About this file

The document is a comprehensive General Conditions Structure spreadsheet for the Colorado Springs School District 11 (District 11) Construction Manager/General Contractor (CMGC) project involving the renovation of Palmer High School. The spreadsheet meticulously details the cost allocation and responsibilities across multiple project phases, including off-site services, on-site services, travel and lodging, temporary facilities, on-site utilities and services, equipment, vertical hoisting, temporary heating, reproduction and printing, quality control, permits and special fees, insurances and bonds, and other project-related costs.

The document provides a granular breakdown of potential costs, indicating whether they are not required, part of the basic fee, general conditions cost, direct cost of work, with A/E services, owner expense, or additional services. A notable detail is the school district's bond policy, which will only cover bonds for a maximum of 3-4 subcontractors, with any additional bonding not permitted in the Guaranteed Maximum Price (GMP). The spreadsheet serves as a comprehensive financial framework for the CMGC approach, offering detailed cost categorization and allocation strategies for the Palmer High School renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 2
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: OFF-SITE SERVICES AND STAFFNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Corporate ExecutivesX
2Principal in ChargeX
3Project ExecutiveX
4Legal (Basic Service)X
5Project ManagerX
6AccountingX
7Added Accounting for LenderX
8SchedulingX
9Special Lender ReportingX
10Life-CycleX
11Energy ManagementX
12Production EngineeringX
13PurchasingX
14Value EngineeringX
15Systems DevelopmentX
16EstimatingX
17Cost EngineersX
18Project CoordinatorX
19Project ExpediterX
20Drafting DetailerX
21Drawing CheckerX
22Safety OfficerX
23E.E.O. OfficerX
24SecretarialX
25Clerk-TypistX
26Fringe Benefits for AboveX
27Vacations for AboveX
28Bonuses for Above (If Any)X
29Legal (Special Services Extras)X
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: ON-SITE SERVICES AND STAFFNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Project Manager (If Required)X
2Project SuperintendentX
3General Superintendent (If Required)X
4Mechanical Coordinator (If Required)X
5Electrical Coordinator (If Required)X
6Project Engineer (If Required)X
7Office Engineer (If Required)X
8Scheduling Engineer (If Required)X
9Field Engineer (If Required)X
10Draftsman/Detailer (If Required)X
11Drawing Checker (If Required)X
12Field Accountant (If Required)X
13Time Keeper/Checker (If Required)X
14Scheduling Engineer (If Required)X
15Expediter (If Required)X
16Secretary (If Required)X
17Clerk-Typist (If Required)X
18Rodman and Helpers (If Required)X
19Safety Engineer (If Required)X
20E.E.O. Officer (If Required)X
21Independent Surveyor (If Required)X
22Personal Computer (If Required)X
23Copy Machine (If Required)X
24Fax Machine (If Required)X
25Fringe BenefitsX
26Vacations for Above StaffX
27Bonuses for above (If Any)X
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: TRAVEL AND LODGINGNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Off-Site Staff Travel CostX
2Off-Site Staff TransportationX
3On-Site Project Manager TransportationX
4Superintendent's TransportationX
5Engineer's TransportationX
6Project Staff Moving ExpenseX
7Project Staff Subsistence CostsX
8Travel/Lodging Out of StateX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: TEMPORARY FACILITIESNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Safety EquipmentX
2First Aid SuppliesX
3Handrails and Toe BoardsX
4Opening ProtectionX
5Fire ExtinguishersX
6Watchman ServiceX
7Office or Trailer RentalX
8Storage or T+A215railer RentalX
9Waterboy-Ice-CupsX
10Temporary ToiletsX
11Change/Shower RoomsX
12Lunch RoomsX
13Temporary StairsX
14Temporary EnclosuresX
15Fireproofing EnclosureX
16Concrete Work EnclosureX
17Masonry Work EnclosureX
18Temporary Building HeatingX
19Project SignsX
20Bulletin BoardsX
21Temporary FencingX
22Covered WalkwaysX
23BarricadesX
24Safety NetsX
25Ambulance CostX
26Security GuardX
27Architect/Engineer Temporary OfficeX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: ON-SITE UTILITIES AND SERVICESNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Telephone InstallationX
2Telephone ExpenseX
3Temporary Power Service (If Required)X
4Power ExpenseX
5Temporary Water ServiceX
6Temporary Heating ServiceX
7Temporary Cooling ServiceX
8Heating Energy ChargesX
9Cooling Energy ChargesX
10Temporary WiringX
11Light BulbsX
12Weekly CleanupX
13Final CleanupX
14Dump Permits and FeesX
15Debris Hauling/RemovalX
16Flagman/Traffic ControlX
17Street/Walk Cleaning (If Required)X
18Dust ControlsX
19Temporary Roads (If Required)X
20Roadway Maintenance (If Required)X
21Temporary Water Expense (If Required)X
22Temporary Sewer ExpenseX
23Two-Way Radio EquipmentX
24Trash Chute and HoppersX
25Architect/Engineer Telephone ChargesX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: ON-SITE EQUIPMENTNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Automobile and FuelX
2Pickup Truck and FuelX
3Flatbed Truck and FuelX
4Water Truck and FuelX
5Air Compressor and FuelX
6Dewatering Equipment and FuelX
7Generator and FuelX
8Debris Removal/Hauling EquipmentX
9Snow Removal EquipmentX
10Tire and Maintenance Cost for AboveX
11Welder and FuelX
12Welding Equipment and FuelX
13Cutter Torches and FuelX
14Office Rentals or CostX
15Storage Rentals or CostX
16Small Tools PurchaseX
17Small Equipment RentalX
18Office Furniture RentalX
19Fax Machine and Supplies (If Required)X
20Copy Machine and Supplies (If Required)X
21Office Equipment and Supplies (If Required)X
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: VERTICAL HOISTINGNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Hoist and Tower RentalX
2Small Material Hoist RentalX
3Hoist Landings and FrontsX
4Hoist OperatorsX
5Hoist Safety InspectionsX
6Hoist Materials SkipsX
7Hoist Material HoppersX
8Erect and Dismantle HoistsX
9Fuel Repairs and MaintenanceX
10Hoist CommunicationsX
11Crane RentalX
12Crane OperatorsX
13Crane Safety InspectionsX
14Erect and Dismantle CraneX
15Fuel, Repairs, MaintenanceX
16Crane Raising/Jumping CostX
17Temporary Elevator RentalX
18Elevator Operations CostX
19Elevator Repairs and MaintenanceX
20Cage Rider at ElevatorX
21Safety InspectionsX
22Forklift RentalX
23Forklift OperatorsX
24Forklift Safety InspectionsX
25Fuel, Repairs, MaintenanceX
26Elevator Service CostsX
27Crane/Hoist InspectionsX
28Erections/Removal of AboveX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: TEMPORARY HEATING (If Required)Not RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Remove Snow and IceX
2Partitions and EnclosuresX
3Piping Cost in BuildingX
4Fuel Cost for HeatingX
5Power Cost for HeatingX
6Steam Purchase CostX
7Furnace RentalX
8Heater RentalX
9Boiler RentalX
10Operator (Temporary System)X
11Operator (Permanent System)X
12Operation Fire WatchX
13Cleaning CostsX
14Maintenance CostX
15Warranty CostX
16Filter ChangeX
17Temporary Office HeatingX
18Lunch Room HeatingX
19Change/Shower Room HeatingX
20Temporary EnclosuresX
21Temporary PartitionsX
22Temporary Exterior EnclosureX
23Enclosure Moving/MaintenanceX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: REPRODUCTION AND PRINTINGNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Cost Study DocumentsX
2Systems Study DocumentsX
3Bid Package DocumentsX
4Bidding InstructionsX
5Construction DocumentsX
6Postage and Express CostsX
7As-Built Documents (Drafting)X
8As-Built Documents (Printing)X
9Accounting FormsX
10Field Reporting FormsX
11Contract AgreementsX
12Schedule Report FormsX
13Estimating FormsX
14Cost Reporting FormsX
16Presentation Charts and GraphicsX
17Data Processing (in House)X
18Reference MaterialsX
19Duplication Expense (Miscellaneous)X
20Shop Drawing PrintingX
21Date Processing (Outside Services)X
22Maintenance ManualsX
23Operation ManualsX
24Special FormsX
25As-Built Record (Field)X
26As-Built Master DraftingX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: QUALITY CONTROLNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Chief InspectorX
2Field InspectorX
3Inspectors OfficeX
4Inspectors TransportationX
5Inspectors EquipmentX
6Special Inspection ConsultantsX
7Special Testing ConsultantsX
8Concrete TestingX
9Masonry TestingX
10Compaction TestingX
11Welding TestingX
12Welding InspectionsX
13Fireproofing InspectionsX
14Soils InvestigationsX
15Special Testing ServicesX
16Supplies and Materials (Field Office)X
17Project PhotographsX
18Warranty Inspections CoordinationX
19Air and Water BalancingX
20Operator On-Site TrainingX
21Operation & Maintenance Manual CoordinationX
22Prepare Operations ManualsX
23Prepare Maintenance ManualsX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: PERMITS AND SPECIAL FEESNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Storage Yard RentalX
2Parking Lot RentalsX
3Parking FeesX
4Curb and Gutter PermitsX
5Sign PermitsX
6Staking FeesX
7Sidewalk PermitsX
8Landscape PermitsX
9Street/Curb Design ChargeX
10Building PermitsX
11Plan Check FeesX
12Water Connection FeeX
13Sanitary FeeX
14Storm Connection FeeX
15Gas Service ChargeX
16Power Service ChargeX
17Steam Service ChargeX
18Chiller Water Service ChargeX
19Special Tap FeesX
20Contractors LicensesX
21RoyaltiesX
22Zoning Fees/ConsultantsX
23Use FeesX
24Construction Equipment LicensesX
25Construction Equipment PermitsX
26Street Bonds/PermitsX
27AGC/ABC Project FeesX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: INSURANCES AND BONDSNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Builders Risk InsuranceX
2Errors and OmissionsX
3General LiabilityX
4Product LiabilityX
5Excess Liability CoverageX
6Workmen's CompensationX
7FICA InsuranceX
8Federal EmploymentX
9State UnemploymentX
10Payment BondX
11Performance BondX
12Street/Property BondsX
13State/Local BondsX
14Contractors BondsX
15Warrantee Bond CostsX
16Subcontractor Bonds:
Note: The school district will only allow a maximum of 3-4 subcontractors to be bonded for which the district will pay for the bonds. Any bonding of subcontractors in excess of 4 cannot be included in the GMP.X
17Off-Site Staff InsuranceX
18Off-Site Staff TaxesX
Colorado Springs D11
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC)
GENERAL CONDITIONS STRUCTURE
Phase: OTHER COSTSNot RequiredBasic FeeGeneral Conditions CostDirect Cost of WorkWith A/E ServicesOwner ExpenseAdditional Services
1Project Taxes (On Construction Work)X
2Construction EquipmentX
3Construction ServicesX
4Construction MaterialsX
5Cost of Design and EngineeringX
6A/E Cost for Bid PackagesX
7A/E Fast Track Cost ExtrasX
8Preliminary Soils InvestigationsX
9Title/Development CostX
10Land CostsX
11Financing/Interest CostX
12Interim Financing CostsX
13Owner Change ContingencyX
14Building Operation after Move-InX
15Building Maintenance after Move-InX
16Moving CoordinationX
17Moving CostsX
18Corrective Work ExtraX
19Costs of Emergency WorkX
20CMGC Overhead CostX
21CMGC Profit MarginX
22GMP Financial ResponsibilityX
23Late Payment InterestX
24Environmental Impact StudiesX

&8&Z&F &[Date

Sheet2

Sheet3

File details come from the government source that posted it. Updated .