (SMACC) to include trauma care for contractors and DOS employees.
21
Site Survey
What are the locations of the fire stations?
Specific locations are to be determined. There will be one on East Compound, one on West Compound and one in or adjacent to Eggers/Seitz.
22
Site Survey
How many personnel are considered critical?
164 personnel are determined to be critical personnel. They would stay if we evacuate the Embassy. They could be Americans or TCNs only not LNs. TCNs require clearances via e-QIP (SF-85). These clearances can take 90 to 120 days to complete.
23
Site Survey
If you have medical casualties on the main Embassy compound, how do you get to Camp Seitz?
By armored ambulance.
24
Site Survey
Can contractors live in the government villas?
The U.S. government will provide housing for critical personnel. It may be in the villas. All other ANs and TCNs will be housed off-compound at Contractor-provided facilities.
25
Site Survey
Will Camp Sullivan be available?
No, not for this contract.
26
Site Survey
What security protection will be provided for off compound personnel?
None. The Contractor will be responsible for all its security requirements outside of Embassy sites. You should consider local Afghan security or the APPF. APPF is changing every day. The contractor must follow all Afghan law and Department of State policies.
27
Site Survey
Will the Department of State provide Quick Reaction Force (QRF)?
No. Nor will you have movement or convoy support. This is why we want you to stay close to the Embassy compound. Over the last six months, GIROA has provided QRF during incidents.
28
Site Survey
Is Green Village an option?
No. The contractor would have to duplicate the KESF convoy now. Green Village is located too far out.
29
Site Survey
What are the security requirements for CHUs? Does this include concrete masonry?
TBD
30
Site Survey
Will you supply armored vehicles of airport movements?
The Government will provide armored vehicles as required for Contractor use. Transportation to and from the airport will be decided after award.
31
Site Survey
Will there be a helipad on the compound? Will the firefighting requirement include crash and rescue?
The plans include one on the East compound, as well as the one at Camp Seitz. The full firefighting requirements are To Be Determined.
32
Site Survey
Will the estimated contractor and employee population change?
This will most likely go down between the RFP release and September 1. There is no breakout with the LN population plus they will only have limited support. However, all proposals should use the numbers provided in the RFP for technical response and cost proposal.
33
Site Survey
What is the transition timeline for each task order?
The transition timeline will be 120 days from award.
34
Site Survey
Weren’t there originally 9 task orders? Why are there only 5 now?
Some of the augmentation support is now moved to support personnel. GSO warehouse and vehicle maintenance is now an option. Veterinary services have been taken out and will stay with the WPPS contract.
35
Site Survey
How should we address options in the RFP?
For some options (e.g. Vehicle Maintenance) we will ask for fixed labor rates, but no FFP. This information will not be evaluated and is for future task order negotiations.
36
Site Survey
Why the change to PEO (Program Executive Office) versus PMO?
Based upon stakeholder feedback.
37
Site Survey
Are most tasks FFP?
All tasks are Firm Fixed Price. There will be CLINs that are CPFF or Cost Reimbursable. Example: Food during the initial phases will be CPFF. Supplies and equipment for Medical will be CPFF. Changes in tax structure will be Cost Reimbursable.
38
Site Survey
Would you like a grab and go like in Baghdad? Would this include short order?
There will be requirements for Snack Bars, to include sandwiches, but not short order. Vending machines would also add to convenience.
39
Site Survey
Does the Embassy Health Unit have a pharmacy?
Yes but not with prescriptions for staff. Primarily only for emergency, providing some maintenance medications until staff prescriptions are filled.
40
Site Survey
Do you have issues with connectivity/internet for telemedicine?
No issues. We send our x-rays to Bagram Airbase to assess. The Contractor will have to coordinate with IRM to access the internet and need to coordinate to access make arrangements with a local Internet Service Provider for the internet access.
41
Site Survey
Where will you locate the West Compound contractor health service? Can we get the dimensions of the space?
It will be in the area currently used as a gym. The MACC will have EMTs and a nurse practitioner or doctor. It will have 220 volt. The dimensions are 24 by 48 feet (roughly, based on the square floor tiles.) Dimensions will be provided in the RFP.
42
Site Survey
What is the medical support for the guard force?
The ALiSS contract will provide medical support for the guards.
43
Site Survey
Does the WPS medical staff go to the Embassy Health Unit for narcotics?
No. They have their own medical unit and maintain a supply of controlled substances.
44
Site Survey
How is medical waste management handled?
That is under a separate, local contract. You just need to remove the waste material from the medical space.
45
Site Survey
How many ambulances do you have and must we staff?
Two armored ambulances and one being procured. The contractor is expected to provide EMTs to staff the ambulances as well as maintain supplies in the ambulances.
46
Site Survey
Will we get floor diagrams for DFACs?
Yes.
47
Site Survey
Is the Ariana Café (an onsite local vendor operation, not associated with the DFACS) included? Can ALiSS contractors eat there?
No, it is a local contract. Currently $4.00 per meal. ALiSS contractors can eat there but there have been hygiene issues.
48
Site Survey
What if the contractor is ready to go before the 180 day transition from DLA food sourcing?
The 180 days is a contractual arrangement between DLA and its provider, allowing them to “eat down” food in the pipeline. We will honor that requirement, although DLA has said that it may be sooner. However, Camps Seitz and Eggers may occur sooner, as they are provided by a local vendor.
49
Site Survey
How will we get to the Embassy from the Qashimi lot firefighting station? Will we get an escort? Do we need a particular sized fire truck?
Much of this TBD. Response time for the Security Force is about three minutes from Camp Seitz to the Embassy. DOS will provide the fire trucks, and Bidders should staff the trucks IAW current guidelines.
50
Site Survey
Will we have communication links and access for the fire service support?
Yes. The TOC will receive the 911 call and dispatch the fire department. We will not require someone in the TOC 24/7.
51
Site Survey
(Med) What about blood products?
DoS will provide the products and the supply chain. The Contractor will be required to manage the blood bank.
52
Site Survey
The tentative Bilateral Security Agreement between DoD and GiROA includes support to U.S. forces as well as the responsibility for all taxes and fees. Will DoS have similar considerations?
No. DoS will be operating as an Embassy with normal diplomatic protocols and considerations.
53
Site Survey
Where will dental services be located?
Emergency dental services would be at the Camp Seitz SMACC.
54
Site Survey
What is the number of days of supply for the clinic?
90 days.
55
Site Survey
What is the DoS standard for emergency response times?
The standard for the ALiSS Contract is 5 minutes.
56
Site Survey
Will key medical personnel be identified in the RFP?
Yes.
57
Site Survey
What if our pricing is based upon non U.S. or Canadian citizens? This provides for a lower labor rate.
For the proposal, all Physicians and Primary Care Providers will be U.S. or Canadian citizens.
58
Site Survey
Will you require postal support similar to Iraq?
Postal Support is an option of the contract. The specific requirements are not identified for the RFP.
59
Site Survey
Will you require Back Scatter and Rapid Scan personnel?
Not in the RFP but an option for the future.
60
Site Survey
Is there a requirement for fuel?
We will continue with DLA as long as possible. Fuel will be in ALiSS as an option.
61
Site Survey
Will we have sample SOOs?
In some instances we will provide to further describe the Option.
62
Site Survey
Do you want us to provide propane?
No, that comes from a local contractor.
63
Site Survey
Will Vehicle Maintenance be implemented?
This will likely get started in the first year and might become Task Order #6. We will provide the quantity and types of vehicles as well as the types of maintenance equipment in the RFP. This includes vehicles in Herat and Mazar, some are WPPS vehicles. Supplies, repair parts and materials will be CPFF.
64
Site Survey
Is one of the goals to take the life support from WPPS and move it to ALiSS?
Yes.
65
Site Survey
Will contractors live on Qashimi?
Possibly, if there is a fire station.
66
Site Survey
Can we access Seitz directly from Qashimi?
No, have to go down the street.
67
Site Survey
While occupying the DOS villa during transition, or as Critical Personnel, will we have access to the Embassy compound in a lockdown?
Maybe. With the Personnel CAC, and RSO support, there will be access.
68
Site Survey
Will there be a different period of performance for each task order?
There will be a 4 month transition period and 8 month performance period in the first year.
69
Site Survey
Will contractors have a separate dining facility? What about the contractor staff that work in the DFAC? Will you require double, segregated, facilities on the compound?
ANs and TCNs will use the cafeterias during work hours, or if they live on the compound (critical personnel) for all meals. LNs may buy meal tickets to eat in the cafeteria. The cafeteria at Camp Seitz has three serving lines…short order grill, American style food and Nepalese food. All eat in any line they choose, as this is just to accommodate preferences. Expect Camp Eggers to have a similar arrangement.
70
Site Survey
Firm Fixed Price Labor. Do you want a level of effort or labor bands? Maybe with a +/- 10% above or below.
TBD
71
Site Survey
In the Draft RFP the observed holidays and work weeks need to be changed.
It will be changed in Section H. The Embassy work week is Sunday to Thursday from 0800 to 1630. The contractor should determine work days/times based upon efficiency and Afghan law.
72
Site Survey
What is the history of Camp Seitz? Current population and guard mix?
Former U.S. Army Corps of Engineers base. Will house approximately 855 personnel. The guard force is South American primarily and soon to be all Nepalese.
73
Site Survey
Who is the current food operations provider at Camp Seitz?
It is ACCL. A local company. They provide food service and provisioning, and feed 723 per day. There are two buildingss with two floors each. They serve both American and Nepalese food. The seating capacity is 118 on two floors (236) or roughly 240 +/- 10. There are 15 reefers for cold and dry storage out back.
74
Site Survey
Did you include the Camp Seitz storage units in the draft RFP?
No, just the Embassy compound.
75
Site Survey
How do contractors get mail?
Currently, contract ANs and TCNs can use the DPO with a 2 lbs limit.
76
Site Survey
Please describe the Villa across form Camp Seitz currently used by ACCL?
Provides space for 72 contractors working at Camp Seitz. It could become available via a local landowner lease. The lease went down from $36,000 per month to $8,000.
77
Site Survey
What is the plan for Camp Eggers?
Consists of 30 leases. Most everything will be knocked down. Total of 16.2 acres. The DFAC will have a projected capacity of 500 to 600 per seating. Will house 1,500 to 1,800 personnel on site. There will be 20 to 30 storage units on site (freezer, cooler and dry goods) in close proximity to the DFAC. . In addition to sit down dining, we will provide marmite meals (hot boxes) to feed Embassy guards. This will cover two shifts and 180 personnel.
78
Site Survey
The medical clinic at Eggers?
MACC configuration, providing Primary Care.
79
Site Survey
Please describe the new Vehicle Maintenance facility.
All of vehicle maintenance will move to the new facility. All equipment is GFE. This includes the paint booth. There is some welding on site. The new facility will have 4 bays and one maybe reserved for the fire engine. The GSO runs the wash bay. The contractors will only bid on labor, as all materials and supplies will be CPFF.
80
Site Survey
Will you provide real estate Points of Contact?
Yes.