Solicitation_PTL_System_A001.docx

DOCX document 208 KB Posted

Attached to
Personnel Tracking Locator Integrator Software and Support
Solicitation number
S-AQMMA-12-R-0413
Issued by

About this file

Solicitation PTL System A001

View the file

Other files

File Type Posted
SF30_PTL_A006.docx DOCX document
Change_Page_67.docx DOCX document
Amendment_0005_Notice.docx DOCX document
SF30_PTL_A005.docx DOCX document
SF30_Continuation_Page_A005.docx DOCX document
Attachment_6_-_PTL_Requirements_Matrix_A005.docx DOCX document
Solicitation_PTL_System_A005.docx DOCX document
Attachment_2_Price_Proposal_Worksheet_A004.xlsx XLSX spreadsheet
PTL_-_Responses_to_Vendor_Questions_A004.docx DOCX document
Solicitation_PTL_System_A004.docx DOCX document
SF30_PTL_A004.docx DOCX document
Attachment_1_Quality_Assurance_Surveillance_Plan_A004.docx DOCX document
Attachment_5_ITCCB_Approved_Hardware_and__Software_A004.xlsx XLSX spreadsheet
SF30_PTL_A003.docx DOCX document
SF30_PTL_A002.docx DOCX document
SF30_PTL_A001.docx DOCX document
Attachment_2_Price_Proposal_Worksheet.xlsx XLSX spreadsheet
Solicitation_PTL_System.docx DOCX document
SF33_PTL.docx DOCX document
Attachment_4_DD254.pdf PDF
Attachment_1_Quality_Assurance_Surveillance_Plan.docx DOCX document
Attachment_3_Past_Performance_Questionnaire.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. S-AQMMA-12-R-0413 A001 Personnel Tracking Locator Department of State

TABLE OF CONTENTS

Section B – SUPPLIES OR SERVICES AND PRICES/COSTS2
B.1 SERVICES2
B.2 TYPE OF CONTRACT2
B.3 PAYMENT, CEILING, AND WITHHOLDING2
SECTION C – STATEMENT OF WORK (SOW)8
C.1 INTRODUCTION8
C.2 BACKGROUND8
C.3 MISSION8
C.4 CONTRACTUAL OVERVIEW8
C.5 PERSONNEL TRACKING LOCATOR (PTL) SYSTEMS9
C.6 ENGINEERING AND TECHNICAL SUPPORT14
C.7 OPERATIONS, MAINTENANCE AND SUSTAINMENT SERVICES16
C.8 TRAINING17
C.9 DOCUMENTATION18
C.10 TRANSITION PLAN20
SECTION D – packaging and marking22
D.1 MARKING OF REPORTS22
D.2 PACKING LIST(S)22
D.3 WARRANTY NOTIFICATION22
SECTION E – INSPECTION AND ACCEPTANCE23
E.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.2522 (FEB 1998)23
E.2 SCOPE OF WORK AND ACCEPTANCE23
SECTION F – DELIVERIES OR PERFORMANCE24
F.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.2522 (FEB 1998)24
F.2 FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)24
F.3 PERIOD OF PERFORMANCE24
F.4 DELIVERABLES24
SECTION G – CONTRACT ADMINISTRATION DATA26
G.1 DESIGNATION OF ADMINISTRATIVE CONTRACTING OFFICE26
G.2 CONTRACTING OFFICERS REPRESENTATIVE DOSAR 652.242-70 (AUG 1999)26
G.3 GOVERNMENT TECHNICAL MONITORS (GTM)27
G.4 TECHNICAL DIRECTION27
G.6 INVOICING INSTRUCTIONS28
G.6.1 Required Invoice Information28
G.7 FINAL INVOICE28
SECTION H - SPECIAL CONTRACT REQUIREMENTS29
H.1 SECURITY REQUIREMENTS29
H.2 CLEARANCE REQUIREMENTS29
H.4 SECURITY CLASSIFICATION30
H.5 GOVERNMENT-FURNISHED EQUIPMENT AND SERVICES31
H.6 PERSONNEL REQUIREMENTS31
H.7 NONPAYMENT FOR UNAUTHORIZED WORK32
H.8 CONTRACTOR COMMITMENTS, WARRANTIES AND REPRESENTATIONS32
SECTION I – CONTRACT CLAUSES34
I.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.252-02 (FEB 1998)34
I.2 FAR CLAUSES INCORPORATED IN FULL TEXT37
I.2.1 Ordering FAR 52.216-18 (Oct 1995)37
(End of clause)37
I.2.2 FAR 52.216-19 Order Limitations (Oct 1995).37
(End of clause)37
I.2.3 FAR 52.216-22 Indefinite Quantity (Oct 1995).37
I.2.4 OPTION TO EXTEND THE TERM OF THE CONTRACT FAR 52.217-09 (MAR 2000)38
I.2.5 AUTHORIZED DEVIATIONS IN CLAUSES FAR 52.252-06 (APR 1984)38
I.2.6 PRIVACY OR SECURITY SAFEGUARDS FAR 52.239-1 (Aug 1996)39
I.3 DEPARTMENT OF STATE ACQUISITION REGULATION (DOSAR) CLAUSES39
I.3.1 SECTION 8(A) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED 652.225-71 (AUG 1999)39
I.3.2 LIMITATION OF FUNDS 652.232-72 (AUG 1999)41
I.3.3 OBSERVANCE OF LEGAL HOLIDAYS AND ADMINISTRATIVE LEAVE 652.237-72 (APR 2004)42
I.3.4 NOTICES 652.243-70 (AUG 1999)43
I.3.5 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (SEP 2007)43
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS47
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS48
K.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.252-02 (FEB 1998)48
K.2 FAR CLAUSES INCORPORATED IN FULL TEXT48
K.2.1 ANNUAL REPRESENTATIONS AND CERTIFICATIONS FAR 52.204-8 (MAY 2011)48
K.2.2 INFORMATION REGARDING RESPONSIBILITY MATTERS FAR 52.209-07 (JAN 2011)51
K.3 AUTHORIZED CONTRACT ADMINISTRATOR53
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS54
L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FAR 52.2521 (FEB 1998)54
L.2 FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)54
L.3 TYPE OF CONTRACT FAR 52.2161 (APR 1984)54
L.4 SERVICE OF PROTEST FAR 52.233-2 (AUG 1996)54
L.5 AUTHORIZED DEVIATIONS IN PROVISIONS FAR 52.252-5 (APR 1984)55
L.6 COMPETITION ADVOCATE/OMBUDSMAN DOSAR 652.206-70 (AUG 1999)55
L.7 INFORMATION TECHNOLOGY SECURITY PLAN AND ACCREDITATION (SEP 2007)55
L.8 ALTERNATE OFFER INFORMATION56
L.9 SOLICITATION RESPONSE56
L.10 TIME, PLACE, AND SUBMISSION OF OFFER56
L.11 PROPOSAL HANDLING56
L.12 DISCUSSIONS WITH THE OFFEROR57
L.13 PROPOSAL DISPOSITION57
L.14 DEBRIEFING OF UNSUCCESSFUL OFFERORS57
L.15 OFFEROR QUESTIONS/CLARIFICATIONS57
L.16 PROPOSAL INSTRUCTIONS57
L.17 VOLUME 1: PRICE PROPOSAL INSTRUCTIONS58
L.17.1 STANDARD FORM 33 (SF 33)58
L.17.2 SECTION B59
L.17.3 REPRESENTATIONS AND CERTIFICATIONS60
L.17.4 TOTAL COMPENSATION PLAN60
L.17.5 SMALL BUSINESS SUBCONTRACTING PLAN60
L.17.6 BUSINESS MANAGEMENT61
L.18 VOLUME 2: TECHNICAL PROPOSAL61
L.18.1 CORPORATE EXPERIENCE61
L.18.2 TECHNICAL PROFICIENCY62
L.18.3 KEY PERSONNEL62
L.18.4 PERSONNEL QUALIFICATIONS AND MANAGEMENT63
L.18.5 QUALITY CONTROL PLAN (QCP)64
L.18.6 PAST PERFORMANCE AND EXPERIENCE64
L.18.7 PRELIMINARY TRANSITION PLAN66
L.19 VOLUME 3: CERTIFICATION AND ACCREDIATION (C&A) DOCUMENTATION66
SECTION M – EVALUATION FACTORS FOR AWARD67
M.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.252-02 (FEB 1998)67
M.2 GENERAL67
M.3 BASIS OF AWARD67
M.4 EVALUATION FACTORS68
M.5 ELIGIBILITY FOR AWARD68
M.6 AWARD PROCESS68
M.7 SOLICITATION AMENDMENTS69
M.8 EVALUATION SUPPORT69
M.9 USE OF SUPPORTING INFORMATION69
M.10 RATINGS OF NON-PRICE FACTORS69
M.11 PRICE EVALUATION70
M.12 EVALUATION OF OPTIONS71
Solicitation No. S-AQMMA-12-R-0413 A001Personnel Tracking Locator

iii Section B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SERVICES

The Contractor shall provide the equipment and services in accordance with Section C, and the attachments.

B.2 TYPE OF CONTRACT

This is an indefinite-delivery, indefinite-quantity (IDIQ) contract for commercial and non-commercial items. Contract types for the individual task orders will fall under one or more of the following, depending on the type, complexity, and urgency of the task order requirement: fixed-price, cost-reimbursement, labor-hour, and/or time-and-materials. If a task order will be performance-based, its requirements will be conveyed and administered at the task order level.

B.3 PAYMENT, CEILING, AND WITHHOLDING

The Government will pay the Contractor the unit prices specified in this section. The Government shall impose a deduction from the amount of payment for each instance of unacceptable performance or non-performance in accordance with Attachment 1, Quality Assurance and Surveillance Plan (QASP).

BASE YEAR

CLIN
Description
Unit Price
Qty
Extended Total
0001
Production Server Enterprise Personnel Tracking System
0002
Back-Up Server Enterprise Personnel Tracking System
0003
Test Server Enterprise Personnel Tracking System
0004
Installation Services
0005
Operations Maintenance, and Technical Support (Monthly)
0006
Administration includes all database, network, and underlying system administration and configuration services (Monthly)
0007
Training Support
0007AA
Initial User Training Sessions
0007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
0008
Engineering and Technical Support Services
0008AA
Security Specialist
0008AB
Network Engineer
0008AC
Database Administrator
0008AD
Systems Administrator
0008AE
Trainer

OPTION YEAR 1

CLIN
Description
Unit Price
Qty
Extended Total
1001
Reserved
1002
Reserved
1003
Reserved
1004
Reserved
1005
Operations Maintenance, and Technical Support (Monthly)
1006
Administration includes all database, network, and underlying system administration and configuration services (Monthly)
1007
Training Support
1007AA
Initial User Training Sessions
1007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
1008
Engineering and Technical Support Services
1008AA
Security Specialist
1008AB
Network Engineer
1008AC
Database Administrator
1008AD
Systems Administrator
1008AE
Trainer

OPTION YEAR 2

CLIN
Description
Unit Price
Qty
Extended Total
2001
Reserved
2002
Reserved
2003
Reserved
2004
Reserved
2005
Operations Maintenance, and Technical Support (Monthly)
2006
Administration includes all database, network, and underlying system administration and configuration services (Monthly)
2007
Training Support
2007AA
Initial User Training Sessions
2007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
2008
Engineering and Technical Support Services
2008AA
Security Specialist
2008AB
Network Engineer
2008AC
Database Administrator
2008AD
Systems Administrator
2008AE
Trainer

OPTION YEAR 3

CLIN
Description
Unit Price
Qty
Extended Total
3001
Reserved
3002
Reserved
3003
Reserved
3004
Reserved
3005
Operations Maintenance, and Technical Support (Monthly)
3006
Administration includes all database, network, and underlying system administration and configuration services (Monthly)
3007
Training Support
3007AA
Initial User Training Sessions
3007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
3008
Engineering and Technical Support Services
3008AA
Security Specialist
3008AB
Network Engineer
3008AC
Database Administrator
3008AD
Systems Administrator
3008AE
Trainer

OPTION YEAR 4

CLIN
Description
Unit Price
Qty
Extended Total
4001
Reserved
4002
Reserved
4003
Reserved
4004
Reserved
4005
Operations Maintenance, and Technical Support (Monthly)
4006
Administration includes all database, network, and underlying system administration and configuration services (Monthly)
4007
Training Support
4007AA
Initial User Training Sessions
4007AB
Advanced User Training Sessions
CLIN
Description
Hourly Rate
Hours
Extended Total
4008
Engineering and Technical Support Services
4008AA
Security Specialist
4008AB
Network Engineer
4008AC
Database Administrator
4008AD
Systems Administrator
4008AE
Trainer

SECTION C – STATEMENT OF WORK (SOW)

C.1 INTRODUCTION

The Department of State (DOS), Bureau of Diplomatic Security (DS), Office of Security Technology (ST), Personnel Tracking and Locator Section, has a requirement for a Government owned, contractor operated enterprise personnel tracking system which can ingest the full spectrum of personnel tracking devices on the market currently and with the ability to ingest future next generation devices at minimal cost to the government for adaptation. The proposed system will replace the current nine year old system that supports Personnel Tracking and Locating (PTL) operations both domestically and overseas.

C.2 BACKGROUND

DS is responsible for deployment of technical security systems that reduce risk to government personnel and facilities. Specifically, the protection of government personnel traveling from the protected mission facility to their foreign counterpart’s office is of paramount importance in the execution of U.S. foreign policy.

C.3 MISSION

The PTL mission is to provide tracking and monitoring capabilities to USG personnel worldwide in support of foreign policy requirements.

C.4 CONTRACTUAL OVERVIEW

The Contractor shall provide three (3) complete redundant PTL Systems. The three systems shall be designated and utilized in the following capacities: 1) Production Server, 2) Back-up Server, and 3) Test Server (i.e., (Gold Standard) verification, certification and authorization (C&A)).

The PTL Systems shall employ state-of-the-art hardware and software technologies to provide the capability to monitor and ingest multiple device formats over varied transmission paths (i.e., worldwide cellular SMS messaging and data, and satellite based tracking devices). The PTL Systems shall aggregate the data collected and distribute it to various front end user systems, and provide a default display capability.

The PTL Systems shall be device agnostic and capable of ingesting data from currently deployed devices to include PECOS-based, Commercial Iridium, Global Star based devices, and cellular devices.

The PTL Systems shall be fully redundant with intra-site hot failover, therefore in the event of a component failure the system shall automatically switch over to its backup component without the need for manual intervention.

The PTL services shall be based at designated Government locations inside the continental United States.

· Commercial-Off-The-Shelf (COTS) fully redundant turn-key system that satisfies the requirements enumerated below.

· Engineering and technical services to include system installation, operational validation of all system elements that support the PTL Systems operations, and associated data services.

· Operations maintenance, technical support, and sustainment services required to support a 24x7x365/6 DOS activities worldwide. The services shall ensure all software and hardware are functional and remain up-to-date.

· Contractor shall assume all costs associated with any required licensing or maintenance agreements.

C.5 PERSONNEL TRACKING LOCATOR (PTL) SYSTEMS

The DOS mission portfolio is comprised of a significant investment in satellite and cellular tracking devices that are currently deployed worldwide. The PTL Systems shall be device agnostic and be capable of ingesting data from the tracking devices currently deployed. The PTL Systems shall be adaptable to allow for new device types and the integration of other transmission paths as necessary.

In order to leverage the existing DOS infrastructure and approved assets the PTL Systems shall provide compatibility with Oracle Version 11 with Oracle Advanced Security - Transparent Data Encryption (TDE).

In order to facilitate the DOS Certification and Accreditation (C&A) requirements, any solution proposed shall be able to document approval or accreditation by another entity of the federal Government. Hardware required must be on the approved federal IT baseline, preferably approved by the State Department Information Technology Change Control Board.

C.5.1 Web Interface

The PTL Systems shall possess the following capabilities:

C.5.1.1 Facilitate the viewing of live track data, historical track data, emergency messages, track administration functions, user administrative functions, and data export functions through a unified, secured, and web interface.

C.5.1.2 Display live/historical tracks with the following device information for all ingested devices: device ID, alias/call-sign, last reported latitude/longitude, last reported track receive time, and emergency status. If the device provides speed, direction or brevity code then the web interface shall display that information as well.

C.5.1.3 Have the capability to export historical device data in CSV format to files.

C.5.1.4 Be able to create, retrieve, update, or delete brevity codes from capable trackers.

C.5.1.5 Record a “receive” timestamp with each received device update

C.5.1.6 Provide secure two-way messaging capability to trackers capable of receiving messages.

C.5.1.7 Provide users the capability to filter live/historical tracks individually or as part of a device group. Each user approved to do so shall be able to filter by device, device name/alias, date/time, or device group.

C.5.1.8 Use role-based access control for all functions and commands available to the government. Users shall be granted only the minimum necessary permissions to perform functions for any given device group. User administration functions shall be granted only to authorized administrators.

C.5.1.9 Provide a means to access all configuration settings through the same unified interface. These shall include all software and program settings except settings of the internal COTS products

C.5.1.10 Provide the capability to authorized administrators to assign a user separate permissions for each nested device group. These permissions include but are not limited to the ability to view or modify devices within the device group.

C.5.1.3.11 Provide system-wide notifications to all users upon software updates, maintenance cycles, or system-wide configuration changes.

C.5.1.3.12 Allow users to create nested device groups and to assign or reassign devices under the user’s control to any of the device groups under that user’s control.

C.5.1.3.13 Show only devices, functions, and configuration settings for which a user has authorization.

C.5.1.3.14 Allow users to remotely configure all capable trackers for which a user has permissions to modify. This configuration shall include remotely changing the reporting rate of each tracker.

C.5.1.3.15 Display an audible/visual emergency warning to the user in the event that a user-viewable device sends an emergency message to the system.

C.5.1.3.16 Provide an authorized user the ability to configure a Geofence for each user-viewable device. The user shall have the ability to configure whether the Geofence activates when a device enters the Geofence, exits the Geofence, or both.

C.5.1.3.17 Allow an authorized user the ability to define and edit multiple Geofences or zones for each user-viewable device (at least 10).

C.5.1.3.18 Be capable of importing a Geofence from file. When the Geofence for any device activates, the PTL System's web interface shall provide an audio and visual warning to those users with the viewing permissions for that device.

C.5.1.3.19 In an emergency, allow an authorized user to remotely activate the microphone of audio-capable trackers. The administrator shall have the capability to globally enable or disable this function. Contractor will define safeguards over how this feature will be controlled to ensure access to this feature will be limited to a restricted group of authorized users only, and track implementation of this feature in the audit logs.

C.5.1.3.20 Provide users the capability to filter live/historical tracks individually or as part of a device group. Each user shall be able to filter by device, device name/alias/call sign, date/time, or device group.

C.5.1.3.21 Provide an authorized user the ability to edit a user-modifiable tracker’s association data, including each tracker’s alias or call-sign.

C.5.1.3.22 Provide an authorized user the ability to edit emergency contact information for each user-viewable device.

C.5.1.3.23 In the event of an emergency, the PTL Systems shall send an emergency notification via e-mail to the configured emergency contact(s) associated with that device in the system.

C.5.1.3.24 Allow authorized users to manually deactivate an audible/visual emergency warning and geo-fence warnings.

C.5.1.3.25 Provide an authorized user the capability to export live tracking data and emergency messages via unencrypted UDP, unencrypted TCP, and HTTPS protocols to any other IP address and port. An authorized user shall be able to switch between export protocols at any time.

C.5.1.3.26 Provide a secure built-in web viewer that allows a user to see selected trackers as icons directly in the web application. Viewer shall allow the user to pan and zoom on the map.

C.5.1.3.27 Provide the user with the capability to disable the built-in viewer when necessary, in order to save bandwidth, or so that the user can use an external viewing application

C.5.1.3.28 Have the ability to zoom to a specified tracker, resolution less than or equal to 250m for geospatial imagery and street level for street maps.

C.5.1.3.29 Differentiate trackers within the display so that a user may distinguish between closely-spaced trackers.

C.5.1.3.30 Provide the capability that when a user viewable device sends an emergency message, the built-in web viewer shall be able to zoom to the device on the map (resolution less than or equal to 250m) and provide an audio/visual warning.

C.5.1.3.31 Provide an authorized user the ability to configure a Geofence for a user-viewable device by highlighting the area directly on a map.

C.5.1.3.32 Provide a visual warning when a device enters or exits a Geo-fence.

C.5.1.3.33 Display the following device information when an icon is selected : device ID, device model, alias/call-sign, last reported latitude/longitude, last reported MGRS, last reported time, and emergency status. If a device provides speed, direction or brevity code then the web interface shall display that information as well.

C.5.2 Operator Display and Presentation

The PTL Systems shall:

C.5.2.1 Serve data to multiple external viewing applications. These applications include but are not limited to Google Earth, ESRI and FalconView.

C.5.2.2 Provide an external viewing application with the ability to display the following device information: device ID, device model, alias/call-sign, last reported latitude/longitude, last reported MGRS, last reported time, emergency status, and brevity code. If the external viewing application supports the ability to display speed and direction this also shall be provided to an external viewing application.

C.5.2.3 Provide and or develop the capability to integrate layers of geospatial data and overlay the data on a Google Earth Baseline.

C.5.3 System Monitoring

The PTL Systems shall provide security auditing and monitoring services, to include intrusion detection and firewall monitoring.

As deemed necessary by the government, the Contractor shall use network management software, another automated process, or a combination of the two to monitor the connection status and health of the externally-connected networks. These externally-connected networks include but are not limited to VPN's to other systems and incoming device transmission networks such as satellite ground stations.

C.5.4 Special Technical Requirements

The PTL Systems shall meet the following technical requirements:

C.5.4.1 Ingest multiple device formats over varied transmission paths, including but not limited to PECOS, Iridium, Global Star, and various 2G/3G/4G cellular networks via Short Message Service (SMS) and data.

C.5.4.2 Ingest, at a minimum, device ID, position, and elevation data from each tracker, and any brevity code. If the device provides it, the PTL Systems shall also ingest device send time, speed, and direction.

C.5.4.3 Provide the ability to ingest encrypted device data using FIPS-approved encryption algorithms where encryption is supported by the device.

C.5.4.4 Utilize an Application Programming Interface (API) for integration to third-party external viewing applications and systems. This API shall include at a minimum: retrieval of live or historical tracks by ID, Alias, Date, Device Group, or other filters, and retrieval of device metadata and geo-fences.

· The API shall be exposed through secured and encrypted services, be it web services, remote method invocation, or complete exposure of proprietary format to the government.

· All API methods shall be exposed, documented, and provided to the government. All API methods and documentation shall be accessible without requiring proprietary software or a license.

C.5.4.5 Provide secure two-way messaging capability to trackers capable of receiving messages.

C.5.4.6 Record a “receive” timestamp with each received device update.

C.5.4.7 Provide the ability to import and export real-time data in the JBFSA format (Versions 1.0, 1.0a, 2.3 and FFT 2.4). The contractor shall update this capability for forward compatibility as required.

C.5.4.8 The production server shall consist of performance languages, either compiled or JIT-compiled, suitable to an enterprise environment.

C.5.4.9 (OPTIONAL) Provide the capability to export live track data and emergency messages in real-time through a one-way guard.

C.6 ENGINEERING AND TECHNICAL SUPPORT

The Contractor shall assist the DOS in achieving security authorization and certification under NIST 800-37 and 800-53 at the “High” level.

C.6.1 Pre-Deployment Tasks

C.6.1.1 The Contractor shall participate in pre-deployment planning prior to operations as directed by the Contracting Officer Representative (COR). These activities typically include providing engineering support and technical data.

C.6.1.2 All Contractor specific terminology inherent to the system shall be documented and defined using industry accepted definitions.

C.6.1.3 The DOS shall perform acceptance testing prior to deployment of the PTL Systems.

C.6.2 Deployment Tasks

C.6.2.1 The Contractor shall develop with the designated COR a site specific Standard Operating Procedure (SOP) prior to activation. The SOP will serve as a living document outlining daily operations procedures, and coordination with the DS point-of-contact (POC) for emergency events and technical support.

C.6.2.2 For daily administration of the system, the Contractor shall provide all database, network, and underlying system administration and configuration services. Daily administration of the system by the government shall be restricted to user management and device administration to include, tracking device management, device communications, and device dissemination for regions of interest.

C.6.3 Certification and Authorization (C&A)

The PTL Systems shall be capable of obtaining a DOS C&A as demonstrated through previous federal certifications and authority to operate. Examples include the Department of Defense DIACAP processes.

The Contractor shall assist in the planning and preparation for the security certification and accreditation (C&A) as part of DOS FIPS 200 and FISMA implementation effort. In coordination with PTL and the DS Chief Technology Officer (CTO), the Contractor shall make changes to ensure that the application can meet security requirements for a high system as documented in the National Institute of Standards and Technology, to include but not limited to those specified within NIST Special Publications 800-37 and 800-53. Contractor will coordinate and create security certification and accreditation documentation for the application and assist with any testing requirements.

The Contractor shall provide certification documentation as previously discussed, to meet current NIST requirements for a system categorized as High for Availability, Integrity and Security.

The Contractor shall provide both electronic and hardcopy copies of the documentation that identifies the standards-compliant Application Programming Interface (API) for integration to third-party external viewing applications and systems.

Any modifications in order to meet NIST 800-37 and 800-53 at the “High” level shall be identified and submitted for approval to the COR. DS shall not incur costs for complete system redesigns in order to obtain the necessary authority to operate tracking system at the system categorization level determined by DOS.

The Contractor shall comply with the following standards in support of this SOW and incorporate them into proposed solution:

a. Comply industry standard quality management practices

b. Comply with AIS Security standards

c. Comply with DOS Standards and Procedures – including all Foreign Affairs Manual (FAM), Department of Defense Acquisition Regulations (DOSARS), and Foreign Affairs Handbook (FAH)

The Contractor shall provide a task order proposal necessary to support DS during the accreditation process. This support will be an ongoing process to include recertification of periodic system updates, upgrades, and modifications that may occur in the life cycle operations of the server. This support includes the following.

· T&M not to exceed a 5 year level of support.

· Attending meetings with DS security specialists and those supporting the C&A efforts.

· Identifying protocols that support the C&A efforts.

· Identifying and providing supporting documentation.

· Identifying a security architecture needed to meet C&A requirements for protecting, auditing, and validating safeguards.

C.7 OPERATIONS, MAINTENANCE AND SUSTAINMENT SERVICES

C.7.1 Development Cycles and Modernization Updates (Critical Gap)

The Contractor shall provide regular development cycles. These cycles shall include bug-fixes, software/server patches, implementation of future (minor) core requirements, and future (minor) built-in web viewer requirements and shall occur at least every 90 days or sooner if deemed necessary by the COR. Updates shall also include modernization updates as part of the regular development cycles. These modernization updates shall include updating the PTL Systems and built-in web viewer such that it can be viewed properly in DOS-approved web browsers. Updates shall be tested on the Test Server in a test domain prior to updating the Production Server. As part of the update package, Contractor shall provide documentation and technical support 60 days in advance of the anticipated change to meet DOS configuration change management requirements and obtain approval for the change.

C.7.2 Software or Architecture Modifications

The PTL Systems consists of COTS products that will act as the server for tracking and locating personnel in regions of interest worldwide. Given that the system consists of COTS products, certain modifications to system software and or architecture may be required to meet DS security standards and information systems accreditations and related C&A testing requirements. The Contractor's support for C&A modifications shall be provided through the task order process. See H.13.

C.8 TRAINING

The Contractor shall provide initial and advanced user training sessions upon twenty-four (24) hour notice from the COR. The sessions shall be conducted for DOS PTL System operators.

C.8.1 Initial User Training

The objective for the initial user training sessions shall be provided to give DOS operators a solid working knowledge and a practical understanding of how to use the PTL Systems interface and functions. The initial user training sessions shall be twenty-four (24) hours in duration (i.e., three days). Following the completion of the sessions the participants shall possess:

· Working knowledge of the capabilities and limitations of the PTL Systems and servers.

· Working knowledge of the systems data flow.

· Basic understanding of the system administration steps and requirements.

· Working knowledge of system operations, including all facets of web interfaces.

· Working knowledge of associated device configuration

· Working knowledge of data monitoring.

· Working knowledge of output monitoring.

· Basic understanding of system troubleshooting, including; associated device troubleshooting, the interpretation of system faults and problem resolution.

C.8.2 Advanced User Training

The objective for the initial user training sessions shall be to give DOS operators a solid working knowledge and a practical understanding of how to use the PTL Systems interface and functions. The advanced user training sessions shall be sixteen (16) hours in duration, (i.e., 2 days). Following the completion of the sessions the participants shall possess:

· Proficient knowledge of the capabilities and limitations of the PTL Systems.

· Proficient knowledge of the systems data flow.

· Proficient understanding of the system administration steps and requirements.

· Proficient knowledge of system operations, including all facets of web interfaces.

· Proficient knowledge of associated device configuration

· Proficient knowledge of data monitoring.

· Proficient knowledge of output monitoring.

· Proficient understanding of system troubleshooting, including; associated device troubleshooting, the interpretation of system faults and problem resolution.

C.8.3 Training Plan

The Contractor shall provide a training plan which addresses how to deploy upgrades and ensure cultural adaptation should any changes be necessary to the user interface. The Contractor shall present the proposed format and outline of the training sessions for COR approval

C.9 DOCUMENTATION

C.9.1 Deployment Plan

The Contractor shall provide a Deployment Plan and Project Life Cycle that will be used in the implementation of the tracking program. Both shall include for each phase, the description of activities to take place, a schedule demonstrating any dependencies, control gates, and milestones.

C.9.2 Configuration Management Plan (CMP)

The Contractor shall provide a CMP which will incorporate a configuration control board which includes the GTM, contractor, PTL staff and other constituencies invited by PTL. The document will describe how the Contractor plans to maintain document and software baselines in coordination with the GTM, plan subsequent development cycles and delivery, and provide suggested revisions to the PTL Systems. The Contractor shall present the proposed format and outline of the plan for COR approval.

C.9.3 Quality Control Plan (QCP)

The Contractor shall provide a QCP which describes how the contractor will maintain control over the quality of the Contractor processes. The Contractor shall adhere to the QCP in a manner that ensures that the highest levels of performance are utilized under this contract. The Contractor’s QCP shall emphasize deficiency prevention over deficiency detection and ensure that all aspects of this contract are performed in accordance with the terms of this contract. The plan shall include corrective action procedures when deficiencies or insufficient performance are identified. The Contractor will be responsible for monitoring contract performance and customer satisfaction and make necessary updates to the QCP when issues arise or when instructed by the COR.

The Contractor shall comply with all applicable current and future laws, directives, and policies including the following:

· Foreign Affairs Handbooks (FAH)

· Foreign Affairs Manual (FAM)

· Department of State Standardized Regulations (DSSR)

· National Electric Code (NEC)

· International Building Code (IBC)

· Computer-Aided Design (CAD) Standards

· Security Classifications E.O. 13526

· Federal Travel Regulation (FTR)

· Freedom of Information Act (FOIA) – Title 5 U.S.C. Section 552)

· Privacy Act (5 U.S.C. § 552a)

· Uniform Federal Accessibility Standards (UFAS)

· Security Health Environmental Management (SHEM)

· Security Classification Guide for the Design and Construction of Overseas Facilities

The Contractor shall provide monthly status reports addressing activities, observations and recommendations. This will be a written report that will address the activities and findings of the prior month. This report will be designed to provide the GTM a comprehensive understanding of where the Contractor is in the project plan, any issues that have arisen, proposed solutions with a cost benefit analysis of those solutions, and a report on any issues from the previous month that needed to be updated.

C.9.4 Usage Reporting

The PTL Systems shall provide reporting to include: air time usage, last device report date and geo-location. Reports shall be customizable to include trackers by device ID or trackers by device group.

C.9.5 Monthly Status Report

Provide a monthly status report of the time of tracks received for all ingested tracker devices.

C.9.6 Situation and Incident Reporting

The Contractor shall submit situation and incident reports:

1. An Incident Report shall be provided within 15 minutes of any unscheduled communications outage and twenty-four (24) hours prior to a scheduled outage.

2. The Incident Report format shall be the responsibility of the Contractor and will be approved by the COR or designee prior to initiation of PTL System operations.

C.9.7 System Design Documentation

The Contractor shall provide systems design documentation describing complete system architecture and full accreditation boundary. The documentation shall include, the PTL Systems, networking equipment, inter-connections, redundancy and failover design, software language(s) used; and all methods/means by which servers, network, and software are secured.

C.10 TRANSITION PLAN

The Contractor shall perform in accordance with the Preliminary Transition Plan. The transition period shall not exceed ninety (90) calendar days. Full performance shall commence following the end of the transition period provided the PTL Systems have been granted DOS authority to operate.

The Contractor shall submit a Final Transition Plan reflecting any revisions or changes to the Preliminary Transition Plan within ten (10) calendar days of receiving the Notice of Contract Award. Any proposed revisions to the Contractors Preliminary Transition Plan shall not result in an increase in the allotted ninety (90) day transition timeframe. The COR will review any changes to the Preliminary Transition Plan within 10 calendar days of receipt.

C.10.1 Phase-in Performance

The Contractor shall assume full responsibility for an orderly phase-in of operations. During the Transition Period the Contractor shall:

· provide the accreditation documentation for DOS connectivity requirements

· complete staffing

· conduct the required user training

· install and test the PTL Systems

· acquire the necessary levels of insurance

· participate in a preliminary joint inventory of all Government Furnished Property

C.10.2 Phase-Out Performance

At the end of the contract a follow-on competition shall be conducted by the CO. In the event the current Contractor is not awarded the follow-on contract the Contractor shall, within 30 calendar days of notice by the CO, develop a Phase-Out Plan for the orderly transition of the operations. The Contractor phase-out procedures shall not disrupt or adversely affect the day-to-day operations and shall result in a smooth and orderly transfer.

SECTION D – packaging and marking

D.1 MARKING OF REPORTS

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(a) Name and Business address of the Contractor;

(b) Contract number and delivery order number, if applicable;

(c) Date of report; and

(d) Program office(s).

D.2 PACKING LIST(S)

A packing list or other suitable shipping document shall accompany each delivery and shall include the following information:

(a) Name and address of consignor;

(b) Name and address of consignee;

(c) Government contract number:

(d) Government bill of lading number covering the shipment, if any; and

(e) Description of the items shipped, including item number, quantity, number of containers, and package number, if any.

D.3 WARRANTY NOTIFICATION

In accordance with FAR 46.706 (b)(5), the Contractor shall stamp or mark the supplies delivered, or otherwise furnish notice with the supplies, of the existence of a warranty, if any. Sufficient information shall be presented duration of the warranty and the name and telephone number of the Contracting Officer to be notified if the supplies are found to be defective.

Solicitation No. S-AQMMA-12-R-0413 A001 Personnel Tracking Locator

SECTION E – INSPECTION AND ACCEPTANCE

E.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.2522 (FEB 1998)

This contract incorporates the following clauses by reference, with the same force and effect as if they were given in full text. Upon request, the CO will make their full text available.

http://www.acquisition.gov or http://farsite.hill.af.mil/

These addresses are subject to change. If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Dept. of State Acquisition Website at http://www.statebuy.state.gov.

Clause
Title
Date
52.246-06
Inspection—Time-and-Material and Labor-Hour
May 2001
52.246-16
Responsibility of Suppliers
Apr 1984

E.2 SCOPE OF WORK AND ACCEPTANCE

Final inspection and acceptance of the PTL Server shall be carried out in accordance with a structured test and acceptance plan approved by the COR, prior to delivery to DOS. Unless otherwise agreed, the Contractor and DOS shall jointly carry out and complete the acceptance activities and the result shall be accounted for in reports designed to clearly document whether the acceptance criteria are met or not. Acceptance of the system shall not be refused because of minor deviations.

If the Contractor at any time has reason to believe that a delivery or performance undertaken in this contract will be delayed, it shall promptly notify DOS and shall subsequently define in writing the estimated period of delay and the estimated new date of delivery or performance.

SECTION F – DELIVERIES OR PERFORMANCE

F.1 CLAUSES INCORPORATED BY REFERENCE FAR 52.2522 (FEB 1998)

This contract incorporates the following clauses by reference, with the same force and effect as if they were given in full text. Upon request, the CO will make their full text available. Go to the Internet at:

https://www.acquisition.gov or http://farsite.hill.af.mil/

These addresses are subject to change. If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Dept. of State Acquisition Website at http://www.statebuy.state.gov.

F.2 FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)

Clause
Title
Date
52.242-15
Stop-Work Order
Aug 1989
52.242-15
Stop-Work Order Alternate I
Aug 1989
52.242-17
Government Delay of Work
Apr 1984
52.247-34
F.o.b. Destination
Nov 1991

F.3 PERIOD OF PERFORMANCE

This contract is comprised of a one (1) year base period, and a four (1) year option periods. The CO can extend the term of the contract for an additional six (6) months in accordance with FAR 52.217-8, Option to Extend Services clause contained in Section I of this contract.

F.4 DELIVERABLES

The Contractor shall provide all deliverables in the timeframe and in a format approved by the COR. The CO shall notify the Contractor in writing of any additional deliverables that may arise during contract performance.

PWS PARAGRAPH
DELIVERABLE
DUE DATE
C.6.2.1
Standard Operating Procedures
30 days from contract award, and updated as changes occur or instructed by the COR.
C.6.3
Certification and Accreditation Documentation and all supporting documentation
Within 2 business days of contract award
C.6.3
Updated Certification and Accreditation Documentation
Per each C&A completed
C.7.1
Change Management Documentation
Every 90 days unless instructed by the COR
C.7.4
Incident Reports
Within 15 minutes of unscheduled outages and 24 hours for schedule outages
C.8.1
Certification and Accreditation Documents
As required or instructed by the COR
C.9.1
Deployment Plan
Within 10 business days of contact award
C.9.2
Configuration Management Plan
Within 10 business days of contact award
C.9.3
Quality Control Plan
Within 30 calendar days of contact award
C.9.4
Usage Reports
By the 5th business day of each contractual month
C.9.5
Monthly Status Reports
By the 5th business day of each contractual month.
C.9.6
Situation and Incident Report
Within 1 business day of occurrence
C.9.7
System and Design Documentation
Within 15 business days of system acceptance
C.10.1
Preliminary Transition Plan
Within 10 business days of contact award
Section I
IT Security Plan.
Within 30 days of contract award

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 DESIGNATION OF ADMINISTRATIVE CONTRACTING OFFICE

This contract will be administered as follows:

Primary Contracting Officer (CO):

Vince J. Chaverini, Jr.
Department of State
Office of Acquisition Management
A/LM/AQM/WWD SA-6

1701 North Fort Myer Drive Arlington, VA 22209 Office: (703) 875-6645

Contract Specialist

Frank B. O'Donnell
Department of State
Office of Acquisition Management
A/LM/AQM/WWD

1400 Wilson Boulevard Arlington, Virginia 22209

Administrative Contract Specialist:

Department of State
Office of Acquisition Management
A/LM/AQM/WWD

Attn: Maxine Hodges 1400 Wilson Boulevard Arlington, Virginia 22209

Written communications regarding the administration of this contract shall make reference to the contract number and shall be mailed to the above address. The COR is responsible for oversight of the technical aspects of the Contractor's performance.

G.2 CONTRACTING OFFICERS REPRESENTATIVE DOSAR 652.242-70 (AUG 1999)

(a) The CO may designate in writing one or more Government employees, by name or position title, to take action for the CO under this contract. Each designee shall be identified as a COR. Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted CO and this authority is delegated in the designation.

(b) The COR for this contract will be Mr. Brett Yankie.

(c) The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract. The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract.

G.3 GOVERNMENT TECHNICAL MONITORS (GTM)

a. A GTM may be designated to provide technical monitoring, advice and assistance, in the monitoring and evaluation of a contractor’s performance at separate consular locations. The GTM is appointed by the CO.

b) The GTM for this contract will be Mr. Floyd Light.

G.4 TECHNICAL DIRECTION

(a) Performance of the work hereunder shall be subject to technical instructions, whether oral or written, issued by the COR or GTM. As used herein, technical instructions are defined to include the following:

(1) Directions to the Contractor which suggest pursuit of certain lines of inquiry, change of work emphasis, fill in details or otherwise serve to assist in the Contractor's accomplishment of Section C.

(2) Guidance to the Contractor which assists in the interpretation of drawings, specifications or technical portions of work description.

(b) Technical instructions must be within the general scope of work stated in the contract.

Technical instructions may not be used to: (1) assign additional work under the contract; (2) direct a change as defined in the "Changes" clause of this contract; (3) increase or decrease the contract price or estimated contract amount (including fee), as applicable, the level of effort, or the time required for contract performance; or (4) change any of the terms, conditions or specifications of this contract.

(c) If, in the opinion of the Contractor, any technical instructions calls for effort outside of the contract or are inconsistent with this requirement, the 'Contractor shall notify the Contracting Officer in writing within ten working days after the receipt of any such instruction. The Contractor shall not proceed with the work affected by the technical instruction unless and until the Contractor and the Contracting Officer agree that the technical instruction is within the scope of this contract.

(d) Nothing in the foregoing paragraph shall be construed to excuse the Contractor from performing that portion of the contractual work statement that is not affected by the technical instructions.

G.6 INVOICING INSTRUCTIONS

The Contractor shall submit to the designated billing office a single invoice for the products and services rendered under this contract to the address listed below. If the Government rejects an invoice, the Contractor shall submit a revised invoice. Revised invoices shall be marked as “revised” with a sequentially assigned revision number. Copies of signed invoices can be sent electronically to DOSPayments@state.gov; faxed to 1-866-483-3436; or mailed to:

Department of State Global Financial Operations (RM/GFS/GFO) Office of Claims (GFO/C) Charleston Financial Service Center Post Office Box 15008 Charleston; SC 29415-5008

(843) 202-3889 Telephone

POC: Mr. Michael Washington WashingtonM@state.gov

G.6.1 Required Invoice Information

The invoice shall contain all information required in Section G, Section I (including, FAR 52.232-7 and 52.232-25). The invoice shall include a listing of each service provided in Section B by CLIN.

G.7 FINAL INVOICE

The Contractor shall specifically identify the last invoice as the “Final Invoice.” The Final Invoice shall be submitted within sixty (60) days from the last day and shall include the remaining amounts, if any are claimed to be due under the basic contract. It shall include a certification that all subcontractors, suppliers, and consultants have been paid (or will be paid upon Contractor’s receipt of payment), and that all Government Furnished or Contractor Acquired Property has been disposed of in accordance with COR direction. This includes return of all ID badges and any other Government furnished property. A full and accurate inventory, accounting for all lost, stolen or damaged property must also be furnished to the COR before final payment is authorized. The final invoice shall include the Contractor’s Release of Claims.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 SECURITY REQUIREMENTS

(a) A facility security clearance at the TOP SECRET level is required for contract performance in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, attached to this contract.

(b) Since it will be necessary for some Contractor personnel to have access to classified material and/or to enter into areas requiring a security clearance, each Contractor employee requiring such access must have an individual security clearance commensurate with the required level of access prior to contract performance. Individual clearances shall be maintained for the duration of employment under this contract, or until access requirements change.

(c) Performance of this contract shall be in accordance with the attached DD Form 254, Department of Defense Contract Security Classification Specification and FAR 52.204-2 "SECURITY REQUIREMENTS."

(d) Classified material received or generated in the performance of this contract shall be safeguarded and disposed of in accordance with the National Industrial Security Program Operating Manual (DOD 5220.22-M).

H.2 CLEARANCE REQUIREMENTS

(a) The Contractor shall have the ability to provide personnel, either directly or through subcontractors, with a minimum clearance of TOP SECRET. Designated Contractor or Subcontractor personnel requiring access to Sensitive Compartmented Information (SCI) shall be approved for SCI access.

(b) The Contractor shall obtain a Department of State building pass for all employees performing under this contract who will require frequent and continuing access to Department of State facilities in accordance with DOSAR 652.237-71 "IDENTIFICATION/BUILDING PASS." Use of DOS building passes in any manner other than for performance of duties assigned under this contract is strictly prohibited.

(1) All Contractor personnel shall be required to attend a DOS Security briefing prior to being granted a building pass.

(2) The COR or designee shall provide the Contractors employees with a completed DS1838, Request of Building Pass Identification Card.

(3) The Contractor shall submit a Visitor Authorization Request (VAR), as referenced in the National Industrial Security Program Operating Manual, to the Bureau of Diplomatic Security, Office of Information Security, Industrial Division (DS/IS/IND) on its corporate letterhead for all cleared personnel to be assigned to the contract. The VAR shall include a copy of the JCAVS Person Summary and contain the following information, at a minimum:

· Employee’s full legal name; social security number and date of birth.

· Registered corporate name for contractor and CAGE Code

· DOS contract number

· Contract performance period dates (one year)

· Security clearance level

· Date the clearance was…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .