Solicitation_PTL_System_A005.docx

DOCX document 227 KB Posted

Attached to
Personnel Tracking Locator Integrator Software and Support
Solicitation number
S-AQMMA-12-R-0413
Issued by

About this file

Solicitation PTL System A005

View the file

Other files

File Type Posted
SF30_PTL_A006.docx DOCX document
Change_Page_67.docx DOCX document
Amendment_0005_Notice.docx DOCX document
SF30_PTL_A005.docx DOCX document
SF30_Continuation_Page_A005.docx DOCX document
Attachment_6_-_PTL_Requirements_Matrix_A005.docx DOCX document
Attachment_2_Price_Proposal_Worksheet_A004.xlsx XLSX spreadsheet
PTL_-_Responses_to_Vendor_Questions_A004.docx DOCX document
Solicitation_PTL_System_A004.docx DOCX document
SF30_PTL_A004.docx DOCX document
Attachment_1_Quality_Assurance_Surveillance_Plan_A004.docx DOCX document
Attachment_5_ITCCB_Approved_Hardware_and__Software_A004.xlsx XLSX spreadsheet
SF30_PTL_A003.docx DOCX document
SF30_PTL_A002.docx DOCX document
Solicitation_PTL_System_A001.docx DOCX document
SF30_PTL_A001.docx DOCX document
Attachment_2_Price_Proposal_Worksheet.xlsx XLSX spreadsheet
Solicitation_PTL_System.docx DOCX document
SF33_PTL.docx DOCX document
Attachment_4_DD254.pdf PDF
Attachment_1_Quality_Assurance_Surveillance_Plan.docx DOCX document
Attachment_3_Past_Performance_Questionnaire.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. S-AQMMA-12-R-0413 A005 Personnel Tracking Locator Department of State

TABLE OF CONTENTS

Section B – SUPPLIES OR SERVICES AND PRICES/COSTS2
B.1 SERVICES2
B.2 TYPE OF CONTRACT2
B.3 PAYMENT, CEILING, AND WITHHOLDING2
SECTION C – STATEMENT OF WORK (SOW)13
C.1 INTRODUCTION13
C.2 BACKGROUND13
C.3 MISSION13
C.4 CONTRACTUAL OVERVIEW13
C.5 PERSONNEL TRACKING LOCATOR (PTL) SYSTEMS15
C.6 INSTALLATION AND DEPLOYMENT SERVICES20
C.7 OPERATION, MAINTENANCE AND SUSTAINMENT SERVICES21
C.8 ENGINEERING AND TECHNICAL SUPPORT23
C.9 TRAINING25
C.10 DOCUMENTATION26
C.11 TRANSITION PLAN28
SECTION D – packaging and marking30
D.1 MARKING OF REPORTS30
D.2 PACKING LIST(S)30
D.3 WARRANTY NOTIFICATION30
SECTION E – INSPECTION AND ACCEPTANCE31
E.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.2522 (FEB 1998)31
E.2 SCOPE OF WORK AND ACCEPTANCE31
SECTION F – DELIVERIES OR PERFORMANCE32
F.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.2522 (FEB 1998)32
F.2 FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)32
F.3 PERIOD OF PERFORMANCE32
F.4 DELIVERABLES32
SECTION G – CONTRACT ADMINISTRATION DATA34
G.1 DESIGNATION OF ADMINISTRATIVE CONTRACTING OFFICE34
G.2 CONTRACTING OFFICERS REPRESENTATIVE DOSAR 652.242-70 (AUG 1999)34
G.3 GOVERNMENT TECHNICAL MONITORS (GTM)35
G.4 TECHNICAL DIRECTION35
G.5 INVOICING INSTRUCTIONS36
G.5.1 Required Invoice Information36
G.6 FINAL INVOICE36
SECTION H - SPECIAL CONTRACT REQUIREMENTS37
H.1 SECURITY REQUIREMENTS37
H.2 CLEARANCE REQUIREMENTS37
H.3 SECURITY CLASSIFICATION38
H.4 GOVERNMENT-FURNISHED EQUIPMENT AND SERVICES39
H.5 KEY PERSONNEL39
H.6 PERSONNEL REQUIREMENTS39
H.7 NONPAYMENT FOR UNAUTHORIZED WORK42
H.8 CONTRACTOR COMMITMENTS, WARRANTIES AND REPRESENTATIONS42
H.9 TASK ORDER (CLIN 0008)42
SECTION I – CONTRACT CLAUSES44
I.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.252-02 (FEB 1998)44
I.2 FAR CLAUSES INCORPORATED IN FULL TEXT47
I.2.1 ORDERING FAR 52.216-18 (Oct 1995)47
I.2.2 OPTION TO EXTEND THE TERM OF THE CONTRACT FAR 52.217-09 (MAR 2000)47
I.2.3 AUTHORIZED DEVIATIONS IN CLAUSES FAR 52.252-06 (APR 1984)47
I.2.4 PRIVACY OR SECURITY SAFEGUARDS FAR 52.239-1 (Aug 1996)47
I.3 DEPARTMENT OF STATE ACQUISITION REGULATION (DOSAR) CLAUSES48
I.3.1 SECTION 8(A) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED 652.225-71 (AUG 1999)48
I.3.2 LIMITATION OF FUNDS 652.232-72 (AUG 1999)50
I.3.3 OBSERVANCE OF LEGAL HOLIDAYS AND ADMINISTRATIVE LEAVE 652.237-72 (APR 2004)51
I.3.4 NOTICES 652.243-70 (AUG 1999)52
I.3.5 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (SEP 2007)52
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS56
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS57
K.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.252-02 (FEB 1998)57
K.2 FAR CLAUSES INCORPORATED IN FULL TEXT57
K.2.1 ANNUAL REPRESENTATIONS AND CERTIFICATIONS FAR 52.204-8 (MAY 2011)57
K.2.2 INFORMATION REGARDING RESPONSIBILITY MATTERS FAR 52.209-07 (JAN 2011)60
K.3 AUTHORIZED CONTRACT ADMINISTRATOR62
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS63
L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FAR 52.2521 (FEB 1998)63
L.2 FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)63
L.3 TYPE OF CONTRACT FAR 52.2161 (APR 1984)63
L.4 SERVICE OF PROTEST FAR 52.233-2 (AUG 1996)63
L.5 AUTHORIZED DEVIATIONS IN PROVISIONS FAR 52.252-5 (APR 1984)64
L.6 COMPETITION ADVOCATE/OMBUDSMAN DOSAR 652.206-70 (AUG 1999)64
L.7 INFORMATION TECHNOLOGY SECURITY PLAN AND ACCREDITATION (SEP 2007)64
L.8 ALTERNATE OFFER INFORMATION65
L.9 SOLICITATION RESPONSE65
L.10 TIME, PLACE, AND SUBMISSION OF OFFER65
L.11 PROPOSAL HANDLING65
L.12 DISCUSSIONS WITH THE OFFEROR66
L.13 PROPOSAL DISPOSITION66
L.14 DEBRIEFING OF UNSUCCESSFUL OFFERORS66
L.15 OFFEROR QUESTIONS/CLARIFICATIONS66
L.16 PROPOSAL INSTRUCTIONS66
L.17 VOLUME 1: PRICE PROPOSAL INSTRUCTIONS67
L.17.1 STANDARD FORM 33 (SF 33)67
L.17.2 SECTION B68
L.17.3 REPRESENTATIONS AND CERTIFICATIONS69
L.17.4 TOTAL COMPENSATION PLAN69
L.17.5 SMALL BUSINESS SUBCONTRACTING PLAN69
L.17.6 BUSINESS MANAGEMENT70
L.18 VOLUME 2: TECHNICAL PROPOSAL70
L.18.1 CORPORATE EXPERIENCE70
L.18.2 TECHNICAL PROFICIENCY70
L.18.3 REQUIREMENTS MATRIX72
L.18.4 KEY PERSONNEL72
L.18.5 PERSONNEL QUALIFICATIONS AND MANAGEMENT73
L.18.6 QUALITY CONTROL PLAN (QCP)73
L.18.7 PAST PERFORMANCE AND EXPERIENCE74
L.18.8 PRELIMINARY TRANSITION PLAN75
L.19 VOLUME 3: CERTIFICATION AND ACCREDIATION (C&A) DOCUMENTATION76
SECTION M – EVALUATION FACTORS FOR AWARD77
M.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.252-02 (FEB 1998)77
M.2 GENERAL77
M.3 BASIS OF AWARD77
M.4 EVALUATION FACTORS78
M.5 ELIGIBILITY FOR AWARD78
M.6 AWARD PROCESS79
M.7 SOLICITATION AMENDMENTS79
M.8 EVALUATION SUPPORT79
M.9 USE OF SUPPORTING INFORMATION79
M.10 RATINGS OF NON-PRICE FACTORS79
M.11 PRICE EVALUATION81
M.12 EVALUATION OF OPTIONS81
Solicitation No. S-AQMMA-12-R-0413 A005Personnel Tracking Locator

iii Section B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SERVICES

The Contractor shall provide the software and services in accordance with Section C, and the attachments.

B.2 TYPE OF CONTRACT

The Government contemplates single award of a stand-alone, hybrid contract resulting from this solicitation. Contract types will be firm-fixed-price for CLINS X001 through X007, CLIN X010 through X015, and labor hour or time-and-materials for CLIN X008 and X009.

B.3 PAYMENT, CEILING, AND WITHHOLDING

The Government will pay the Contractor the unit prices specified in this section. The Government shall impose a deduction from the amount of payment for each instance of unacceptable performance or non-performance in accordance with Attachment 1, Quality Assurance and Surveillance Plan (QASP).

BASE YEAR

CLIN
Description
Unit Price
Qty
Extended Total
0001
PTL Software Application (production copy)
0002
PTL Software Application (back-up copy)
0003
PTL Software Application (test copy)
0004
Installation and Deployment Services
0005
Program Management (Monthly)
0006
Operations, Maintenance, and Technical Support (Monthly)
0007
Training Support
0007AA
Initial User Training Sessions
0007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
0008
Engineering and Technical Support Services (Time and Material CLINs)
0008AA
Security Specialist

1,880

0008AB
Network Engineer

1,880

0008AC
Database Administrator

1,880

0008AD
Systems Administrator

1,880

0008AE
Systems Engineer

1,880

0008AF
Software Engineer

1,880

0008AG
Trainer
0009
Material
Not-to-Exceed
$20,000.00

OPTIONAL SERVERS

CLIN
Description
Unit Price
Qty
Extended Total
0010
Personnel Tracking Server (Production)
0011
Personnel Tracking Server (Back-up)
0012
Personnel Tracking Server (Test)

BASE YEAR

OPTIONAL SOFTWARE FUNCTIONALITY

CLIN
Description
Extended Total
0013
Web Interface. Reference C.5.1
0013AA
Secure two-way messaging capability to trackers capable of receiving messages. Reference C.5.1.6
0013AB
System-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes. Reference C.5.1.11
0013AC
Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracking device. Reference C.5.1.14
0013AD
Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10). Reference C.5.1.17
0013AE
Be capable of importing a Geofence from file. Reference C.5.1.18
0013AF
In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs. Reference C.5.1.19
0013AG
Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers. Reference C.5.1.28
0013AH
Operator Display and Presentation. Reference C.5.2
0013AI
If the external viewing application supports the ability to display speed and direction this data also shall be provided to the external viewing application. Reference C.5.2.2
0013AJ
Capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline. Reference C.5.2.3
0014
System Monitoring. Reference C.5.3
0014AA
The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.
0014AB
As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.
0015
Special Technical Requirements. Reference C.5.4
0015AA
The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment. Reference C.5.4.6
0015AB
Provide the capability to export live track data and emergency messages in real-time through a one-way guard. Reference C.5.4.8

OPTION YEAR 1

CLIN
Description
Unit Price
Qty
Extended Total
1001
Reserved
1002
Reserved
1003
Reserved
1004
Reserved
1005
Program Management (Monthly)
1006
Operations, Maintenance, and Technical Support (Monthly)
1007
Training Support
1007AA
Initial User Training Sessions
1007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
1008
Engineering and Technical Support Services (Time and Material CLINs)
1008AA
Security Specialist

1,880

1008AB
Network Engineer

1,880

1008AC
Database Administrator

1,880

1008AD
Systems Administrator

1,880

1008AE
Systems Engineer

1,880

1008AF
Software Engineer

1,880

1008AG
Trainer
1009
Material
Not-to-Exceed
$20,000.00

OPTION YEAR 1

OPTIONAL SOFTWARE FUNCTIONALITY

CLIN
Description
Extended Total
1013
Web Interface. Reference C.5.1
1013AA
Secure two-way messaging capability to trackers capable of receiving messages. Reference C.5.1.6
1013AB
System-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes. Reference C.5.1.11
1013AC
Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracking device. Reference C.5.1.14
1013AD
Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10). Reference C.5.1.17
1013AE
Be capable of importing a Geofence from file. Reference C.5.1.18
1013AF
In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs. Reference C.5.1.19
1013AG
Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers. Reference C.5.1.28
1013AH
Operator Display and Presentation. Reference C.5.2
1013AI
If the external viewing application supports the ability to display speed and direction this data also shall be provided to the external viewing application. Reference C.5.2.2
1013AJ
Capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline. Reference C.5.2.3
1014
System Monitoring. Reference C.5.3
1014AA
The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.
1014AB
As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.
1015
Special Technical Requirements. Reference C.5.4
1015AA
The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment. Reference C.5.4.6
1015AB
Provide the capability to export live track data and emergency messages in real-time through a one-way guard. Reference C.5.4.8

OPTION YEAR 2

CLIN
Description
Unit Price
Qty
Extended Total
2001
Reserved
2002
Reserved
2003
Reserved
2004
Reserved
2005
Program Management (Monthly)
2006
Operations, Maintenance, and Technical Support (Monthly)
2007
Training Support
2007AA
Initial User Training Sessions
2007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
2008
Engineering and Technical Support Services (Time and Material CLINs)
2008AA
Security Specialist

1,880

2008AB
Network Engineer

1,880

2008AC
Database Administrator

1,880

2008AD
Systems Administrator

1,880

2008AE
Systems Engineer

1,880

2008AF
Software Engineer

1,880

2008AG
Trainer
2009
Material
Not-to-Exceed
$20,000.00

OPTION YEAR 2

OPTIONAL SOFTWARE FUNCTIONALITY

CLIN
Description
Extended Total
2013
Web Interface. Reference C.5.1
2013AA
Secure two-way messaging capability to trackers capable of receiving messages. Reference C.5.1.6
2013AB
System-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes. Reference C.5.1.11
2013AC
Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracking device. Reference C.5.1.14
2013AD
Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10). Reference C.5.1.17
2013AE
Be capable of importing a Geofence from file. Reference C.5.1.18
2013AF
In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs. Reference C.5.1.19
2013AG
Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers. Reference C.5.1.28
2013AH
Operator Display and Presentation. Reference C.5.2
2013AI
If the external viewing application supports the ability to display speed and direction this data also shall be provided to the external viewing application. Reference C.5.2.2
2013AJ
Capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline. Reference C.5.2.3
2014
System Monitoring. Reference C.5.3
2014AA
The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.
2014AB
As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.
2015
Special Technical Requirements. Reference C.5.4
2015AA
The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment. Reference C.5.4.6
2015AB
Provide the capability to export live track data and emergency messages in real-time through a one-way guard. Reference C.5.4.8

OPTION YEAR 3

CLIN
Description
Unit Price
Qty
Extended Total
3001
Reserved
3002
Reserved
3003
Reserved
3004
Reserved
3005
Program Management (Monthly)
3006
Operations, Maintenance, and Technical Support (Monthly)
3007
Training Support
3007AA
Initial User Training Sessions
3007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
3008
Engineering and Technical Support Services (Time and Material CLINs)
3008AA
Security Specialist

1,880

3008AB
Network Engineer

1,880

3008AC
Database Administrator

1,880

3008AD
Systems Administrator

1,880

3008AE
Systems Engineer

1,880

3008AF
Software Engineer

1,880

3008AG
Trainer
3009
Material
Not-to-Exceed
$20,000.00

OPTION YEAR 3

OPTIONAL SOFTWARE FUNCTIONALITY

CLIN
Description
Extended Total
3013
Web Interface. Reference C.5.1
3013AA
Secure two-way messaging capability to trackers capable of receiving messages. Reference C.5.1.6
3013AB
System-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes. Reference C.5.1.11
3013AC
Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracking device. Reference C.5.1.14
3013AD
Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10). Reference C.5.1.17
3013AE
Be capable of importing a Geofence from file. Reference C.5.1.18
3013AF
In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs. Reference C.5.1.19
3013AG
Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers. Reference C.5.1.28
3013AH
Operator Display and Presentation. Reference C.5.2
3013AI
If the external viewing application supports the ability to display speed and direction this data also shall be provided to the external viewing application. Reference C.5.2.2
3013AJ
Capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline. Reference C.5.2.3
3014
System Monitoring. Reference C.5.3
3014AA
The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.
3014AB
As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.
3015
Special Technical Requirements. Reference C.5.4
3015AA
The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment. Reference C.5.4.6
3015AB
Provide the capability to export live track data and emergency messages in real-time through a one-way guard. Reference C.5.4.8

OPTION YEAR 4

CLIN
Description
Unit Price
Qty
Extended Total
4001
Reserved
4002
Reserved
4003
Reserved
4004
Reserved
4005
Program Management (Monthly)
4006
Operations, Maintenance, and Technical Support (Monthly)
4007
Training Support
4007AA
Initial User Training Sessions
4007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
4008
Engineering and Technical Support Services (Time and Material CLINs)
4008AA
Security Specialist

1,880

4008AB
Network Engineer

1,880

4008AC
Database Administrator

1,880

4008AD
Systems Administrator

1,880

4008AE
Systems Engineer

1,880

4008AF
Software Engineer

1,880

4008AG
Trainer
4009
Material
Not-to-Exceed
$20,000.00

OPTION YEAR 4

OPTIONAL SOFTWARE FUNCTIONALITY

CLIN
Description
Extended Total
4013
Web Interface. Reference C.5.1
4013AA
Secure two-way messaging capability to trackers capable of receiving messages. Reference C.5.1.6
4013AB
System-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes. Reference C.5.1.11
4013AC
Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracking device. Reference C.5.1.14
4013AD
Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10). Reference C.5.1.17
4013AE
Be capable of importing a Geofence from file. Reference C.5.1.18
4013AF
In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs. Reference C.5.1.19
4013AG
Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers. Reference C.5.1.28
4013AH
Operator Display and Presentation. Reference C.5.2
4013AI
If the external viewing application supports the ability to display speed and direction this data also shall be provided to the external viewing application. Reference C.5.2.2
4013AJ
Capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline. Reference C.5.2.3
4014
System Monitoring. Reference C.5.3
4014AA
The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.
4014AB
As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.
4015
Special Technical Requirements. Reference C.5.4
4015AA
The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment. Reference C.5.4.6
4015AB
Provide the capability to export live track data and emergency messages in real-time through a one-way guard. Reference C.5.4.8

SECTION C – STATEMENT OF WORK (SOW)

C.1 INTRODUCTION

The Department of State (DOS), Bureau of Diplomatic Security (DS), Office of Security Technology (ST), Personnel Tracking and Locator (PTL) Section, has a requirement for an enterprise personnel tracking system which can ingest the full spectrum of personnel tracking devices on the market currently and with the ability to ingest future next generation devices at minimal cost to the government for adaptation. The proposed system will replace the current nine year old system that supports PTL operations both domestically and overseas.

C.2 BACKGROUND

DS is responsible for deployment of technical security systems that reduce risk to government personnel and facilities. Specifically, the protection of government personnel traveling from the protected mission facility to their foreign counterpart’s office is of paramount importance in the execution of U.S. foreign policy.

C.3 MISSION

The PTL mission is to provide tracking and monitoring capabilities to USG personnel worldwide in support of foreign policy requirements.

C.4 CONTRACTUAL OVERVIEW

At a minimum the Contractor shall provide three (3) software application packages. The three applications will be installed an utilized in the following capacities: 1) Production Server, 2) Back-up Server, and 3) Test Server (i.e., (Gold Standard) verification, certification and authorization (C&A)).

Note: The term "PTL System" as used hence forth shall refer to the Contractors software application installed and operating on either the Contractors or Government furnished hardware platform.

The PTL System shall employ state-of-the-art hardware and software technologies that provide the capability to monitor and ingest multiple device formats over varied transmission paths (i.e., worldwide cellular SMS messaging and data, and satellite based tracking devices). The PTL System shall aggregate the data collected and distribute it to various front end user systems, and provide a default display capability.

The PTL services shall be based at designated Government locations inside the continental United States.

· Commercial-Off-The-Shelf (COTS) fully redundant turn-key system that satisfies the requirements enumerated below.

· Engineering and technical services to include system installation, operational validation of all system elements that support the PTL Systems operations, and associated data services.

· Operations maintenance, technical support, and sustainment services required to support a 24x7x365/6 DOS activities worldwide. The services shall ensure all software and hardware (optional) are functional and remain up-to-date.

· Contractor shall assume all costs associated with any required licensing or maintenance agreements for the life of the contract.

C.4.1 PTL Server The PTL servers (e.g., Contractor or GFE) are mission-critical enterprise servers and shall provide the I/O throughput, reliability, durability and expansion capabilities required to support the PTL mission. The server possessing an expansion capability shall ensure no degradation of the operating system or processing speed over the life of the contract. The PTL System shall operate 24/7/365 and support the following volume of user and tracking activity.

Description
Quantity
Note
Global tracking devices deployed
5,500
1
Estimated per year growth
20%
2
Estimated Simultaneous Users
1,000
3

NOTES:

1 Legacy systems remain in the inventory, but DOS immediate future is to baseline the DOS-issued tracking devices in our tracking program to Iridium-Based NAL-built SHOUTs, SHOUT-NANOs, and 9602-LP devices. These devices transmit messages in the PECOS message structure.

2 Estimated yearly growth is compounded per performance period. Estimate may change based on world events and/or budget constraints. More significant and unpredictable is the number of tracking devices procured and fielded by other federal agencies. Integrating the data from these other, unknown type/number, tracking devices is critical to situational awareness for DOS posts overseas.

3 DOS requires unrestricted global web access for approximately hundreds to thousands of users.

The DOS information security program ensures the security for all systems, networks, and data that support operations. The DOS established a comprehensive Information Security Program (ISP) to ensure the confidentiality, availability and integrity of its information and support systems. The current information security program identifies the relevant laws, regulations, and policies; delineates responsibilities; describes the governance mechanism; and catalogues the elements of the Department’s operational, defense-in-depth cyber security strategy. The DOS Standard Operating Environment (SOE) is a specification for using a standard architecture and applications within a Department information system.

The PTL hardware shall be either on or be capable of being added to the State Department Information Technology Change Control Board (ITCCB) list of approved hardware and software. See Attachment 5.

C.4.2 PTL Software

The PTL software application shall be capable of ingesting data from currently deployed devices, which are PECOS-based, Iridium devices manufactured by NAL Research. The PTL system shall be device agnostic and capable of ingesting multiple other device types, as the government also desires to expand its device portfolio with commercial Iridium devices, Global Star based devices, and cellular devices, among others. Using task orders, the contractor shall integrate devices selected by the government into the PTL system when necessary.

The PTL Systems shall be fully redundant with intra-site hot failover, therefore in the event of a component failure the system shall automatically switch over to its backup component without the need for manual intervention.

The functional requirements enumerated in the paragraphs below are categorizes as either "Mandatory" or "Optional." Mandatory functional requirements are required at the time of contract award, and Optional functional requirements must be incorporated into the PTL application during the performance of the contract. See Attachment 6.

In order to facilitate the DOS Certification and Accreditation (C&A) requirements, any solution proposed shall be able to document approval or accreditation by another entity of the federal Government.

C.5 PERSONNEL TRACKING LOCATOR (PTL) SYSTEMS

The DOS mission portfolio is comprised of a significant number of devices that are currently deployed worldwide. The PTL Systems shall be device agnostic and be capable of ingesting data from the tracking devices currently deployed, as well as new, FIPS-approved-encrypted devices using varied transmission paths. The PTL Systems shall be adaptable to allow for new device types and the integration of other transmission paths as necessary.

In order to leverage the existing DOS infrastructure and approved assets the PTL Systems shall provide compatibility with Oracle Version 11 with Oracle Advanced Security - Transparent Data Encryption (TDE).

The DOS has a requirement for a ready-to-deploy solution that meets the maximum number of functional requirements identified in the subparagraphs below, possesses an existing authorized to operate (ATO) and meets minimum government information assurance standards in accordance with NIST or DIACAP standards .

C.5.1 Web Interface

The PTL Systems shall possess the following capabilities:

C.5.1.1 Facilitate the viewing of live track data, historical track data, emergency messages, track administration functions, user administrative functions, and data export functions through a unified, secured, and web interface.

C.5.1.2 Display live/historical tracks with the following device information for all ingested devices: device ID, alias/call-sign, last reported latitude/longitude, last reported track receive time, and emergency status. If the device provides speed, direction or brevity code then the web interface shall display that information as well.

C.5.1.3 Have the capability to export historical device data in CSV format to files.

C.5.1.4 Be able to create, retrieve, update, or delete brevity codes in the web interface for each tracking device.

C.5.1.5 Record a “receive” timestamp with each received device update

C.5.1.6 Provide secure two-way messaging capability to trackers capable of receiving messages.

C.5.1.7 Provide users the capability to filter live/historical tracks individually or as part of a device group. Each user approved to do so shall be able to filter by device, device name/alias, date/time, or device group.

C.5.1.8 Use role-based access control for all functions and commands available to the government. Users shall be granted only the minimum necessary permissions to perform functions for any given device group. User administration functions shall be granted only to authorized administrators.

C.5.1.9 Provide a means to access all configuration settings through the same unified interface. These shall include all software and program settings except settings of the internal COTS products

C.5.1.10 Provide the capability to authorized administrators to assign a user separate permissions for each nested device group. These permissions include but are not limited to the ability to view or modify devices within the device group.

C.5.1.11 Provide system-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes.

C.5.1.12 Allow users to create nested device groups and to assign or reassign devices under the user’s control to any of the device groups under that user’s control.

C.5.1.13 Show only devices, functions, and configuration settings for which a user has authorization.

C.5.1.14 Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracking device.

C.5.1.15 Display an audible/visual emergency warning to the user in the event that a user-viewable device sends an emergency message to the system.

C.5.1.16 Provide an authorized user the ability to configure a Geofence for each user-viewable device. The user shall have the ability to configure whether the Geofence alarms when a device enters the Geofence, exits the Geofence, or both. If configured, when a tracking device enters or exits the Geofence, the PTL System's web interface shall provide an audio and visual warning to those users with the viewing permissions for that device.

C.5.1.17 Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10).

C.5.1.18 Be capable of importing a Geofence from file.

C.5.1.19 In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs.

C.5.1.20 Provide an authorized user the ability to edit a user-modifiable tracker’s association data, including each tracker’s alias or call-sign.

C.5.1.21 Provide an authorized user the ability to edit emergency contact information for each user-viewable device.

C.5.1.22 In the event of an emergency, the PTL Systems shall send an emergency notification via e-mail to the configured emergency contact(s) associated with that device in the system.

C.5.1.23 Allow authorized users to manually deactivate an audible/visual emergency warning and geo-fence warnings.

C.5.1.24 Provide an authorized user the capability to export live tracking data and emergency messages via unencrypted UDP, unencrypted TCP, and HTTPS protocols to any other IP address and port. An authorized user shall be able to switch between export protocols at any time.

C.5.1.25 Provide a secure built-in web viewer that allows a user to see selected trackers as icons directly in the web application. Viewer shall allow the user to pan and zoom on the map.

C.5.1.26 Provide the user with the capability to disable the built-in viewer when necessary, in order to save bandwidth, or so that the user can use an external viewing application

C.5.1.27 Have the ability to zoom to a specified tracker, resolution less than or equal to 250m for geospatial imagery and street level for street maps.

C.5.1.28 Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers.

C.5.1.29 Have the ability to zoom to a specified tracker, at street-level resolution, meaning streets must be distinctly identifiable, for both geospatial imagery and street maps.

C.5.1.30 Provide an authorized user the ability to configure a Geofence for a user-viewable device by highlighting the area directly on a map.

C.5.1.31 Display the following device information when an icon is selected : device ID, device model, alias/call-sign, last reported latitude/longitude, last reported MGRS, last reported time, and emergency status. If a device provides speed, direction or brevity code then the web interface shall display that information as well.

C.5.2 Operator Display and Presentation

The PTL Systems shall:

C.5.2.1 Serve data to multiple external viewing applications. These applications include but are not limited to Google Earth, ESRI and FalconView. This data will include the following device information: device ID, device model, alias/call-sign, last reported latitude/longitude, last reported MGRS, last reported time, emergency status, and brevity code.

C.5.2.2 If the external viewing application supports the ability to display speed and direction this data also shall be provided to the external viewing application.

C.5.2.3 Provide the capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline.

C.5.3 System Monitoring

The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.

As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.

C.5.4 Special Technical Requirements

The PTL Systems shall meet the following technical requirements:

C.5.4.1 Ingest multiple device formats over varied transmission paths, including but not limited to PECOS, Iridium, Global Star, and various 2G/3G/4G cellular networks via Short Message Service (SMS) and data.

C.5.4.2 Ingest, at a minimum, device ID, position, and elevation data from each tracker, and any brevity code. If the device provides it, the PTL Systems shall also ingest device send time, speed, and direction.

C.5.4.3 Provide the ability to ingest encrypted device data using FIPS-approved encryption algorithms where encryption is supported by the device.

C.5.4.4 Utilize an Application Programming Interface (API) for integration to third-party external viewing applications and systems. This API shall include at a minimum: retrieval of live or historical tracks by ID, Alias, Date, Device Group, or other filters, and retrieval of device metadata and geo-fences.

· The API shall be exposed through secured and encrypted services, be it web services, remote method invocation, or complete exposure of proprietary format to the government.

· All API methods shall be exposed, documented, and provided to the government. All API methods and documentation shall be accessible without requiring proprietary software or a license.

C.5.4.5 Provide the ability to import and export real-time data in the JBFSA format (Versions 1.0, 1.0a, 2.3 and FFT 2.4). The Contractor shall update this capability for forward compatibility as required.

C.5.4.6 The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment.

C.5.4.7 The PTL shall have the ability to store all tracking data for a minimum of two (2) years.

C.5.4.8 (OPTIONAL) Provide the capability to export live track data and emergency messages in real-time through a one-way guard.

C.6 INSTALLATION AND DEPLOYMENT SERVICES

The Contactor shall be responsible for the installation of the PTL systems in a dedicated Government facility. The Contractor shall provide a comprehensive test plan that will be used to verify the full design functionality and operational readiness of the PTL system once installed. The Contractor shall provide the test plan to the COR for review. Installation shall including the following:

· Pre-configuring and installing software.

· Connecting the PTL systems to the Government provided communication and internet.

· Installing the PTL systems, including web servers, database servers, Open Street/Open Topo map servers, and peripheral equipment.

· Documenting the entire system architecture and Standard Operating Procedures (SOPs). The SOP will serve as a living document outlining daily operations procedures, and coordination with the DS point-of-contact (POC) for emergency events and technical support.

· Performing system testing and verification to ensure the operational readiness of the system and the full function of fail-over mechanisms.

C.6.1 Pre-Deployment Tasks

The Contractor shall participate in pre-deployment planning prior to operations as directed by the Contracting Officer Representative (COR). These activities typically include providing engineering support and technical data. All Contractor specific terminology inherent to the system shall be documented and defined using industry accepted definitions.

The DOS shall perform acceptance testing prior to deployment of the PTL Systems.

C.7 OPERATION, MAINTENANCE AND SUSTAINMENT SERVICES

The Contractor shall provide Tier 1 maintenance support for the three (3) PTL servers and software applications. Tier 1 supports includes responding to questions regarding the PTL application, assisting with user creation, and device management Operations maintenance, technical support, and sustainment services required to support a 24x7x365/6 DOS activities worldwide. The services shall ensure all software and hardware (optional) are functional and remain up-to-date.

When a service call is placed the Contractor shall acknowledge receipt of that call within thirty minutes and be on-site during normal DOS business hours and outside of normal business hours in accordance with the priority levels enumerated in the table below. Normal business hours are defined as 07:30 am to 4:30 pm EST, Monday through Friday including all designated federal holidays. The Contractor shall employ a trouble ticket system for logging, tracking, and retaining the history of all service calls.

PRIORITY LEVEL
NORMAL BUSINESS HOURS
OUTSIDE NORMAL BUSINESS HOURS
HIGH
1
2
MEDIUM
2
4
LOW
4
8

The Contractor shall perform the following maintenance tasks in support of the PTL program:

· Monitor and maintain comprehensive awareness of system health and status.

· Performing routine and preventative maintenance of all hardware associated with the PTL system consistent with reasonable commercial practices for systems of its type.

· Update all software and operating system versions, security patches, software upgrades and patches; hardware fixes and upgrades; virus signatures, and other maintenance activities for software components used in the PTL system.

· Adhere to the Contingency Plan (i.e., included in the Quality Control Plan), and the defined response protocols, and systematic procedural checklists for rapidly assessing and resolving problems.

C.7.1 Scheduled System Outages

The Contractor shall provide a written notice to the COR one (1) week in advance of all planned or required system maintenance activities that require a PTL systems outage. The Contractor shall ensure that planned system outages do not conflict with critical DOS activities or are performed during times when there is a traditional high level of user activity. The Contractor shall provide the required Incident Report within 24 hours for schedule outage.

C.7.2 Unscheduled System Outages

In the event of an unplanned outage, or component failure the Contractor. upon arriving on-site, shall immediately ensure that the systems automatically switched over to the redundant backup system and the failure is transparent to the end-users. The Contractor shall then assess the extent and cause for the outage and provide an estimated time to restore the failed system to full operation. The Contractor shall provide the required Incident Report within 15 minutes of unscheduled outage.

C.7.3 Development Cycles and Modernization Updates (Critical Gap)

The Contractor shall provide regular development cycles. These cycles shall include bug-fixes, software/server patches, implementation of future (minor) core requirements, and future (minor) built-in web viewer requirements and shall occur at least every 90 days or sooner if deemed necessary by the COR. Updates shall also include modernization updates as part of the regular development cycles. These modernization updates shall include updating the PTL Systems and built-in web viewer such that it can be viewed properly in DOS-approved web browsers. Updates shall be tested on the Test Server in a test domain prior to updating the Production Server. As part of the update package, Contractor shall provide documentation and technical support 60 days in advance of the anticipated change to meet DOS configuration change management requirements and obtain approval for the change.

C.7.4 System Administration

The Contractor shall provide all database, network, and underlying system administration and configuration services. Daily administration of the system by the government shall be restricted to user management and device administration to include, tracking device management, device communications, and device dissemination for regions of interest.

C.8 ENGINEERING AND TECHNICAL SUPPORT

The Contractor shall assist the DOS in immediately achieving security authorization and certification under NIST 800-37 and 800-53 at the “Medium” level and eventually move the system to the “High” level as required by DOS/IRM.

C.8.1 Software or Architecture Modifications

The PTL Systems consists of COTS products that will act as the server for tracking and locating personnel in regions of interest worldwide. Given that the system consists of COTS products, accredited for other federal agencies, certain modifications to system software and or architecture may be required to finalize DS security standards and information systems accreditations and related C&A testing requirements. The Contractor's support for software and architecture modifications shall be provided through the task order process. See H.9.

C.8.2 Certification and Accreditation (C&A)

The Contractor shall be required to support the DOS C&A process for both the initial PTL systems and for any re-certifications (i.e., entire system or individual elements) resulting from future system updates, upgrades, or modifications.

The PTL Systems shall be capable of immediately obtaining a DOS certification and accreditation (C&A) at a “Medium” level as demonstrated through previous federal certifications and authority to operate. Examples include the Department of Defense DIACAP processes.

The Contractor may be required to assist the DOS in meeting the information assurance requirements at the high level for confidentiality, integrity and availability as defined by the National Institute of Standards and Technology.

The Contractor shall assist in the planning and preparation for the security C&A as part of DOS FIPS 200 and FISMA implementation effort. In coordination with PTL and the DS Chief Technology Officer (CTO), the Contractor shall make changes to ensure that the application can immediately meet security requirements for a ”Medium” system as documented in the National Institute of Standards and Technology, to include but not limited to those specified within NIST Special Publications 800-37 and 800-53. Contractor will coordinate and create any additional security certification and accreditation documentation for the application/solution and assist with any testing requirements.

The Contractor shall provide certification documentation as required above, to meet current NIST requirements for a system categorized as ”medium” for confidentiality, integrity and availability and be prepared to move the system to “High” once directed by the government.

The Contractor shall provide both electronic and hardcopy copies of the documentation that identifies the standards-compliant Application Programming Interface (API) for integration to third-party external viewing applications and systems.

Any modifications in order to meet NIST 800-37 and 800-53 at the “Medium” level shall be identified and submitted for approval to the COR. DS shall not incur costs for complete system redesigns in order to obtain the initial necessary authority to operate tracking system at the system categorization level determined by DOS.

The Contractor shall comply with the following standards in support of this SOW and incorporate them into proposed solution:

a. Comply industry standard quality management practices

b. Comply with AIS Security standards

c. Comply with DOS Standards and Procedures – including all Foreign Affairs Manual (FAM), Department of Defense Acquisition Regulations (DOSARS), and Foreign Affairs Handbook (FAH)

The re-certification support will be an ongoing process to include periodic system updates, upgrades, and modifications that may occur in the life cycle operations of the server. This support includes the following.

· Attending meetings with DS security specialists and those supporting the C&A efforts.

· Identifying protocols that support the C&A efforts.

· Identifying and providing supporting documentation.

· Identifying a security architecture needed to meet C&A requirements for protecting, auditing, and validating safeguards.

The Contractor's support for the new PTL systems C&A and future system re-certifications shall be provided through the task order process. See H.9.

C.8.3 Device Integration

The PTL system shall be device agnostic and capable of ingesting tracking data from multiple device types to expand The DOS tracking device data compatibility portfolio includes commercial interfaces for Iridium devices, Global Star based devices, and cellular devices. The Contractor shall also be free to recommend new devices for integration if the devices use FIPS-approved encryption mechanisms.

The Contractor shall support the PTL systems capability to permit the import of data of future device data into the system using a plug-in architecture. The Contractor shall be required to fully integrate new device data into the PTL system and provide a common operating picture for all deployed devices. The Contractor's support for future device integration shall be provided through the task order process. See Paragraph H.9.

C.9 TRAINING

The Contractor shall provide initial and advanced user training sessions upon twenty-four (24) hour notice from the COR. The sessions shall be conducted for DOS PTL System operators.

C.9.1 Initial User Training

The objective for the initial user training sessions shall be provided to give DOS operators a solid working knowledge and a practical understanding of how to use the PTL Systems interface and functions.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .