SAMPLE - Construction Agreement (Bond Required).pdf

PDF 2 MB Posted

Attached to
ECEP Cooling Tower Basin Improvements
Solicitation number
146496
Issued by
Polk County, Florida

About this file

This is a Construction Agreement (Bond Required) template issued by the Central Florida Tourism Oversight District for construction projects located in Orange or Osceola County, Florida. The agreement establishes the contractual relationship between the District (Owner) and a selected Contractor for performance of specified construction work. The contract documents include a Scope of Work, Project Milestone Schedule, Recap of Contract Sum, Pending Alternates, Unit Price Schedule, Special Contract Conditions, and General Conditions of the Contract for Construction. The Contractor must commence work upon receipt of a written Notice-to-Proceed and complete all work within a specified timeframe with interim milestone dates as detailed in the contract. The work must achieve Substantial Completion by a specified number of days from the Notice-to-Proceed and Final Completion by an additional specified number of days thereafter. The Contract requires submission of a Project Site-Specific Safety Plan and compliance with detailed safety requirements covering general safety, personal protective equipment, confined spaces, electrical work, fall protection, equipment operation, and utility locating procedures.

The Contract Sum is established as a lump sum or not-to-exceed amount specified in Exhibit C, with monthly progress payments calculated at ninety-five percent of work completed through each Payment Application Date, with retainage withheld for incomplete work. Final payment is due within fourteen days after completion of punch list items and execution of the Close-out Change Order, contingent upon the Contractor's full compliance with all contract provisions. The Contractor must provide a recorded Public Construction Bond in conformance with Florida Statute 255.05 for the full Contract Sum amount, guaranteeing faithful performance and prompt payment to all laborers and material suppliers. The agreement includes provisions for liquidated damages if Substantial Completion is not achieved by the specified deadline, with the daily rate to be determined. The Contractor warrants all labor, materials, and equipment for one year from final completion and bears all costs associated with performance, including taxes, labor, materials, equipment, and overhead. The contract is governed by Florida law with exclusive jurisdiction in Orange County Circuit Court, and includes requirements for E-Verify compliance, public records compliance per Florida Statute Chapter 119, and compliance with scrutinized companies restrictions under Florida Statute Section 287.135.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

{PROJECT NAME}

CONTRACT NO.: {cmagreement356}

PROJECT MANUAL

CONSTRUCTION AGREEMENT (BOND REQUIRED)

Date of Issuance: {cmsfinalapprovaldatetime296}

Owner: Central Florida Tourism Oversight District 1900 Hotel Plaza Boulevard Lake Buena Vista, Florida 32830

Owner’s Representative: Central Florida Tourism Oversight District 1900 Hotel Plaza Boulevard Lake Buena Vista, Florida 32830

Engineer/Architect of Record: Designer Name Designer Street Address Designer City State Zip

Contractor: {cmexternalpartyname363} {cmexternalpartyaddress335} {cmexternalpartycity336}, {cmexternalpartystate340} {cmexternalpartyzipcode341}

SA

MPL

E

PROJECT MANUAL

Definition: The compilation of Documents listed herein is hereinafter referred to as the Project Manual.

The following listed documents comprise the Project Manual entitled:

{Project Name}

CONSTRUCTION AGREEMENT

Contract Number: {cmagreement356}

CONTRACT DOCUMENTS

Exhibit A – Scope of Work and List of Contract Documents Exhibit B – Project Milestone Schedule Exhibit C – Recap of Contract Sum Exhibit D – Pending Alternates

Exhibit E – Unit Price Schedule

Special Contract Conditions General Conditions of the Contract for Construction Payment Bond Performance Bond Dual Obligee Rider Consent of Surety for Partial Payment Application Contractor's Interim Affidavit (sample) Contractor's Request for Information (“RFI”) (sample) Directive (sample) Close-Out Change Order Forms (sample)

Drawings – Drawings are separately bound. For the List of Drawings, refer to Specification Section 00850, entitled List of Drawings and Specifications, contained in the Project Manual, entitled {Project Name}, dated _________. All Drawings listed therein, and any applicable Addenda subsequently issued thereto, are specifically incorporated into the Project Manual by this reference.

Specifications - For the List of Specifications, refer to Specification Section 00850, entitled List of Drawings and Specifications, contained in the Project Manual, entitled {Project Name}, dated __________. All specifications listed therein, and any applicable Addenda subsequently issued thereto, are specifically incorporated into the Project Manual by this reference.

END OF TABLE OF CONTENTS - PROJECT MANUAL

SA

CONTRACT NO: {cmagreement356}

{Project Name}

CONSTRUCTION AGREEMENT

THIS AGREEMENT, made effective as of __________________, by and between Central Florida Tourism Oversight District (herein referred to as the “Owner,” “District” or “CFTOD”), whose mailing address is 10450 Turkey Lake Road, Box # 690519, Orlando, FL 32869, and {cmexternalpartyname363} (herein referred to as the “Contractor”), whose mailing address is {cmexternalpartyaddress335}, {cmexternalpartycity336}, {cmexternalpartystate340} {cmexternalpartyzipcode341}.

W I T N E S S E T H

WHEREAS, Central Florida Tourism Oversight District issued a _____________ (“___”) No. C00____ on ____ for __________;

WHEREAS, ___ (_) bidders responded, and ________________ was the lowest responsive and responsible bidder. The Contractor was subsequently selected as the intended awardee for these services;

and (OR)

WHEREAS, ___ (_) proposers responded, and ________________ was the highest ranked proposer.

The Contractor was subsequently selected as the intended awardee for these services; and

In consideration of the mutual covenants hereinafter set forth, the parties hereto agree as follows:

Article 1

DEFINITIONS: THE CONTRACT DOCUMENTS

1.1. The capitalized terms used herein shall have the meanings set forth in the General Conditions of the Contract for Construction (herein referred to as the “General Conditions”) unless a specific definition therefor is provided herein. Unless otherwise specified, references herein to numbered articles and paragraphs are to those in this Agreement. This Agreement shall be referred to throughout the Contract Documents as the “Agreement” or “Contract.”

1.2. The Contract Documents consist of this Agreement, the Conditions of the Contract (General and Special), the Drawings, the Specifications, all Addenda (except portions thereof relating purely to any of the bidding forms or bidding procedures), all Modifications and all other documents identified in the “List of Contract Documents” included in Exhibit A, which is attached hereto. Such documents form the Contract and all are as fully a part thereof as if attached to this agreement or repeated herein.

Article 2

STATEMENT OF THE WORK

2.1. The totality of the obligations imposed upon the Contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the “Work.”

2.2. Exhibit A, “Scope of Work and List of Contract Documents,” contains a brief description of the Project.

2.3. The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and nonprofessional services, and shall perform all other acts and supply all other things necessary to fully and properly perform and complete the Work. The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor.

SA

Article 3

OWNER'S REPRESENTATIVE

3.1. The Owner's authorized representative (herein referred to as the “Owner's Representative”) shall be {cmsownersrep_name76} whose mailing address is Post Office Box 690519, Orlando, Florida 32869; provided, however, that the Owner may, without liability to the Contractor, unilaterally amend this Article from time to time by designating a different person or organization to act as its representative and so advising the Contractor in writing, at which time the person or organization so designated shall be the Owner's Representative for purposes of this Agreement. Except as otherwise provided in this Agreement, and until the Contractor is notified in writing to the contrary, all actions to be taken by, all approvals, notices, consent, directions and instructions to be given by, all notices and other matters to be delivered to, all determinations and decisions to be made by and, in general, all other action to be taken by, or given to, the Owner shall be taken, given and made by, or delivered or given to, the Owner’s Representative in the name of and on behalf of the Owner; provided, however, that the Owner (and not the Owner’s Representative) shall be solely obligated to the Contractor for all sums required to be paid by the Owner to the Contractor hereunder.

3.2. Nothing contained in this Agreement shall create any contractual relationship between the Contractor and the Owner’s Representative; provided, however, that the Owner’s Representative shall be deemed to be a third party beneficiary of those obligations of the Contractor to the Owner as imposed by this Agreement.

Article 4

THE ARCHITECT/ENGINEER

4.1. The Architect/Engineer for the Project (herein referred to as the “A/E”) is *DESIGNER NAME, whose mailing address is *DESIGNER ADDRESS, CITY, ZIP.

Article 5

TIME OF COMMENCEMENT AND COMPLETION

5.1. The Contractor shall commence the Work promptly upon receipt of written Notice-to-Proceed (“NTP”) from the Owner and shall complete all Work within __Days after issuance of said NTP (OR) shall complete all Work on or before {cmexpirationdate287} (such period of time is herein referred to as the “Contract Time”) and in accordance with such interim milestone dates (herein referred to as the “Milestones”) as may be specified in the Contract Documents. The Contract Time and any such Milestones are of the essence of the Contract.

5.2. If any Work is performed by the Contractor prior to the execution of this Agreement based on receipt of written notice to proceed, all such Work performed shall be in accordance with and governed by the Contract Documents.

5.3. The Contractor acknowledges that the Owner has made no warranties to the Contractor, expressed or implied, that the Contractor will be able to follow a normal, orderly sequence in the performance of the Work or that there will be no delays in, or interference with, the Work.

SUBSTANTIAL COMPLETION

Substantial Completion of the Work shall be achieved no later than ____DAYS from the Notice-to-Proceed.

The Notice-to-Proceed is defined as the date the Owner provides the Notice to Contractor to begin the project.

FINAL COMPLETION

Final Completion of the Work shall be achieved no later than ___ DAYS from the Notice-to- Proceed.

SA

Article 6

CONTRACT SUM

6.1. Provided that the Contractor shall strictly and completely perform all of its obligations under the

Contract Documents, and subject only to additions and deductions by Change Order or as otherwise provided in the General Conditions, the Owner shall pay to the Contractor, in current funds and at the times and in the installments hereinafter specified, the lump sum amount of/an amount not-to-exceed ONE-HUNDREDTHS DOLLARS ({cmsoriginal_totalamt172}) (herein referred to as the “Contract Sum”) to cover the Contractor's profit and general overhead and all costs and expenses of any nature whatsoever (including, without limitation, taxes, labor and materials), foreseen or unforeseen, and any increases in said costs and expenses, incurred by the Contractor in connection with the performance of the Work, all of which costs and expenses shall be borne solely by the Contractor.

Article 7

APPLICATIONS FOR PAYMENT

7.1. The Contractor shall, on the twenty-fifth (25th) day of each calendar month (herein referred to as the “Payment Application Date”), deliver to the Owner an Application for Payment in accordance with the provisions of Article 9 of the General Conditions. Before submitting the first Application for Payment, Contractor shall submit (and resubmit until approval is obtained) to the Owner's Representative for approval the “Schedule of Values,” generally following the Uniform Construction Index (CSI) cost analysis format but further broken down by facility, labor and material, all as required by the Owner's Representative. Each item in the "Schedule of Values" shall only include its proper share of overhead and profit. The Schedule of Values, when approved by the Owner's Representative, shall be used as a basis for the Contractor's Application for Payment

7.2. All invoices should reference the contract number and shall be addressed appropriately as outlined below based on the Owner’s Representative/department the invoice pertains to:

Central Florida Tourism Oversight District (“District” or “CFTOD”) projects

District utility projects managed by Reedy Creek Energy Services (“RCES”)

Central Florida Tourism Oversight District Attention: Accounts Payable P.O. Box 690519 Orlando, Florida 32869 All invoices shall be sent to ap@oversightdistrict.org

Central Florida Tourism Oversight District C/O: Reedy Creek Energy Services - Utilities Division Attention: Accounts Payable P.O. Box 690519 Orlando, Florida 32869 All invoices shall be sent to wdw.rces.billing@disney.com

Article 8

PROGRESS PAYMENTS AND FINAL PAYMENT OF THE CONTRACT SUM

8.1. Based on the Contractor's Application for Payment, the Schedule of Values submitted by the

Contractor and approved by the Owner, and the Owner’s approval of the Application for Payment pursuant to Article 9 of the General Conditions, the Owner shall make monthly payments to the Contractor on account of the Contract Sum. Such monthly payments shall be made on or before the twenty-fifth (25th) day of each calendar month or the thirtieth (30th) day after receipt by the Owner of such documentation as the Owner may require pursuant to Article 9 of the General Conditions to substantiate the amount owed, whichever is later; provided, however, that the Owner shall have no obligation to make payment as aforesaid if it has withheld approval thereof as permitted under Subparagraph 9.3.1. of the General Conditions or if the Contractor has not submitted to the Owner all documentation required to substantiate the Application for Payment.

SA

MPL

mailto:wdw.rces.billing@disney.com

Each such monthly payment shall be in an amount equal to ninety-five percent (95%) of the net amount allowed the Contractor for labor, materials and equipment incorporated or used in the Work (or suitably stored at the job site if the Owner has agreed in advance to pay for such stored materials and equipment) through the Payment Application Date, as indicated in the Owner's approval of the Application for Payment, after deducting any sums withheld by the Owner pursuant to the Contract Documents and the aggregate of all previous payments to the Contractor on account of the Contract Sum. Upon Substantial Completion of the Work, as determined by the Owner, the Owner shall pay to the Contractor a sum sufficient to increase the aggregate payments theretofore made to the Contractor on account of the Contract Sum to ninety-five percent (95%) of the Contract Sum, less such retainage as the Owner shall determine is necessary for all incomplete Work, unsettled claims or other matters for which the Owner is permitted to withhold under the General Conditions.

8.2. Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the Contractor within fourteen (14) days after completion of those items set forth in the Punch List, including, without limitation, approval by Owner of the final Application for Payment, and execution by the Contractor of the Close-out Change Order, in accordance with the General Conditions; provided, however, that final payment shall in no event be due unless and until the Contractor shall have complied with all provisions of the Contract Documents, including those contained in Subparagraph 9.4.2 of the General Conditions.

8.3. Return of Funds. Contractor will return any overpayments due to unearned funds or funds disallowed pursuant to the terms of the Agreement that were disbursed to the Contractor. The Contractor must return any overpayment within forty (40) calendar days after either discovery by the Contractor, its independent auditor, or notification by the Owner of the overpayment.

LIQUIDATED DAMAGES

Should the Contractor fail to achieve Substantial Completion by the date provided in the Contract, the Contractor shall pay and/or the District may retain from the compensation otherwise to be paid to the Contractor, as liquidated damages, the sum of $____.00 for each consecutive calendar day until Substantial Completion is achieved; said sum is agreed upon as a reasonable and proper measure of damages which the District will sustain per diem by failure of the Contractor to complete work within the time as stipulated; it being recognized by the District and the Contractor that the injury to the District which could result from a failure of the Contractor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty on the Contractor. The liquidated damages referenced herein may also be assessed and collected against the Surety. Liquidated damages do not apply to final completion dates.

Article 9

CONTRACTOR'S REPRESENTATIONS, WARRANTIES AND COVENANTS

9.1. The Contractor hereby represents and warrants to the Owner that:

A. it is duly licensed to observe and perform the terms, covenants, conditions and other provisions on its part to be observed or performed hereunder;

B. it is experienced and skilled in the construction and work of the type described in, or required by, the Contract Documents;

C. all equipment and materials used in connection with the Work shall be new (except if otherwise required by the Specifications) and the equipment, the materials and the Work shall be of the best quality, free from faults and defects and shall strictly conform to the Contract Documents;

and

D. it has, by careful examination satisfied itself as to: (1) the nature, location and character of the job site including, without limitation, the surface and subsurface conditions of the land and all structures and obstructions thereon, both natural and manmade, surface water conditions

SA

of the Job Site and the surrounding area and, to the extent pertinent to the Work, all other conditions; (2) the nature, location and character of the general area in which the Job Site is located including, without limitation, its climatic conditions, the availability and cost of labor and the availability and cost of materials, tools and equipment; (3) the quality and quantity of all materials, supplies, tools, equipment, labor and professional services necessary to complete the Work in the manner required by the Contract Documents; and (4) all other matters or things which could in any manner affect the performance of the Work. Without limitation on the foregoing, the Contractor recognizes the physical and operational restrictions on carrying on of the Work in or about the Project or the Job Site.

9.2. The Contractor accepts the relationship of trust and confidence established by this Agreement between it and the Owner. It covenants with the Owner that it shall: furnish its best skill and judgment and cooperate with the Owner in furthering the interests of the Owner; furnish efficient business administration and superintendence and an adequate supply of workmen, equipment, tools and materials at all times; and perform the work in the best and soundest way and in the most expeditious and economical manner consistent with the best interests of the Owner.

9.3. The Contractor warrants all labor, materials, and equipment furnished under the agreement are of the type and quality required for the Project, and installed in a good and workmanlike manner in accordance with the Contract Documents. Contractor shall guarantee the Work shall be free from any defects in workmanship for a period of not less than ONE (1) year from the date of final completion. Contractor shall guarantee the materials provided shall be free from any defects for the longer of: (A) ONE (1) year from the date of final completion; or (B) the period of warranty provided by any supplier or manufacturer. The Owner may withhold final payment until the Contractor provides complete written manufacturers' warranties to the Owner’s Representative at the end of the project.

Article 10

TERMINATION

10.1. Termination of the Contract by the Owner, with or without cause, and by the Contractor are provided for in Article 15 of the General Conditions. If the Owner terminates the Contract pursuant to Paragraph 15.2. of the General Conditions, and the unpaid balance of the Contract Sum exceeds the costs and expenses incurred by or on behalf of the Owner in finishing the Work, including compensation for any additional architectural, engineering, management and administrative services, such excess shall, upon the completion of the Work, be paid to the Contractor. If such costs exceed such unpaid balance, the Contractor shall pay the difference to the Owner upon demand.

Article 11

NON-FUNDING

11.1. In the event that budgeted funds for this Agreement are reduced, terminated, or otherwise become unavailable, Owner may terminate this Agreement upon written notice to Contractor without penalty to Owner. Owner shall be the final authority as to the availability of the funding.

Article 12

FORCE MAJEURE

12.1. Neither party shall be responsible for damages or delays caused by Force Majeure or other events beyond the reasonable control of the party and which could not reasonably have been anticipated or prevented.

SA

12.2. Force Majeure includes, but is not limited to, war, terrorism, riots, epidemics, fire, acts of nature, strikes, lockouts, pandemics, court orders, and acts, orders, laws, or regulations of the government of the United States or the several states, prohibiting or impeding any part from performing its respective obligations.

12.3. If Force Majeure occurs, the parties shall mutually agree on the terms and conditions upon which services may continue. Should Contractor be delayed in the commencement, performance, or completion of the Work due to any of the conditions under this section, Contractor shall be entitled to an extension of time only, provided however, that in no event shall Contractor be entitled to any increased costs, additional compensation, or damages of any type resulting from such Force Majeure delays.

Article 13

NO WAIVER OF SOVEREIGN IMMUNITY

13.1. Nothing in this Agreement operates as a waiver of District’s sovereign immunity or any rights or limits of liability existing under Florida law. District’s indemnity obligations herein are limited to the financial limitations provided in F.S. Section 768.28, whether said loss, cost, damage, claim or expense arises from tort, contract or any other theory of law and shall not extend to any loss, cost, damage, claim or expense resulting from the acts or negligence of the Contractor. These terms shall survive the termination of this Agreement and shall be fully binding until any proceeding brought under this Agreement is barred by statute of limitations.

Article 14

PUBLIC RECORDS

14.1. The Contractor shall comply with all applicable provisions of the Florida Public Records Act, Chapter

119, Florida Statutes. Specifically, the Contractor shall:

A. Keep and maintain public records required by the public agency to perform the service.

B. Upon request from the public agency’s custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law.

C. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the public agency.

D. Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the Contractor or keep and maintain public records required by the public agency to perform the service. If the Contractor transfers all public records to the public agency upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency’s custodian of public records, in a format that is compatible with the information technology systems of the public agency.

IF THE CONTRACTOR HAS QUESTIONS REGARDING THE

APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE

CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING

SA

TO THIS AGREEMENT, CONTACT THE OWNER’S CUSTODIAN OF

PUBLIC RECORDS AT TELEPHONE NUMBER 407-939-3240, EMAIL

ADDRESS PUBLICRECORDS@OVERSIGHTDISTRICT.ORG, MAILING

ADDRESS CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT,

ATTN: PUBLIC RECORDS ADMINISTRATOR, P.O. BOX 690519,

ORLANDO, FLORIDA 32869.

Article 15

E-VERIFY COMPLIANCE

15.1. The Contractor and its subcontractors warrant compliance with all federal immigration laws and regulations that relate to their employees. The Contractor agrees and acknowledges that the Owner is a public employer that is subject to the E-Verify requirements as set forth in Section 448.095, Florida Statutes, and that the provisions of F.S. Sec. 448.095 apply to this Agreement.

Notwithstanding the provisions of Article 10 hereof and Article 15 of the General Conditions of the Contract for Construction, which forms a part of this Agreement, if the Owner has a good faith belief that the Contractor has knowingly hired, recruited or referred an alien who is not duly authorized to work by the immigration laws of the Attorney General of the United States for employment under this Agreement, the Owner shall terminate the Agreement. If the Owner has a good faith belief that a subcontractor performing work under this Agreement knowingly hired, recruited or referred an alien who is not duly authorized to work by the immigration laws or the Attorney General of the United States for employment under this Agreement, the Owner shall promptly notify the Contractor and order the Contractor to immediately terminate the contract with the subcontractor. The Contractor shall be liable for any additional costs incurred by the Owner as a result of termination of a contract based on Contractor’s failure to comply with E-Verify requirements referenced herein.

Article 16

SCRUTINIZED COMPANIES

16.1. By executing this Agreement, the Contractor certifies that it is eligible to bid on, submit a proposal for, enter into or renew a contract with the Owner for goods or services pursuant to Section 287.135, Florida Statutes. Owner may terminate Agreement immediately upon discovering that Contractor: (A) has been placed on the Scrutinized Companies or Other Entities that Boycott Israel List; (B) is engaged in a boycott of Israel; (C) has been placed on the Scrutinized Companies with Activities in Sudan List; (D) has been placed on the Scrutinized Companies with Activities in Iran Terrorism Sectors List; or (E) has been engaged in business operations in Cuba or Syria. This Agreement may also be terminated immediately if the Contractor falsely certified or has become ineligible to bid and contract with local government entities under F.S. 287.135. If this Agreement is terminated by the Owner as provided above, the Owner reserves the right to pursue any and all legal remedies against the Contractor, including, but not limited to the remedies described in Section 287.135, Florida Statutes. If this Agreement is terminated, the Contractor shall be paid only for the work completed as of the date of the Owner’s termination. Unless explicitly stated in this Section, no other damages, fees or costs may be assessed against the Owner for its termination of the Agreement pursuant to this Section.

Article 17

LEGAL PROCEEDINGS

17.1. The Contract Documents shall be construed and interpreted in accordance with the laws of the State of Florida, to the exclusion of its rules concerning conflicts of laws, and shall constitute the entire and

SA

MPL

mailto:PUBLICRECORDS@OVERSIGHTDISTRICT.ORG sole understanding of the parties hereto notwithstanding any prior oral or written statements, instructions, agreements, representations, or other communications.

17.2. Any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Contract, or arising out of any matter pertaining to this Contract or the Work to be performed hereunder (a “Proceeding”), shall be submitted for trial, without jury, solely and exclusively before the Circuit Court of the Ninth Judicial Circuit in and for Orange County, Florida;

provided, however, that if such Circuit Court does not have jurisdiction, then such Proceeding shall be submitted solely and exclusively before the United States District Court for the Middle District of Florida (Orlando Division); and provided further that if neither of such courts has jurisdiction, then such Proceeding shall be submitted solely and exclusively before any other court sitting in Orange County, Florida having jurisdiction. The parties (A) expressly waive the right to a jury trial, (B) consent and submit to the sole and exclusive jurisdiction of the requisite court as provided herein and (C) agree to accept service of process outside the State of Florida in any matter related to a Proceeding in accordance with the applicable rules of civil procedure.

17.3. In the event that any provision of any of the Contract Documents is judicially construed to be invalid by a court of competent jurisdiction, such provision shall then be construed in a manner allowing its validity or, if this leads to an impracticable result, shall be stricken but, in either event, all other provisions of the Contract Documents shall remain in full force and effect.

Article 18

ASSIGNMENT

18.1. This Agreement is for the services of Contractor and may not be assigned by Contractor in any fashion, whether by operation of law, or by conveyance of any type including, without limitation, transfer of stock in Contractor, without the prior written consent of Owner, which consent Owner may withhold in its sole discretion. Owner retains the right to assign all or any portion of this Agreement at any time. Upon such assignment, and provided the Assignee shall, in writing, assume Owner's obligations under this Agreement, Owner shall be automatically released and discharged from any and all of its obligations under this Agreement, and Contractor shall thenceforth look solely to the Assignee for performance of Owner's obligations under this Agreement.

Article 19

EFFECTIVE DATE

19.1. Any Work performed or caused to be performed by Contractor prior to the effective date of this Agreement shall be deemed to have been performed under this Agreement when agreed to by the Owner.

Article 20

HEADINGS

20.1. The headings contained in this Agreement are inserted for convenience of reference only and shall not be construed in any manner for the purpose of interpreting the provisions thereof.

Article 21

ENTIRE AGREEMENT

21.1. This Agreement supersedes any and all discussions, understandings or other agreements, either oral or written, between the parties hereto with respect to the Work and contains all the covenants and agreements between the parties with respect to the Work. Each party to this Agreement acknowledges that no representations, inducements, promises, or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that no other agreement, statement, course of dealing usage of trade, or promise not contained in this Agreement shall be valid or binding or used to interpret this Agreement. Any modification or amendment of this Agreement will be effective only if it is in writing and signed by

SA

both parties. Any failure by Owner to require strict compliance with any provision of this Agreement shall not be construed as a waiver of such provision, and Owner may subsequently require strict compliance at any time, notwithstanding any prior failure to do so.

Article 22

PUBLIC CONSTRUCTION BOND

22.1. The Contractor must submit a recorded, Public Construction Bond in conformance with Florida Statute 255.05 for the Total Contract Sum Amount of _______ ONE-HUNDREDTHS DOLLARS ($______) as security for the faithful performance of the work within the time set forth as required herein and for prompt payment to all persons defined in 713.01, Florida Statues, who furnish labor, services, or materials for the completion of the work provided herein. Bond must be recorded in the county where the project is located, which is Orange or Osceola County, Florida.

IN WITNESS WHEREOF, the parties have caused this Agreement to be duly executed effective as of the day and year first above written.

OWNER: CONTRACTOR:

CENTRAL FLORIDA TOURISM

OVERSIGHT DISTRICT {cmexternalpartyname363_1}

Signature: Signature:

Print Name: S.C. Kopelousos Print Name:

Title: District Administrator Title:

Date: Date:

EXHIBIT A

SCOPE OF WORK AND LIST OF CONTRACT DOCUMENTS

A - 1

I. Scope of Work:

{ScopeOfService}

II. List of Contract Documents:

A. Drawings: Drawings are separately bound. For the List of Drawings, refer to Specification Section 00850, entitled List of Drawings and Specifications, contained in the Project Manual, entitled {Project Name}, and dated ____________. All Drawings listed therein, and any applicable Addenda subsequently issued thereto, are specifically incorporated into the Project Manual by this reference.

B. Specifications: For the List of Specifications, refer to Specification Section 00850, entitled List of Drawings and Specifications, contained in the Project Manual, entitled {Project Name}, and dated ____________. All Drawings listed therein, and any applicable Addenda subsequently issued thereto, are specifically incorporated into the Project Manual by this reference.

C. This Exhibit A, Scope of Work and List of Contract Documents, _ pages

D. Exhibit B, Project Milestone Schedule, 1 page E. Exhibit C, Recap of Contract Sum, 1 page

F. Exhibit D, Pending Alternates, 1 page G. Exhibit E, Unit Price Schedule, _ pages

H. Special Contract Conditions, 15 pages

I. General Conditions of the Contract for Construction, 25 pages J. Payment Bond, 2 pages

K. Performance Bond, 2 pages L. Dual Obligee Rider, 1 page

M. Consent of Surety for Partial Payment Application, 1 page N. Contractor’s Interim Affidavit (SAMPLE), 2 pages

O. Contractor’s Request for Information (SAMPLE), 1 page

P. Directive (SAMPLE), 1 page Q. Close-Out Change Order Forms (SAMPLE), 6 pages

END OF EXHIBIT A

EXHIBIT B

PROJECT MILESTONE SCHEDULE

B - 1

The Contractor agrees to commence and complete the Work in strict accordance with the Project Milestone Schedule for performance of the work, as provided below:

MILESTONE DESCRIPTION START DATE COMPLETION DATE

Notice-to-Proceed Day 1 Day 1

Substantial Completion Day 1 __ Days from Notice-to-Proceed

Final Completion Day __ __Days from Notice-to-Proceed

END OF EXHIBIT B

EXHIBIT C

RECAP OF CONTRACT SUM

C - 1

The Contract Sum is based solely on the Contractor’s proposed Base Bid Lump Sum Amount/Not-to-Exceed Amount of {cmstotalamt_cototal315}.

END OF EXHIBIT C

EXHIBIT D

PENDING ALTERNATES

D - 1

THERE ARE NO PENDING ALTERNATES

OR AS FOLLOWS

END OF EXHIBIT D

EXHIBIT E

UNIT PRICE SCHEDULE

E - 1

In accordance with Article 12 of the General Conditions of the Contract for Construction, the following Unit Price Schedule may be used for additions and/or deletions to the Contract Work as the Owner’s Representative may direct.

1. Unit Price items shall be inclusive of all items of expense, including but not limited to applicable materials (delivered to the Job Site and unloaded), labor (including receiving, handling, scaffolding, distributing, storing, hoisting, installation, clean-up and protection), equipment, professional consulting services, drafting services, trucking, permits, appliances, supervision, engineering, taxes, insurance, overhead, profit and bonds.

2. Except where specific exceptions are indicated, it is understood that all equipment and material to be furnished is to be identical with that which is called for in the Specifications.

3. The Unit Price indicated for each item hereinafter described shall remain in effect for the duration of the Contract and shall apply to both additions and deletions. Any changes in the Work shall be computed on a net quantity basis multiplied by the Unit Price.

4. For all Directive changes (Unit Price, Lump Sum or Time & Material), rentals for equipment not listed herein shall be based on a prorata portion as to the portion of the month used of the current monthly Blue Book rates; or by actual invoice from the Rental Agency, whichever is less.

5. The Owner reserves the right to choose Unit Price; Lump Sum; or Time & Material pricing in accordance with Article 12 of the GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION.

Item Description Unit Price Unit of Measure

E - 2

The following rates may be utilized as the basis for adjustments to the Contract Sum for additions to and deletions from the Contract Work, as the Owner’s Representative may direct, in accordance with Article 12 of the General Conditions of the Contract for Construction. The rates contained in this schedule shall be subject to all restrictions and provisions set forth in Unit Price Schedule.

A. HOURLY WAGE RATES:

All Hourly Wage Rates are inclusive of Contractor’s overhead, profit and cost of all employee burdens, benefits, insurance and Worker’s Compensation coverage. Upon request by the Owner’s Representative, the Contractor shall provide, as supporting data, evidence of the direct cost of labor, Contractor’s overhead, profit and each category of employee burden, benefit and related cost.

Overtime rates are applicable to a five-day workweek for hours worked in excess of 40 hours per week, excluding weekends and holidays. Wage rates shall remain in effect through Contract Completion.

Labor Category Total Straight Time Hourly Wage Rate

Total Overtime Hourly Wage Rate

E - 3

B. CONTRACTOR-OWNED EQUIPMENT RATES:

The table below lists each type of Contractor-owned equipment to be utilized in the performance of the Work and the hourly, daily, weekly and monthly rate corresponding to each. Each and every listed rate is an all-inclusive rate, which includes but is not necessarily limited to, the cost of purchasing, leasing, maintaining, licensing, transporting and fueling the equipment, the Contractor’s overhead and any profit to be derived by the Contractor from the use of the equipment pursuant to the Agreement, and is not subject to additional markup by the Contractor. Each and every equipment rate shall remain in effect for the duration of the Contract and shall apply for the purpose of calculating changes to the amount of the Contract Sum attributable to both additions to and deletions from the Work (collectively, changes to the Work). Any costs for such equipment that are attributable to changes to the Work shall be computed on a net hourly, daily, weekly or monthly basis, as applicable, multiplied by the corresponding rate.

The rates applied in such computations shall be strictly applied in the following manner: the hourly rate shall be applied when the equipment is utilized for less than one (1) eight-hour day; the daily rate shall be applied when the equipment is utilized for more than one (1) but less than five (5) consecutive days; the weekly rate shall be applied when the equipment is utilized for more than five (5) consecutive days but less than four (4) consecutive weeks; and, the monthly rate shall be applied when the equipment is utilized for four (4) or more consecutive weeks, including any net portions thereof, which shall be applied on a prorated basis. The equipment rates set forth below are exclusive of the cost of Labor, if any, that is necessary to operate the equipment. The equipment rates included in the list below do not apply to rented equipment, the costs for which are subject to the corresponding provisions set forth in Article 12 of the General Conditions of the Contract for Construction.

END OF EXHIBIT E

Equipment Type Hourly Rate Daily Rate Weekly Rate Monthly Rate

SA

CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT

SPECIAL CONTRACT CONDITIONS - SEPTEMBER 2025 EDITION

TABLE OF CONTENTS:

I. General Safety Requirements, Contractor Parking and Access, Break Areas II. Construction Site Minimum Personal Protective Equipment (“PPE”) and Clothing Requirements III. Reserved IV. Asbestos/Cadmium or Lead/CFCs V. Confined Spaces VI. Hazardous and Chemical Waste Disposal VII. Electrical Safety Policy VIII. Lock out/Tag out (“LOTO”) IX. Fall Protection X. Aerial Work Platforms (“AWP”) XI. Ladders XII. Trenching and Excavation XIII. Utility Locates XIV. Mobile Cranes XV. Heavy Equipment Operations XVI. Diving Operations XVII. RCES Power Outage Scheduling Requirements for Contractors

DEFINITIONS:

The following is a list of defined terms and their corresponding meaning as they appear within this document:

Contractor: The word, Contractor, as it appears within this document, means the Contractor or the Consultant as named and as defined within the Agreement. The Contractor’s, rights, privileges, duties and obligations, as set forth herein also apply to each of its Sub-contractors and Sub-subcontractors and the suppliers of each and to the Consultant and each of its Sub-consultants and Sub-subconsultants and the suppliers of each.

Owner: The word, Owner, as it appears within this document, means the Owner, acting on its own behalf, or the Owner’s Representative, acting on the Owner’s behalf, each as named and defined within the Agreement, together with their designated representative(s).

I. GENERAL SAFETY REQUIREMENTS, CONTRACTOR PARKING AND ACCESS, BREAK AREAS

The Owner is dedicated to establishing and maintaining a safe work environment on all of its sites.

Accordingly, the Contractor is obligated to strictly abide by the safety regulations and requirements set forth within these Special Contract Conditions. Flagrant disregard for safety regulations and requirements by the Contractor may result in disciplinary action up to and including immediate suspension of all relevant work activities and permanent removal of the responsible party, individual (or both) from the Owner’s property.

All workers must maintain appropriate and respectful behavior at all times. The following behaviors are not allowed and may result in disciplinary action up to and including immediate removal from the property:

a) Fighting

b) Horseplay

c) Possession of firearms

d) Possession/use of alcohol/drugs

Work performed must be planned and communicated prior to starting and must incorporate safety into the planning. This shall take the form of a Project Site-Specific Safety Plan (“PSSP”), a hazard analysis, pre-task planning, etc. The type of planning used should be based on the complexity of the project and the associated safety hazards. Do not begin work before safety measures are in place and training is complete. Any changes to the PSSP must be communicated to the Owner.

All workers, including managers and supervisors, shall have the proper training and instruction on general safety requirements for the project as well as any task or equipment specific training required to complete the project. This also includes temporary workers. Awareness-type training is not sufficient where task or equipment specific training is required.

No one shall knowingly be permitted to work while their ability or alertness is so impaired by fatigue, illness, or other cause that they may expose themselves or others to injury.

All jobsite emergencies shall be reported immediately. For fire or medical emergencies, call 911 and ask for CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT. Report all emergencies to an immediate supervisor, the project manager and the Owner.

All work-related materials must be stored in an orderly fashion, keeping exits, access ways, walkways and sidewalks unobstructed. Work areas must be kept as clean and free of debris as practicable. Trashcans must be provided for refuse.

Smoking, “vaping”, and smokeless tobacco use will be permitted in designated areas only. The Owner reserves the right to designate these areas on a project.

Workers shall not engage in any activity, including cell phone usage, which diverts their attention while actually engaged in performing work. This includes operating vehicles and equipment. If cell phone usage is the primary means of communication, then it must be used in hands-free mode.

The use of ear buds is prohibited.

No one shall ride in a vehicle or mobile equipment unless they are on a seat, with the exceptions of aerial work platforms (AWPs”) and other equipment designed to be ridden while standing. Riding in the back of pick-ups shall not be allowed.

Seatbelts must be used when provided in any type of vehicle, including but not limited to, personal vehicles, industrial trucks, haulage, earth moving, and material handling vehicles. Seatbelts must also be used in a personal transport vehicle (“PTV”) if so equipped.

Posted speed limits and other traffic signs shall be observed at all times. Stop for personnel in and/or entering a crosswalk as they have the right of way.

Do not pass or drive around busses when they are loading, unloading, or stopped in a driving lane.

Park in authorized areas only. Do not block or obstruct intersections, fire lanes or fire hydrants, traffic lanes, pedestrian walkways, driveways or parking lot entrances. Vehicles parked in unauthorized places may be towed without notice at the vehicle owner’s expense.

Fresh drinking water must be provided at construction job sites. If a cooler is used instead of bottled water, then it must be maintained in a sanitary condition, be capable of being tightly closed, equipped with a tap, and clearly marked as to its content. Disposable cups must be provided.

Trashcans must be provided for the disposable cups and/or bottles.

Portable restrooms and hand washing facilities must be provided, if needed, and must be maintained in a clean and sanitary condition. Portable restrooms must meet Florida Administrative Code 64E-6.0101. The Owner reserves the right to determine the location of these facilities.

SA

II. CONSTRUCTION SITE MINIMUM PERSONAL PROTECTIVE EQUIPMENT (“PPE”) AND CLOTHING

REQUIREMENTS

The Contractor shall require that all workers within the construction limits always wear/utilize personal protective equipment (“PPE”), including but not limited to the following: hard hats, safety glasses, high visibility vests or shirts, construction/work-grade footwear and long pants. Additional PPE shall be utilized when other specific hazards are present as defined by the Project Specific Safety Plan (“PSSP”). All PPE must meet current Occupational Safety and Health Administration (“OSHA”) and American National Standards Institute (“ANSI”) requirements. The Owner reserves the right of final decision, in its sole and absolute discretion, as to whether the PPE utilized meets project requirements. “Cowboy” and similar novelty hard hats are not permitted. Sleeveless shirts are not permitted. All high-visibility clothing is to be monitored closely to ensure that all items retain the protective qualities provided by the manufacturer. Vests and shirts that have become faded are to be replaced and shall not be worn while performing work on the Owner’s job site.

Shirts designed to be worn by the general public, such as those endorsing sports teams or other products or services, even if they are yellow, green, or orange, are not considered high-visibility shirts and do not meet the requirements set forth herein. In the event that any of the requirements set forth within this Section conflict with the requirements set forth elsewhere within this document or within any of the Contract Documents, the more stringent requirements shall apply.

III. RESERVED

IV. ASBESTOS/CADMIUM OR LEAD/CFCs

A. ASBESTOS

Contractor acknowledges that it has been made aware that Asbestos-Containing Materials (ACM) and/or Presumed Asbestos-Containing Materials (PACM), including without limitation, thermal system insulation, and sprayed on or troweled on surfacing material that is presumed to contain asbestos, exists or may exist at the Job Site and that Contractor may be performing Work or services in or near areas that contain ACM and/or PACM as specified in the Contract Documents. Contractor takes full and complete responsibility for communicating existing conditions to all Subcontractors, Sub-subcontractors and employees thereof in accordance with the Occupational Safety and Health Administration Hazard Communication Standard 29 CFR Part 1926.59. The Owner and Contractor agree that the quantities of ACM and/or PACM referred to in the Contract Documents are approximate and are enumerated for the sole purpose of providing notification pursuant to the Occupational Safety and Health Administration Asbestos Standards, 29 CFR Parts 1910, 1915, and 1926.

B. CADMIUM and/or LEAD Contractor acknowledges that it has been made aware that cadmium and/or lead exists, or may exist, at the Job Site and that Contractor may be performing Work or services in or near areas that contain cadmium and/or lead as specified in the Contract Documents.

Contractor takes full and complete responsibility for communicating existing conditions to all subcontractors and employees thereof in accordance with the Occupational Safety and Health Administration Hazard Communication Standard 29 CFR Part 1926.59. The Owner and Contractor agree that the cadmium and/or lead referred to in the Contract Documents are described for the sole purpose of providing notification pursuant to the Occupational Safety and Health Administration Cadmium Standard 29 CFR 1926.63 and/or Lead Standard 29 CFR 1926.62.

C. CHLOROFLUOROCARBONS (CFCs) Contractor acknowledges that it has been made aware that chlorofluorocarbons (CFCs) exist, or may exist at the Job Site and that Contractor may be performing Work or services in or near areas that contain CFCs as specified in the Contract Documents. Should the Contractor’s work result in (i) any loss or release of CFCs from any source, including any equipment or containers, or (ii) any addition by Contractor of CFCs to any equipment or container, then Contractor shall provide all necessary documentation concerning such loss, release or addition, including the quantities of CFCs affected, to the Owner. The Owner and Contractor agree that the quantities of CFCs referred to in the Contract Documents are approximate and are enumerated for the sole purpose of providing notification to the Contractor.

D. USE OF ASBESTOS/LEAD/CADMIUM CONTAINING MATERIALS

Contractor shall not utilize or install any asbestos, lead, or cadmium-containing products on the Owner’s property or within the scope of Work or services contemplated by this Agreement. It is the responsibility of the Contractor to obtain appropriate Material Safety Data Sheets for all materials to be used, and verify that the products do not contain asbestos, lead or cadmium. This requirement extends to any materials that may be specified in the Contract Documents. Specification of a particular material by the Owner in the Contract Documents does not relieve the Contractor from its responsibility to verify that the specified material does not contain asbestos, lead or cadmium.