SAJ-2000-00644_Main_St_Pier_NWP3_Verification_Letter.pdf
PDF 3 MB Posted
- Attached to
- 2620ITB - Main Street Pier Repairs - 2026
- Solicitation number
- 2620ITB
- Issued by
- Volusia County, Florida
About this file
This document is a Department of the Army permit verification letter issued by the U.S. Army Corps of Engineers, Jacksonville District, to the City of Daytona Beach authorizing repairs to an existing commercial pile-supported pier structure located at 1200 Main Street in Daytona Beach, Florida. The project encompasses removal of approximately 900 square feet of deteriorating concrete slab and beam foundation at the southwest portion of the structure, repair or replacement of 28 pier pilings, and replacement of decking boards, cross bracing, and other structural elements. The work is authorized under Nationwide Permit 3 (Maintenance) pursuant to Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The permit verification is valid until March 15, 2031, and work must commence or be under contract before the permit expires to maintain the 12-month completion window from expiration. The project is subject to inspection by Corps representatives at any time deemed necessary to ensure compliance with permit terms and conditions. The contractor must submit a completed ENG Form 6285 certification of compliance within 60 days of work completion.
The permit imposes comprehensive project-specific special conditions addressing environmental protection, including erosion control measures, floating turbidity barriers with weighted skirts around all work areas, compliance with the Jacksonville District Programmatic Biological Opinion, manatee protection requirements, and provisions for North Atlantic right whale avoidance. All construction personnel must be briefed on manatee presence and protection requirements, including cessation of in-water operations if manatees approach within 50 feet. The permittee must maintain a copy of the permit and approved plans at the construction site and post caution signs regarding manatees and idle speed/no wake operations. Additional conditions address cultural and historic resource protection, requiring immediate notification to the Florida Department of State and Corps if archaeological or historical materials are discovered. The permit transfer form provided allows for property transfer with execution by the new owner to validate continuation of permit responsibilities and binding conditions on subsequent owners.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, JACKSONVILLE DISTRICT
701 SAN MARCO BOULEVARD
JACKSONVILLE, FLORIDA 32207
May 7, 2026
Regulatory Division North Permits Branch Cocoa Section
SAJ-2000-00644 (NWP-PJR)
City of Daytona Beach Attn: Mr. James Nelson 950 Bellevue Avenue Daytona Beach, FL 32114 Sent via email: nelsonjames@codb.os
Dear Mr. Nelson:
The U.S. Army Corps of Engineers (Corps) has completed the review of your application for a Department of the Army permit. Your application was assigned file number SAJ-2000-00644. A review of the information and drawings provided indicate that the proposed work would result in the repair of an existing commercial pile-supported structure to the following specifications:
a). Removal of approximately 900 square feet deteriorating concrete slab and beam supporting foundation, located at the southwest portion of the structure.
b). Repair or replacement of twenty-eight (28) pier pilings.
c). Replacement of decking boards, cross bracing, and other structural elements.
The activities subject to this permit are authorized pursuant to authorities under Section 10 of the Rivers and Harbors Act (33 U.S.C. § 403) and Section 404 of the Clean Water Act (33 U.S.C. § 1344). The project would affect the intertidal zone of the Atlantic Ocean. The project is located 1200 Main Street in Section 4, Township 15 South, Range 33 Eas, in Daytona Beach, Volusia County, Florida.
Latitude: 29.227133° Longitude: -81.006631°.
Your project, as depicted on the enclosed drawings, is authorized by Nationwide Permit (NWP) 3 (Maintenance). This verification is valid until March 15, 2031. In order for this NWP authorization to be valid, you must ensure that the work is performed in accordance with the Nationwide Permit general conditions, the Jacksonville District regional conditions, and the general and project-specific special conditions listed below.
Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP expires or is modified or revoked, you will have 12 months from the date of expiration, modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. You can access the mailto:nelsonjames@codb.os
-2-
U.S. Army Corps of Engineers' (Corps) Jacksonville District's Regulatory web page for links to view NWP information at:
https://www.sad.usace.army.mil/Missions/Regulatory/Florida/. Please be aware this Internet address is case sensitive and should be entered as it appears above. Once there, select “Permitting,” then “Nationwide Permits” for links to the federal register containing the text of the 2026 NWPs and the associated NWP general conditions, as well as separate links to the Jacksonville District regional conditions.
General Conditions:
1. The time limit for completing the work authorized ends on March 15, 2031.
2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity, or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit you must obtain the signature of the new owner on the attached transfer form (Attachment 1) and forward a copy to this office to validate the transfer of this authorization.
5. You must allow a representative from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Project Specific Special Conditions:
The following project specific special conditions are included with this verification:
1. Reporting Address: The Permittee shall submit all reports, notifications, documentation, and correspondence required by the general and special conditions of this permit to either (not both) of the following addresses:
a. For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
https://www.sad.usace.army.mil/Missions/Regulatory/Florida/ mailto:SAJ-RD-Enforcement@usace.army.mil
-3-
b. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
The Permittee shall reference this permit number, SAJ-2000-00644 (NWP-PJR), on all submittals.
2. Posting of Permit: The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site.
3. Self-Certification: Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the ENG Form 6285, “Certification of
Compliance with Department of Army Permit” (located at https://www.publications.usace.army.mil/Portals/76/Eng_Form_6285_2024%20Dec
%20FI NAL.pdf) and submit it to the Corps.
4. Cultural Resources/Historic Properties:
a. No structure or work shall adversely affect, impact, or disturb properties listed in the National Register of Historic Places (NRHP), or those eligible for inclusion in the NRHP.
b. If, during permitted activities, items that may have historic or archaeological origin are observed the Permittee shall immediately cease all activities adjacent to the discovery that may result in the destruction of these resources and shall prevent his/her employees from further removing, or otherwise damaging, such resources. The applicant shall notify both the Florida Department of State, Division of Historical Resources, Compliance Review Section at (850)-245-6333 and the Corps, of the observations within the same business day (8 hours).
Examples of submerged historical, archaeological or cultural resources include shipwrecks, shipwreck debris fields (such as steam engine parts, or wood planks and beams), anchors, ballast rock, concreted iron objects, concentrations of coal, prehistoric watercraft (such as log "dugouts"), and other evidence of human activity. The materials may be deeply buried in sediment, resting in shallow sediments or above them, or protruding into water. The Corps shall coordinate with the Florida State Historic Preservation Officer (SHPO) to assess the significance of the discovery and devise appropriate actions. Project activities shall not resume without verbal and/or written authorization from the Corps.
c. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and, if deemed necessary by the SHPO or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based on the
-4-circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.
d. In the unlikely event that unmarked human remains are identified on non-federal lands; they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archaeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume without written authorization from the SHPO and from the Corps.
5. Erosion Control: Prior to the initiation of any work authorized by this permit, the
Permittee shall install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized.
6. Turbidity Barriers: Prior to the initiation of any of the work authorized by this permit, the Permittee shall install floating turbidity barriers with weighted skirts that extend within define distance desired or use 1 foot of the bottom around all work areas that are in, or adjacent to, surface waters. The turbidity barriers shall remain in place and be maintained daily until the authorized work has been completed and turbidity within the construction area has returned to ambient levels. Turbidity barriers shall be removed upon stabilization of the work area.
7. Jacksonville District Programmatic Biological Opinion (JAXBO): Structures and activities authorized under this permit will be constructed and operated in accordance with all applicable PDCs contained in the JAXBO, based on the permitted activity. Johnson’s seagrass and its critical habitat were delisted from the Endangered Species Act on May 16, 2022. Therefore, JAXBO PDCs required to minimize adverse effects to Johnson’s seagrass and its critical habitat are no longer applicable to any project. Failure to comply with applicable PDCs will constitute noncompliance with this permit. In addition, failure to comply with the applicable PDCs, where a take of listed species occurs, would constitute an unauthorized take.
The NMFS is the appropriate authority to determine compliance with the Endangered Species Act. The most current version of JAXBO can be accessed at
-5-the Jacksonville District Regulatory Division website in the Endangered Species section of the Sourcebook located at:
http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx
JAXBO may be subject to revision at any time. The most recent version of the JAXBO must be utilized during the design and construction of the permitted work.
8. Manatee Conditions: The Permittee shall comply with the “Standard Manatee
Conditions for In-Water Work – 2011”. The most recent version of the Manatee Conditions must be utilized. The conditions are provided as an attachment to this permit.
9. Assurance of Navigation and Maintenance: The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
10. Regulatory Agency Changes: Should any other regulatory agency require changes to the work authorized or obligated by this permit, the Permittee is advised that a modification to this permit instrument is required prior to initiation of those changes.
It is the Permittee’s responsibility to request a modification of this permit from the Cocoa Regulatory Office.
This letter of authorization does not include conditions that would prevent the ‘take’ of a state-listed fish or wildlife species. These species are protected under sec.
379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code.
With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species.
This letter of authorization does not give absolute Federal authority to perform the work as specified on your application. The proposed work may be subject to local building restrictions mandated by the National Flood Insurance Program. You should contact your local office that issues building permits to determine if your site is located http://www.myfwc.com/license/wildlife/ http://www.fnai.org/
-6-in a flood-prone area, and if you must comply with the local building requirements mandated by the National Flood Insurance Program.
This letter of authorization does not preclude the necessity to obtain any other Federal, State, or local permits which may be required.
Thank you for your cooperation with our permit program. The Corps’ Jacksonville
District Regulatory Division is committed to improving service to our customers. We strive to perform our duty in a friendly and timely manner while working to preserve our environment. We invite you to complete our automated Customer Service Survey at https://regulatory.ops.usace.army.mil/customer-service-survey/. Please be aware this Internet address is case sensitive and you will need to enter it exactly as it appears above. Your input is appreciated – favorable or otherwise.
Should you have any questions related to this NWP verification or have issues accessing the documents referenced in this letter, please contact Paul Ruben at the Cocoa Permits Section at 400 High Point Drive, Suite 600 Cocoa, Florida 32926-6630, by telephone at 321-504-3771 ext 0026, or by email at paul.j.ruben@usace.army.mil.
Sincerely, Paul J. Ruben, Project Manager Cocoa Permits Section
Enclosures
Attachment 1: Permit Transfer Request Attachment 2: Manatee Conditions Attachment 3: Regulations for Approaching Right Whales Attachment 4: Project Designs https://regulatory.ops.usace.army.mil/customer-service-survey/ mailto:paul.j.ruben@usace.army.mil
DEPARTMENT OF THE ARMY PERMIT TRANSFER REQUEST
DA PERMIT NUMBER: SAJ-2000-00644 (NWP-PJR)
When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire.
To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Section, Post Office Box 4970, Jacksonville, FL 32232-0019 or submit via electronic mail to:
SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
(TRANSFEREE-SIGNATURE) (SUBDIVISION)
(DATE) (LOT) (BLOCK)
___________________________________ (STREET ADDRESS)
(NAME-PRINTED)
(MAILING ADDRESS)
(CITY, STATE, ZIP CODE)
mailto:SAJ-RD-Enforcement@usace.army.mil
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
The permittee shall comply with the following conditions intended to protect manatees from direct project effects:
a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle Speed/No
Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.
d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation.
Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or in Vero Beach (1-772-562-3909) for south Florida, and emailed to FWC at ImperiledSpecies@myFWC.com.
f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8½ " by 11" explaining the requirements for “Idle Speed/No Wake” and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at http://www.myfwc.com/WILDLIFEHABITATS/manatee_sign_vendors.htm. Questions concerning these signs can be forwarded to the email address listed above.
Summary Interpretations of the noise impact zones associated with the project shown in Table 80 are as follows:
• Potential injury for fish and sea turtles from single pile strikes (sSEL) is not measurable as the source levels do not exceed the threshold values for injury.
• Potential injury to fish from cumulative sound exposure (cSEL) each day is possible within
10 m from the pile. For the purpose of this example, fish includes sturgeon and smalltooth sawfish. Since threshold values for sea turtles are not currently known we assume the thresholds used for fish also apply to sea turtles. Therefore we assume the 10 m cumulative sound exposure injury zone also applies to sea turtles.
• Behavioral responses of sea turtles may occur up to 46 m (150 ft) from the project.
• Behavioral responses of fish may occur up to 215 m (705 ft) from the project.
Appendix C: North Atlantic Right Whale Information Form 16 Federal Regulations Governing the Approach to North Atlantic Right Whales
1. Federal regulations governing the approach to North Atlantic right whales can be found at 50 CFR 224.103(c). It is illegal to approach and remain within 500 yards of right whales; 500 yards is equal to the distance of 5 football fields.
Prohibitions on approaching right whales are as follows (Excerpts from 50 CFR 224.103(c), available at www.ecfr.gov): Unless otherwise lawfully allowed or unless doing so would create an imminent and serious threat to a person or vessel, it is unlawful to:
(i) Approach (including by interception) within 500 yards
(460 m) of a right whale by vessel
(ii) Fail to undertake required right whale avoidance measures. If underway, a vessel must steer a course away from the right whale and immediately leave the area at a slow safe speed.
2. Updates can be downloaded from:
a. http://www.nmfs.noaa.gov/pr/species/mammals/cetaceans/rightwhale_northatlantic.htm, or
b. www.ecfr.gov http://www.ecfr.gov/ http://www.nmfs.noaa.gov/pr/species/mammals/cetaceans/rightwhale_northatlantic.htm http://www.ecfr.gov/
1. FORMWORK SHALL BE DESIGNED IN ACCORDANCE WITH THE ACI "MANUAL OF CONCRETE
PRACTICE", LATEST EDITION.
2. REINFORCING STEEL SHALL BE DETAILED AND PLACED IN ACCORDANCE WITH THE ACI "MANUAL
OF CONCRETE PRACTICE", LATEST EDITION, UNLESS OTHERWISE NOTED.
3. PROVIDE COLUMN AND WALL DOWELS OF THE SAME SIZE AND NUMBER AS THE RESPECTIVE
COLUMN AND WALL REINFORCING UNLESS OTHERWISE DETAILED.
4. PROVIDE TWO #4 BARS AS STIRRUP CARRY BARS WHERE NO TOP STEEL IS AVAILABLE TO HOLD
STIRRUPS.
5. WHEREVER AN APPROVED PIPE OR CONDUIT EXTENDS THROUGH A BEAM, PROVIDE ONE
ADDITIONAL STIRRUP ON EACH SIDE OF THE OPENING.
6. CONCRETE PROTECTION FOR REINFORCING BARS SHALL BE IN ACCORDANCE WITH THE
"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE", ACI 318-19.
7. CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 24 HOURS PRIOR TO PLACING
CONCRETE.
8. CONSTRUCTION JOINTS IN BEAMS, JOISTS OR SLABS TO BE LOCATED BETWEEN THE 1/4 POINT
AND CENTERLINE OF SPAN, OR AS DIRECTED BY THE ENGINEER.
9. DO NOT PLACE OR CUT HOLES IN CONCRETE SLABS, BEAMS, WALLS OR COLUMNS WITHOUT
PRIOR APPROVAL OF THE ENGINEER.
10. EXTERIOR EXPOSED CONCRETE SHALL BE AIR-ENTRAINED. AIR CONTENT SHALL BE 6 PERCENT
(+/-1 1/2 PERCENT).
11. CAMBER CONCRETE MEMBERS FOR DEAD LOAD DEFLECTION BY ADJUSTING FORMS.
12. PIPES AND CONDUITS EMBEDDED IN OR PASSING THROUGH STRUCTURAL MEMBERS MUST BE
APPROVED BY THE STRUCTURAL ENGINEER. PIPE AND CONDUITS EMBEDDED IN CONCRETE
SHALL NOT BE LARGER THAN 2 INCHES IN OUTSIDE DIAMETER AT THEIR WIDEST POINT OR
FITTING OR 1/3 OF THE THICKNESS OF THE SLAB, BEAM OR WALL.
13. ELECTRICAL CONDUIT OR PIPES EMBEDDED IN OR PASSING THROUGH SLABS, BEAMS OR WALLS
SHALL BE LOCATED AND PLACED SO THAT:
A. THEY ARE NOT CLOSER THAN THREE DIAMETERS ON CENTER.
B. THE CONCRETE COVER IS NOT LESS THAN 2 INCHES.
C. THEY RUN BETWEEN REINFORCING AND DO NOT DISPLACE IT IN ANY MANNER.
14. ALUMINUM CONDUITS SHALL NOT BE PLACED IN CONCRETE.
15. CHAMFER ALL EXPOSED CONCRETE CORNERS. SEE ARCHITECTURAL/STRUCTURAL DRAWINGS
FOR REQUIREMENTS.
16. CONCRETE SHALL BE TESTED BY THE OWNER’S TESTING LAB. REFER TO SPECIFICATIONS FOR
REQUIREMENTS.
17. PROPER CURING PROCEDURES SHALL BE USED FOR SLAB ON GRADE TO PREVENT CURLING.
18. CALCIUM CHLORIDE SHALL NOT BE USED IN CONCRETE MIXES.
19. ALL CONCRETE SHALL CONTAIN CRYSTALLINE ADMIXTURE THAT CAUSES CONCRETE TO BE
SEALED AGAINST PENETRATION OF WATER. PRODUCT SHALL BE XYPEX CHEMICAL
CORPORATION, XYPEX ADMIXTURE, 3 PERCENT BY WEIGHT OF CEMENT CONTENT, OR
APPROVED EQUIVALENT. COMPLY WITH RECOMMENDATIONS OF MANUFACTURER.
1. CONSTRUCTION AND DESIGN OF ALL WOOD FRAMING SHALL CONFORM TO THE NATIONAL
FOREST PRODUCTS ASSOCIATION DESIGN SPECIFICATIONS, AMERICAN PLYWOOD ASSOCIATION,
NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION, AND THE STATE OF FLORIDA
BUILDING CODE, LATEST EDITIONS.
2. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE DRAWINGS OF ALL
OTHER DISCIPLINES AND THE SPECIFICATIONS. THE CONTRACTOR SHALL VERIFY THE
REQUIREMENTS OF OTHER TRADES AS TO SLEEVES, CHASES, HANGERS, INSERTS, ANCHORS,
HOLES, AND OTHER ITEMS TO BE PLACED OR SET IN THE STRUCTURAL WORK.
3. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT
TO APPROVAL BY THE ENGINEER.
4. TIMBER:
A. ALL STRUCTURAL SYSTEMS RELATING TO WOOD FRAMING WHICH ARE TO BE COMPOSED OF
COMPONENTS TO BE FIELD ERECTED SHALL BE SUPERVISED BY THE SUPPLIER DURING
MANUFACTURING, DELIVERY, HANDLING, STORAGE, AND ERECTION IN ACCORDANCE WITH
THE SUPPLIER’S INSTRUCTIONS AND REQUIREMENTS.
B. SOUTHERN YELLOW PINE (SYP) LUMBER:
JOISTS: SYP SELECT STRUCTURAL GRADE
GUARDRAIL POSTS: SYP No. 1 GRADE OTHER SAWN LUMBER: SYP No. 2 GRADE
SOUTHERN PINE TREATED ROUND TIMBER: PILE GRADE IN ACCORDANCE WITH ASTM D25
DECKING: MARINE-GRADE 2X8 BY LUMBEROCK (OR APPROVED EQUAL)
C. ALL RAMPS ESTABLISHED WITHIN THE WOODEN DOCK SECTIONS SHOULD BE ESTABLISHED TO
ADA REQUIREMENTS. SLOPES MUST NOT EXCEED 1:12 (V:H) AND HANDRAILS MUST BE
ESTABLISHED ON BOTHSIDES OF THE RAMP ACCORDING THE TYPICAL SECTION FOUND IN
PLANS. TRANSITION OF THE WOODEN ACCESS RAMPS SHOULD BE FLUSH WITH THE DECK AND
A MINIMUM CLEARANCE OF 36" OF SPACE SHOULD BE BETWEEN HANDRAILS.
D. ALL STRINGERS, PILE CAP BOARDS OR OTHER TIMBER COMPONENTS NOT WITHIN THE
WALKWAYS SHALL BE SYP No. 2 GRADE.
E. TREATMENT OF TIMBER SHALL BE AS FOLLOWS: HANDRAILS AND DECKING -0.25 PCF CCA
(COPPER CHROMIUM ARSENATE), STRINGERS, PILE CAP BOARDS AND OTHER COMPONENTS
EXCEPT PILING -0.6 CCA, PILINGS/POSTS -2.5 CCA. IF REQUIRED BY THE OWNER OR LOCAL
AGENCY, TREATMENT SHALL BE EQUIVALENT LEVELS OF ACQ (ALKALINE COPPER
QUATEMARY). REFER TO TIMBER SUPPLIER FOR EQUIVALENT ACQ LEVELS OF PROTECTION.
F. DECKING SHALL BE PLACED WITH 1/4 INCH GAPS BETWEEN BOARDS.
G. ONE LAYER OF ROOFING FELT SHALL BE PLACED BETWEEN DECK (EACH ONE) AND
STRINGERS.
H. ALL BOARDS FOR DECKING SHALL BE INSTRALLED CROWN DOWN.
5. LOADING APPLIED TO THE STRUCTURE DURING THE PROCESS OF CONSTRUCTION SHALL NOT
EXCEED THE SAFE LOAD-CARRYING CAPACITY OF THE STRUCTURAL MEMBERS. THE LIVE LOADS
USED IN THE DESIGN OF THIS STRUCTURE ARE INDICATED IN THE “DESIGN SPECIFICATIONS”. DO
NOT APPLY ANY CONSTRUCTION LOADS UNTIL STRUCTURAL FRAMING IS PROPERLY CONNECTED
TOGETHER AND UNTIL ALL TEMPORARY BRACING IS IN PLACE.
6. NAILING OF GUARDRAIL SHEATHING SHALL BE:
8d AT 6 INCHES ON CENTER AT PANEL EDGES
8d AT 12 INCHES ON CENTER AT INTERMEDIATE FRAMING MEMBERS
7. INSTALL ALL SHEATHING WITH THE LONG DIMENSIONS OF THE PANEL ACROSS SUPPORTS AND WITH PANEL CONTINUOUS OVER TWO OR MORE SPANS. STAGGER PANEL END JOINTS. ALLOW 1/8-
INCH SPACING AT PANEL ENDS AND EDGES UNLESS OTHERWISE RECOMMENDED BY THE
SHEATHING MANUFACTURER.
8. ALL NAILING SHALL BE CAREFULLY DRIVEN AND NOT OVERDRIVEN. THE USE OF STAPLES IS
PROHIBITED.
9. BOLTS, SCREWS, AND NAILS:
A. ALL FASTENERS, INCLUDING NAILS, SCREWS, THREADED RODS, BOLTS, NUTS, WASHERS,
PLATES, LAGS, ETC. SHALL BE GRADE 316 STAINLESS STEEL (SS). WASHERS USED WITH
SINGLE-BOLTED OR DOUBLE-BOLTED CONNECTIONS (FOR EXAMPLE: STRINGER TO PILING
CONNECTION, CAP BOARD CONNECTIONS OR CROSS-BRACING) SHALL BE MINIMUM 3-INCH
DIAMETER "DOCK WASHERS". STANDARD WASHERS FOR SPLICE BLOCK AND RAILINGS.
B. BOLTS SHALL BE EXTENDED FULLY THROUGH THE NUTS BUT NOT EXTEND BEYOND THE NUT
MORE THAN 1/2 INCH.
C. STAINLESS STEEL (SS) SCREWS AS SHWON IN PLANS.
10. HURRUCANE STRAPS AND HANGER:
A. SIMPSON STRONG TIE TWIST STRAPS (STAINLESS STEEL HURRICANE STRAPS), HTSQ20SS-
SDS.
B. EIGHT (8) TOTAL SCREWS, HALF STRINGERS AND HALF CAP BOARDS. SCREWS SHALL BE
SIMPSON STRONG TIE 1/4"X1 1/2" SDS, STAINLESS STEEL.
C. UNO, HANGER CONNECTION SHALL DEVELOP THE SHEAR STRENGTH OF THE BEAM AND JOIST.
11. WOOD MEMBERS BEARING ON CONCRETE AND MASONRY WALLS SHALL HAVE 1/2-INCH AIR
SPACES AROUND SIDES AND ENDS OF MEMBERS. BEAM ENDS SHALL HAVE THE TOP CORNERS
NOTCHED TO ALLOW BEAMS TO FALL OUT OF BEARING POCKETS FREELY IN THE EVENT OF FIRE
COLLAPSE.
12. NAILING OF WOOD FRAMING MEMBERS SHALL CONFORM TO THE MINIMUM NAILING SCHEDULE.
13. ALL FRAMING EXPOSED TO THE WEATHER OR IN CONTACT WITH MASONRY OR CONCRETE SHALL
BE PRESSURE-TREATED IN ACCORDANCE WITH THE AMERICAN WOOD PRESERVERS
ASSOCIATION SPECIFICATIONS. WHERE POSSIBLE, ALL CUTS AND HOLES SHOULD BE COMPLETED
BEFORE TREATMENT. CUTS AND HOLES DUE TO THE ON-SITE FABRICATION SHALL BE BRUSHED
WITH 2 COATS OF COPPER NAPHTHENATE SOLUTION CONTAINING A MINIMUM OF 2% METALLIC
COPPER IN SOLUTION (PER AWPA STANDARD M4).
14. PREFABRICATED METAL JOIST HANGERS, HURRICANE CLIPS, HOLD-DOWN ANCHORS, SELF-
DRILLING SCREWS, AND OTHER ACCESSORIES SHALL BE AS MANUFACTURED BY “SIMPSON
STRONG-TIE COMPANY” OR APPROVED EQUAL. INSTALL ALL ACCESSORIES PER THE
MANUFACTURER’S REQUIREMENTS. ALL STEEL SHALL HAVE A MINIMUM THICKNESS OF 0.04
INCHES (PER ASTM A653) AND BE GALVANIZED (G60 COATING) OR STAINLESS STEEL, TYPE 316 AS
SPECIFIED.
15. ALL JOISTS SHALL BE POSITIONED WITH THE NATURAL CAMBER TURNED UP.
1. DIMENSIONS OF EXISTING CONSTRUCTION OR CONSTRUCTION IN PROGRESS SHALL BE
VERIFIED AND COORDINATED PRIOR TO FABRICATION OF STRUCTURAL COMPONENTS.
2. VERIFY AND COORDINATE, WITH ALL CONTRACTORS, THE LOCATION OF ALL ARCHITECTURAL
AND MECHANICAL APPURTENANCES AND OPENINGS.
3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS FOR
ADDITIONAL INFORMATION.
4. EXPANSION ANCHORS SHALL BE HILTI KWIK BOLT 3.
5. ADHESIVE ANCHORS SHALL BE HILTI HIT-HY 200.
6. SLEEVE ANCHORS SHALL BE HILTI HLC.
7. SCREW ANCHORS SHALL BE HILTI KWIK HUS.
8. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR THE FOLLOWING ITEMS PRIOR TO
FABRICATION: STRUCTURAL CONCRETE, REBAR REINFORCEMENT, CONCRETE MIX DESIGN,
WOOD STUDS AND JOISTS.
9. THE CONTRACTOR MUST SUBMIT SPECIFICATIONS FOR ALL THE MATERIAL BEING USED IN THIS
PROJECT FOR THE ENGINEER’S REVIEW.
DESIGN WIND PRESSURE (CLEAR WIND FLOW), PSF
EFFECTIVE WIND AREA, SF
AREAS DESCRIPTION≤25 >25, ≤ 100
INTERIOR REGION OF THE BOARDWALK
ZONE 3 (+)
NOTES:
1. RAIL AND PARAPET WIND PRESSURE: +72/-72 PSF.
2. NEGATIVE PRESSURES ACT AWAY FROM COMPONENT SURFACE. POSITIVE PRESSURES ACT TOWARD COMPONENT SURFACES.
3. WIND PRESSURES SHOWN IN THIS TABLE ARE ULTIMATE PRESSURES OBTAINED VIA ASCE 7-22.
MULTIPLY BY 0.6 TO GET SERVICE WIND PRESSURES.
3 1
2 3
+95
T Y
P
IC
A L
T Y
P
IC
A L
TYPICAL
5'-0"
GENERAL ROOF PLAN
> 100
ZONE 3 (-)
ZONE 2 (+)
ZONE 2 (-)
ZONE 1 (+)
ZONE 1 (-)
-131
+71
-68
+48
-44
+71
-68
REGION OF THE BOARDWALK SURFACE LOCATED
WITHIN 5'-0" OF THE BOARDWALK EDGES
TYPICAL
5'-0"
REGION OF THE BOARDWALK LOCATED WITHIN 5'-0"
AND 10'-0" OF THE BOARDWALK EDGES
+71
-68
+48
-44
+48
-44
+48
-44
+48
-44
1. TO THE BEST OF OUR KNOWLEDGE, THE STRUCTURAL DRAWINGS AND SPECIFICATIONS COMPLY
WITH THE APPLICABLE REQUIREMENTS OF THE GOVERNING BUILDING CODE.
2. CONSTRUCTION IS TO COMPLY WITH THE REQUIREMENTS OF THE GOVERNING BUILDING CODE AND
ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL CODES, STANDARDS, REGULATIONS AND
LAWS.
3. THESE DRAWINGS ARE INTENDED TO SHOW THE GENERAL ARRANGEMENT AND SCOPE OF WORK.
THESE DRAWINGS ARE NOT INTENDED TO BE SCALED FOR MEASUREMENTS, OR TO SERVE AS SHOP
DRAWINGS.
4. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUCTED TO APPLY ANY SIMILAR SITUATION ELSEWHERE IN THE PROJECT, EXCEPT WHERE
A DIFFERENT DETAIL IS SHOWN.
5. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY IN THE FIELD ALL DIMENSIONS, ELEVATIONS, CONNECTIONS, AND ALL EXISTING CONDITIONS. NOTIFY ENGINEER OF ANY
DISCREPANCY PRIOR TO PROCEEDING WITH FABRICATION OR INSTALLATION. DIMENSIONS OF
EXISTING STRUCTURES ARE PROVIDED FOR INFORMATION AND ILLUSTRATION PURPOSES ONLY. IF
CONFLICTS OCCUR IN OR BETWEEN DOCUMENTS AND FIELD CONDITIONS OR OTHERWISE THE
CONTRACTOR SHALL IMMEDIATELY CONTACT THE ENGINEER FOR CLARIFICATION AND DIRECTION
BEFORE PROCEEDING WITH THE WORK.
6. EVERY REASONABLE EFFORT HAS BEEN MADE TO VERIFY EXISTING CONDITIONS AND REPRESENT IN PLANS THE STRUCTURAL DAMAGE. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXTENT OF REPAIR WORK PRIOR TO BIDDING. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SUBSEQUENT
OR INCIDENTAL WORK REQUIRED TO PROPERLY INSTALL ALL NEW WORK INDICATED OR
REASONABLY INFERRED FROM THE DRAWINGS.
7. IF ANY ERRORS OR OMISSIONS APPEAR IN THE DRAWINGS THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IN WRITING OF SUCH OMISSION OR ERROR PRIOR TO PROCEEDING WITH ANY WORK
WHICH APPEARS TO BE IN QUESTION.
8. CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE EXISTING STRUCTURE, SURFACES,
CONDITIONS & EXTENT OF WORK INVOLVED. AFTER EXAMINATION, A WORK SCHEDULE SHALL BE PREPARED AND SUBMITTED IN WRITING TO THE OWNER AND THE ENGINEER FOR THEIR APPROVAL
PRIOR TO COMMENCEMENT OF ANY WORK.
9. PRIOR TO STARTING WORK, THE CONTRACTOR SHALL CONDUCT A MEETING WITH THE ENGINEER TO
VERIFY EXISTING CONDITIONS AT EACH AREA AFFECTED AND DISCUSS THE PROCEDURES AND
SEQUENCE FOR THE ANTICIPATED REPAIR SOLUTIONS.
10. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO OBSERVE THE WORK AS
REQUIRED BY THE OWNER, ENGINEER OR BUILDING DEPARTMENT. CONTRACTOR SHALL VERIFY
THAT EACH AND EVERY STRUCTURAL ITEM HAS BEEN ACCEPTED BY THE INSPECTOR PRIOR TO
PROCEEDING WITH SUBSEQUENT WORK AND/OR CONCEALING ANY STRUCTURAL ITEM. ANY
STRUCTURAL ITEM WHICH HAS NOT BEEN SPECIFICALLY ACCEPTED BY THE INSPECTOR AND/OR ANY
CONCEALING CONSTRUCTION COULD BE SUBJECT TO REMOVAL AND RECONSTRUCTION.
11. ANY EXISTING ACTIVE UTILITY SERVICE LINES, INDICATED OR NOT, SHALL BE PROTECTED FROM DEMOLITION OR DAMAGE. PRIOR TO DISCONNECTING ANY UTILITY SERVICE LINE IF NECESSARY, NOTIFY THE OWNER AND COORDINATE THE TIME WITH THE OWNER SCHEDULE.
12. THE CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS AND JOB SITE SAFETY,
COORDINATION WITH BUILDING OPERATIONS, MAINTENANCE OF TRAFFIC, AND CONSTRUCTION
PROCEDURES.
13. EXISTING STRUCTURE WHERE FOUND DAMAGED AND NOT EXPLICITLY REQUIRED TO BE REPAIRED
BY THESE PLANS SHALL BE REPAIRED AT THE ENGINEER'S DIRECTION.
14. CONTRACTOR TO EXECUTE ALL REPAIR WORK IN AN ORDERLY AND CAREFUL MANNER WITH DUE
CONSIDERATION FOR ANY EXISTING STRUCTURE/SURFACES. EXTREME CAUTION SHALL BE
EXERCISED TO ENSURE THAT NO DAMAGE OCCURS TO ANY OF THE EXISTING
STRUCTURE/SURFACES TO REMAIN. IF ANY MEMBER/SURFACE BECOMES DAMAGED DUE TO
CONSTRUCTION ACTIVITY, THE DAMAGED MEMBER/SURFACE SHALL BE REPAIRED/REPLACED AT THE
CONTRACTOR’S OWN EXPENSE.
15. CONTRACTOR TO REMOVE ITEMS AS REQUIRED TO ACCOMMODATE ADJACENT WORK. REINSTALL AFTER COMPLETION OF CONSTRUCTION ACTIVITIES TO A CONDITION ACCEPTABLE TO THE OWNER
AND ENGINEER.
16. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROPERLY DISPOSE DEMOLISHED MATERIALS. UPON
COMPLETION OF REPAIR WORK, ADJACENT AREAS AND PROPERTY SHALL BE LEFT CLEAN AND
SATISFACTORY TO THE AUTHORITIES HAVING JURISDICTION, THE OWNER, AND THE ENGINEER. ANY AND ALL DAMAGES TO BUILDING SURFACES, EQUIPMENT, ETC. CAUSED DURING PERFORMANCE OF
WORK SHALL BE THE RESPONSIBILITY OF CONTRACTOR TO REPAIR TO ORIGINAL CONDITIONS.
17. ANY UNFAVORABLE CHANGES IN THE WORKING CONDITIONS FROM THOSE IDENTIFIED IN THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE REPORTED TO THE STRUCTURAL
ENGINEER FOR THE VERIFICATION BEFORE PROCEEDING WITH THE WORK.
18. CONTRACTOR MAY, FOR HIS OWN CONVENIENCE, AT NO ADDITIONAL COST TO THE OWNER,
PROPOSE A DIFFERENT SOLUTION/MATERIALS TO THOSE SHOWN IN THE PLANS. ALL
SOLUTIONS/MATERIALS MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL. SEE NOTE 3 ON
SHOP DRAWING SECTION. CONTRACTOR SHALL SUBMIT SIGNED AND SEALED DRAWINGS AND
CALCULATIONS FOR ANY PROPOSED SOLUTION THAT MAY REQUIRE ENGINEERING.
19. CONTRACTOR SHALL COORDINATE ANY BUILDING ACCESS REQUIREMENTS WITH THE OWNER.
20. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. TO INSTALL/REPAIR
ALL MATERIALS FOR JOB.
21. IT SHALL NOT BE THE INTENT OF THESE PLANS AND SPECIFICATIONS TO SHOW EVERY MINOR DETAIL
OF CONSTRUCTION. CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL MATERIALS
NECESSARY FOR A COMPLETE JOB AND PROVIDE ALL REQUIREMENTS FOR MATERIALS TO BE
INSTALLED IN PROPER WORKING CONDITIONS.
SHOP DRAWINGS
1. THE CONTRACTOR MUST SUBMIT SPECIFICATIONS FOR ALL THE MATERIAL BEING USED IN THIS
PROJECT FOR THE ENGINEER’S REVIEW.
2. NO SHOP DRAWING SHALL BE SUBMITTED FOR ENGINEER REVIEW UNTIL AFTER THEY HAVE BEEN
THOROUGHLY REVIEWED BY THE CONTRACTOR FOR CONSTRUCTION METHODS, DIMENSIONS AND
OTHER TRADE REQUIREMENTS AND STAMPED WITH THE CONTRACTORS’ APPROVAL STAMP.
ENGINEER ASSUMES NO RESPONSIBILITY FOR DIMENSIONS, QUANTITIES, ERRORS OR OMISSIONS
AS A RESULT OF REVIEWING ANY SHOP DRAWINGS. ANY ERRORS OR OMISSIONS MUST BE
RECTIFIED BY THE CONTRACTOR, IRRESPECTIVE OF RECEIPT, CHECKING OR REVIEW OF DRAWINGS
BY THE ENGINEER AND EVEN THOUGH WORK IS DONE IN ACCORDANCE WITH SUCH DRAWINGS.
3. THE STRUCTURAL ENGINEER REVIEWS SUBMITTAL TO CONFIRM THAT THE SUBMITTAL IS IN
GENERAL CONFORMANCE WITH THE DESIGN CONCEPT PRESENTED IN THE CONTRACT
DOCUMENTS. QUANTITIES AND DIMENSIONS ARE NOT CHECKED. NOTATIONS ON SUBMITTALS DO
NOT AUTHORIZE CHANGES TO THE CONTRACT SUM. CHECKING OF THE SUBMITTAL BY THE
STRUCTURAL ENGINEER SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR
DEVIATIONS FROM THE CONTRACT DOCUMENTS AND FROM ERRORS OR OMISSIONS IN THE
SUBMITTAL.
4. IF THE CONTRACTOR DEEMS THAT SHORING IS REQUIRED FOR CONSTRUCTION, SIGNED AND
SEALED SHOP DRAWINGS AND CALCULATIONS BY A FLORIDA PROFESSIONAL ENGINEER SHALL BE
SUBMITTED FOR REVIEW AND APPROVAL.
SAFETY
1. THE CONTRACTOR IS RESPONSIBLE AND SHALL COMPLY WITH THE SAFETY REQUIREMENTS
ESTABLISHED BY LOCAL, STATE AND FEDERAL LAWS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY, ALL MEANS AND METHODS
PROCEDURES, AND SEQUENCES OF CONSTRUCTION. ALSO, IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO EMPLOY THE NECESSARY PROFESSIONAL SERVICES TO DETERMINE, DESIGN AND
SUPERVISE THE INSTALLATION OF THE APPROPRIATE MEANS AND METHODS FOR EXECUTION OF
THE REPAIR WORKS.
3. AT ALL TIMES, PROVIDE PROTECTION AGAINST WEATHER (RAIN, WIND, STORMS OR THE SUN), SO AS TO MAINTAIN ALL WORK, MATERIALS, APPARATUS AND FIXTURES FREE FROM INJURY OR DAMAGE.
4. PROVIDE AND MAINTAIN APPROPRIATE MEANS (E.G. BARRICADES) TO ISOLATE WORK AREAS OF
THE BUILDING DURING RESTORATION WORKS.
5. THE CONTRACTOR MUST PROVIDE DROP CLOTHS OR OTHER MEANS TO EFFECTIVELY PREVENT THE
FALLING OF DEBRIS.
6. THE CONTRACTOR MUST COORDINATE ALL WORKS WITH CITY OF DAYTONA BEACH.
7. FIRE PROTECTION SYSTEM SHALL REMAIN OPERATIONAL AT ALL TIMES DURING REPAIRS.
1. DESIGN IN ACCORDANCE WITH THE 2023 FLORIDA BUILDING CODE, EXISTING BUILDING, EIGHTH EDITION.
2. MINIMUM 28 DAY CONCRETE CYLINDER STRENGTH SHALL BE:
FOOTINGS 5000 PSI (MAXIMUM W/C=0.4), TYPE II CEMENT
COLUMNS 5000 PSI (MAXIMUM W/C=0.4), TYPE II CEMENT
BEAMS 5000 PSI (MAXIMUM W/C=0.4), TYPE II CEMENT
OTHERS 5000 PSI (MAXIMUM W/C=0.4), TYPE II CEMENT
3. REINFORCING STEEL SHALL CONFORM TO ASTM A615 GRADE 60.
4. EPOXY COATED REINFORCING STEEL SHALL CONFORM TO ASTM A775 GRADE 60.
5. STRUCTURAL STEEL ANGLES AND OTHER ROLLED MEMBERS SHALL CONFORM TO ASTM A572 GRADE 50.
6. DESIGN LOADS:
DEAD LOADS SELF WEIGHT
5 PSF (MEP)
5 PSF (COLLATERAL)
LIVE LOAD 100 PSF (DECK)
50 PLF (UNIFORM, TOP RAIL)
200 LB (CONCENTRATED, TOP RAIL)
50 LB (CONCENTRATED, INTERMEDIATE
RAIL)
LIVE LOAD REDUCTION
LIVE LOAD REDUCTION PER FBC 2023 SECTION 1607.11 IS INCLUDED.
RAIN LOAD
RAIN INTENSITY 8.3 IN/HR.
WIND LOAD
RISK CATEGORY II
ULTIMATE WIND SPEED Vult = 140 MPH NOMINAL WIND SPEED Vasd = 109 MPH
EXPOSURE D
TORNADO DOES NOT CONTROL
INTERNAL PRESSURE COEFFICIENT GCpi = 0.0 (OPEN BUILDING)
COMPONENTS AND CLADDING REFER TO TABLE THIS SHEET
7. STRUCTURAL STEEL PLATES SHALL CONFORM TO THE FOLLOWING:
THICKNESS <= 1/8" ASTM A1011 CS TYPE B (OR APPROVED EQUAL)
3/16" <= THICKNESS <= 4" ASTM A572 GRADE 50
THICKNESS > 4" ASTM A36
8. THREADED RODS SHALL CONFORM TO ASTM A36 UNLESS NOTED OTHERWISE.
9. STRUCTURAL WOOD FRAMING SHALL CONFORM TO NFPA NATIONAL DESIGN SPECIFICATIONS (OR MEET
ALL THE MINIMUM PUBLISHED VALUES) AS FOLLOWS:
JOISTS SPECIES SYP GRADE SELECT STRUCTURAL
GUARDRAIL POSTS: SPECIES SYP GRADE No 1 OTHER SAWN LUMBER: SPECIES SYP GRADE No 2
10. RESISTANCE TO LATERAL LOADS ON STRUCTURE IS PROVIDED BY BOARDWALK DECK DIAPHRAGMS.
CONTRACTOR SHALL PROVIDE SUFFICIENT TEMPORARY BRACING UNTIL ALL LATERAL SUPPORT
SYSTEMS ARE IN PLACE AND FUNCTIONAL.
11. ALL STRUCTURAL FRAMING AND CONNECTIONS HAVE BEEN DESIGNED FOR THE FINAL COMPLETED CONDITION AND HAVE NOT BEEN INVESTIGATED FOR POTENTIAL LOADINGS ENCOUNTERED DURING
ERECTION AND CONSTRUCTION. ANY INVESTIGATION OF THE STRUCTURAL FRAMING AND
CONNECTIONS FOR ADEQUACY DURING THE ERECTION AND CONSTRUCTION PROCESS IS THE
RESPONSIBILITY OF THE CONTRACTOR.
12. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION AND JOB SITE SAFETY.
SPALL REPAIRS AND CRACK SEALING
1. GENERAL
A. THE REPAIRS SHALL INCLUDE ALL AREAS WHERE SPALLS, CRACKS, DEBOND, AND
DELAMINATION ARE FOUND IN THE STRUCTURAL ELEMENTS, INCLUDING SLABS, COLUMNS,
GUARDRAILS, BEAMS AND WALLS.
B. CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT, AND PERFORM ALL
PREPARATION, CONCRETE SPALL REPAIR, AND CONCRETE CRACK REPAIR, AS SHOWN ON THE
DRAWINGS, SPECIFIED HEREIN, AND REQUIRED FOR A COMPLETE AND PROPER INSTALLATION.
C. MATERIALS' MANUFACTURER MUST BE A COMPANY SPECIALIZED IN MANUFACTURING THE
PRODUCTS SPECIFIED IN THIS SECTION WITH MINIMUM 20 YEARS DOCUMENTED EXPERIENCE.
D. ALL APPLICATIONS SHALL BE DONE BY A CERTIFIED INSTALLER (MINIMUM 10 YEARS OF
DOCUMENTED EXPERIENCE) FOLLOWING THE MANUFACTURERS’ DIRECTIONS AND STANDARDS.
THE CONTRACTOR MUST SUBMIT THE TECHNICAL SPECIFICATIONS FROM THE MANUFACTURER
FOR THE PRODUCTS SELECTED TO BE REVIEWED AND APPROVED BY THE ENGINEER.
E. PRIOR TO APPLICATION, REMOVE ALL DETERIORATED CONCRETE, DIRT, OIL, GREASE, AND ALL
BOND INHIBITING MATERIALS FROM SURFACE. PREPARATION WORK SHOULD BE DONE BY
APPROPRIATE MEANS IN ORDER TO OBTAIN THE CONDITIONS REQUIRED BY THE
MANUFACTURER FOR THE APPLICATION OF ANY SPECIFIC PRODUCT. SURFACE PREPARATION
METHODS MUST BE ACCORDING TO THE MANUFACTURERS' RECOMMENDATIONS AND
APPROVED BY THE ENGINEER AND OWNER BEFORE PROCEEDING.
F. BONDING AGENT, MIXING, APPLICATION AND CURING VARIES FROM PRODUCT TO PRODUCT. THE
CONTRACTOR MUST FOLLOW THE MANUFACTURERS’ RECOMMENDATIONS FOR EACH SPECIFIC
PRODUCT.
G. SURFACE PREPARATION WORKS MUST BE INSPECTED AND DEEMED ACCEPTABLE BY THE
OWNER AND ENGINEER, PRIOR TO APPLICATION OF THE SPECIFIED PRODUCTS.
H. CONTRACTOR SHALL PROTECT EXISTING REINFORCEMENT DURING REMOVAL OF DAMAGED
CONCRETE.
SPALL REPAIRS AND CRACK SEALING (CONT'D)
2. SPALL REPAIR MATERIALS
A. REPAIR ALL CONCRETE SPALLS, AREAS OF DELAMINATED CONCRETE, CONCRETE WITH
SURFACE EXPOSED REINFORCEMENT AND CONCRETE AREAS WHERE EMBEDDED STEEL SHOWS
SIGNS OF CORROSION.
B. FOR VERTICAL AND OVERHEAD SURFACES: MIX AND APPLY TWO-COMPONENT, POLYMER-
MODIFIED, CEMENTITIOUS, NON-SAG MORTAR, SIKATOP 123 PLUS AS MANUFACTURED BY SIKA
CORPORATION (OR APPROVED EQUAL BY ENGINEER) IN STRICT ACCORDANCE WITH THE
MANUFACTURER’S INSTRUCTIONS.
C. BONDING AGENT AND REINFORCEMENT PROTECTION COATING: BONDING AGENT AND ANTI-
CORROSION COATING SHALL BE SIKA ARMATEC 110 EPOCEM AS MANUFACTURED BY SIKA
CORPORATION (OR APPROVED EQUAL BY ENGINEER) IN STRICT ACCORDANCE WITH THE
MANUFACTURER’S INSTRUCTIONS.
3. CRACK REPAIR MATERIALS
A. CRACK SIZES VARY FROM HAIRLINE TO FINE. ALL CRACKS THAT NEED TO BE REPAIRED ARE NOT NECESSARILY SHOWN IN PLAN. ALL CRACKS WITH A WIDTH OF 0.01 INCHES AT ANY LOCATION OR
WIDER NEED TO BE SEALED AS INDICATED IN DETAILS.
B. HORIZONTAL GRAVITY-FED CRACK REPAIRS: MIX AND APPLY HYBRID URETHANE, 10-MINUTE
CONCRETE MENDER AS MANUFACTURED BY ROADWARE INCORPORATED (OR APPROVED EQUAL
BY ENGINEER) IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
C. VERTICAL AND OVERHEAD PRESSURE-INJECTED CRACK REPAIRS: MIX AND APPLY HIGH-
MODULUS, LOW-VISCOSITY, HIGH-STRENGTH, EPOXY RESIN ADHESIVE SIKADUR 35 HI-MOD LV AS
MANUFACTURED BY SIKA CORPORATION (OR APPROVED EQUAL BY ENGINEER) IN STRICT
ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS.
D. VERTICAL AND OVERHEAD CRACK SEALING AND INJECTION PORT INSTALLATION: MIX AND APPLY
HIGH-MODULUS, HIGH-STRENGTH, EPOXY PASTE ADHESIVE SIKADUR 31 HI-MOD GEL AS
MANUFACTURED BY SIKA CORPORATION (OR APPROVED EQUAL BY ENGINEER) IN STRICT
ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
SEAL:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER:
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
AS NOTED
www.graef-usa.com
1 2 3 4 5 6
D
C
B
A
D
C
B
A
1 2 3 4 5 6
2300 Maitland Center Parkway, Suite 210 Maitland, FL 32751
407 / 659 6500
This item has been digitally signed and sealed by Scott D. Hinrichs, P.E. on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Scott D. Hinrichs PE License #: 67810
CERT # 4270
PERMIT SET
C :\A ut od es k\
R ev it\ Lo ca l F ile s\
R el ea se
4\
-4
5_
S
_j ad
.a nt ou n.
rv t
5/
/2
5:
:4
P
M
CITY OF DAYTONA BEACH
MAIN STREET PIER
PARTIAL BOARDWALK AND
RAILING REPLACEMENT
GENERAL NOTES
05/23/2025
S001
2019-4115
JA
WL
SH
DESIGN SPECIFICATIONS
CONCRETE
GENERAL NOTES WOOD FRAMING
MISCELLANEOUS
WIND PROVISIONS FOR
COMPONENTS AND CLADDING
GENERAL NOTES (CONT'D)
A6A5A4A3A2A1
B6B5B4B3B2B1
C6C5C4C3C2C1
D6D5D4D3D2D1
LINE
BEYOND
CENTER, GRID
DEMOLITION
EXISTING
(HALFTONE)
HIDDEN
MATCHLINE
NEW (CUT)
NEW (PROJECTION)
OVERHEAD
MATERIAL
ALUMINUM
BRICK
CONCRETE
CONCRETE
MASONRY BLOCK
EARTH
GRAVEL
GROUT
WOOD STRUCTURAL
PANEL
STEEL
REFERENCE
BREAK LINE
N
A6
S-501
EXISTING GRID
INDICATOR
GRID INDICATOR
NORTH INDICATOR
SECTION VIEW
INDICATOR
SLOPE INDICATOR
STEP INDICATOR
REVISION CLOUD
SPAN DIRECTION
INDICATOR
ELEVATION VIEW
INDICATOR
KEYNOTE INDICATOR
REVISION INDICATOR
OPENING
(FLOOR, ROOF
OR WALL)
ELEVATION
INDICATOR
TOC
100'-0"
S-201
A1
A1
A1
A1B1
C1
D1
A6/S-501 VIEW INDICATOR
A6
S-501
VIEW CALLOUT
PC01
F01
DP01
TOPC 99'-0"
C01, P01
TOF 96'-0"
C01, P01
TODP 96'-0"
C01, P01
G B
TOF 96'-0"
FOUNDATION WALL,
CONTINUES UP
GRADE BEAM
PILE CAP
WALL FOOTING
FOOTING STEP
SPREAD FOOTING MARK
TOP OF FOUNDATION
ELEVATION
GRADE BEAM MARK
COLUMN OR PIER,
ENDS HERE
TOGB 99'-0"TOP OF GRADE
BEAM ELEVATION
CONCRETE COLUMN
OR PIER MARK
CJ
CJ
CJ
TOW 100'-0"TOP OF WALL
ELEVATION
SLAB ON GRADE CONTROL
OR CONSTRUCTION JOINT
CJ
PILE CAP MARK
COLUMN OR PIER,
CONTINUES UP
TOP OF PILE CAP
ELEVATION
SG01
TOC 100'-0"
FLOOR TYPE MARK
SPREAD FOOTING
TOP OF FOUNDATION
ELEVATION
DRILLED PIER
TOP OF DRILLED PIER
ELEVATION
DRILLED PIER MARK
F01
TOF 96'-0"
C01, P01
FOUNDATION WALL,
ENDS HERE
CJ
DOOR STOOP
F01
TOF 96'-0"
C01, P01
UTILITY THROUGH WALL
IE 95'-6"
TOF 95'-0"
CW01
WF01
WALL MARK
WALL FOOTING MARK
CONCRETE ENCASED
COLUMN
DIAGONAL BRACING ABOVE OR
BELOW
COLUMN CONTINUES
COLUMN ENDS HERE (BEAM
FRAMES OVER COLUMN)
ANGLE
KICKER
BRACE
BRACED BOTTOM FLANGE LOCATION
MOMENT CONNECTION
W x3
8)
1"
SECTION DESIGNATION
TOTAL NUMBER OF
SHEAR STUDS
CAMBER AT MIDSPAN
FACTORED AXIAL TRANSFER FORCE
(KIPS). DESIGN BEAM END CONNECTION
FOR TRANSFER FORCE IN ADDITION TO
SHEAR REACTION. FORCE MAY ACT IN
EITHER DIRECTION.
FACTORED END
SHEAR REACTION
(KIPS)
TOP OF STEEL ELEVATION, NOTED ON
EACH END INDICATES A SLOPED BEAM
CANTILEVER SAME SECTION AS
BACK SPAN UNLESS NOTED
OTHERWISE
CAMBER AT END OF CANTILEVER1"
COLUMN STARTS HERE
BEAM SPLICE
SHEAR CONNECTION
W P
BEAM WEB PENETRATION MARK
FACTORED END MOMENT
REACTION (FOOT-KIPS)
1'
-0
FL01
TOC 100'-0"
TOS 99'-6"
FLOOR TYPE MARK
EMBED PLATE
EDGE OF SLAB OR EDGE OF DECK
OPENING
BOTTOM FLANGE BRACE
JOIST BOTTOM
CHORD EXTENSION
FL01
TOC 100'-0"
B
SH01 SHEARHEAD MARK
DROP PANEL
BEAM MARK
BEAM
OPENING
FLOOR TYPE MARK
EDGE OF SLAB
COLUMN, CONTINUES
ABOVE FLOOR
COLUMN STRIP OR
MIDDLE STRIP
BOUNDARY
REINFORCEMENT, SHOWN
AND SCHEDULED ON PLAN
COLUMN, STOPS BELOW FLOOR
WALL, CONTINUES
ABOVE FLOOR
WALL, STOPS BELOW
FLOOR
SLAB UPWARD CAMBER
MARK
3/4"
CONCRETE SLAB ON
STEEL FLOOR DECK
(TRANSVERSE)
CONCRETE SLAB ON
STEEL FLOOR DECK
(LONGITUDINAL)
CONCRETE SLAB
ON GRADE
WELDED WIRE FABRIC
REINFORCEMENT
ANCHOR ROD
ADHESIVE ANCHOR
2'-0"
BENT BAR
2'-0" H x 3'-0" V
BAR DRILLED
AND EPOXY SET
INTO CONCRETE
EXPANSION ANCHOR
SHEAR STUDRAIL
REINFORCEMENT
SCREW ANCHOR
2# 4E
F
G
WALL REINFORCEMENT EXTENT
WALL TO BE GROUTED SOLID.
IF "G" IS OMITTED, GROUT WALL
CORES AT BAR LOCATIONS ONLY.
BAR SIZE
NUMBER OF BARS
BAR SPACING (INCHES)
LOCATION OF BAR(S) WITHIN
BLOCK CORE:
EF = 1/2 TOTAL NUMBER OF
BARS EACH FACE
C = CENTER IN WALL
IF = INSIDE FACE
OF = OUTSIDE FACE
VERTICAL BARS TO PASS
THROUGH INTERMEDIATE BOND
BEAMS
L0
MP01
MW01
MASONRY
WALL MARK
MASONRY
LINTEL MARK
MASONRY
PIER MARK
DEFINES OVER WHAT LENGTH OF
WALL REINFORCEMENT IS TO OCCUR
MASONRY
BEARING PLATE
MARK
MBP1 MBP1
STEEL BEAM
OR JOIST
BOND BEAM
CONCRETE MASONRY
UNIT (SECTION)
CONCRETE
MASONRY UNIT (TOP)
BRICK VENEER
L2 -1
H 2-
S
W
SW2
QUANTITY OF 2x MEMBERS
SAWN LUMBER HEADER
NOMINAL DEPTH
HOLD DOWN
SHEAR WALL
LVL HEADER OR BEAM
COLUMN
JOIST OR PRE-ENGINEERED
WOOD TRUSS
BEARING WALL
2 +/- 3.5 KIPS
HOLLOW CORE
PRECAST PLANK
(LONGITUDINAL)
HOLLOW CORE
PRECAST PLANK
(TRANSVERSE)
PRECAST TEE
(TRANSVERSE)
PRECAST TEE
(LONGITUDINAL)
STEEL ROOF DECK
(TRANSVERSE)
STEEL ROOF DECK
(LONGITUDINAL)
BOLT
SHEAR STUD
THREADED ROD
WOOD
BLOCKING OR
SHIM
WOOD FRAMING
WOOD GLULAM
WOOD MICROLAM
WOOD PARALAM
NAIL
LAG SCREW
SECTION TOP (T) FRONT (F) BACK (B) BOTTOM (BOT)
HP,
M, W
C, MC
L
(2) L
SLBB LLBB
HSS
HSS
(ROUND),
PIPE
MT,
WT
BG,
DLH,
G, K, LH,
VG
LLVLLH
T
BOT
F B
F B
T
BOT
T
BOT
T
BOT
T
BOT
T
BOT
T
BOT
T
BOT
SECTION ELEVATION (E)TOP (T)
T
T
T
T
T
T
E E
C JOIST
C STUD
FURRING
CHANNEL
FURRING
HAT
CHANNEL
LIGHT
GAUGE
ANGLE
RUNNER
CHANNEL
FL01
TOC 100'-0"
B
SH01 SHEARHEAD MARK
DROP PANEL
BEAM MARK
BEAM
OPENING
FLOOR TYPE MARK
EDGE OF SLAB
COLUMN, CONTINUES
ABOVE FLOOR
MILD REINFORCEMENT
COLUMN, STOPS AT FLOOR
F =X
X K
/F T
U
POST-TENSIONING FORCE
REQUIRED AT UNIFORM TENDONS
X
X X .X
X
UNIFORM POST-TENSIONING
TENDONS
X .X
X X
.X X
X.XXX.XXX.XX
F=XX K/FT
B
POST-TENSIONING FORCE
REQUIRED AT BANDED TENDONS
BANDED POST-TENSIONING TENDONS
X .X
X X
.X X
TENDON CGS ELEVATION AT MIDSPAN
OR CENTERLINE OF SUPPORT
FL01
TOC 100'-0"
G
01 GIRDER MARK
GIRDER
OPENING
FLOOR TYPE MARK
EDGE OF SLAB
COLUMN, CONTINUES
ABOVE FLOOR
COLUMN, STOPS AT FLOOR
F =X
X K
/F T
POST-TENSIONING FORCE
REQUIRED AT SLAB TENDONS
TENDON CGS ELEVATION AT MIDSPAN
OR CENTERLINE OF SUPPORT
G
B01
B01X .X
X X
.X X
X .X
X
B01
X .X
X
X .X
X
SLAB POST-TENSIONING TENDONS
BEAM MARK
BEAM
MILD REINFORCEMENTX
G
SEAL:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER:
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
AS NOTED
www.graef-usa.com
1 2 3 4 5 6
D
C
B
A
D
C
B
A
1 2 3 4 5 6
2300 Maitland Center Parkway, Suite 210 Maitland, FL 32751
407 / 659 6500
This item has been digitally signed and sealed by Scott D. Hinrichs, P.E. on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Scott D. Hinrichs PE License #: 67810
CERT # 4270
PERMIT SET
C :\A ut od es k\
R ev it\ Lo ca l F ile s\
R el ea se
4\
-4
5_
S
_j ad
.a nt ou n.
rv t
5/
/2
5:
:5
P
M
CITY OF DAYTONA BEACH
MAIN STREET PIER
PARTIAL BOARDWALK AND
RAILING REPLACEMENT
GENERAL INFORMATION
05/23/2025
S002
2019-4115
JA
WL
SH
1WAY ONE-WAY
AB ANCHOR BOLT
ADDL ADDITIONAL
ADDM ADDENDUM
AHU AIR HANDLING UNIT
ALT ALTERNATE
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
B PL BASE…