Handouts from Palmer Open House Sept. 5, 2024.pdf
PDF 148 KB Posted
- Attached to
- Palmer High School Renovation CMGC
- Solicitation number
- S2025-1001
- Issued by
- El Paso County, Cope CDP, Colorado
About this file
The provided document is a Construction Dates Plan for Palmer High School in Colorado Springs, Colorado, prepared by District 11 Schools. The plan depicts three separate site maps showing the construction dates of different areas of the school campus, including the main campus, auxiliary gymnasium, and ERPS gymnasium-athletic field. The construction dates range from 1939 to 2008, indicating multiple phases of development and expansion over several decades.
The site maps are color-coded to highlight different construction periods, with buildings labeled by their year of construction. The main campus map shows buildings from various years, including 1939, 1954, 1955, 1969, 1970, 1954, 2000, and 2008. The auxiliary gymnasium site consists entirely of 1969 construction, while the ERPS gymnasium-athletic field features a large 1957 building with a small 2002 addition. These plans likely serve as background documentation for the upcoming Palmer High School Renovation CMGC project, providing historical context for the existing facilities and potential renovation areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A Document 1.pdf | ||
| Palmer Asbestos Letter.pdf | ||
| Palmer Renovation Flyer.pdf | ||
| S2025-1001 General Conditions Structure.xlsx | XLSX spreadsheet | |
| S2025-1001 Palmer HS Renovation CMGC.pdf | ||
| RTA-PE PHS Presentation_08142024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .